TSSR YDE093 - Ekounou - IHS Remplir Un Formulaire D'accès

ce document explique la procédure pour pouvoir remplir un formulaire d'accès sur site afin de pouvoir travailler

Uploaded by

Leonel Ossou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views49 pages

TSSR YDE093 - Ekounou - IHS Remplir Un Formulaire D'accès

ce document explique la procédure pour pouvoir remplir un formulaire d'accès sur site afin de pouvoir travailler

Uploaded by

Leonel Ossou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 49

TECHNICAL SITE SURVEY REPORT

SRAN Project CAMTEL Cameroon

SITE NAME : YDE093_Ekounou_IHS


SITE ID : YDE093
PROPOSED CONF. : ASOE + AHEGG(3)
DATE OF SURVEY : 2024.02.28

PARTICIPANTS / SURVEY TEAM


NAME COMPANY MOBILE NO
OSSOU Leonel TELEINFRA 656417538

Revision History

Rev Remarks- Date Name


1
2
3
4
5
6

Customer:
YDE093_Ekounou_IHS
© Nokia - All rights reserved.
2 GENERAL INFORMATION

Site Information
Site Name : YDE093_Ekounou_IHS
Site ID : YDE093
Site Address :

ASOE + AHEGG(3) YES


AMIA+ASIB+ABIO+AHEGG( NO
BTS HW conf 6)
ASOE + AREA(1) NO
AMIA + ASIB + ABIO + NO
AHEGG(8) General Site Photo

MW HW confi UBT1 23 Ghz


UBT2
UBT3
router

:
Map Information
Edition : Google Earth
Year Published :

SITE MAP

Geographical Coordinates (WGS 84 Format) (QNG Format)


Latitude : 3.84238
N Y
Longtitude : 11.53421
E X
Ground Level (ASL) : 762 m
Key Information :

Rev. Remarks Date Name Date 28-Feb-24 SITE ID


0. Survey Engineer:
TELEINFRA Site Name: YDE093_Ekounou_Ocm_IHS YDE093
OSSOU Leonel
1 30-Dec-99
CW Engineer:
2 30-Dec-99
Checked:
3

4 GENERAL INFORMATION FILE OWNER


5 ……..
REV : Page:
Site Survey Report
Nokia - Camtel Cameroon 1 3
3 SITE INFORMATION
Type of site:
YES Green Field NO Mobile Shelter NO Rooftop Shelter NO Outdoor Cabinet YES Wall Mount NO
Explain type of Tower:
Tower Manufacturer NA
Lattice Tower YES Monopole NO Wall Mounted NO RoofTop Tower NO

Mast NO Roof Top Monopole NO Other:

Tower height : 38m Crane required Yes/NO


NO

Building height (ground level to top of structure) 0m


Site Sharing information -
Orange Cameroun CAMTEL MTN
Other
Site Access Needed:
NOC IHS 656044446
YES
From Whom:

3.1 Existing ANTENNA MOUNTING AND LAYOUT


All mounting heights are from the ground level to the center of the antenna

EXISTING ANTENNA NPO VALUES Camtel other operator other operator


S1 S2 S3 S4 S1 S2 S3 S3 S4 S1 S2 S3 S4
Antenna Height (m) 19,8 19,8 19,8 37,3/28,8
37,3/28,837,3/28,8 31,3 31,3 31,3
Antenna size (length) 2,6 2,6 2,6 2,27/1,58
2,27/1,582,27/1,58 2,68 2,68 2,68
Azimuth (True Northº) 40 150 300 110/104
200/230 345/340 40 142 333
Remote Electrical Tilt
Mechanical Tilt 1 5 5 4/2 4/2 4/2 0 0 0
Antenna type Triband Triband Triband hex-band
hex-bandhex-band hex-band hex-band hex-band
Antenna model (No) ATR4517R0
ATR4517R0ATR4517R0
RRVV2HH-6533B-R6/T4-90A-R1-V2
RRVV2HH-6533B-R6/T4-90A-R1-V2
RRVV2HH-6533B-R6/T4-90A-R1-V2 5980300G 5980300G 5980300G
Antenna connector type DIN Female
DIN6xFemale
7/16 DIN
6x 7/16
Female 6x 7/16 4.3-104.3-10
FemaleFemale
4.3-10 Female 4.3-10 Female
4.3-10 Female
4.3-10 Female
Combiner (yes/no) no no no no no no no no no

