KE-000650 - Pipeline Abandonment Philosophy - Rev A 2

pipeline

Uploaded by

jeevashankar2805
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.
CHKD.

ICM
ISSUED FOR REVIEW AND COMMENTS

Projects and Construction Department


DESCRIPTION

PIPELINE ABANDONMENT PHILOSOPHY


SO-02/23
JO/EWO

VN
BY

RE-FEED FOR RELOCATION OF EX-LOADING


31/05/2024
DATE

DOCK PIPING
NO.

REVISIONS

DRAWN:
BY: VN
Prepared By:
DATE: 31/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:
MAY 2024
APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 1
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

TABLE OF CONTENTS
CHKD.

ICM

1.0 INTRODUCTION .............................................................................................................. 4


1.1 BACKGROUND ..................................................................................................... 4
ISSUED FOR REVIEW AND COMMENTS

1.2 PROJECT OBJECTIVE ......................................................................................... 4


2.0 DOCUMENT PURPOSE................................................................................................... 5
DESCRIPTION

3.0 ABBREVIATIONS ............................................................................................................ 5


4.0 DEFINITIONS ................................................................................................................... 5
5.0 REFERENCES ................................................................................................................. 6
5.1 SAUDI ARAMCO REFERENCES .......................................................................... 6
5.2 PROJECT DOCUMENTS ...................................................................................... 6
6.0 ORDER OF PRECEDENCE ............................................................................................. 7
SO-02/23
JO/EWO

7.0 SITE CONDITIONS AND PROJECT SCOPE ................................................................... 7


7.1 SITE CONDITIONS ............................................................................................... 7
VN
BY

7.2 SCOPE .................................................................................................................. 7


31/05/2024

8.0 DECOMMISSIONING, DEMOLITION AND CONSTRUCTION ACTIVITIES .................... 8


DATE

8.1 GENERAL REQUIREMENTS ................................................................................ 8


8.2 DECOMMISSIONING .......................................................................................... 10
NO.

REVISIONS 8.3 DEMOLITION ...................................................................................................... 10


DRAWN:
BY: VN 9.0 DECOMMISSIONING PLAN .......................................................................................... 10
DATE: 31/05/2024
9.1 PIPELINES .......................................................................................................... 10
CHKD BY: ICM
9.2 ELECTRICAL, INSTRUMENTATION AND CONTROL ........................................ 11
OPR’G DEPT
10.0 SPECIFIC REQUIREMENT FOR PIPELINES ................................................................ 11
BY:
10.1 CLEANING AND DECONTAMINATION .............................................................. 11
DATE:

10.2 FLUSHING .......................................................................................................... 11


ENG. DEPT.

BY:
10.3 FLUSHING FLUID DISPOSAL ............................................................................. 12
DATE: 10.4 DISPOSAL PITS VOLUME .................................................................................. 13

APPD. FOR CONSTR.


10.5 SYSTEM SHUTDOWN ........................................................................................ 14
BY: 10.6 DISCONNECTION AND REMOVAL .................................................................... 14
DATE: 10.7 ABANDONMENT AT SEABED ............................................................................ 16
CERTIFIED 10.8 PIPELINE DEMOLITION ..................................................................................... 16
BY:
10.9 DEMOLISHED ITEMS ......................................................................................... 16
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 2
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

10.10 SPECIFIC REQUIREMENTS FOR THE 10” DOLPHIN A TO ONSHORE


CHKD.

ICM

ABANDONED DIESEL PIPELINE........................................................................ 17


10.11 SPECIFIC REQUIREMENTS FOR THE 4” DOLPHIN A TO SEA BERTH-2
ABANDONED DIESEL PIPELINE........................................................................ 17
ISSUED FOR REVIEW AND COMMENTS

11.0 CONTRACTOR’S OBLIGATION .................................................................................... 17


11.1 GENERAL ........................................................................................................... 17
DESCRIPTION

11.2 HEALTH AND SAFETY ....................................................................................... 18


11.3 ENVIRONMENT .................................................................................................. 18
12.0 SCHEDULE .................................................................................................................... 19
13.0 DOCUMENTATION ........................................................................................................ 19
13.1 DECOMMISSIONING PLAN ................................................................................ 19
13.2 FLUSHING AND DISPOSAL ............................................................................... 20
SO-02/23
JO/EWO

13.3 DEMOLITION ...................................................................................................... 20


APPENDICES ............................................................................................................................ 21
VN
BY

A ABANDONMENT/DEMOLITION DRAWINGS OF PIPELINES AT DOLPHIN-A /


EX-LOADING DOCK ........................................................................................... 22
31/05/2024
DATE

B ISOLATION AND FLUSHING DRAWINGS .......................................................... 23


C SAMPLE LIQUID INTERFACE LENGTH CALCULATION ................................... 24
NO.

REVISIONS D PIPELINE VOLUME CALCULATION ................................................................... 25


DRAWN:
BY: VN

DATE: 31/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 3
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

1.0 INTRODUCTION
CHKD.

ICM

The Khafji Joint Operations (KJO, herein referred to as COMPANY) is located in the Arabian
Gulf and jointly owned by ARAMCO Gulf Operation Company (AGOC) and Kuwait Gulf Oil
Company (KGOC). The project relates to the Ex-Loading Station which is a set of platforms,
ISSUED FOR REVIEW AND COMMENTS

namely Dolphin-A platform, Dolphin B platform and Ex-Loading Dock platform which are
located approximately 5 km offshore to the east of Al-Khafji, KSA. Valve Control Platform
(VCP) is located further approximately 5 km offshore from Dolphin-A platform, and Sea
DESCRIPTION

Berths 1 & 2 are located 1 km offshore from Dolphin-A platform.


The project involves conducting Re-FEED for a pipeline concept which involves replacement
of diesel pipeline to Dolphin-A and the Sea Berths, and a new electrical cable from Dolphin-
A to VCP. The work is also to revalidate the existing FEED packages to ensure that the new
FEED package includes all of the new scope and compliance to latest Saudi Aramco
Standards.
Kent Engineers & Constructors Inc. herein referred to as CONTRACTOR, has been awarded
the Re-FEED package i.e. the new Front-End Engineering Design (FEED) for Relocation of
SO-02/23
JO/EWO

Ex-Loading Dock Pipeline Project.

1.1 BACKGROUND
VN
BY

The Khafji onshore facility relies on functioning pipework on the old Export Loading Dock,
31/05/2024

which is located offshore and plays a crucial role in importing petroleum products. This dock
DATE

consists of three platform structures: North Dolphin-B, North Dolphin-A, and the Ex-Loading
Dock. The Ex-Loading Dock structure has deteriorated significantly and needs to be
NO.

demolished. The pipelines connected to it will also be relocated. An underwater survey has
A

REVISIONS confirmed that the dock’s jacket cannot be repaired. As a result, the decision has been made
DRAWN: to demolish the Ex-Loading Dock and modify Dolphin-A to ensure the continued supply of
BY: VN diesel fuel to the Khafji onshore facility.
DATE: 31/05/2024
In view of above, COMPANY (KJO) initiated the project and carried out Front End
CHKD BY: ICM
Engineering Design (FEED) packages in accordance with Saudi Aramco Desktop Standard
OPR’G DEPT
(as per July 2013) and completed the original FEED in September 2014. The planned work
BY:
scope at the time was for the re-routing of a number of pipelines in the immediate vicinity of
the Ex-Loading Dock.
DATE:
In January 2023, the COMPANY made the decision to approve certain scope changes in the
ENG. DEPT. existing FEED packages and proceed further with the project by undertaking a Re-FEED.
BY: This was done to address the operational requirements for the supply of fuel and diesel to
DATE: the Khafji Onshore Facilities, as well as to ensure compliance with the latest Saudi Aramco
Desktop Standards and identify any gaps that may exist between the existing FEED and the
APPD. FOR CONSTR. latest standards.
BY:
1.2 PROJECT OBJECTIVE
DATE:

The primary objective of RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPELINE


CERTIFIED
herein referred to as PROJECT is to implement the operational requirements for the supply
BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 4
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

of diesel fuel from Sea Berth-1 & 2 to North Dolphin-A platform and from North Dolphin-A
CHKD.

