Scope of Work
Consultancy service for modification of existing Pond ash
     dryer system for reject handling from furnace & Ash hoper
      including vibrating screen at crusher house for pond ash
                              Tulsigam
1.      PREAMBLE:
        WCL intends to do followings.
a.     Modification in existing Pond ash dryer system for reject handling &
       vibrating screen at crusher house:
       i)      In the existing system, the discharge from the furnace and ash hopper is
                directly released onto the ground.
       ii)     Use of screw conveyors/ belt conveyors/chain conv. to transport ash from
               discharge to a designated storage or disposal area.
       iii) Designated ash storage silos or bins to safely contain the material until
            disposal or reuse.
       iv) In the current setup, pond ash is fed directly into the pond ash hopper
            without any preliminary screening. To improve the quality and
            consistency of the material, it is proposed to install a vibrating
            screen within the existing crusher hopper.
       v) Integration of sensors and control systems for efficient operation and
            maintenance.
The concept /proposal drawing showing requirement is attached.
b. Technical feasibility study for reject handling through new proposed system
1.1          It is proposed to appoint a consultant for providing comprehensive
             engineering service for followings.
        a) Equipment Layout, Flow sheets and Single line diagram and GA
           drawings.
        b) System design
        c) Basic Engineering
        d) Procurement Assistance
        e) Detailed   engineering         including    integration     with    existing
           system/process
        i) Cost Estimation
        j) Technical feasibility study for point
3.0       SCOPE OF SERVICES FOR BATTERY LIMIT
3.1 Engineering, Procurement & Project Management:
3.1.1.          General
          a. Evaluation & acceptance of Basic Engineering
3.2      Acceptance Of Basic Engineering:
           a. Participation in take -off meeting for preparation of Basic Engineering of
              system design & scheme with maximum utilisation of existing facilities
              available.
           b. Provide assistance for adoption of Basic engineering to conform to Indian
              regulations, operating conditions and standard engineering practices.
           c. Participation in design conference to finalise the design criteria and
              design documents as BIS code/ European code/American code
3.3       Engineering Services:
           a. Plant Engineering including integration with existing systems /process
              along with retrofit works.
           b. Prepare system layout / GA Drawings and Process Flow Sheets.
           c. Finalisation of the equipment’s and Civil & structural design as per
              approved design criteria.
           d. Undertake design based on information / Review from equipment
              supplier(s) with proper integration for completeness of system /process.
           e. Review / Checking and approval of the Suppliers drawings.
3.4        Mechanical Engineering:
           a. Finalization of System layout based on basic engineering.
           b. Preparation of flow sheets for process plant and material handling
             sections.
           c.        Preparation of GA drawings, Elevations, Cross sections, Floor plans
                   showing equipment levels & co-ordinates etc.
           d.        Shop floor Fabrication drawings for ducting, chutes, Hoppers etc.
                   with bill of materials not falling in the scope of the Supplier will be
                   prepared by consultant.
           e.        Detail specifications of equipment’s & machinery.
           f.        Preparation of the utility pipe routing & sizing, single line drawings
                   (water & air) with bill of materials of pipes, valves & Fittings etc.
        g.      Review and approval of GA drawings /interface/ interconnection
              detail.
        h.    Finalisation & providing inputs for civil and structural design of
              building, equipment foundations/equipment supports/mounting
              arrangement and retrofit works etc.
        i.      Checking and giving concurrence to Civil drawings for levels, pocket
              details, insert plates, clearances etc. required for equipment based on
              supplier Mech. Drawing & Electrical drawings.
        j.      Preparation of final as-built Drawings based on final construction
                and erection.
        k.    Any other miscellaneous work related to the project within battery
              limit.
3.5   Electrical Engineering
       a.    Fault level calculations, including Relay settings for 11KV/0.433 KV
             circuits.
       b.    Design criteria and detailed specification for Earthing System.
       c.    Review of the vendor drawings for the equipment.
       d.    Prepare the following detailed layout drawings:
              Single Line Diagram & Complete SLD along with its Hook up to existing
               plant SLD.
              Unit Sub-stations (USSs) & its complete equipment layout.
              Cable Trench underground or overhead (inside and outside plant
               sections)
              Supply of drawing for approval from electrical inspectorate as
               required.
              Upgradation & modification in SLD, System architecture, DCS, CRD
               etc. for proposed system.
              Cable trays (inside and outside plant sections)
              Lighting
              Cable routing
              Cable schedule
              Field mounted electrical equipment
              Control schematics
         e.    Finalization and providing inputs for civil and structural design of
               buildings    /equipment's    foundations/retrofit   works/mounting
               arrangements etc.
