0% found this document useful (0 votes)
36 views36 pages

Electrical Project Behtel

Uploaded by

Tehnoben Nova
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views36 pages

Electrical Project Behtel

Uploaded by

Tehnoben Nova
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

/ Employer:

PUBLIC ENTERPRISE FOR STATE ROADS &


Ministry of Transport and Communications of behalf of the
Government of the Republic of N. Macedonia

Contractor: BECHTEL ENKA UK 2 LIMITED United Kingdom


Branch Office in North Macedonia Skopje

/ Design special contractor: Chakar & Partners, d.o.o. Skopje,

Corridor 8 and Corridor 10d


Section Prilep-Bitola,

/ Title of volume:

-
Main design for the construction of a temporary facilities
PRILEP during the construction of Corridor 10d
Highway section: A3 Prilep-Bitola

/ November 2024
-

Preparation of project documentation for construction of a temporary settlement PRILEP,


needed for motorway A3 PRILEP BITOLA construction

/ BASIC DESIGN DATA

/ Employer:
PUBLIC ENTERPRISE FOR STATE ROADS &
Ministry of Transport and Communications of behalf of the Government of
the Republic of N. Macedonia
BECHTEL ENKA UK 2 LIMITED United Kingdom
/ Contractor: Branch office in North Macedonia Skopje
Maksim Gorki No. 13, NASTEL building 1, Entr. 1-4/4

8 (NMMP)
-
Project/section: CORRIDOR 8 AND CORRIDOR 10d MOTORWAY PROJECT (NMMP)
Section Prilep-Bitola,

/ Basic design
Design stage:

-
Main design for the construction of a temporary facilities PRILEP during the
Code and title of volume: construction of Corridor 10d,
Highway section: Prilep-Bitola

M07.12-1
Book: M07.12-1 Design of Fuel Tank

126/2023
Teh. number:

-
Design special contractor:

Director:

Responsible designer:

Collaborators:

/ Revision:

/ Place, date: / November 2024


/ CONTENT:

/ Front page
/ Content
/ General part

/ Text part:
1.
Project assignment
2.
Technical description
3.
Technical calculations
4.
Bill of quantities and specification of equipment and materials

/ Graphical part

/ Drawing title / Scale


Dwg no.
/ Schematic view / 1
-

Preparation of project documentation for construction of a temporary settlement PRILEP,


needed for motorway A3 PRILEP BITOLA construction

15 18
124/10, 18/11, 36/11, 54/11, 13/12, 144/12, 25/13, 79/13, 137/13, 163/13, 27/14, 28/14,
42/14,
115/14, 149/14, 187/14, 44/15, 129/15, 127/15, 30/16, 31/16, 39/16, 71/16, 2/16, 35/18, 64/18

According to Articles 15 and 18 of the Construction Law (Official Gazette of the Republic of
Macedonia no.130/09, 124/10, 18/11, 36/11, 54/11, 13/12, 144/12, 25/13, 79/13, 137/13, 163/13,
27/14, 28/14, 42/14, 115/14, 149/14, 187/14, 44/15, 129/15, 127/15, 30/16, 31/16, 39/16,
71/16,

/ DECISION

The employee Boris Tanevski, BSc.Mech.Eng. with Authorization No.3.0122 for civil construction is
appointed as a responsible designer in the preparation of:

/ MAIN DESIGN

for the construction of a temporary facilities PRILEP during the


construction of Corridor 10d
Highway section: Prilep - Bitola
/Associates:
, ./Slobodan Gjorgoski, BSc.El.Eng.

/ EXPLANATION

The employee Boris Tanevski, BSc.Mech.Eng. is appointed as justified responsible designer


according to the conditions of the Construction Law.
˃̨̡̛̛̛̛̛̛̬̭̬̖̭̯̬̬̖̭̯̬̦̬̱̪̬̦̐̏̐̌̐̌̌̔̐̌̏
̶̛̣̌ www.crm.com.mk

ʥ̨̬̠͗ϬϴϬϵͲϱϬͬϭϱϬϬϮϬϮϰϬϬϱϮϴϭϰ
ʪ̛̯̱̥̬̖̥̖̌̏͗ϭϯ͘Ϯ͘ϮϬϮϰ̐͘ϭϭ͗ϬϬ

ͬʫ̡̨̡̨̡̛̛̣̖̯̬̦̭̖̦̱̥̖̦̯̔̌̔̔ͬ̚

ʿʽ˃ʦˀʪʤ
̨̛̛̬̖̭̯̬̬̦̖̠̦̭̯̌̐̌̌̔̚

˃ʫʶʽʦʻʰʿʽʪʤ˃ʽˉʰʯʤˁ˄ʥʵʫʶ˃ʽ˃
ʫʺʥˁ͗ 4138201
ʻ̛̌̏͗̚ ʪ̨̡̨̛̛̛̛̬̱̹̯̦̙̖̦̖̬̦̦̭̣̯̦̏̌̐̌̐̚ˋʤʶʤˀͲʿʤˀ˃ʻʫˀˁʪʽʽˁ̡̨̪̠̖
ˁ̛̖̹̯̖̔͗ ʻʤˀʽʪʫʻˇˀʽʻ˃̬̍͘ϱͲϰͬϵˁʶʽʿʵʫͲˉʫʻ˃ʤˀ͕ˉʫʻ˃ʤˀ

ʿʽʪʤ˃ʽˉʰʯʤˀʫʧʰˁ˃ˀʰˀʤʻʤʪʫʵʻʽˁ˃
ʿ̨̧̬̖̥̖̯̦̬̯̖̖̔̌̌̍͗ ˀ̨̡̛̛̛̛̖̭̯̬̬̦̖̪̹̯̣̱̱̣̦̭̐̌̌̌̌̌̌̍̚̚̚
ʿ̨̨̛̛̬̬̯̖̯̦̖̠̦̭̯̌̔ͬ
̵̴̨̛̛̣̦̪̬̦̹̬̐̌̏̌̔̌̌͗ ϳϭ͘ϭϮͲʰ̵̸̨̨̨̨̨̡̨̨̧̛̛̦̙̖̦̖̬̭̯̭̦̖̪̬̦̯̖̦̭̖̯̱̖̏̐̏̌̏̏̌̚

