0% found this document useful (0 votes)
11 views4 pages

Gtbgtbgo 5

Uploaded by

Owen Jackson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

Gtbgtbgo 5

Uploaded by

Owen Jackson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 4

3 Main Street

Extend and renovate internally and externally


2017/04/0001S
Mr A Smith
N/A
John Doe
Site Report Pro
23 Aug 2019
Produced using Site Report Pro for iOS
Project Details
3 Main Street
23 Aug 2019
Name:
Summary:
Reference:
Description:
Status:
Started:
3 Main Street
Extend and renovate internally and externally
2017/04/0001S
Full renovation and extension as per project
document reference and planning application
17/6353G
In Progress (27 Apr 2017)
10 Jan 2017
Client Name:
Mr A Smith
Client Telephone: 07700900000
Client Email:
Auditor Name:
[email protected]
John Doe
Auditor Company: Site Report Pro
3 Main Street
Produced using Site Report Pro for iOS
Page 2 of 11
3 Main Street
23 Aug 2019
Kitchen Units
Due Date:
Priority:
Status:
Description:
05 Jun 2017
High
In Progress
Kitchen mantle needs to be ordered and fitted to these dimensions
Assigned To: Me
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 3 of 11
3 Main Street
23 Aug 2019
Fireplace
Due Date:
Priority:
Status:
Description:
07 Jun 2017
Medium
In Progress
Recess brickwork, install cement board and plaster
Assigned To: No Assignment
Comments:
13 May 2017 at 4:26 pm
Issue Exported
Assigned: John
Please can you do this work ASAP.
26 Jul 2017 at 4:55 pm
Issue Unlocked
3 Main Street
Produced using Site Report Pro for iOS
Page 4 of 11
3 Main Street
23 Aug 2019
Bathroom Taps
Due Date:
Priority:
Status:
Description:
12 Jun 2017
High
New
Re-align tap position, plasterboard,skim and tile
Assigned To: No Assignment
Comments:
01 May 2017 at 12:05 pm
Issue Exported
Assigned: Tony
Align taps. Plaster in and finish.
26 Jul 2017 at 4:56 pm
Issue Unlocked
3 Main Street
Produced using Site Report Pro for iOS
Page 5 of 11
3 Main Street
23 Aug 2019
Kitchen Trim
Due Date:
Priority:
Status:
Description:
14 Jun 2017
Low
New
Trim needs adjusting
Assigned To: Tony
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 6 of 11
3 Main Street
23 Aug 2019
Front Window
Due Date:
Priority:
Status:
Description:
20 Jun 2017
Low
New
Fit plastic covers and remove all tape
Assigned To: Joe
Comments:
15 May 2017 at 2:59 pm
Issue Exported
Assigned: Joe
Please add this to your job list
3 Main Street
Produced using Site Report Pro for iOS
Page 7 of 11
3 Main Street
23 Aug 2019
Replace Chipped Brick
Due Date:
Priority:
Status:
Description:
21 Jun 2017
High
New
Replace brick before starting next course
Assigned To: John
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 8 of 11
3 Main Street
23 Aug 2019
Rendering
Due Date:
Priority:
Status:
Description:
23 Jun 2017
Medium
New
Repair damaged beading.
Remove exposed woodwork.
Assigned To: Drew
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 9 of 11
3 Main Street
23 Aug 2019
Drain
Due Date:
Priority:
Status:
Description:
23 Jun 2017
Medium
New
Connect drain to mains drainage and fill hole
Assigned To: Gary
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 10 of 11
3 Main Street
23 Aug 2019
Remove Air Vent
Due Date:
Priority:
Status:
Description:
26 Jun 2017
Medium
New
Old air vent in master bedroom needs to be removed
Assigned To: Me
Comments:
No Comments
3 Main Street
Produced using Site Report Pro for iOS
Page 11 of 11

You might also like