0% found this document useful (0 votes)
9 views1 page

Feathers Demolition Contractor Site Access Request

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

Feathers Demolition Contractor Site Access Request

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Contractor

Site Access Request


Doc# MOPS053 Mall Operations

Request Date: 29/08/2025 Fit-Out □Project □Other Permit Serial:


SECTION A: (Access Details ) - This permit is mandatory to access the site
Main Contractor: Modern Expert Building Contracting LLC List of Sub-Contractors / Suppliers

Contact Name: Samsudheen

Contact Mobile: 0509831145

Unit name /
Demolition Works in Feathers Café,
Mall area /
CCF
Project:

Date From: 29/08/25 Date To: 20/09/2025

□24 hours □Before Trading□After Trading


Specific Access
After Trading
Timing:
SECTION B: (Mall Rules & Regulations)

Site Access: Safety Rules on site:


1. Present this permit to obtain access to the mall 1. All workers must wear Safety shoes, Helmets and Vests.
2. All workers must have valid U.A.E Labor Cards to 2. Site must be equipped with four fire extinguishers (2Co2 +
access the site 2Water) and a Fire blanket.
3. Always display on site: 3. Use only Aluminum scaffoldings.
• Mall permit (Mandatory) 4. Use only metal-halide lights.
• Police permit (if required) 5. Ladders above 3m are not allowed.
• FM (Fujairah Municipality) permit (if required) 6. Hot works are not allowed without a valid permit.
• CAR Insurance (Mandatory) 7. Hot works permit has to be renewed every 24 hours.

• MAF approved drawings (if required) 8. No smelly (i.e. painting, spraying...) works without permit.

• Updated List of labors' names 9. No noisy works during trading hours.

• Emergency Contact Numbers 10. Any base builds services shall not to be altered without a permit.
11. Use proper switches and connectors for electric wires.
12. No eating or sleeping on site.

SECTION C: (Contractor Request Statement)


We hereby agree that we are liable for any claim or demand for accident, injury, damage, loss and/or compensation of any kind
whatsoever arising out or in connection with all claims or demands which may arise out of any failure by us or our subcontractors
listed above which may be made against the Mall in the performance of our obligations under the scope of this project.

For assistance or further inquiries 24x7, contact:


- Mall Duty Manager: 056-6558750
Contractor Signature - Enova Duty Supervisor: 058-8408173
& Stamp:
- Security Supervisor: 055- 6870420
- Security Control Room: 09-2012399

SECTION D: (Mall Approval)


This permit allows the above contractor / sub-contractors accessing the mentioned site on the dates and timing requested above.
All mall policies and safety standards shall be applied and maintained.
Remarks:
CCF StampMake
& Date:
all sub
Please protect Mall Fecilities

Page 1/1 Version: August 29, 2025 Doc#: MOPS053