ʪ̨̨̛̛̬̱̖̠̦̭̯̐̔̏
ʻ̖̥̌
̨̨̛̦̯̬̖̹̦̯̪̬̥̖̯̏̌͗
ʫ̨̛̛̛̛̖̦̯̬̦̖̠̦̭̯̏̔̌̔
̨̨̨̛̦̬̖̹̦̯̏̌̔̏ ʰ̥̌
̨̪̬̥̖̯͗
ʽ̨̨̨̛̛̬̖̦̠͕̣͕̔̍̌̔̏̚
ʻ̖̥̌
̶̶̨̨̛̛̛̣̖̦͕̭̣̭̦̭̯̐̌͗

ʿ̨̡̬̦̪̱̌̏̌̌͗ʿ̨̨̨̡̨̨̨̨̛̛̛̛̬̯̠̬̖̣̖̦̯̥̙̖̭̖̠̪̬̬̏̏̌̌̔̌̌̏̐̏̔̚ˉ̨̛̛̖̦̯̬̣̦̯̬̖̭̯̬̦̌̐̌̌
ˀ̡̛̖̪̱̣̍̌ˁ̖̖̬̦̏̌ʺ̡̨̨̨̡̨̛̖̦̠̬̌̔̌̏̔ϴ̨̨̨̛̖̦̖̦̯̦̪̬̖̥̯̔̌̔̔̌͘

ʥ̨̬̠͗ϬϴϬϵͲϱϬͬϭϱϬϬϮϬϮϰϬϬϱϮϴϭϰ ˁ̯̬̦̌̌ϭ̨̔ϭ
Верификација
Информации за верификација на автентичноста на овој документ се достапни со користење на QR кодот, односно на следниот линк:
https://www.crm.com.mk/ds/validateDocument/40B2ED74E953B8ED4D77654A7EBF3ED963A48337E9FD5E422EB9D95907C3CEEB
Овој документ е официјално потпишан со електронски печат и електронски временски жиг. Автентичноста на печатените копии од овој документ може да биде
електронски верификувана.
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

IP66,

NYY-J 5x10mm

NYY-J 3x1.5mm
5
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

NYY-J
5x1.5mm .
NYY-J 5x1.5mm

NYY-J 5x4mm.

NYY-J 5x4mm

NYY-J 5x2.5mm.

mm

6
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

General part

The electrical project for the fuel storage facility in question has been
prepared in accordance with the positive legal regulations and the graphic
representation of the equipment layout in the specified area. The designed
installations, according to their specification, should meet the technical
requirements for this type of facility. This includes protection of the facility,
all tanks in it, pumps, connections between tanks and all metal parts from
potential differences, sparking and possible short circuits in the installation.
The entire automation for the specified area is located in a freestanding IP66
distribution cabinet, placed on a foundation in the specified area. The supply
cable to it is from the G.R.O. for the entire complex where the specified
storage facility is planned. According to the electrical consumers that are
specified to be installed and their installed power, the supply underground
cable of type NYY-J 5x10mm will be sufficient for the storage facility to
function.
From the Freestanding Distribution Cabinet, 6 separate outlets are
provided, the first outlet for ambient lighting on the island where fuel is
poured into vehicles. The lighting at the island is with an LED reflector that
will be controlled by an automatic day-night photo sensor, and there will also
be the possibility of manual control. This outlet will be powered by a NYY-J
3x1.5mm cable placed in a trench or pulled into an underground corrugated
hose with a cable. The second outlet is with a NYY-J 5x1.5mm signal cable
for fuel gauge no. 1 at transfer pump no. 1. The third outlet is also with a
NYY-J 5x1.5mm signal cable for fuel gauge no. 2 at transfer pump no. 2. The
fourth outlet is for powering the fuel transfer pump no. 1. The same pump
will be powered by a NYY-J 5x4mm cable. The fifth outlet is for powering
the fuel transfer pump no. 2. This pump will be powered by a NYY-J 5x4mm
cable. The sixth outlet is for powering the fuel pump in the vehicles installed
in the device installed on the fuel island. This pump will be powered by a
NYY-J 5x2.5mm cable. All outlets will be protected by fuses and switches
installed in the switch cabinet and controlled by command buttons and rocker
7
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

switches. The entire cabinet will be protected by a 40A AC switch controlled


by a remote trigger and a safety button installed on the switch cabinet door.
The listed cables will be placed in an earthen trench with dimensions of
300x800 mm or pulled into an underground corrugated hose with a cable. Gal
guards or warning tape,, ATTENTION ELECTRIC CABLE,, shall be placed
above the cables or hose.

-
Fe-Zn 30x4mm
mm

W.

Kako zazemjuva~ se koristi FeZn koja se


postavuva vo temelite na objektot na 5 - 10sm vo mr{av
beton.Na temelniot zazemjuva~ se povrzuva KPO i MRO.

8
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

Preodniot otpor na lentata }e bide presmetan spored


slednata formula:

preoden otpor na zazemjuva~ot


specifi~en otpor na zemjata
dlabo~ina na koja e zakopana lentata (m)
nadvore{en dijametar na lentata (m)
dol`ina na lentata (m)

Dokolku pri izvedbata ne se postigne baranata otpornost, toga{


izveduva~ot treba so dopolnitelni sondi so L = 1.5m., F 5/4"
zabieni vo zemjata da se dobie baranata vrednost na otporot.

Sostavil:

dipl.el.ing. Slobodan \orgoski

9
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

PROTECTIVE GROUNDING
The fuel storage facility and fuel transfer pump in vehicles should be
protected by a thorough grounding conductor to which all fuel storage
tanks, all fuel flow meters, fuel transfer pumps as well as the fuel pump in
vehicles on the island with the dispensing device will be connected. The
thorough grounding conductor, which should be made of iron-galvanized
strip Fe-Zn 30x4mm laid in a channel with dimensions of 300x700 mm,

achieve a grounding resistance that should be less than 5W.


