0% found this document useful (0 votes)
4 views1 page

Documents - A0bb7not31 ... NTCC Summer Internship 2025

Instructions Manual

Uploaded by

piku thukral
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

Documents - A0bb7not31 ... NTCC Summer Internship 2025

Instructions Manual

Uploaded by

piku thukral
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

05/03/2025

Amity Institute of Psychology & Allied Sciences, AUUP Noida


Notice
Summer Internship
NTCC Summer Break Activity
M.A. (AP, OP, CP, CLP)
(Batch 2024-26)

This is to inform the 2nd semester students of M.A. (AP, OP, CP, CLP) programs that the NTCC
during summer break (Summer Internship) is scheduled from 12th May, 2025 to 4th July,
2025 (as per the university academic calendar).
The internship will be undertaken during the above summer break (2025). Since the summer
internship needs to be undertaken thoroughly and extensively, you are expected to be engaged
full day (hence no specification of no. of hours), for optimal learning. Students need to focus
on the application of different concepts/theories/models etc. from psychology, in the practical
environment. The same will be put together by you, in the form of a report, once the internship
is over (as per the guidelines).
In this context, students are encouraged to pursue genuine internships (providing ample
learning opportunities), adding value to your CVs or leading to better job offers later or PPOs.
You are expected to thoroughly explore your options and finalize your decision, well in
advance (you will be required to upload the offer letter on the portal, as per the given deadlines,
on commencement).
For the internship, those students who require the "bonafide/NOC" certificate, can approach
their PLs, who will get it processed further. You are required to mail regarding your
requirement (include name of org. where applying) to your respective PL and follow up.
For further clarification, please attend the briefing session to be held soon (details of the same
will be shared).

NTCC Coordination Committee (P.G.)


AIPS

cc: Amizone

You might also like