1 Establish a new project
Run the main program, start the software:
Establish a new project: “File”—“New”.
You can name the project by yourself or use the default one which named according
to the date.
2 The modification of projection properties
Set the project properties in the interface below: (“File”—“Project Properties”)
3 The settings of coordinate system
Enter into the coordinate system setting interface (“File”—“Coordinate System”) to
set the ellipsoid, projection and the parameters.
4 Import the data
After accomplishing the operation above, then import the data to the software.
Choose the data type in the interface below:
5 File information edit
Before importing the data, you need to enter the points name and the antenna type by double
click the raw data:
All files will be displayed after the data are imported. You can set the antenna height, the
receiver type and the antenna type by double clicking the observation files.
6 Baseline processing
Click “Process Project”(“Baseline”—“Process Project”) to process all the baselines.
The process time of the baselines is decided by the quantity of the baselines, the observation
time, the baseline processing settings and the running speed of the computer.
7 The settings before adjustment
After processing, we need to check the result. As this instruction is a brief one, we suppose
that all the baselines which participate in the processing are qualified. Normally if the observation
condition is good, we can process all the baseline successfully one time.
Before network adjusting, we need to confirm the control points first.
Look at the picture below: click “Points”, then right click the points in the right frame and set
the points as control points.
Then click “control points” to edit the control points.
Edit the control points in the interface below:
Then go to “Adjust Options” interface(“Adjust”→” Adjust Options”):
8 Network adjustment
Click “Adjust(A)” then “Adjust(P)” to go to the adjustment interface.
Click “Auto Adjust”, the software will do free 3D net adjust, constraint 3D net adjust in
WGS84, constraint 3D net adjust in target system and constraint 2D net adjust in target system
automatically and there will be a result listing. You can scan the corresponding report by choosing
the net adjustment type and clicking “Get Report”.
9 Result Output
Click “Report Options” in “Adjust”, then you can set the content and the format of the report.
Then click “Get Report” to see the report.
These are the basic operation steps of static data processing.