For safety and protection against sparking, two potential equalization
cabinets should be installed at both transfer pumps, equipped with
appropriate comb-type switches in the "EX" version and equipped with an
appropriate flat conductor with a clamp for gripping metal parts of the
vehicle that supplies fuel for transfer.
As a grounding conductor, FeZn tape 30x4mm is used, which is placed
in the foundation of the object at 5 - 10 cm in thin concrete. KPO and MRO
are connected to the foundation grounding conductor.

The initial resistance of the belt will be calculated according to the


following formula:

Rl -transmitted resistance to ground ( )


-specific earth resistance ( m)
H-depth at which the lentata is buried (m)
d-outside diameter of lens (m)
l-strip lenght (m)

10
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

If the required resistance is not achieved during the execution, the


contractor should use additional probes with L = 1.5m, F 5/4" driven into the
ground to obtain the required resistance value.

Compiled by:

dipl.el.ing. Slobodan Gjorgoski

11
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

PROEKTNA ZADA^A
Za izvedba na elektri~na instalacija vo sklad za gorivo:

Osnovniot proekt za izvedba na elektri~na instalacija vo sklad za


gorivo da se izraboti vo soglasnost so prifatenite arhitektonsko-
grade`ni osnovi, postojnite propisi i va`e~kite standardi, kako i
najnovite iskustva i preporaki za vakov vid na objekti.

I.OP[TO

Da se predvidat slednite elektri~ni instalacii :

- instalacija za elektri~no osvetlenie ;

- instalacija za elektri~ni priklu~oci ;

II. Elektri~na instalacija za jaka struja

1. Priklu~ok - da se izvede spored elektroenergetskata soglasnost na


,,EVN" Makedonija .

2. Samostoe~ki Razvoden ormar IP66 e izraboten od dva pati dekapiran


~eli~en lim. Razvodniot ormar e se sostaven od tri dela i toa del za
osiguruva~i i sklopki, del za klemi i horizontalen rastavuva~ i del za
{ini i vrski.
Vo delot za {ini se predvideni klemi za zazemjuvawe. Vo ormarot da se
postavi postoqe rastavuva~ so soodvetni no`esti osigura~i od tip NVoo
40A. -

3. Provodnicite - elektri~nata instalacija za osvetlenie i


priklu~nite mesta da se izvedat so provodnik ( NYY-J 3x1.5mm ) polo`eni vo
podzemno korugovano rebrasto crevo so sajla do reflektorot.

12
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

4. Elektri~nata instalacija za osvetlenie da se izvede so provodnik


~ii presek ne smee da bide pomal od 1,5 mm2, a za priklu~nicite so presek
1,5 mm2 , 2,5 mm2 i 4mm2 vo zavisnost od predvidenoto optovaruvawe na sekoj
izvod poedine~no. Napojnite energetski vodovi od glavnata tabla do
pumpite br.1 i br.2 kaj {ahtite br.1 i br.2 za preto~uvawe da se izvede so
provodnik ( NYY-J 5x4mm ) polo`eni vo podzemno korugovano rebrasto crevo
so sajla. Napojnite signalni vodovi od glavnata tabla do pumpite br.1 i br.2
kaj {ahtite br.1 i br.2 za preto~uvawe da se izvede so provodnik ( NYY-J
3x2.5mm ) polo`eni vo podzemno korugovano rebrasto crevo so sajla.
Napojnite signalni vodovi od glavnata tabla do mera~ite za gorivo br.1 i
br.2 kaj {ahtite br.1 i br.2 za preto~uvawe da se izvede so provodnik (
GG/J(GN50) 5x1.5mm ) polo`eni vo podzemno korugovano rebrasto crevo so
sajla. Napojniot energetski vod od glavnata tabla do pumpata za to~ewe na
gorivo na ostrovot za to~ewe na gorivo da se izvede so provodnik ( NYY-J
5x2.5mm ) polo`en vo podzemno korugovano rebrasto crevo so sajla.

5. Prekinuva~i - site prekinuva~i da se postavat na vratata na


Samostojniot Razvoden ormar.

6. Ormar za izedna~uvawe na potencijal - kaj dvete {ahti za


preto~uvawe na gorivo treba da bide opremen so prekinuva~i vo ,,EH,,
izvedba i provodnik so {tipka za povrzuvawe na voziloto koe nosi gorivo
so temelniot zazemjuva~ i izedna~uvawe na potencijalot i eliminirawe na
mo`nosta za pojava na razlika vo potencijalite, napon, iskra, nesakan
po`ar i eksplozija.

7. Za{tita da se predvidi vo se prema energetska soglasnost, a so


vodewe na treti `olto-zelen, odnosno petti `olto-zelen provodnik.

8. Na site sijali~ni mesta da se predvidat soodvetni led reflektori.

Sostavil:

dipl.el.ing. Slobodan \orgoski


13
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

PROJECT ASSIGNMENT

For the execution of the electrical installation in accordance with the fuel:

The basic project for the execution of the electrical installation in the fuel tank
should be made in accordance with the accepted architectural and construction
principles, existing regulations and valid standards, as well as the latest
experiences and recommendations for this type of objects.

I. GENERAL

To foresee the following electrical installations:

- electrical lighting installation;

- installation of electrical connections;

II. Electric installation for strong current

1. The conclusion - to be carried out according to the electric power agreement


of "EVN" Macedonia.

2. IP66 stand-alone distribution cabinet made of two-fold decapitated steel


sheet. The distribution cabinet is made up of three parts, namely the part for
fuses and switches, the part for terminals and the horizontal disconnector, and
the part for wires and cables.
Grounding terminals are provided in the case. In the cabinet, there should be a
switch with suitable fuses of type NVoo 40A. The cabinet should be grounded
with an insulated conductor of yellow-green color that will be connected to the
basic grounder in the measuring point made near the cabinet.