Remarks:

3.2 NEW ANTENNA MOUNTING AND LAYOUT + GPS Detalis


Angola Telecom
All mounting heights are from the ground level to the center of the antenna
Remarks
New ANTENNA NPO VALUES
S1 S2 S3 S4 S5 S6
Antenna Height (m) 27,8 27,8 27,8 Need to check
the space
Azimuth (º) 40 150 300 available to install
a new antenna at
Electrical Tilt 1 5 5 the same ht. of
the existing
Mechanical Tilt antenna.
Antenna (Model No) APXVLL21B_43-C-I20
APXVLL21B_43-C-I20
APXVLL21B_43-C-I20
Antenna type WidebandWideband
X-pol Antenna
Wideband
X-pol Antenna
X-pol Antenna
Option 2: The
nearest possible
space for antenna
Remarks: installation should
also be mentioned

3.3 RF cable details (for new System)


Sec1 Sec2 Sec3 Sec4 Sec5 Sec6 Remarks
3m 3m 3m
RF Jumpers for 1800Mhz,
1
3m 3m 3m
RF Jumpers for 2100Mhz

RET cable length required


3m 3m 3m

3.4 AC/DC Power Cable Distribution Details (for new System)


Remarks/ Comments
AC cable length - AC Breaker 30m 4 x16mm
FPFH - to be used on tower top Yes No

FPFH - Rectifier DC cable, quantity and length - 1 2 35 m

DC cable for AHEGG 1800Mhz FPFH - RFM, the length 20m For all 3 sectors
DC cable for AHEGG 2100Mhz FPFH - RFM, the length 20m For all 3 sectors
DC cable for AREA 1800Mhz FPFH - RFM, the length N.A
Grounding cable for Nokia RAN Equipments, Incl SM (16mm) 50m For all Nokia RAN devices
Grounding cable for Power cabinet Equipments (35mm) 10m
Grounding cable demand (MW) N.A
Grounding cable, if new Bus Bar required at Top of Tower ( Bus bar to Grounding point) 35m Customer Scope

3.5 Fronthaul Cable Details (for new System)


Optic cable for 1800Mhz RFM, the length 50m
Optic cable for 2100Mhz RFM, the length 50m
MW1 IF Eth/Optic cable, the length ….. m
MW1 DC cable, the length ….. m
MW1 size/azimith/height AGL ….. m/…."/…..m
MW2 IF Eth/Optic cable, the length ….. m
MW2 DC cable, the length ….. m
MW2 size/azimith/height AGL ….. m/…."/…..m
MW3 Eth/Optic cable, the length ….. m
MW3 DC cable, the length ….. m
MW3 size/azimith/height AGL ….. m/…."/…..m
MW3 size/azimith/height AGL

Rev. Remarks Date Name Date 28-Feb-24 SITE ID

0.
Survey Engineer:
Site Name: YDE093_Ekounou_IHS YDE093
OSSOU Leonel
1
CW Engineer: Customer:
2

Checked:
3

4
NPO and Cabling information FILE OWNER

5 ……..
REV : Page:
Nokia - Camtel Cameroon Site Survey Report 1 4
4.0. TRANSMISSION AND DC POWER SUPPLY EQUIPMENT-(N/A for new site)
4.1 Type
Fibe of transmission equipment:
r
(opti Fiber (optical) Electrical
cal)

Type of Tx connector LC,(SM) No of spare ports


Type of router
Capacity of spare ports NA

ODF photo Patch Panel photo other ODF

4.2 Details of DC power supply system:


Manufacturer HUAWEI Total Power (KW)
No. Rectifier Modules 4.00 Current Consumption (V/A)
Module Rating (KW) 3.00 Future Consumption (KW)