ICM

platform to Onshore facilities through new pipelines.


The Re-FEED shall be conducted as per latest Saudi Aramco Standards (Cutoff –
30th September 2023) and HCIS 2017 Directives.
ISSUED FOR REVIEW AND COMMENTS

2.0 DOCUMENT PURPOSE


DESCRIPTION

The purpose of this document is to define the requirements for decommissioning, demolition
and abandonment of the pipelines.
This document should be used by the CONTRACTOR as an initial guideline to develop a
detailed abandonment procedure based on local rules, internationally recognised codes and
standards and COMPANY guidelines, where applicable.

3.0 ABBREVIATIONS
SO-02/23
JO/EWO

Abbreviation Description
AGOC ARAMCO Gulf Operation Company
VN
BY

BPD Barrels Per Day


31/05/2024

FEED Front End Engineering Design


DATE

KGOC Kuwait Gulf Oil Company


NO.

KJO Khafji Joint Operations


A

REVISIONS
KSA Kingdom of Saudi Arabia
DRAWN:
BY: VN PLEM Pipeline End Manifold
DATE: 31/05/2024
SABP Saudi Aramco Best Practices
CHKD BY: ICM

SAEP Saudi Aramco Engineering Procedure


OPR’G DEPT

BY:
SAES Saudi Aramco Engineering Standards
DATE: SAMSS Saudi Aramco Material System Specifications
ENG. DEPT. SPM Single Point Mooring
BY:
VCP Valve Control Platform
DATE:

APPD. FOR CONSTR. 4.0 DEFINITIONS


BY:
COMPANY Khafji Joint Operations
DATE:
CONTRACTOR The party engaged in performing the EPC phase of the PROJECT
CERTIFIED
may/can Is used where alternatives/actions are equally acceptable.
BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 5
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

must Indicates a legal or statutory requirement.


CHKD.

ICM

PROJECT Re-FEED for Relocation of Ex-loading Dock Piping


PROJECT SITE Khafji Onshore Facilities, North Dolphin-A, North Dolphin-B, Ex-
Loading Dock, Sea Berth-1, Sea Berth-2, Valve Control Platform
ISSUED FOR REVIEW AND COMMENTS

shall Indicates a mandatory requirement.


should Indicates a strong recommendation to comply with the requirements
DESCRIPTION

of this document.

5.0 REFERENCES

5.1 SAUDI ARAMCO REFERENCES


Saudi Aramco Engineering Standards and Procedures
SAES-A-008 Chemical Cleaning Requirements
SO-02/23
JO/EWO

SAES-A-103 Protection of the Marine Environment


SAES-A-104 Wastewater Treatment, Reuse, and Disposal
VN
BY

SAEP-76 Decommissioning of Offshore Pipelines


31/05/2024
DATE

SAEP-327 Management of Wastewater from Hydrotesting, Cleaning, Flushing and


Dewatering Pipelines, Tanks and Vessels
NO.

SAEP-388 Chemical Cleaning of Pipelines


A

REVISIONS
SAEP-1662 Chemical Cleaning of Plant Equipment and Piping
DRAWN:
BY: VN SAES-L-850 Design of Submarine Pipelines and Risers
DATE: 31/05/2024
SAEP-13 Project Environmental Impact Assessments
CHKD BY: ICM

OPR’G DEPT
5.2 PROJECT DOCUMENTS
BY: KJO-REDP-T-0081-23 Response to Technical Query 5200002-05-TQ-PI-0005
DATE:
Clarification for Existing Pipelines to be Abandon/Demolish
KJO-REDP-T-0111-24 Response to Technical Query 5200002-05-TQ-PI-0005
ENG. DEPT.
Clarification for Existing Pipelines to be Abandon/Demolish
BY:

DATE:
KA-000054_DB Destruct P&ID – Old Loading Dock
KA-000707_DA Demolition Layout Subsea
APPD. FOR CONSTR.

BY:
KA-000708_DA Demolition Layout Platform Piping
DATE: KA-000709 Offshore Tie-In Schedule

CERTIFIED
KA-000711 P&ID for P/L Flushing – Crude Oil Lines
BY: KA-000712 P&ID for P/L Flushing – Diesel Oil Lines
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 6
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

KA-000713 P&ID for P/L Flushing – Fuel Oil Lines


CHKD.

ICM

KA-000714 P&ID for P/L Flushing – 10” Abandoned Line


KA-000568 Piping Plan – Temporary Flushing Line
ISSUED FOR REVIEW AND COMMENTS

6.0 ORDER OF PRECEDENCE


The design and engineering facilities shall be in accordance with regulations and standards
DESCRIPTION

in order of precedence as per below list.


• KSA Local Laws and Regulations.
• HCIS directives 2017
• KJO Safety Manual.
• KJO Drafting Manual.
• Saudi Aramco Desktop Standards (30th Sep-2023)
SO-02/23
JO/EWO

• Industry and International Codes/Standards.


However, if there are any conflicts between HCIS standards and other applicable Mandatory
VN
BY

Saudi Aramco Engineering Requirements (MSAERs), in that case, more stringent


requirements of HCIS (or) SAES will be followed with the approval procedure SAEP-302.
31/05/2024
DATE

7.0 SITE CONDITIONS AND PROJECT SCOPE


NO.

REVISIONS 7.1 SITE CONDITIONS


DRAWN:
BY: VN
Inspection reports show that structural damage to the existing Ex-Loading Dock is beyond
DATE: 31/05/2024
repair. For this reason, COMPANY has decided to demolish the Ex-Loading Dock and the
piping and associated components. All existing pipelines that arrive at Dolphin-A and Ex-
CHKD BY: ICM
loading Dock are to be abandoned.
OPR’G DEPT

BY:
7.2 SCOPE
DATE: This document describes the abandonment philosophy of the existing pipelines that
original/terminates at Dolphin-A and Ex-Loading Dock considered in the FEED scope.
ENG. DEPT.

BY:
Basic details for the existing Dolphin-A / Ex-Loading Dock pipelines are shown in Table 7-1.

DATE: Table 7-1: FEED Scope of Pipelines to be Abandoned

APPD. FOR CONSTR. Pipeline Size Length In


(Note 1) (NPS) (km) Origin Destination Service Scope Note
BY:
Pipelines To/From Ex-Loading Dock and Onshore
DATE: 12 LD-0-F1 12 ~5 Ex-Loading Dock Onshore Fuel Oil Yes
12 LD-0-F2 12 ~5 Ex-Loading Dock Onshore Fuel Oil Yes
CERTIFIED 12 LD-0-D 12 ~5 Ex-Loading Dock Onshore Diesel Oil Yes 2
BY: 30 LD-0 30 ~5 Onshore Ex-Loading Dock Crude Oil Yes

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 7
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

Pipeline Size Length In


CHKD.