3. Conductors - electrical installation for lighting and connected places to be


performed with a conductor (NYY-J 3x1.5mm ) placed in an underground
corrugated ribbed hose with a cable to the reflector.
14
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

4. The electrical installation for lighting should be carried out with a conductor
with a cross-section of no less than 1.5 mm2, and for trailers with a cross-
section of 1.5 mm2, 2.5 mm2 and 4 mm2 depending on the expected load on
each extract individually. Feed the power lines from the main board to pumps
No. 1 and No. 2 and require No. 1 and No. 2 to be transferred with a conductor
(NYY-J 5x4mm) placed in an underground corrugated ribbed hose with a cable .
Feed the signal lines from the main board to pumps no.1 and no.2 and require
no.1 and no.2 to be transferred with a conductor (NYY-J 3x2.5mm) placed in an
underground corrugated ribbed hose with cable. Feed the signal lines from the
main board to the fuel gauges No. 1 and No. 2 and ask No. 1 and No. 2 for
transfer to be carried out with a conductor (GG/J(GN50) 5x1.5mm) laid
underground corrugated ribbed hose with cable. The power supply line from the
main board to the fuel dispenser pump on the fuel dispenser island should be
carried out with a conductor (NYY-J 5x2.5mm) placed in an underground
corrugated ribbed hose with a cable.

5. Circuit breakers - all circuit breakers are to be placed on the door of the Self-
contained Electrical Cabinet.

6. Closet for individual storage of potential - both fuel storage tanks should be
equipped with a circuit breaker in the "EH" version and a conductor with a button
for connecting the vehicle that carries fuel with the basic grounding and
equalizing the potential and eliminating the possibility of potential difference,
voltage, spark, unwanted fire and explosion.

7. Protection should be provided according to the energy consent, and by


running the third yellow-green, that is, the fifth yellow-green conductor.

8. Adequate led reflectors should be provided at all signal points.

Compiled by:

dipl.el.ing. Slobodan Gjorgoski

15
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

TEHNI^KI OPIS

Za izveduvawe na elektri~ni instalacii i


niskonaponski priklu~ok za sklad za gorivo

Elektri~nite instalacii se izraboteni vo se spored proektnata


programa, arhitektonsko - grade`nite podlogi, raspored na
cisternite, pumpite, {ahtite, ostrovot za preto~uvawe i
konsultacija so Investitorot i posebnite propisi za vakov vid na
instalacii. Elektri~nite instalacii se vo sklad so vodovodnite i
ma{inskite instalacii.

A. JAKOSTRUJNI ELEKTRI^NI INSTALACII

Elektroenergetski priklu~ok

Priklu~uvaweto na objektot na distributivnata elektri~na mre`a


da bide soglasno Re{enieto na elektroenergetska soglasnost so
uslovi za priklu~uvawe na celiot kompleks na distributivnata
elektri~na mre`a izdadena od podru`nicata KEC na EVN - ESM .

Vo proektot napojuvaweto e re{eno od N.N. mre`a vo celiot


kompleks od najbliskiot stolb koj e najblisku do skladot.
Napojuvaweto do Samostojniot Razvoden Ormar e so podzemen kabel (
NYY-J 4h10mm2 ) . Ednovremenoto optovaruvawe na objektot se
opredeluva sprema instaliranata mo}nost i predvideniot
koeficient na ednovremenost za skladot.

16
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

TECHNICAL DESCRIPTION

For the execution of electrical installations i


low voltage fuel tank plug

The electrical installations are made according to the project program, the
architectural - building foundations, the layout of the tanks, pumps, tanks, the
island for storage and consultation with the Investor and the special regulations
for this type of installation. The electrical installations are in accordance with the
plumbing and mechanical installations.

A. HIGH CURRENT ELECTRICAL INSTALLATIONS

Electrical plug

The connection of the facility to the distribution electric network must be in


accordance with the decision of the electric power agreement with the
conditions for connection of the entire complex of the distribution electric
network issued by the KEC branch of EVN - ESM.

This project was decided by N.N. the network in the entire complex from the
nearest pillar that is closest to the warehouse. The power supply to the
Independent Switchboard is with an underground cable (NYY-J 4h10mm2). The
simultaneous loading of the object is determined by the installed capacity and
the predicted coefficient of simultaneity for the warehouse.

17
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

TEHNI^KI USLOVI ZA IZVEDBA NA


ELEKTRI^NA INSTALACIJA

A. JAKOSTRUJNA ELEKTRI^NA INSTALACIJA

1. Tehni~kite merki i uslovi se sostaven del na proektot i kako


takvi se zadol`itelni za izveduva~ot na rabotite.
2. Presmetkata, tehni~kite uslovi i izvedbata na elektri~nata
instalacija e vo soglasnost so va`e~kite pozitivni propisi (MKS
standardi ).
3. Pri postavuvawe na provodnicite za ednofazna ili trifazna
struja vo giblivo plasti~no crevo, site provodnici koi pripa|aat na edno
strujno kolo moraat da bidat postaveni vo ista giblivo crevo.
4. Me|usebnoto povrzuvawe na vodovite treba da se izveduva so
stegalki, spojki so navoj ili zakovnici. Pove}e`ilni bakarni provodnici
so presek pogolem od 6 mm2 i edno`ilni provodnici so presek pogolem od
16 mm2 treba da se vrzuvaat preku kabelski papu~i. Lemeweto na
provodnicite vo instalacijata treba da se izbegnuva.
5. Vrzuvaweto i prodol`uvaweto na provodnicite smee da se vr{i
samo vo razvodnite kutii i ormari.
6. Paralelno vodewe na elektri~nite vodovi so oxaci treba da se
izbegnuva, a dokolku toa ne e mo`no, vodovite treba da se postavat na okolu
20 sm. rastojanie od oxacite.
7. Pri vkrstuvawe na elektri~nite provodnici so oxaci, neophodno e
da se postavi izolacija.
8. Pri paralelno vodewe na izolirani elektri~ni vodovi za jaka
struja so gasni, pari, toplinski i vodovodni cevki, pome|u izolacionite
vodovi na jaka struja i cevkite mora da se zapazi minimalno rastojanie od 5
sm. i da se postavi toplinska izolacija.
9. Vkrstuvawe i paralelno vodewe na provodnici od telefonska
instalacija i provodnici od jaka struja, treba da e pod prav agol i
18
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