3.6     Process Control & Instrumentation
3.6.1     System Design
         Prepare control concept of the system, type of microprocessor controls,
         control loops for optimized operation of the plant, system architecture for
         central control based on latest programmable controllers available.
3.6.2 Preparation of Technical Specifications
          Prepare detailed technical specifications for the following:
         Micro-processor-based colour graphic control system comprising CPUs.
        Input/ Output rack both for plant and supervisory level controls, including
        uninterrupted power supply system.
         Field sensors and process instruments for temperature, pressure, level, flow
        etc.
         Instrument power distribution boards/junction boxes/instruments panel and
        erection hardware’s & accessories.
3.6.3 Scrutiny of Vendor's Drawing and Documents
         Scrutinize the GA drawings, control schematics, interface/inter-connection
         diagrams; I/O addresses etc., to check conformity with the technical
         specifications.
3.6.4 Control & Instrumentation Engineering Drawings
         Review detailed design and schemes as per the details given below:
      Process & Instrumentation diagrams (based on recommendations of
  suppliers & main machinery Supplier )
      Block Interlocking diagrams for material handling sections (complete
  section).
         Cabling concept for control & instrumentation cables
         Interfacing diagrams for PC controlled drives
     Interfacing diagrams for sub-control systems to be supplied by main
  machinery suppliers
      Details of close loop controls for optimizing plant operation in various
  process departments
          Control cable schedules and termination details for electrical drives (Control
      & Instrumentation cable schedules for microprocessor-based control systems
      shall be prepared).
            Mimic diagrams
            Layout of local control rooms & local control rooms (If any)
           Typical mounting arrangement of process instruments to be mounted in the
      field
            GA drawings showing location of field mounted instruments.
            Cable routing details for control & instrumentation cables.
          Preparation of tender enquiry documents for instrumentation supply &
      erection work of the plant and floating the tender documentation to various
      reputed contractors.
          SCS list signal list , final IO list to be prepared along with its interfacing with
      existing system & plant controller & DCS.
         E&I BOM to be prepare by consultant if anything needs to be purchase from
      WCL side.
3.7           Civil and Structural design and drawings
 a. Building, Structures and foundations will be designed on the load data provided
    by different suppliers of the machinery.
 b. Construction Drawings – Structural
      i.    Detailed civil and structural design work including RCC details for
            foundations of hoppers, ramps, conveyors structures (trestles, galleries
            etc.), Transfer towers for entire unit in totality within the battery limit. All
            retrofit & existing Civil/structural strengthening works for which required
            Civil design drawing shall be provided , which is part of system process.
      ii. Preparation of detailed RCC working drawings including BOM.
      iii. Drawings for civil work will include:
           Civil general arrangement drawing with plans and elevations.
           RCC details of columns, beams, slabs with insert plates , anchor bolts etc.
            along with BOM and Bar Bending Schedule drawings
      iv. Preparation of detailed GA drawings of structural steel, conveyors
          structures (trestles, galleries) ,Transfer towers , take up towers, , shed
          ladders, stairs, platforms etc. & shop floor drawings with BOM including
          development drawings.
      v. Shopfloor fabrication drawings for structural steel works with detailed bill
         of material.
      vi. Bill of materials of steel / cement.
3.8        General for Civil Work
           a.        Prepare final working drawings and insert plate schedule for
                     construction.
           b.        Provide final and as built drawing for reference purpose and submit soft
                     copy of the drawing prepared for WCL.
           c.        Prepare detailed architectural drawings with plans, elevations, cross-
                     sections with detail of finishing.
3.9         Other Services:
       a.       Other services as may be required for complete implementation within
                battery limits.
       b. Based on final construction and erection at site . preparation &submission of
           final “AS BUILT” GA drawings for records in soft copies. Provide final as built
           drawing for records in soft copy based on inputs provided by WCL.
3.10        Procurement Services:
      a.        Prepare detailed specifications and tender document for Mechanical –
                Electrical – C&I for Suppliers & Contractors.
      b.        Prepare specifications, sizes and bill of quantity and tender document for
                procurement of:
                1.    Steel and Cement
                2.    Electrical / Instrument / Câblés / Cable trays etc.
                3.    Piping & fittings, valves etc.
      c.        Evaluate offers, give recommendations, participate in negotiations, and
                assist in placement of order with all conditions and guarantee clauses.
3.11 Construction Supervision:
 a.        Supervision to ensure adherence to drawings, specifications, and quality.
 b. Provide clarification/solutions for discrepancies in design /drawings/ give
    alternate section etc.
c.   Participate in commissioning and guarantee test runs for individual/ systems to
     ensure the performance qualitatively and quantitatively.
Above scope is only illustrative but Consultant will be overall responsible for all the
services/engineering required to build project to achieve the objective in totality
within battery limit