Rectifier Cabinet Photo


Power Rating Photo (Ampers) PDB with visible breakers
with open door

4.3 Details of Battery Back-up:


Manufacturer NARADA and HUAWEI
Type of Battery VRLA and Lithium
(GEL/VRLA/Lithium)
Battery Capacity (Ah) 150(VRLA)/100(Li Ion)
No. of Battery (banks) 3 banks of VRLA and 6
banks of Lithium
No. of Battery per bank 4 for VRLA, 1 for Lithium
Battery Photo Battery Photo Battery Photo
Bank 1 Bank 2 Bank 3

4.4 New cabinet/ expanssion


Position of DCSPDU NA

Does the DCSPDU have a isolator NA

Size of power cable from Rect to DCSPDU NA

Type of cable from DCSPDU to tower top NA

Comments
Emplacement disponible sur le site pur linstallaion d'une no
d'energie

4.5 Existing Radio load in amps(current using clamp meter)

900 Mhz 1800 Mhz 900 Mhz 1800 Mhz 2100 Mhz 2600 Mhz
Sec 1 1,9 1,5 1,1 1,3 1,3 1.4
Sec 2 2,2 2,6 3,1 2,1 2,2 2.1
Sec 3 1,7 1,1 1,3 1,1 1,4 1
Sec 4

Yes New Cabinet - NO Expand existing power cabinet Swap existing Remarks:
Space on site

Possible to expand : NO number of rectifier units


PDB exapandable (space for extra CB):

Number and size of free CB's in PDU(BB)

Space in DC Rect for new CB's(quantity and rating)


Number and size of free CB's in DCSPDU

Space in DC SPDU for new CB's(quantity

Photo of PDB(Rect) overview Photo of PDB free CB's

Photo of
DCSPDU isolator Photo of PDB free CB's
DCSPDU(overall)
4.7 Infrastructure Alarms
Number of Existing Infra Alarms terminated NA

Distance from Proposed AMIA/FSEE to Alarm Tag Block NA

Make of Krone Tag block NA

Photo of Krone Tag


Block and back mount
frame

Comments

Rev. Remarks Date Name Date


Survey Engineer:
0. Site Name: YDE093_Ekounou_Ocm_IHS
1 CW Engineer:

Checked:
3

4
DC POWER SUPPLY AND TRANSMISSION
5
Nokia - Cameroon

Nokia - Camtel Cameroon Site Survey Report


r new site)

5.00

Other Patch Panel

33.00
invisible

Others
Battery Photo
Bank 4

NA

NA

NA

NA

site pur linstallaion d'une nouvelle Baie


d'energie

images montrant l'emplacement disponible

2600 Mhz 3500 Mhz Comments


1.4
2.1
1

Remarks:
Photo of PDB free
free CB's
space for CB's

Photo of DCDU free


free CB's
space for CB's
NA

NA

NA

SITE ID
kounou_Ocm_IHS YDE093

Customer:

Y AND TRANSMISSION
FILE OWNER
……
REV : Page:
rvey Report 1 7
5.0 EXISTING Cable ladders/ trays & wallthrough

Horizontal cable ladder sector 1 Vertical cable Ladder sector 1 Wallthrough (for shelters only)

Repeated for other sectors (RT only) if different

Horizontal cable ladder sector 2 Vertical cable Ladder sector 2 Horizontal cable ladder sector 3

Vertical cable Ladder sector 3 Vertical cable Ladder sector 2 Outside tower photo (up)

Horizontal cable ladder sector 4 Vertical cable Ladder sector 4 Additional photos
Additional photos Additional photos Additional photos

Comments

Cable Ladder space OK ✘ NO


Cable Ladder expandable YES ✘ NO
Wallthrough needed YES NO ✘

Possible to add cable ladder YES ✘ NO

New overhead gantry required YES NO ✘

Size and length of propossed gantry

existing space in existing underground YES NO



sleeve
YES NO ✘
Existing Bosal pipe on site
YES NO ✘

Can the Bosal pipe be reuesed

YES NO
New Bosal required ✘

REMARKS(details of new cable tray/gantry/underground sleeve)