rastojanieto me|u ednite i drugite vodovi mora da iznesuva najmalku 10sm.,


a kade toa ne e mo`no treba da se postavi izolaciona podlo{ka od 3mm.
debelina.
10. Ako horizontalno paralelno se polagaat vodovi na jaka struja,
telefon i slaba struja odnosno mal napon, najprvo se polo`uvaat vodovite
za jaka struja na rastojanie 30 sm. od tavanot, 10 sm. nad niv signalnite i 10
sm. nad niv telefonskite vodovi. Vo sekoj slu~aj vodovite za telefon
moraat da bidat na rastojanie od najmalku 20 sm. od energetskite vodovi.
11. Razvodnite kutii da se postavat pod agol od 45 stepeni.
Provodnicite za slaba struja treba da bidat postaveni vo posebni cevki so
posebni razvodni kutii, taka {to napolno da bidat odvoeni od
provodnicite na jaka struja.
12. Pri premin niz pregraden yid pome|u vla`na i suva prostorija,
giblivoto crevo treba da bide postaveno taka {to vo nivnite otvori da ne
se sobira voda. Crevata treba da se od materijal koj e otporen na vlaga ili
da se da se postavat taka da imaat pad kon vla`nata prostorija. Istoto toa
va`i i pri polagawe na creva niz nadvore}en yid na zgradata so pad na
crevata kon nadvor.
13. Pri preo|awe niz pregraden yid pome|u vla`na i suva prostorija,
vodovite za vla`ni prostorii mora da zavr{uvaat vo suva prostorija, so
rpibor namenet za vla`ni prostorii.
14. Pri preo|awe niz yid na vodovite sli~ni na kabel bez za{titna
lenta ( GOT ili PGO ) tie mora da se za{titat so giblivo crevo. Se
prepora~uva kraevite na crevoto da ne izleguvaat nadvor od yidot, tuku da
se zavr{at vo yid, a otvorite na yidot da se zaoblat so lesen malter.
15. Pricvrstuvaweto na vodovite sli~ni na kabel so pomo{ na
opfatnici mora da se vr{i na najgolemo rastojanie od 30 sm. za preseci na
vodovite zaklu~no do 1,5 mm2, do 40 sm. za vodovi so presek od 1,5 mm2 do 4
mm2, do 50 sm. za vodovi so presek od 4 do 10 mm2.
16. Giblivite creva od site vodovi treba da se polagaat po prava
linija i toa samo vertikalno i horizontalno. Koso polagawe mo`e da se
vr{i samo vo isklu~itelni slu~ai. Pri horizontalno polagawe crevata
mora da imaat mal pad kon kutiite, za da ne se sobira ili zadr`uva voda vo
crevata.
17. Giblivite creva mo`at da se polagaat na yidovi i pred
malterisuvaweto ako se yidovite suvi.

19
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

18. Za prethodno pricvrstuvawe na giblivite creva mo`e da se


upotrebi gips, ako se crevata polo`eni vo postojano suva prostorija. Vo
prostoriite koi se povremeno vla`ni, za prethodno pricvrstuvawe na
crevata ne treba da se upotrebuva gips, tuku cementen malter ili kuki.
19. Horizontalno polagawe na vodovite na viso~ina pomala od 2 m.
treba da se izbegnuva, a vo slu~aj toa da ne e mo`no da se izbegne, da se
izvede za{tita od mehani~ko o{tetuvawe na vodovite.
20. Giblivite creva moraat da imaat dovolen dijametar za lesno
vovlekuvawe na provodnicite. Postavuvaweto na provodnicite vo cevkite
mora da bide izvedeno taka {to provodnicite bez te{kotii da mo`at da se
izvlekuvaat i i vovlekuvaat. Izoliranite vodovi smeat da se vovlekuvaat
vo giblivite creva posle su{eweto na malterot.
21. Na site kraevi na crevata moraat da se postavat posebni uvodnici
kako bi se onevozmo`ilo o{tetuvawe na izolacijata.
22. Provodnici PP/R izolirani so termoplasti~na masa mo`at
neposredno da se polagaat vo malter ako so postojnite propisi odgovaraat
za takvo polagawe.
23. Ovie vodovi se polagaat samo horizontalno ili vertikalno. Koso
polagawe ne e dozvoleno.
24. Po celata dol`ina na ovie vodovi treba da bidat pokrieni so
malter najmalku 6 mm. osven vodovi koi se polagaat vo {uplini vo tavanot i
yidovite koi se izraboteni od beton, kamen ili sli~en materijal koj ne
gori i ne pomaga gorewe.
25. Postavuvaweto na kutii da se vr{i po pravilo najmnogu na sekoi
6m. Spojnite kutii moraat da se postavat taka {to }e bide ovozmo`eno
lesno vovlekuvawe i izvlekuvawe na provodnicite. Pome|u dve kutii po
pravilo ne smee da ima pove}e od dve kolena ili krivini.
26. Niz ista kutija smeat da se polagaat provodnici od razli~ni
strujni kola.
27. Site razvodni kutii moraat da bidat propisno zatvoreni i
mehani~ki za{titeni.
28. Razvodnite tabli da se postavat taka {to gorniot rab da bide
povisok od 1,8m.
29. Prekinuva~ite mora da se postavat na faznite provodnici.
30. Site prekinuva~i po pravilo se postavuvaat na (1-1,5)m. od podot vo
suvi prostorii, dodeka vo vla`ni prostorii moraat da se postavat
soodvetni prekinuva~i za vla`ni prostorii ili nadvor od prostorijata.
20
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