ICM

(Note 1) (NPS) (km) Origin Destination Service Scope Note


Pipelines To/From Ex-Loading Dock and Onshore
10 10 ~5 Ex-Loading Dock Onshore Diesel Oil Yes 4
Abandone
ISSUED FOR REVIEW AND COMMENTS

d line
4 ~5 Onshore Ex-Loading Dock Marine Diesel No 3
Pipelines To/From Ex-Loading Dock and Sea Berth-1
18 ~1 Sea Berth-1 Ex-Loading Dock Fuel Oil Yes
DESCRIPTION

26-LD-SB1 26 ~1 Ex-Loading Dock Sea Berth-1 Crude Oil Yes


Pipelines To/From Ex-Loading Dock and Sea Berth-2
12 ~1 Sea Berth-2 Dolphin-A Diesel Oil Yes 2
4 ~1 Dolphin-A Sea Berth-2 Marine Diesel No 3
10 LD-SB2 10 ~1 Dolphin-A Sea Berth-2 Bunker Oil Yes
30-LD-SB2 30 ~1 Dolphin-A Sea Berth-2 Crude Oil Yes
Pipelines To/From Ex-Loading Dock and VCP
30 LD-VS 30 ~4 Dolphin-A VCP Crude Oil Yes

Note:
SO-02/23
JO/EWO

1. All pipelines are of material API 5L Gr. B. All pipelines have 0.5” wall thickness, with the
exception of the already abandoned 4” marine diesel pipelines which has 0.375” wall
thickness.
VN
BY

2. The diesel oil pipelines from Sea Berth-2 to Dolphin-A, and from Dolphin-A to Onshore
31/05/2024

shall only be abandoned after the commission of new diesel pipeline route from Sea
DATE

Berth-1 to Onshore.
3. As per K03-PI-DW-002, The 4in Marine Diesel Pipeline is already cut, plugged and
NO.

REVISIONS
abandoned on the seabed at the Dolphin-A end. There may be requirement to
DRAWN:
disconnect/cut the pipeline at Sea Berth-2 underwater manifold (see Section 10.11 for
BY: VN specific considerations).
DATE: 31/05/2024
4. Abandonment of this pipeline shall additionally refer to specific requirements detailed in
CHKD BY: ICM Section 10.10.
OPR’G DEPT As per project TQ (5200002-05-TQ-PI-0005, response KJO-REDP-T-0111-24), subject
BY: pipelines are to be abandoned on the seabed.
DATE: Abandonment of pipeline on seabed involves flushing of the pipelines and subsequently the
cutting of pipelines on the sea bed. The location of cut shall be selected such that sea bed
ENG. DEPT.
clearance for the new diesel pipelines are provided. Subsequently, the cut section of subsea
BY:
pipeline, risers and topside pipework on the Dolphin-A / Ex-Loading Dock shall be
DATE: demolished.
APPD. FOR CONSTR.

BY:
8.0 DECOMMISSIONING, DEMOLITION AND CONSTRUCTION ACTIVITIES
DATE: 8.1 GENERAL REQUIREMENTS
CERTIFIED Pipeline abandonment activities shall require positive isolation, cleaning, flushing,
BY: decontaminating. Sections on and within the vicinity of Dolphin-A and Ex-Loading Dock shall
be demolished and the remainder of the pipeline shall be abandoned on the seabed.
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 8
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

Dismantling shall cover electrical equipment, instrumentation and control equipment, and
CHKD.

ICM

associated wiring of the subject pipelines. Requirement for control system deactivation shall
be part of the abandonment activities and shall be clearly set out in CONTRACTOR’s
procedure.
The CONTRACTOR shall develop a detailed demolition plan for the items designated to be
ISSUED FOR REVIEW AND COMMENTS

demolished. The abandonment plan shall take into account of the sequence of activities
outlined below:
DESCRIPTION

1. Clean and demolish subject pipelines and associated topside piping and instrumentation
with the exception of the 12” Diesel Oil offloading route from Sea Berth-2 to Onshore.
Note: Destruct activities shall ensure that the operability of the 12” Diesel Oil route is
maintained. Where demolishing activity may result in temporary outage of the 12” Diesel
Oil offloading route, this shall be planned and performed within COMPANY approved
time window when no offloading operation is planned.
2. Decommission and remove existing Sea Berth-1. This will involve the removal of all items
at Sea Berth-1 such that the seabed is clear of obstruction to allow for the installation of
SO-02/23
JO/EWO

the new Single Point Mooring (SPM) buoy. Existing items to be removed include the
Conventional Buoy Mooring (CBM), underwater manifold, hose, mooring chains and
anchors.
VN
BY

Any pipelines found to protrude excessively from the seabed within the offloading vessel
31/05/2024

swing circle shall be subject to remedial action to ensure the availability of vessel under
DATE

keel clearance at LAT.


Note: Protrusion of existing pipeline that result in vessel under keel clearance of less
NO.

REVISIONS
than the 1.0 m (ABS criteria) at LAT within the offloading vessels swing circle is
DRAWN:
unacceptable. The SPM Concept Feasibility Assessment report (KE-000690) assessed
BY: VN the under keel clearance at 16.0 m water depth to be 1.2 m. Therefore, the LAT water
DATE: 31/05/2024 depth to top of pipe will require to be at minimum 15.8 m to satisfy this criteria. Pipelines
CHKD BY: ICM
found to impinge on this criteria shall be subject to remedial action.
3. Install and perform flooding, cleaning, gauging of new diesel pipelines at Sea Berths 1
OPR’G DEPT
and 2 to Dolphin-A and from Dolphin-A to shore on completion of pipe lay.
BY:

DATE:
4. Install new PLEM at Sea Berth-1 after SPM chain lay and tension test.
5. Tie in of Sea Berth-1 to Dolphin-A and Dolphin-A to shore pipelines to PLEM/platform
ENG. DEPT.
tie-in spools, risers and topside. Hydrotest and leak test each of the fully tied in pipelines.
BY:
6. Dewater the pipeline from Sea Berth-1 to onshore using diesel fluid for commissioning.
DATE:

7. After commissioning of new diesel pipeline from Sea Berth-1, clean the existing Sea
APPD. FOR CONSTR.
Berth-2 to Onshore diesel pipeline and perform abandonment works. At Dolphin-A
BY: platform, remove the topside diesel pipework, riser, cut pipeline subsea and
DATE:
electrical/instrumentation; At Sea Berth-2, remove the existing under water manifold,
hose, and cut pipelines subsea (as required) to provide clearance for new PLEM, hose
CERTIFIED and tie in spool.
BY:
8. Install new PLEM at Sea Berth-2.
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 9
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

9. Tie in of Sea Berth-2 to Dolphin-A pipelines to PLEM/platform tie-in spools, risers and
CHKD.

ICM

topside. Hydrotest and leak test Sea Berth-2 to Dolphin-A pipeline.


10. Dewater the pipeline from Sea Berth-2 to Dolphin-A using diesel fluid for commissioning.
Dewatering will require the removal of pipeline water into a barge.
ISSUED FOR REVIEW AND COMMENTS

8.2 DECOMMISSIONING
Following are decommissioning scope covered by this document:
DESCRIPTION

• Isolate and secure all electrical and instrumentation facilities and equipment.
• Flush all designated pipelines.
• Disconnect and isolate pipelines to be abandoned.