5.1 Antenna Poles (photo of existing poles - , or proposed location for new pole)

Antenna Pole Sector 1 Antenna Pole Sector 2 Antenna Pole Sector 3

Sec B- Leg 2
(AHEGG) location
Hight=19,8m

Sec A- Leg 1
(AHEGG) location
Hight=19,8m
Sec B- Leg 2
(AHEGG) location
Hight=19,8m

Sec A- Leg 1
(AHEGG) location
Hight=19,8m

Antenna Pole Sector 4

Space for Antenna Pole Sector 1 Space for Antenna Pole Sector 2 Space for Antenna Pole Sector 3

Sec A- Leg 2
Hight=27,8m
Sec A- Leg 1 (AHEGG) location
Hight=27,8m Hight=26m
(AHEGG) location Azimuth-150
Hight=26m
Azimuth-40

Space for Antenna Pole Sector 4

Existing H Boom/poles

N/A : No existing H-Boom N/A : No existing H-Boom N/A : No existing H-Boom

N/A : No existing H-Boom Space for new Antenna Pole 1 Space for new Antenna Pole 2
N/A : No existing H-Boom Space for new Antenna Pole 1 Space for new Antenna Pole 2

Space for new Antenna Pole 3 Space for Antenna Pole 4

Existing poles measurements

Sector 1 2 3
A Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)

B Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)

C Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)
Angular(3,10m;diam0.08m)

D
E
E
F

REMARKS

5.2 Tower Leg profile

L=17cm

NO YES NO
Monopole any triangular any tubular

Monopole Diameter at antenna height : Ah


m

5.3 EARTHING AND LIGHTNING


Earthing YES Connection to existing To install - groundbar

(position of earth rods must be shown on sketch drawings)


Grounding Pits
Not possible to construct NNew location

Rev. Remarks Date Name Date SITE ID


Site Name: YDE093_Ekounou_Ocm_IHS YDE093
Survey Engineer:
0.
1 CW Engineer:
Customer:
2
Checked:
3
4 CW requirements FILE OWNER
5 …..
Nokia - Cameroon REV :
Site Survey Report
Nokia - Camtel Cameroon 1
for shelters only)

le ladder sector 3

wer photo (up)

nal photos
nal photos

mments

on for new pole)

Pole Sector 3

Sec C- Leg 3
(AHEGG) location
Hight=19,8m
nna Pole Sector 3

Sec A- Leg 3
Hight=27,8m
(AHEGG) location
Hight=26m
Azimuth-300

xisting H-Boom

w Antenna Pole 2
w Antenna Pole 2
SITE ID
YDE093
Customer:

FILE OWNER
…..
REV : Page:
1 6
6.0 SITE PHOTOGRAPHS
6.1 Site

Road Access Photo Overal Site Photo Locks Photo

REMARKS:

6.2 Equipment Room or overal site if Outdoor

Room's Room's Room's Room's


Side 1 Side 2 Side 3 Side 4

REMARKS:

6.3 BTS Cabinets -

Transmission other operator


GSM Cabinet WiMAX Cabinet
cabinet cabinet
GSM Cabinet WiMAX Cabinet
cabinet cabinet

Proposed space for RAN System Proposed space for RAN System
Module 1 Module 2

REMARKS:

6.4 Clamps

Free space for Clamp to be Space to attach Power cable to


Fiber clamps removed the power cable be removed

6.5 Grounding Bus Bar

To connect To connect RF To connect


Misc.
System Module Module Diplexer
To connect To connect RF To connect
Misc.
System Module Module Diplexer

Rev. Remarks Date Name Date SITE ID


Site Name: YDE093_Ekounou_Ocm_IHS YDE093
Survey Engineer:
0.
1 CW Engineer:
Customer:
2
Checked:
3

4 Overal site photos FILE OWNER


5 ……
Nokia - Cameroon REV : Page:
Site Survey Report
Nokia - Camtel Cameroon 1 5
Outdoor Grounding Bar
Quantity and existing of Grounding bar holes within one meter between the Mast body and the outdoor cabling
ladder:__5_ (Used:_1_ Remaining:_4__ ) with snap

Quantity and existing of Grounding bar holes within one meter between the feeder cable and the feeder window :_____
(Used:__ Remaining:_____ ) Indoor __ (Used:__ Remaining:_____ ) with snap

additional available Grounding bars: ____ with the snap.