31. [uko priklu~nicite se postavuvaat na visina po `elba, ne pomala


od 30 sm. (0.3 - 0.6) m. vo kancelarii, ( 0,8 - 1,2 ) m. vo ostanatite prostorii
osven vo prostorii kade prestojuvaat deca ( gradinki i sl.) .Tamu
priklu~nicite treba da se postavuvaat na visina od podot od 1,8m. ili da
bidat za{titeni so za{titen poklopec od vnatre.
32. Vo vla`ni prostorii ( kapatila vo stanovi ) mo`e da se postavat
{uko priklu~nici no so za{titen poklopec itoa na visina od ( 1,5 - 1,7 )m.
od podot.
33. Site potro{uva~i vo bawite nu`no e da se priklu~at na posebni
strujni kola.
34. Vertikalno polo`eni vodovi vo bawite treba da bidat so
minimalno rastojanie od 60 sm. od kadata, a horizontalno na rastojanie od
1m. nad gorniot rab na kadata osven za potro{uva~i so direkten priklu~ok
kako {to e bojler za koi toa rastojanie mo`e da bide i pomalo.
35. Site svetilki vo bawite moraat da bidat za{titeni od voda
odnosno vlaga.
36. Site elektri~ni potro{uva~i i uredi koi vo slu~aj na dopir mo`e
da dojdat do pogolem napon, ako ima gre{ka vo instalacijata, potrebno e da
bidat za{titeni.
37. Vo bawite ili drugi vla`ni prostorii, site metalni delovi kako
{to se: kada, ~e{ma, odvodna metalna cevka, mesingana vodovodna cevka,
gasni cevki ili centralno greewe, a ne pripa|aat vo elektri~nata
instalacija, treba da bidat galvanski povrzani za za{titniot vod i toa
mesto treba da se ozna~i.
38. Nultiot vod ne smee da bide osiguruvan so osiguruva~ nitu da se
vodi kon prekinuva~. Negoviot otpor od razvodnata tabla do
najoddale~enoto mesto vo objektot ne smee da bide pogolem od 0,2W
39. Po zavr{enata rabota na elektri~nite instalacii, zadol`itelno
treba da se izmeri otporot na nultiot vod i toa so izvadeni osigura~i so
cel da se izvr{i ednovremena kontrola na ispravnost na vrskite.
40. Posle izveduvaweto na elektri~nite instalacii mora da se izvr{i
merewe na otporot na izolacija koj treba da iznesuva minimum 1000 W za
sekoj volt od nominalniot napon za sekoj meren del.
41. Mereweto na izolacijata se vr{i pome|u dva provodnici kako i
me|u provodnikot i zemjata. Pri mereweto treba da bidat isklu~eni site
potro{uva~i, a site sklopki - prekinuva~i da bidat vklu~eni.

21
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

42. Izveduva~ot e dol`en pred po~nuvaweto na izveduvaweto na


rabotite da go prou~i proektot. Dokolku ima nekoi nejasni raboti treba
da bara pojasnuvawe na proektantot.
43. Elektri~nata instalacija od razvodnata tabla do
elektromotornite i drugite potro{uva~i }e mo`e da se izvede koga }e bide
to~no poznato mestoto na priklu~ok na istite.
44. Vo proektot ne smeat da se izvr{at nikakvi izmeni bez prethodna
soglasnost na proektantot odnosno nadle`niot organ, a za pogolema izmena
potrebna e soglasnost i od revizionata komisija koja go odobrila proektot.
45. Pred pu{tawe na instalacijata vo upotreba ili pri revizija,
potrebno e da se proveri dali instalacijata e izvedena sprema ovoj proekt
i MKS propisite za vakov vid na rabota.

TECHNICAL CONDITIONS FOR PERFORMANCE OF ELECTRICAL


INSTALLATION

A. HIGH CURRENT ELECTRICAL INSTALLATION

1. Technical measures and conditions are an integral part of the project and as
such are mandatory for the performance of the work.
2. The calculations, technical conditions and execution of the electrical
installation are in accordance with the valid positive regulations (MKS
standards).
3. When placing the conductors for single-phase or three-phase current in a
flexible plastic hose, all conductors belonging to one circuit must be placed in
the same flexible hose.
4. The interconnection of the wires should be done with clamps, threaded
connectors or rivets. Multi-core copper conductors with a cross-section greater
than 6 mm2 and single-core conductors with a cross-section greater than 16
mm2 should be connected via cable lugs. The soldering of the conductors in the
installation should be avoided.
5. Connecting and extending the conductors may only be done in distribution
boxes and cabinets.
6. Parallel running of the electric lines with the poles should be avoided, and if
this is not possible, the lines should be placed at about 20 cm. distance from
chimneys.
22
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

7. When crossing electrical conductors with wires, it is necessary to install


insulation.
8. When running insulated electric lines for high current in parallel with gas,
steam, heat and water pipes, a minimum distance of 5 cm must be observed
between the insulated lines of high current and the pipes. and to set up thermal
insulation.
9. The crossing and parallel running of the conductors from the telephone
installation and the conductors of high current should be at a right angle and the
distance between one and the other conductors must be at least 10 cm, and
where this is not possible it should be put an insulating pad od 3mm debelina.
10. If lines of high current, telephone and low current or low voltage are laid
horizontally in parallel, the lines for high current are laid first at a distance of 30
cm. from the ceiling, 10 cm. above them signals and 10 cm. telephone lines
above them. In any case, the telephone lines must be at a distance of at least
20 cm. from energy lines.
11. Razvodnite boxes to be placed under an angle of 45 degrees. Conductors
for weak current should be placed in special pipes with special distribution
boxes, so that they are completely separated from conductors of high current.
12. When moving down partitions between wet and dry rooms, the hose should
be placed in such a way that water does not collect in the openings. The bed
should be made of a material that is resistant to moisture or it should be placed
so that you have a fall towards the wet room. The same applies when laying the
hoses down the roof of the building with the hose falling outside.
13. When passing through a partition between a wet and dry room, the pipes for
wet rooms must end in a dry room, with a fitting intended for wet rooms.
14. When connecting cables similar to cables without protective tape (GOT or
PGO), they must be protected with a flexible hose. It is recommended that the
ends of the hose do not extend beyond the wall, but that it ends in the wall, and
open on the wall to be surrounded with light plaster.
15. The connection of the cables similar to the cable with the help of the
compasses must be done at a maximum distance of 30 cm. for cutting closed
wires up to 1.5 mm2, up to 40 cm. for pipes with a cross section of 1.5 mm2 to 4
mm2, up to 50 cm. for pipes with a cross section of 4 to 10 mm2.
16. Hoses from all lines should be laid in a straight line and only vertically and
horizontally. Slanting can only be done in exceptional cases. When laying the
crevasses horizontally, they must have a slight slope to the boxes, so that water
does not collect or remain in the crevasses.
23
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

