0% found this document useful (0 votes)
7 views1 page

108 BLDG Roof Parapet

Uploaded by

deepuVNIT
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

108 BLDG Roof Parapet

Uploaded by

deepuVNIT
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LP

Asphalt Road
EP

LP
Road EP

LP

Entrance Entrance

Water Channels
Omantel Manhole

Safety Pipe line Safety Pipe line


Manhole

P3 132 KV High Voltage cable Line TOP EL


E:816904.570
N:1874963.204
ELV:17.094 BOP
EL
E:816904.570
N:1874963.204
EP BOX
EP EP
P2
ELV:15.864 EP EP

Manhole Sewage
Manhole

Entrance NEC-1
E:816932.940
N:1874971.961
ELV:19.645
Water
Tank
Office
Pipe

Track
Sewage holding tank

Fire facilities
消防设施
1F 2F P1
餐厅
Dining 办公室 Manhole Sewage

Office

Water-treatment equipment
Substation

水处理设施
EP

1F
1-3TM5 1-3TM6 1-1TM5
EP

1-1TM6

蓄水池
Cistern
Pipe
消防回车场
12MX12M

1F 1F
办公室 办公室
Office Office 2-1TM3 2-1TM4 2-3TM3 2-3TM4
1-3TM3 1-3TM4 1-1TM3 1-1TM4

1F运维办公室

Sewage holding tank


Office A

Overhead Transmission Line


1-3TM1 1-3TM2 1-1TM1 1-1TM2 2-1TM1 2-1TM2 2-3TM1 2-3TM2
k
ac
Tr

A
1-3# 1-1# 2-1# 2-3#

PLANT

Entrance
Entrance

B A
1-4# 1-2# 2-2#

Sewage holding tank


1F 1F

UTM
运维办公室 B 仓库 B-1

NORTH
Office B Warehouse B-1
k
Trac Manhole Sewage EP

Pipe
1F 1F 2-2TM1 2-2TM2
1-4TM1 1-4TM2 1-2TM1 1-2TM2 仓库 B-2

132 KV High Voltage cable Line


蓄水池、水泵
Warehouse B-2 Cistern & water pump
空地
Space
消防设施 水处理设施
Water-treatment 2-2TM3 2-2TM4
Fire facilities equipment
BOX: 48unit 1-4TM3 1-4TM4 1-2TM3 1-2TM4
BOX:39unit
P: About 100MW P: About 55MW

Pipe
1-4TM5 1-4TM6 1-2TM5 1-2TM6

Area: About 100,000㎡ 2-2TM5 Area: About 50,000㎡


NEC-2
E:816867.840
N:1874765.196
ELV:20.645

P6 P7

EP

Com

Line
pou

sion
nd
Wal

smis
l EP

d Tran
k
Trac

rhea
Ove
EP

Manhole Sewage

P5

Pipe
P4
Plot Boundary

P8

P10

EP

P9

B
PP-01 PP-02 PP-03 PP-04 PP-05

PP-06
PP-18
PP-17

PP-07
PP-08
PP-16

A A

MUSCAT ENGiNEERING CONSULTANCY LLC

PP-09
PP-15

Salalah 200MW Data Center Project

PRECAST CONTRACTOR:
SHAMS ENGINEERING & TRADING LLC.
(Precast Division)
P.O.Box: 65 ; P.C: 121
Plot # 50 , Al Khalili Building
Barka, Sultanate of Oman,
GSM: +968 97424200

PP-14 PP-13 PP-12 PP-11 PP-10 Email: [email protected] , [email protected]


Website: www.setoman.com

Lamasat Experience LLC, P.O.Box: 2358, P.C:


112, Bowsher, Sultanate of Oman, Tel: +968
SPECIALIZED IN BUILDING SYSTEMS 24902822; GSM: +968 97424200

B Salalah 200MW Data Center Project

ROOF PARAPET LAYOUT


ROOF PARAPET LAYOUT

EGN-SLL-STR-DWG- 108 A1