If grounding bars are not available at the site please mention how many bars are required (Ground+ Tower).
If grounding bars are not available at the site please mention how many bars are required (Ground+ Tower).

Snap
SITE ID
YDE093
Customer:

FILE OWNER
……
Page:
5
the outdoor cabling

he feeder window :_____


ith snap

we propose 3 grounding bars with 6 holes (one bar


d (Ground+ Tower).
per sector) on the tower
we propose 3 grounding bars with 6 holes (one bar
d (Ground+ Tower).
per sector) on the tower
7.0 EXISTING ANTENNA PHOTOS
SECTOR 1
other other
Camtel Sec A- Leg 1 operator 1 operator 2
Hight=19,8m
Azimuth-40
Number of port-6

Close up photo of GSM Close up photo of other


Close up photo of Antenna
Antenna operator Antenna
Front to show location on
Front to show location on Front to show location on
tower
tower tower

Antenna Mounting Pole Length


other other
Camtel
operator 1 operator 2

SECTOR 2
other other
Camtel
operator 1 operator 2
Sec B- Leg 2
Hight=19,8m
Azimuth-1
Number of
port-6
Close up photo of GSM Close up photo of other
Close up photo of Antenna
Antenna operator Antenna
Front to show location on
Front to show location on Front to show location on
tower
tower tower

Antenna Mounting Pole Length


other other
Camtel
operator 1 operator 2

SECTOR 3

Close up photo of GSM Close up photo of other


Close up photo of Antenna
Antenna operator Antenna
Front to show location on
Front to show location on Front to show location on
tower
tower tower
Sec C- Leg 3
Hight=16,8m
Azimuth-340
Number of port-6

Antenna Mounting Pole Length


other other
Camtel
operator 1 operator 2

SECTOR 4 other
operator

Close up photo of GSM Close up photo of other


Close up photo of Antenna
Antenna operator Antenna
Front to show location on
Front to show location on Front to show location on
tower
tower tower

Antenna Mounting Pole Length


other other
Camtel
operator 1 operator 2

NOTES:Only Camtel onsite, MTN have 06 panels on site

Rev. Remarks Date Name Date SITE ID


Site Name: YDE093_Ekounou_Ocm_IHS YDE093
Survey Engineer:
0.
1 CW Engineer:
Customer:
2
Checked:
3
4 Antenna System photos FILE OWNER
5 ……
Nokia - Cameroon REV : Page:
Site Survey Report
Nokia -Camtel Cameroon 1 8
SITE ID
YDE093
Customer:

FILE OWNER
……
Page:
8
8 PANORAMIC VIEW
Panoramic view (0º to 90º) - Sector 1 (Height of Picture taken - 27 m, Ht of Building - m,Tower ht - 25 m)

REMARKS: 0 degrees, 30 degrees, 60 degrees, 90 degrees

Panoramic view (120º to 210º) - Sector 2

REMARKS: 120 degrees, 150 degrees, 180 degrees, 210 degrees


120 degrees, 150 degrees, 180 degrees, 210 degrees

Panoramic view (240º to 330º)- sector 3

REMARKS: 240 degrees, 270 degrees, 300 degrees, 330 degrees

Rev. Remarks Date Name Date 28-Feb-24 SITE ID


0.
Survey Engineer:
Site Name: YDE093_Ekounou_IHS
YDE093
30-Dec-99
OSSOU Leonel
1 30-Dec-99 CW Engineer:
Customer:
2 30-Dec-99

Checked:
3

4
PANORAMIC VIEW (SECTOR 1 & 2 & 3)
FILE OWNER
5 ……
REV : Page:
Nokia - Camtel Cameroon Site Survey Report 1 7
9.0 PROPOSALS / REQUIREMENTS:

Include propossed detailed swap S.O.W and swap process


based on site conditions. Also include any RFI requirement, if
any.
Hot Swap/Cold swap