17. Flexible hoses can be laid on walls and before plastering if they are dry.
18. Gypsum can be used for pre-attachment of flexible hoses, if the hose is
placed in a permanently dry room. In rooms that are occasionally wet, plaster
should not be used for pre-fastening the hoses, but cement mortar or hooks.
19. Horizontal laying of water pipes at a height of less than 2 m. it should be
avoided, and in case it is not possible to avoid, to carry out protection against
mechanical damage to the lines.
20. Flexible hoses must have a sufficient diameter for easy pulling of the
conductors. The placement of the conductors in the pipes must be done in such
a way that the conductors can be pulled out and pulled out without difficulty. The
insulated lines may be pulled into the hoses after the plaster has dried.
21. At all ends of the hoses, special guides must be placed in order to prevent
damage to the insulation.
22. PP/R conductors insulated with thermoplastic mass can be directly laid in
mortar if they are suitable for such laying according to existing regulations.
23. These lines are laid only horizontally or vertically. Slanting is not allowed
24. The entire length of these lines should be covered with mortar at least 6 mm.
except for the lines that are laid in the plane of the ceiling and the pipes that are
made of concrete, stone or similar material that does not burn and does not help
burning.
25. The placement of the box should be done according to the rule at least
every 6m. The junction boxes must be placed in such a way that easy pulling
and pulling of the conductors is possible. As a rule, there must not be more than
two corners or curves between two boxes.
26. Conductors from different electrical circuits may be placed under the same
box.
27. Site distribution boxes must be properly closed and mechanically protected.
28. Separate the boards so that they are placed so that the upper part is higher
than 1.8m.
29. Circuit breakers must be placed on the phase conductors.
30. Site breaks are usually set at (1-1.5)m. from the floor in dry rooms, while in
wet rooms, appropriate breakers for wet rooms or outside the premises must be
installed.
31. Connections are placed at a height of one cubit, not less than 30 cm. (0.3 -
0.6) m. in the office, (0.8 - 1.2) m. in the rest of the premises, except for the
premises where children are present (kindergartens, etc.). There, the shelters

24
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

should be placed at a height of 1.8m from the floor. or to be protected with a


protected cover from the inside.
32. In wet areas (bathrooms in apartments) it is possible to install the hood with
a protective cover at a height of (1.5 - 1.7) m. from podot.
33. It is necessary for all consumers to be connected to special electrical
circuits.
34. Vertical lines in the pipes should be at a minimum distance of 60 cm. from
the bathtub, and a horizontal distance of 1m. above the upper edge of the boiler,
except for consumers with a direct connection, as it is a boiler, for which
distance can be a little.
35. All lamps you bring must be protected from water or moisture.
36. All electrical consumers and devices that in case of contact can reach a
higher voltage, if there is an error in the installation, it is necessary to be
protected.
37. In bathrooms or other wet areas, all metal parts such as: tub, shower, metal
drainage pipe, brass water pipe, gas pipes or central heating, which do not
belong to the electrical installation , should be galvanically connected to the
protective line and that place should be marked.
38. The zero line must not be secured by securing or be connected by
disconnection. Its resistance from the distribution board to the farthest place in
the object must not be greater than 0.2W
39. After completing the work on the electrical installations, the resistance of the
neutral wire must be measured with the fuses removed in order to
simultaneously check the correctness of the connections.
40. After the execution of the electrical installations, the insulation resistance
must be measured, which should amount to a minimum of 1000 W for each volt
of the nominal voltage for each measured part.
41. The measurement of the insulation is carried out between the two
conductors as well as the ground. When measuring, all consumers should be
turned off, and all circuits - breakers should be turned on.
42. The contractor is obliged to study the project before starting the work. If
there are any unclear things, the designer should ask for clarification.
43. The electrical installation from the distribution board to the electric motors
and other consumers will be able to be carried out when the exact location of
their connection is known.

25
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

44. No changes may be made in the project without the prior consent of the
designer or the competent authority, and for major changes, the consent of the
revision commission that approved the project is also required.
45. Before putting the installation into use or during revision, it is necessary to
check whether the installation has been carried out according to this project and
the MKS regulations for this type of work.

Compiled by:

dipl.el.ing. Slobodan Gjorgoski

26
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

ELEKTRI^NA PRESMETKA

Za izveduvawe na elektri~ni instalacii i


niskonaponski priklu~ok za sklad za gorivo
1. Odreduvawe na instalirana i ednovremena mo}nost na S.R.O.
Ednovremeni potro{uva~i vo prostorot na skladot za gorivo I pumpata za
to~ewe na gorivo:

Osvetlenie 0.1 kW

Trifazni priklu~oci 16.5 kW


---------------------------
Pin.= 16.6 kW

Pin.= 16.6 kW
n = 0,8 faktor na ednovremenost
Ped.= 13.28 kW

2. Proverka na padot na naponot od MRO do S.R.O.


Ednovremena mo}nost Ped.= 13.28 kW

Faktor na mo}nost cos

Napon U = 380 V

L = 50 m.

S = 10 mm2

K = 56 ( Sm/mm2 )

U % = ( n * Pin. * L * 105 )/ K * S * U2 * cos

27
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

3. Proverka na padot na naponot od S.R.O. do trifazen


potro{uva~ - pumpa za preto~uvawe
Ednovremena mo}nost Ped.= 7.5 kW

Faktor na mo}nost cos

Napon U = 380 V

L = 40 m.

S = 4 mm2

K = 56 ( Sm/mm2 )

U % = ( n * Pin. * L * 105 )/ K * S * U2 * cos

4. Vkupniot pad na napon od M.R.O. do trifazen potro{uva~

U % = 1.03% + 1.16% = 2,19% < 5%

Spored ova , presmetkite vo potpolnost zadovoluvaat.

5. Ednovremena struja od N.N. priklu~ok do S.R.O. na skladot,


odreduvawe na glavni osigura~i i tip na dovoden kabel.