8.3 DEMOLITION
Following are demolition scope covered by this document:
SO-02/23


JO/EWO

Subsea cutting of pipeline.


• Disconnection and removal risers and pipeline sections from cut location to Dolphin-A
and Ex-Loading Dock.
VN
BY

• Remedial action for pipeline sections within the offloading vessel swing circle that
31/05/2024
DATE

impinges the under keel clearance criteria.


• Removal of all seabed debris impinging on the new pipeline route.
NO.

Following are demolition scope are not covered here:


REVISIONS

DRAWN: • Cut and remove all topside piping from Dolphin-A and the Ex-Loading Dock structure.
BY: VN

DATE: 31/05/2024
• Disconnection and removal of Sea Berth-1 items.
CHKD BY: ICM • Demolish and remove bridge from Dolphin-A to Ex-Loading Dock
OPR’G DEPT • Demolish and remove Ex-Loading Dock structure.
BY:

DATE: 9.0 DECOMMISSIONING PLAN

ENG. DEPT. The following section outline the minimum requirements for decommissioning activities to be
BY: performed by the CONTRACTOR, broken down by discipline.
DATE:
9.1 PIPELINES
APPD. FOR CONSTR.
The subject pipelines will be flushed clean in order to remove all liquid hydrocarbon contents
BY: to an acceptable level before demolition can take place. CONTRACTOR shall carefully
DATE:
consider and define the steps that need to be taken to achieve this. FEED stage isolation
and flushing drawings are provided in Appendix A.
CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 10
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

9.2 ELECTRICAL, INSTRUMENTATION AND CONTROL


CHKD.

ICM

CONTRACTOR shall perform the following activities for decommissioning of pipeline related
electrical, instrumentation and control equipment.
• After the pipeline are flushed, depressurised and isolated, deenergise the associated
ISSUED FOR REVIEW AND COMMENTS

electrical, instrumentation and control equipment.


• Disconnect and remove wire/cables from panel board terminals and field instruments,
DESCRIPTION

etc.
• Remove junction boxes, trays and all associated fittings.

10.0 SPECIFIC REQUIREMENT FOR PIPELINES

10.1 CLEANING AND DECONTAMINATION


FEED stage isolation and flushing drawings are provided in Appendix A. CONTRACTOR
shall develop a detailed procedure for cleaning and flushing the pipelines.
SO-02/23
JO/EWO

Flushing operation shall be performed using the offshore platforms (i.e. Ex-Loading Dock,
Dolphin-A, VCP, Sea Berths 1 and 2) as the inlet and the Khafji Onshore Facilities as the
VN
BY

reception end of the flushing route.


CONTRACTOR shall identify the extremities of each pipeline, taking into account of the full
31/05/2024
DATE

normal flow route of the pipeline in order to remove pipeline fluids fully. For example, the
crude oil pipeline system consists of a 30” pipeline from Onshore to Ex-Loading Dock and
26” pipeline from Ex-Loading Dock to Sea Berth-1. The flushing route of the crude oil pipeline
NO.

REVISIONS
will therefore be from Sea Berth-1 to onshore.
DRAWN: CONTRACTOR shall supply a vessel/barge with flexible hoses, applicable sizes of
BY: VN
mechanical connectors and pumps for seawater injection at the offshore end of the pipelines.
DATE: 31/05/2024
CONTRACTOR shall use the offshore platforms to divert flushing fluid flow as needed during
CHKD BY: ICM the flushing operation.
OPR’G DEPT To facilitate the reception of flushing fluid at the onshore end of the pipeline, CONTRACTOR
BY: shall install flushing outlet at the onshore end of the pipeline, upstream of the first isolation
DATE:
valve in the flushing route. CONTRACTOR shall divert pipeline fluids from the pipeline
flushing outlet to applicable disposal locations as described in Flushing Fluid Disposal
ENG. DEPT. Section 10.3.
BY:
10.2 FLUSHING
DATE:

CONTRACTOR shall flush the pipelines to remove hydrocarbon contents and any loose
APPD. FOR CONSTR.
material present. Complete cleaning, such as removal of deposited wax or other hard
BY: deposition on the inner walls of the pipelines is not required.
DATE:
All pipelines shall be flushed with sea water sourced from the sea. Treatment of seawater
CERTIFIED
with chemicals (e.g. corrosion inhibitor, biocide, oxygen scavenger) is not required, but
should be filtered to limit the arrival of sediments at Khafji. CONTRACTOR shall propose
BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 11
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

appropriate filter size. The use of chemicals for the purpose of pipeline cleaning/flushing shall
CHKD.

ICM

be proposed by CONTRACTOR.
Prior to the start of flushing CONTRACTOR shall ensure that all necessary isolation valves
on Khafji are available and functioning to mitigate water entering into the product storage
tanks.
ISSUED FOR REVIEW AND COMMENTS

CONTRACTOR shall perform pipeline flushing until sufficient level of cleanliness have been
achieved. Sufficient level of cleanliness required shall be in accordance with Section 7.11 of
DESCRIPTION

SAES-A-103, until no sheen can be observed on the surface of the water through a visual
sheen test.
CONTRACTOR shall dispose of flushing fluids to the reclaim pits to reclaim hydrocarbons
from the flushed pipelines. The water shall be sent to the wastewater injection facility for
disposal once they are deemed hydrocarbon free and the required level of cleanliness has
been achieved.
CONTRACTOR shall take into account of availability of Khafji reclaimer pits for flushing
operation. CONTRACTOR shall submit to company the flushing plan which shall include
SO-02/23
JO/EWO

volume of fluids to be disposed into the Khafji pits and plan his activities according to
availability of the pits. There are no permanent pigging facilities available for the pipeline
except for the 12” diesel pipeline from Dolphin-A to Khafji.
VN
BY

CONTRACTOR shall consider the use of gel pigs where possible to minimize the transition
31/05/2024

zone and mixing between hydrocarbon and flushing water, and to minimise volume of
DATE

flushing fluids to be disposed of. CONTRACTOR shall consider handling and disposal of gel
pigs upon receipt.
NO.

REVISIONS
CONTRACTOR should identify any areas where trapped pockets of hydrocarbons are likely,
DRAWN:
such as dead legs or isolatable sections (e.g. spare tie in branch/tee, pig launcher/ receiver,
BY: VN flow loop) within the pipeline and topside piping system, and remove applicable isolation of
DATE: 31/05/2024 the deadleg to expose it to the flow of flushing fluids.
CHKD BY: ICM A single flush is the equivalent of the total pipeline volume, which shall be calculated using
the entire length of a given pipeline route to be flushed. The entire length shall be measured
OPR’G DEPT
from the point of injecting flushing water to the point of discharge at the onshore disposal
BY:
pits. Single flush volumes are detailed in Section 10.4 for CONTRACTOR as basis for
DATE: estimating flushing operation cost. CONTRACTOR shall provide a nominal cost per flush
(and part of) for each pipeline volume flush required or day rate for the flushing operation.
ENG. DEPT.

BY:
10.3 FLUSHING FLUID DISPOSAL
DATE:
During the first flush, CONTRACTOR shall assess the hydrocarbon product within the
APPD. FOR CONSTR. pipeline for suitability to return pipeline fluid back to the storage tanks. This shall involve
BY:
testing of pipeline fluid at the outlet during flushing operation. The disposal of flushing fluid
shall consider the following:
DATE:
• CONTRACTOR shall confirm that in plant/onshore piping route and storage tank remain
CERTIFIED available for diverting fluids back to storage tank. CONTRACTOR shall divert
BY: hydrocarbons back to storage tanks if it is suitable to do so. It shall be ensured that
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 12
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

during this operation that the pipeline fluid is tested at regular intervals to confirm it
CHKD.