Installation BoQ and Other comments


List and Quantity of equipment to be recovered

Rev. Remarks Date Name Date SITE ID


0.
Survey Engineer:
Site Name: YDE093_Ekounou_Ocm_IHS YDE093
1 CW Engineer:
Customer:
2
Checked:
3
4 FILE OWNER
5 …….
Nokia - Cameroon REV : Page:
Site Survey Report
Nokia - Camtel Cameroon 1 11
SITE ID
YDE093

Customer:

FILE OWNER
…….
Page:
11
10 Drawings-Layouts
Site layout showing distances for new cables, propossed position for new equipment, distance
between tower legs, existing/propossed earthing points, north and site entrance.

NEED to add layout Like

APPROVAL
Nokia Comments: Camtel Comments:

Nokia Signature Date Camtel Signature Date

Rev. Remarks Date Name Date 30-Dec-99 SITE ID Legend


Survey Engineer:
YDE093 Proposed Nokia New Antenna Poles Yellow
0. Site Name: YDE093_Ekounou_Ocm_IHS
30-Dec-99 Proposed Nokia New RFM/FPFH Poles Orange
Exisitng Antennas / Equipments Green
1 30-Dec-99 CW Engineer:
Customer: Proposed Nokia BusBar Red
2 30-Dec-99
Checked:
3

4 FILE OWNER
5 ……
REV : Page:
Site Survey Report
Nokia - Camtel Cameroon 1 9
11 Drawings - Plan & Elevations

Example: Tower drawing with existing antennas, and proposed new RFM's, MW and
Antenna locations (min one side view one top view-with north and measurements)

Elevation View Plan View

###

Legend
Proposed Nokia New Antenna Poles Yellow
Proposed Nokia New RFM/FPFH Poles Orange
Exisitng Antennas / Equipments Green
Proposed Nokia BusBar Red

APPROVAL
Nokia Comments: Camtel Comments:

Nokia Signature Date Camtel Signature Date

Rev. Remarks Date Name Date 28-Feb-24 SITE ID


Site Name:YDE093_Ekounou_IHS YDE093
Survey Engineer:
0. 30-Dec-99
OSSOU Leonel
1 30-Dec-99 CW Engineer:
Customer:
2 30-Dec-99
Checked:
3
4 FILE OWNER
5 …….
Nokia Siemens Networks - QATAR REV : Page:
Site Survey Report
Nokia - Camtel Cameroon 1 11
12 Line of Sight per direction

LINK OF SIGHT CHECK


LINK

Link Name Data Transmission by Optical Fiber …


Space diversity Yes ✘
No
Azimuth … … Unit ( e.g. Degres )
Minimum antenna height … … Unit ( e.g. meter )
Proposed antenna height … … Unit ( e.g. meter )
Comments ………………………………………………………………………………………………

VISIBILITY

Compass serial number : …


Binocular serial number : …
Visibility Naked eye With binocular
Obstacle Yes No
Comments ……………………………………………………………………………………………

TYPE OF OBSTACLE

Building Yes No
Chimney Yes No
Airport Yes No
High voltage electricity tower and cable Yes No
Tree Yes No
Other Yes No …
Comments ……………………………………………………………………………………………
Responsibility
NOKIA Customer

………………………………………

Responsibility
NOKIA Customer

…………………………

Responsibility
NOKIA Customer

X
X
X
X
X
X
…………………………
YES
NO

Fiber (optical)
MW
Other
Configuration Type Details

4x4_ASOE + AHEGG(3) with 8-


Configuration 1 ports, X-Pol, Panel Antenna, 2.0m,
2x 690-960/2x 1695-2690MHz.

4x4_ASOE + AHEGG(3) with


Configuration 2 Wideband X-pol Antenna, 1710-
2690/1710-2690 MHz, 2.1m

AMIA+ASIB+ABIO+AHEGG(6) with
12-Ports, X-Pol, Hybrid Beam
Configuration 3 Antenna, 2.0m, 2x 698-960MHz,
65deg, 4x 1710-2690MHz