3D Sketch
3D Sketch
NORTH
B
12,60
H10.1
6,55 4,00 2,05
4,00
183-St DN150
3,20 1,40
F1.2
F1.3
20
90
184-St DN150
FLOOR +235,400
+235,400
DRAIN
1,90
C C
183-St DN150
H12.1 183-St DN100 183-St DN100 0,77%
2,45
0,9%
H12.2 184-St DN100 184-St DN100 HEAT EXCHANGER
(WEIGHT 2000 kg)
3,50
+235,400
H11.2 184-St DN100 184-St DN100
184-St DN150
SUPPLY AND RETURN WATER H1.1 183-St DN100 183-St DN100
TO CHP 1 UND CHP 2 (20)
F1.1
H1.2 184-St DN100 +235,200 STRUCTURE 55 FUEL TANK - 45m³
184-St DN100 HYDRAULIC DISTRIBUTOR
2,40
EAST
Sko-2-W-52-701 Sko-2-W-52-701
7,60
7,20
Y3,50 A
18
4 -S
H2.1 183-St DN100 183-St DN100
tD
BOILER
N1
50
(WEIGHT 6500 kg)
H2.2 184-St DN100 184-St DN100
18
F2.2 F2.1
3 -S
tD
N1
25
3,50
WATER TREATMENT
F2.3
0,75%
2,90
184-St DN100
183-St DN100
183-St DN100
184-St DN100
184-St DN80
183-St DN80
183-St DN80
184-St DN80
183-St DN80
184-St DN80
184-St DN50
183-St DN80
184-St DN80
184-St DN50
184-St DN50
183-St DN50
A +235,400
D
183-St DN100
184-St DN100
183-St DN100
184-St DN80
183-St DN80
184-St DN80
183-St DN80
184-St DN80
183-St DN80
184-St DN80
183-St DN80
184-St DN50
183-St DN50
MEDIUM / FLUID SS = STAINLESS STEEL
St = STEEL
MATERIAL
EXHAUST CHIMNEY PE = POLYETHYLENE
NOMINAL SIZE / OUTER DIAMETER x WALL THICKNESS GRP = GLASS FIBRE REINFORCED PLASTIC
H3.2
H3.1
H4.2
H4.1
H8.2
H8.1
H5.2
H5.1
H6.2
H6.1
H7.2
H7.1
H9.2
H9.1
SUPPLY AND RETURN WATER OPTIONAL: ADDITIONAL INFORMATION PVC = POLYVINYL CHLORIDE
TO DIGESTER 1 AND 2 (18) E.G. PRESSURE NOMINAL, STANDARD DIMENSION RATIO, ...
100-PE100 Ø110x6,6 SDR17
EXAMPLES:
300-SS DN200 PN10
190-St DN200 PN10
190-GRP DN800 PN6
B 191-PVC DN100 PN6
20 12,20 20
12,60
5,50 6,50
LEGEND
HATCH = MATERIAL DIMENSION / ANNOTATION
X0,00 X5,50 X12,00
REINFORCED CONCRETE
1,00 50 ARCHITECTURAL DIMENSION IN METER AND CENTIMETER
INSULATION HARD
Y0,00
BUILDING AXIS
ASPHALT
X0,00
EXISTING GROUND
Sko-2-W-52-701
PLANNING NOTE :
• ALL NECESSARY PLANNING FOR THE TRADES WITH REGARDS TO COLLISIONS AND PROFESSIONAL EXECUTION IS
40
Y7,00 TO BE EXAMINED - OR POSSIBLY ADAPTED OR AMENDED - BY THE PLANNING OFFICE AND THE CONTRACTORS
WITHIN THE FRAMEWORK OF THEIR CONSTRUCTION DOCUMENTATION.
• ALL WALL, COLUMN AND CEILING THICKNESSES MUST BE STATICALLY CHECKED PRIOR TO CONSTRUCTION.
C C
20 2,30 20
1 : 50
3,50
0 0,5m 2,5m 5m
20
FUEL OIL PUMP STRUCTURE 55 FUEL TANK - 45m³ 1 KF EK 03.06.2024 OIL PUMP CHAMBER, HYDRAULIC DISTRIBUTOR AND BOILER POSITION UPDATED, PIPING ADDED
2 KF EK 22.08.2024 HEAT EXCHANGER AND ELECTRO CABINETS ADDED, PIPES 13.1 UND 13.2 DELETED, BUILDING ENLARGED
Revision / Drawn / Графичка Approved /
WEST
EAST
Date / Датум: Remark / Забелешка:
Sko-2-W-52-701 Sko-2-W-52-701 Ревизија: обработка: Одобрил:
7,60
6,80
3,20
3,60
20
BP / SCB / MSZ
Y0,00 Responsible Designer / Одговорен проектант:
40
NI / ID / EK / DD
Draftsman / Графичка обработка:
AP
Subcontractor / Подизведувач: Approved / Одобрил: Date / Датум:
Sko-2-W-52-701
Designer / Проектант: Project manager / Раководител на проектот:
Reviewer / Ревидент:
X0,00 X5,50 X12,00
SCALE 1 : 50 09/2023
Scale / Размер:
1 : 50
Project type / Тип на проект: Design area / Фаза на проектирање: Sheet size / Drawing No. / Цртеж бр: Revision / Ревизија:
Димензии:
Osnoven Proekt Guiding Design
A0 (841x1189) Sko-2-W-52-001 2
Основен проект