ICM

remain suitable to be diverted back to storage tank and to detect for the arrival of the
hydrocarbon/flushing water transition zone.
• When volume of expected hydrocarbon product is close to being displaced (such as
ISSUED FOR REVIEW AND COMMENTS

when the arrival of the transition zone is expected, the flow should then be diverted to
Khafji disposal pit to avoid possible contamination of the storage tanks. All onshore
isolation valves of the existing product lines shall be closed to mitigate against ingress
DESCRIPTION

of water into the tanks during flushing.


• When flush water appears to be more water than hydrocarbon products, the flow shall
be diverted into RP-001 disposal pit. This is expected to occur just after the arrival of the
gel pig that separates hydrocarbon and flushing water.
CONTRACTOR shall consider the size of the interface zone of mixed fluids when directing
products to the applicable locations to minimise the amount of product sent to the reclaim
pits. This shall be calculated using the appropriate methods (example in Appendix C).
CONTRACTOR shall consider the use of gel pigs where possible to provide separation of
SO-02/23
JO/EWO

water and hydrocarbon product during flushing, and minimise the interface zone of mixed
fluid.
CONTRACTOR shall calculate the disposal volumes required and submit to COMPANY to
VN
BY

confirm of capacity of disposal pit and permissible discharge flow rate and quantity available
31/05/2024

to the CONTRACTOR for flushing works.


DATE

Management and disposal of flushing water shall comply with the requirements of SAEP-327
Management of Wastewater from Hydrotesting, Cleaning, Flushing and Dewatering
NO.

Pipelines, Tanks and Vessels.


REVISIONS

DRAWN:
10.4 DISPOSAL PITS VOLUME
BY: VN

DATE: 31/05/2024 CONTRACTOR shall evaluate if other pits could be used to dispose of effluent from this
CHKD BY: ICM
process.

OPR’G DEPT
Due to other project demands on the reclaim pits, CONTRACTOR shall assume that only
25% of the total capacity of the Khafji pit and pit RP-001 are available. The volumes available
BY:
for use are therefore 4,622 m3 and 1,193 m3, respectively.
DATE:
The estimated single flush liquid volume of the respective pipelines, including the 12”
ENG. DEPT. temporary flushing line to RP-001 for each pipeline are as follows (see Appendix D for
BY: details):
DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 13
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.
CHKD.

Pipeline Flush Route Approximate Lengths and Diameters Estimated


ICM

Volume (m3)

Crude Oil 1 – VCP to shore 4km @ 30in + 5km @ 30in + 850m @ 12in 3897
ISSUED FOR REVIEW AND COMMENTS

Crude Oil 2 – SB1 to shore 1km @ 26in + 5km @ 30in + 850m @ 12in 2509

Crude Oil 3 – SB 2 to shore 1km @ 26in + 5km @ 30in + 850m @ 12in 2509
DESCRIPTION

Fuel Oil Line 1 1 – SB1 to shore 1km @ 18in + 5km @ 12in + 700 @ 12in 547

Fuel Oil Line 2 1 – SB2 to shore 1km @ 10in + 5km @ 12in + 700m @ 12in 449

Diesel Line 1 – SB 2 to shore 1km @ 12in + 5km @ 12in + 850m @ 12in 482

10.5 SYSTEM SHUTDOWN


SO-02/23
JO/EWO

The integrity of the decommissioning plan shall ensure that systems to be decommissioned
can be isolated efficiently. CONTRACTOR shall inform COMPANY of the need for system
deactivation / isolation in advance of the decommissioning work.
VN
BY

10.6 DISCONNECTION AND REMOVAL


31/05/2024
DATE

Disconnection and removal of seabed items shall only be performed following completion of
the flushing and cleaning.
NO.

Due to the aged condition of the existing pipelines, CONTRACTOR shall ensure that any
REVISIONS
manoeuvring of pipeline does not risk the safety of divers. CONTRACTOR shall consider the
DRAWN:
BY: VN
use of adequate support to the pipeline that ensures minimal load to the pipeline, such as the
use of jetting to create a suitable size pit to facilitate subsea cutting.
DATE: 31/05/2024

CHKD BY: ICM Removal of any pipeline sections or associated structures should be supported by
appropriate mitigation measures to minimize the potential impact on the environment at each
OPR’G DEPT phase of the removal process from separation to transportation, handling and final disposal.
BY: The treatment and final destination of any removed pipeline sections, associated structures
DATE: and residual waste should be carried out in accordance with COMPANY policies and
standards.
ENG. DEPT.

BY: 10.6.1 ONSHORE


DATE: The cleaned section of the pipeline shall be air gapped from the onshore section. This can
be achieved through the following steps:
APPD. FOR CONSTR.

BY: 1. Disconnection of the flange on the offshore pipeline side of the isolation valve.
DATE: 2. Cutting a short section of pipe from the disconnected flange to facilitate access space to
install blind flange at the end of the isolation valve.
CERTIFIED

BY:
3. The remainder of pipeline section towards the offshore end which has been cut shall be
left in situ subject to acceptable environmental and safety risk.
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 14
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

CONTRACTOR shall ensure that pipe is supported during cutting operation to ensure
CHKD.

ICM

personnel safety. Overhanging pipework following cutting shall be adequately supported


such that it does not pose a safety risk.

10.6.2 DOLPHIN-A
ISSUED FOR REVIEW AND COMMENTS

All pipelines that originate/terminates at Dolphin-A and Ex-Loading Dock shall be


disconnected via pipeline cutting as the base case. Where it is found that the pipeline is tied-
DESCRIPTION

in to the platform subsea via tie in flange and that the location of the flange satisfies the cut
location requirement, then the pipeline can be disconnected by undoing the flange joint. The
narrative below is described based on cutting.
Pipeline sections shall only be cut following completion of flushing operation. The pipeline
shall be depressurised to ambient pressure, including removal of hydrostatic head and fluid
column within the riser in air section.
The preliminary cut points at Dolphin-A are shown in the subsea demolition plot plan in
Appendix A.
SO-02/23
JO/EWO

The riser and pipeline sections from the riser above water tie in flange to the pipeline cut
subsea are to be removed, leaving the pipeline abandoned with an open end on the seabed.
VN
BY

10.6.3 SEA BERTH-1


31/05/2024

All existing items at Sea Berth-1 shall be disconnected and removed (underwater manifold,
DATE

mooring chains, buoys) with the exception of the pipelines in the area. In order to remove the
existing underwater manifolds, it is considered that pipelines at Sea Berths may be
NO.

abandoned by cut and removal as the FEED base case; Alternatively, by disconnection of
REVISIONS flange between pipeline and underwater manifold (where available). This shall be subject to
DRAWN: confirmation that pipeline end connections do not present obstruction to the new
BY: VN
pipeline/PLEM route or present risk of snagging.
DATE: 31/05/2024

CHKD BY: ICM


As the existing pipelines are within the vessel swing circle during offloading, it shall be verified
from survey that the top of pipe is at sufficient depth to provide 1m minimum under keel
OPR’G DEPT clearance. The aged pipelines may have been subject to some level of settlement/self burial
BY: over its life. However, if pipeline sections are found to impinge on the 1m minimum under
keel clearance within the new SPM swing circle, then these sections shall be subject to
DATE:
remediation (e.g. trenching or cut and remove) prior to abandonment. CONTRACTOR shall
ENG. DEPT. determine and agree with COMPANY the appropriate mitigation.
BY:
10.6.4 SEA BERTH-2
DATE:
The existing underwater manifold at Sea Berth-2 shall be disconnected and removed. In
APPD. FOR CONSTR.
order to remove the existing underwater manifolds, it is considered that pipelines at Sea
BY: Berths may be abandoned by cut and removal as the FEED base case; Alternatively, by
DATE:
disconnection of flange between pipeline and underwater manifold (where available). This
shall be subject to confirmation that pipeline end connections do not present obstruction to
CERTIFIED the new pipeline/PLEM route or present risk of snagging.
BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 15
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

CONTRACTOR shall determine the extent of pipeline sections in proximity of the manifold to
CHKD.