Ied. = Ped.vk. * 103 / 1/73 * U * cos 25.25 A

Izbirame glavni osigura~i, NVoo 40A i

Usvojuvame napoen kabel NYY-J 5x10 mm2

Spored ova , presmetkite vo potpolnost zadovoluvaat

Sostavil :

dipl.el.in`. Slobodan \orgoski

-------------------------------

28
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

ELECTRICAL CALCULATION

For the execution of electrical installations and


low voltage fuel tank plug

1. Determining the installed and simultaneous capacity of the S.R.O.

Current consumption in the space of the fuel warehouse and the fuel filling
station:

Lighting 0.1 kW

Three-phase connections 16.5 kW


---------------------------
Pin.= 16.6 kW

Pin.= 16.6 kW
n = 0,8 simultaneity factor
Ped.= 13.28 kW

3. Checking the voltage drop from MRO to S.R.O.

Simultaneous power Ped.= 13.28 kW

Power factor cos

Voltage U = 380 V

L = 50 m.

S = 10 mm2

K = 56 ( Sm/mm2 )

U % = ( n * Pin. * L * 105 )/ K * S * U2 * cos

4. The total voltage drop from M.R.O. to three-phase consumer

U % = 1.03% + 1.16% = 2,19% < 5%

According to this, the calculations fully satisfy


29
-
Preparation of project documentation for construction of a temporary settlement
PRILEP, needed for motorway A3 PRILEP BITOLA construction

5. Current current from N.N. attachment to S.R.O. in stock, determining the main fuse
and the type of cable supplied.
Ied. = Ped.vk. * 103 / 1/73 * U * cos 25.25 A

We choose main fuses, NVoo 40A and

We adopt a power cable NYY-J 5x10 mm2

According to this, the calculations fully satisfy

Compiled by:

dipl.el.ing. Slobodan Gjorgoski

30
GENIKO

PREDMER
elektri~na instalacija

red koli- edin.


OPIS mera VKUPNO
br. ~ina cena
A. ELEKTRI^NA INSTALACIJA/ ELECTRICAL INSTALLATION
Isporaka и монта`а na plasti~no dvoslojno
1 crevo F50 , 450N/Delivery and installation on
plastic double-layer hose F50, 450N m 200 100 20000
Isporaka и монта`а na S.S. razvoden ormar
od dva pati dekapiran lim so debelina 2mm
komplet so {ini za razvod, nula i
zazemjuvawe 800х600х300 (В х Ш х Д)
2 IP66/Delivery and installation on S.S. distribution
cabinet made of two-fold pickled sheet metal with
a thickness of 2 mm, a set of cables for
distribution, zero and grounding 800x600x300 (H
x W x L) IP66 par 1 27500 27500
Isporaka na 1 postoqe rastavuva~ za
no`asti osigura~i i 1 komplet so 3 no`asti
3 osigura~i NV oo 32A секое постоље/Delivery on 1
base, disconnector for blade fuses and 1 set with 3 blade
fuses NV oo 32A each base par 1 12000 12000
Isporaka и монта`а na avtomatski
4 osigura~i/Delivery and installation of circuit
breakers par 0
10A 3r S 1 1000 1000
25A 3r S 2 1200 2400
6A 3 400 1200
Isporaka и монта`а na diferencijalni AS
sklopka 40A komplet so dale~inski
5 okinuva~ i taster STOP/Delivery and
installation of differential AS switch 40A complete
with remote trigger and STOP button par 1 16500
Isporaka и монта`а na pocinkuvana lenta
6 Fe-Zn 30x4 mm/Delivery and installation of
galvanized strip Fe-Zn 30x4 mm kg 150 300 45000

Isporaka и монта`а na vkrsna pocinkuvana


7
plo~ka Fe-Zn 60x60mm/Delivery and installation
of cross galvanized plate Fe-Zn 60x60mm par 10 480 4800
Isporaka и монта`а na sonda za
zazemjuvawe f 5/4" L=1500mm комплет со
8 шелна/Delivery and installation of earthing probe
f 5/4" L=1500mm complete with clamp par 3 1500 4500
GENIKO

Isporaka i monta`a na лицнаст проводник


9 P/F 25mm / P/F 25mm conductor for installation
and installation м 20 260 5200
Isporaka i monta`a na кабел папуча на
10 штрафење Сu 25/8 / Delivery and installation of
screw-on cable lugs Cu 25/8 par 20 150 3000
Isporaka и монта`а na Gal {titnik / Delivery and
11
installation of Gal Shield par 150 35 5250
Isporaka и монта`а na lenta za predupreduvawe
,, VNIMANIE ELEKTRI^EN KABEL,, / Delivery and
12
installation of warning tape "ATTENTION
ELECTRICAL CABLE" kg 8 350 2800
Isporaka и монта`а na grebenasti prekinuva~
13 GS 10- 10U / Delivery and installation of the GS 10-
10U cam switch par 3 780 2340
Isporaka и монта`а na led reflektor
14 100W, IP65 / Delivery and installation of LED
spotlight 100W, IP65 пар 1 1800 1800
Isporaka и монта`а na ситен монтажен
материјал за во ормар ( проводници, туљаци,
шина за елементи, перфориран пласти~ен
канал, VS клеми и собирници за нула и земја) /
15
Delivery and installation of small assembly
materials for the cabinet (conductors, sleeves,
element rail, perforated plastic channel, VS
terminals and busbars for neutral and ground) пауш 14000 14000
Isporaka и монта`а na две ормарчиња за
изедначување на потенцијал, комплет со
проводник, штипка и гребенаста склопка во
16 ,,ЕХ,, изведба / Delivery and installation of two
potential equalization cabinets, complete with
conductor, clamp and comb-type switch in "EX"
version par 2 44000 88000
Isporaka i monta`a na kabli so slednite
17 dimenzii: / Delivery and installation of cables
with the following dimensions: m' 0
NYY-J 5x10mm m 100 510 51000
NYY-J 5x4mm m 100 270 27000
NYY-J 5x2,5mm m' 50 140 7000
NYY-J 5x1,5mm m' 150 85 12750
NYY-J 3x1,5mm m 70 60 4200
VKUPNO:

Sostavil:
dipl.el.in`.Slobodan \orgoski