ICM

be cut and removed to provide clearance for the installation of new PLEM, offloading hose
and tie in spool which is envisaged to be in a similar location.
Disconnection/cutting of pipelines from the underwater manifold shall additionally consider
specific requirement for the previously abandoned 4” marine diesel oil pipeline (See Section
ISSUED FOR REVIEW AND COMMENTS

10.11).
DESCRIPTION

10.7 ABANDONMENT AT SEABED


Pipelines to be abandoned shall be cut/disconnected and subsequently be left open ended
at both ends (exceptions for previously abandoned pipelines) to accelerate natural
degradation and to ensure that there are no on-bottom stability issues. The pipeline
abandoned state is further detailed in the Offshore Tie-In Schedule (KA-000709).
CONTRACTOR shall install concrete mattresses over the pipeline ends for a minimum
distance of 5 meters from the cut end. CONTRACTOR shall determine suitable mattress size
and arrangement required to ensure mattress and pipeline end stability. The installation of
SO-02/23

these mattresses is to ensure that the decommissioned pipelines remain stable on the sea
JO/EWO

bed and to prevent any environmental hazard or snagging risk to marine users. The exact
length of each pipeline section to be covered by mattresses shall be confirmed by
VN
BY

CONTRACTOR during detailed design stage. CONTRACTOR shall also evaluate the long
term stability of the pipeline and where required, propose other options for achieving pipeline
31/05/2024

on-bottom stability during detailed engineering.


DATE

10.8 PIPELINE DEMOLITION


NO.

REVISIONS
All work shall be performed in strict compliance with, approved construction or demolition
DRAWN:
design drawings, procedures, relevant COMPANY standards and specifications, codes of
BY: VN practices and industry standards.
DATE: 31/05/2024
CONTRACTOR shall identify all temporary pipe support, and lifting aid deemed necessary
CHKD BY: ICM to facilitate the demolition of pipeline sections.
OPR’G DEPT Prior to the start of demolition and removal works, CONTRACTOR shall record and document
BY: the original conditions of the pipelines and submit such information to COMPANY.
DATE: CONTRACTOR shall salvage and hand-over reusable materials to KJO.
ENG. DEPT. CONTRACTOR shall note that demolition of any structures shall only take place only after
BY: demolition, removal and salvage of all pipelines and cables.
DATE:
10.9 DEMOLISHED ITEMS
APPD. FOR CONSTR. CONTRACTOR shall include in their procedure details for the removal of demolished pipeline
BY: pieces and the transportation of these items to a safe lay down area allocated by COMPANY.
DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 16
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

10.10 SPECIFIC REQUIREMENTS FOR THE 10” DOLPHIN A TO ONSHORE


CHKD.

ICM

ABANDONED DIESEL PIPELINE


The 10” abandoned diesel pipeline is broken at about 1.4km from the platform. This pipeline
is considered to contain diesel in situ from its previous service. Remainder of liquid
hydrocarbons shall be carefully sucked from this line at the platform into a barge for disposal
ISSUED FOR REVIEW AND COMMENTS

in an approved pond or pit. Liquid should be sucked from the pipeline until minimal visible
hydrocarbons and relatively clear sea water is received at the barge. Necessary spill
DESCRIPTION

response measures should be in place for this operation.


Following suction of hydrocarbons, the pipeline should be plugged at the cut end to be
abandoned on the seabed by cementing to prevent any remaining hydrocarbons from
entering the marine environment. CONTRACTOR shall prepare appropriate procedure to set
the cement plug. CONTRACTOR shall assure that minimal hydrocarbon spill in the
cementing operation by considering setting of plug prior to pipeline cutting or CONTRACTOR
shall assure that minimal hydrocarbon is present based on observation of suctioned fluid or
sampling prior to cutting the pipeline.
SO-02/23
JO/EWO

10.11 SPECIFIC REQUIREMENTS FOR THE 4” DOLPHIN A TO SEA BERTH-2


ABANDONED DIESEL PIPELINE
VN
BY

Note, the 4” marine diesel pipeline is still connected to the underwater manifold at Sea Berth-
2. Available existing data indicates this pipeline is abandoned and plugged at Dolphin-A end.
31/05/2024

However there are uncertainty of whether hydrocarbon remains internally when the line is
DATE

plugged. Removal of Sea Berth-2 may require the disconnection/cutting of this 4” abandoned
line in order to provide space for installing the new PLEM and hose arrangement. If required,
NO.

REVISIONS
CONTRACTOR shall ascertain the status of abandonment by obtaining information from
DRAWN:
COMPANY and if data is unavailable from COMPANY, CONTRACTOR shall evaluate the
BY: VN condition of the line (internal fluids, available connection for cleaning) through survey and
DATE: 31/05/2024 include pipeline in flushing/cleaning scope. If cleanliness of the line cannot be achieved to
CHKD BY: ICM
allow abandonment with open end to environment, CONTRACTOR shall consider the use of
cement plug at Sea Berth-2 end to prevent any remaining hydrocarbons from entering the
OPR’G DEPT marine environment.
BY:

DATE: 11.0 CONTRACTOR’S OBLIGATION


ENG. DEPT.
11.1 GENERAL
BY:
CONTRACTOR shall be responsible in obtaining all necessary work permits, approvals from
DATE:
COMPANY in relation to the work executed.
APPD. FOR CONSTR.
CONTRACTOR shall be responsible in obtaining permits associated with the discharge of
BY: flushing fluids from COMPANY and relevant authorities.
DATE: All CONTRACTOR procedures shall be approved by COMPANY before the start of any work.
CERTIFIED CONTRACTOR shall be solely responsible for the planning and execution of the work at all
BY: times. COMPANY’s review and acceptance of CONTRACTOR’s method statement and
DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 17
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

procedures shall not in any way relieve the CONTRACTOR from his obligation and liability
CHKD.

ICM

to comply with all applicable specifications and standards.


COMPANY’s certification of AFC and AFD drawings shall not relieve the CONTRACTOR
from his responsibility for the correctness of drawings. COMPANY shall not be liable for any
inaccuracy, design deficiency and errors and omission by the CONTRACTOR’s developed
ISSUED FOR REVIEW AND COMMENTS

engineering work. CONTRACTOR is responsible in verifying actual site condition and where
actual conditions differ to the original plan/drawings, inform the COMPANY of necessary
DESCRIPTION

adjustments to ensure the safety and success of his operation.


The specifications referenced in this document are considered to be the minimum
requirement. It is CONTRACTOR’s responsibility to verify these requirements and to ensure
that they are fit for the purpose intended and meet all required international technical
standards and COMPANY standards during the detailed engineering stage.
All deviation from COMPANY standards shall require a waiver in accordance with SAEP-302.
CONTRACTOR shall ensure that power supply to Valve Control Platform, navigation lights,
platform lighting and other running facilities supplied from switchgear on Dolphin-A platform
SO-02/23
JO/EWO

is always available. Safeguards shall be put in place to ensure the safety of all personnel
working around energized systems while electrical and instrumentation upgrades are being
performed.
VN
BY

CONTRACTOR shall comply with COMPANY’s Marine Instruction Manual for works
31/05/2024

supported by offshore vessel to minimize the risk of vessel impact during demolition works.
DATE

11.2 HEALTH AND SAFETY


NO.

REVISIONS
The pipelines are more than 50 years old and any manoeuvring activities (such as lifting,
DRAWN:
pulling, cutting or clamping) may lead to accidental damage that can be hazardous to the
BY: VN divers and personnel on vessel deck. CONTRACTOR shall exercise caution through the
DATE: 31/05/2024 course of this operation and this shall be reflected in CONTRACTOR’s detailed engineering
CHKD BY: ICM
work, procedure development and the selection of materials and any other activities required
to undertake the scope of work.
OPR’G DEPT
CONTRACTOR shall install adequate temporary barricades, platforms, partitions, sign-
BY:
boards, lighting, alarms, covering materials and protective shields for both personnel and
DATE: facilities to ensure safe execution of works.
ENG. DEPT.
11.3 ENVIRONMENT
BY:
CONTRACTOR shall prepare mitigation plan for accidental spills.
DATE:
All decommissioning operations for pipeline should adhere to SAES-A-103, SAEP-327 and
APPD. FOR CONSTR.
any other relevant COMPANY environmental policies and standards for assessing the
BY: possible future effects on the marine environment, taking account of the Environmental
DATE:
Impact Assessment (KE-000025) undertaken during in FEED phase. All abandonment /
decommissioning plans, drawings, method statements and schedules shall be coordinated
CERTIFIED with COMPANY’s Environment Department.
BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 18
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

Oily Water from cleaning and flushing of the subsea pipelines shall be treated in the Oily
CHKD.

ICM

Water System and recycled with other oily water streams. Residual hydrocarbon sludge must
also be processed in an approved and acceptable way consistent with the treatment of other
sludge from routine KJO operations.
CONTRACTOR shall ensure that all contaminated water is disposed of in accordance with
ISSUED FOR REVIEW AND COMMENTS

procedures that have been reviewed and approved by COMPANY.


DESCRIPTION

12.0 SCHEDULE
CONTRACTOR shall prepare and submit a detailed schedule for decommissioning activities
in conjunction with the decommissioning and construction activities of the PROJECT. The
schedule will be reviewed and approved by COMPANY prior to the commencement of any
activities or operations.

13.0 DOCUMENTATION
SO-02/23
JO/EWO

13.1 DECOMMISSIONING PLAN


CONTRACTOR shall develop site specific “Pipeline Decommissioning Plan” in accordance
VN
BY

with SAEP-76, and submit to COMPANY for review and approval. The plan shall include the
following as minimum:
31/05/2024
DATE

1. Description of pipelines to be decommissioned.


2. Inventory of materials.
NO.

REVISIONS
3. Pre-decommissioning survey for cut segments of offshore pipeline to be demolished.
DRAWN: 4. Cleaning/flushing procecure
BY: VN

DATE: 31/05/2024 5. Onshore cathodic protection system disconnection and decommissioning procedure.
CHKD BY: ICM 6. Qualitative risk assessment assessing the safety risks and mitigations for all stages of
the work.
OPR’G DEPT

BY: 7. Environmental impact assessment (EIA).


DATE: 8. Selected decommissioning option. along with its justification.
ENG. DEPT. 9. Emergency response plan developed in accordance with Saudi Aramco Emergency
BY: Management Guidelines.
DATE: 10. Pipeline material disposal plan
APPD. FOR CONSTR.
11. Debris clearance plan.
BY: 12. Engineering calculations
DATE: 13. Supporting studies
CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 19
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

13.2 FLUSHING AND DISPOSAL


CHKD.

ICM

CONTRACTOR shall develop site specific “Flushing and Disposal Plan” and submit to
COMPANY for review and approval. The plan shall include the following as minimum:
1. Collated historical information of the pipelines (fluid composition, operating and
ISSUED FOR REVIEW AND COMMENTS

maintenance records).
2. Types of contaminants inside the pipelines.
DESCRIPTION

3. Method of decontamination (if any chemicals or other additives are required to


accomplish this task, CONTRACTOR shall seek prior approval from COMPANY for the
use of such chemicals or additives)
4. Details of equipment and techniques used for flushing.
5. Method and frequency of sampling for pipeline contents that are to be diverted back to
storage tanks.
6. Details of the management (analysis, treatment, transportation and final disposal
SO-02/23

destination) of waste water contaminated with crude, diesel, fuel oil and entrained wax
JO/EWO

clumps etc.
7. Suitability of oily water treatment facilities and drain pits availability, and propose how
VN
BY

such facilities would be used as part of the flushing operation.


31/05/2024

8. Procedure for flushing and draining with appropriate propellants based on the results of
DATE

the EIA study (KE-000025). The procedure shall detail the following:
o The total amount of the liquids to be drained/flushed.
NO.

REVISIONS o Any temporary connections required for the draining/flushing of the liquids which
DRAWN: shall be provided by the CONTRACTOR.
BY: VN

DATE: 31/05/2024
o Draining / flushing of pipelines which shall be completed in batches depending on
the status of the production facilities.
CHKD BY: ICM

OPR’G DEPT 13.3 DEMOLITION


BY: CONTRACTOR shall provide the following items for COMPANY approval in relation to
DATE: demolition and removal or pipeline sections:
ENG. DEPT.
1. List of all materials and equipment for demolition and removal works to COMPANY for
BY:
review and approval prior to the commencement of any demolition work.
DATE: 2. Method statements and procedures for demolition, removal, temporary storage and
disposal of materials.
APPD. FOR CONSTR.
3. Drawings that illustrate items for demolition, the sequence of demolition work that are to
BY:
be carried out in stages and the final as-build/as-left condition.
DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 20
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.
CHKD.

ICM
ISSUED FOR REVIEW AND COMMENTS
DESCRIPTION

SO-02/23
JO/EWO

VN
BY

31/05/2024
DATE

APPENDICES
NO.

REVISIONS

DRAWN:
BY: VN

DATE: 31/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 21
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

A ABANDONMENT/DEMOLITION DRAWINGS OF PIPELINES AT DOLPHIN-A / EX-


CHKD.

ICM

LOADING DOCK
KA-000054_DB Destruct P&ID – Old Loading Dock
KA-000707_DA Demolition Layout Subsea
ISSUED FOR REVIEW AND COMMENTS

KA-000708_DA Demolition Layout Platform Piping


DESCRIPTION

SO-02/23
JO/EWO

VN
BY

31/05/2024
DATE
NO.

REVISIONS

DRAWN:
BY: VN

DATE: 31/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 22
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 25
KJO-3411-02W.doc
30 LD-VS (Crude Oil)

26 LD-SB1 (Crude Oil)

30 LD-O (Crude Oil)


18 LD-SB1 (Fuel Oil)

12 LD-O-F1 (Fuel Oil)

12 LD-O-F1 (Fuel Oil)


THIS DRAWING HAS BEEN
RE-PRODUCED FROM DWG.
NO. K-008753, SH. 001 REV. 00

12 LD-O-D (Diesel Oil)


10 LD-SB2 (Bunker Oil)

26 LD-SB2 (Crude Oil)

12 LD-SB2 (Diesel Oil)

10 Abandoned Line
(Diesel Oil)
DIAGRAM HIGHLIGHTED TO INDICATE PIPELINE FLOW
ROUTES. HIGHLIGHTED PIPELINES ARE TO BE FLUSHED AND
DECONTAMINATED PRIOR TO DESTRUCT AS HIGHLIGHTED.
N

THIS DRAWING

COORDINATES :

THIS DRAWING HAS BEEN


RE-PRODUCED FROM DWG.
NO. K03-PI-DW-002.001 REV. 0
THIS DRAWING HAS BEEN
RE-PRODUCED FROM KJO DWG.
NO. K03-PI-DW-001 REV.0
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

B ISOLATION AND FLUSHING DRAWINGS


CHKD.

ICM

KA-000711 P&ID for P/L Flushing – Crude Oil Lines


KA-000712 P&ID for P/L Flushing – Diesel Oil Lines
ISSUED FOR REVIEW AND COMMENTS

KA-000713 P&ID for P/L Flushing – Fuel Oil Lines


KA-000714 P&ID for P/L Flushing – 10” Abandoned Line
DESCRIPTION

KA-000568 Piping Plan – Temporary Flushing Line


SO-02/23
JO/EWO

VN
BY

24/05/2024
DATE
NO.

REVISIONS

DRAWN:
BY: VN

DATE: 24/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 22
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 24
KJO-3411-02W.doc
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

C SAMPLE LIQUID INTERFACE LENGTH CALCULATION


CHKD.

ICM
ISSUED FOR REVIEW AND COMMENTS
DESCRIPTION

SO-02/23
JO/EWO

VN
BY

24/05/2024
DATE
NO.

REVISIONS

DRAWN:
BY: VN

DATE: 24/05/2024

CHKD BY: ICM

OPR’G DEPT

BY:

DATE:

ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 23
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 24
KJO-3411-02W.doc
REF. http://neutrium.net/fluid_flow/calculating-interface-volumes-for-multi-product-pipelines/
TERMINOLOGY
Re Reynolds number
D Inner diameter of the pipeline, m 12 0.3048 m
L Length of the pipeline, m 5000 m
ρ Fluid density kg/m3 917.5 kg/m3
f The Darcy friction factor of the pipe line
µ Average viscosity of fluid 0.001315 kg/m.sec
ρ1 Water density kg/m3 1025 kg/m3
ρ2 Diesel density kg/m3 810 kg/m3
µ1 Water viscosity cp 0.00108 kg/m.sec
µ2 Diesel viscosity cp 0.00155 kg/m.sec
V Average velocity 1 m/sec

Re 212664.6

1 JABLONSKI

L Interface 210.2154 m

2 BIRGE

L Interface 60.31713 m GASOLINE-GASOLINE NOT APPLICABLE

L Interface 99.83513 m GASOLINE-KEROSENE NOT APPLICABLE

3 SMITH & SCHULZE

L Interface 112.9688 m

4 TAYLOR

L Interface 119.689 m

5 SJENITZER

L Interface 75.85947 m

6 AUSTIN & PALFREY

1 L Interface 134.5119 m APPLICABLE


2 L Interface 38.101 m

7 UDOETOK & NGUYEN

L Interface 351.4377 m
Pipe roughness 0.04572 mm
Dercy Friction factor 0.022474 Method-1 JGC
Dercy Friction factor 0.073576 Method-2 Online including a factor of 5 for pipe roughness
Dercy Friction factor 0.013 Method-3 JGC-37-E-Table-10 (Literature) http://www.kolumbus.fi/jukka.kiijarvi/clunowa/fluid_mechanics/pdf_articles/darcy_friction_factor.pdf
n 3.686662
w 0.585
0.035784
4.66E-06

INTERFACE VOLUME 2 x INTERFACE VOLUME


25.6 m3 51 m3
2 x INTERFACE LENGTH
703 m
KJO-3411-02W

AL-KHAFJI JOINT OPERATIONS


APPD.

BJP
CERT.

D PIPELINE VOLUME CALCULATION


CHKD.

ICM

Pipeline
Fuel Oil Fuel Oil
Service Crude Oil Crude Oil Crude Oil Diesel Line
Line 1 Line 2
Remark
ISSUED FOR REVIEW AND COMMENTS

Flush 1 – VCP to 2 – SB1 to 3 – SB 2 to 1 – SB1 to 1 – SB2 to 1 – SB 2 to


Route shore shore shore shore shore shore

4km @ 30in + 1km @ 26in + 1km @ 26in + 1km @ 18in + 1km @ 10in + 1km @ 12in +
Length and
DESCRIPTION

5km @ 30in + 5km @ 30in + 5km @ 30in + 5km @ 12in + 5km @ 12in + 5km @ 12in +
Diameter 850m @ 12in 850m @ 12in 850m @ 12in 700 @ 12in 700m @ 12in 850m @ 12in

Length 1
4000 1000 1000 1000 1000 1000 Approx.
(m)
OD 1 (in) 30 26 26 18 10.75 12.75
OD 1 (mm) 762 660.4 660.4 457.2 273.05 323.85
WT 1 (mm) 12.7 12.7 12.7 12.7 12.7 12.7
ID 1 (m) 0.7366 0.635 0.635 0.4318 0.24765 0.29845
SO-02/23

VOL 1 (m3)
JO/EWO

1705 317 317 146 48 70


Length 2 5000 5000 5000 5000 5000 5000 Approx.
OD 2 (in) 30 30 30 12.75 12.75 12.75
VN
BY

OD 2 (mm) 762 762 762 323.85 323.85 323.85


24/05/2024

WT 2 (mm) 12.7 12.7 12.7 12.7 12.7 12.7


DATE

ID 2 (mm) 0.7366 0.7366 0.7366 0.29845 0.29845 0.29845


VOL 2 (m3) 2131 2131 2131 350 350 350
NO.

Length 3 850 850 850 700 700 850 Approx.


REVISIONS

DRAWN: OD 3 (in)
BY: VN OD 3 (mm)
DATE: 24/05/2024
WT 3 (mm)
CHKD BY: ICM
Based on
ID 3 (mm) 0.3048 0.3048 0.3048 0.3048 0.3048 0.3048 12" Hose
OPR’G DEPT
ID
BY:
VOL 3 (m3) 62 62 62 51 51 62
DATE:
TOTAL
3897 2509 2509 547 449 482
VOL (m3)
ENG. DEPT.

BY:

DATE:

APPD. FOR CONSTR.

BY:

DATE:

CERTIFIED

BY:

DATE:

TITLE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
PIPELINE ABANDONMENT PHILOSOPHY
THIS DRAWING
IS NOT TO BE
USED FOR
CONSTRUCTION RE-FEED FOR RELOCATION OF EX-LOADING DOCK PIPING 24
OR FOR 1301 A KE-000650
A
ORDERING
MATERIALS UNTIL NORTH DOLPHIN-A & B, EX-LOADING DOCK, VCP, SB-1 & 2 OF
CERTIFIED AND
DATED
AL-KHAFJI SAUDI ARABIA Jo/So # PCD/OFF/SO-02/23 24
KJO-3411-02W.doc