0% found this document useful (0 votes)
11 views5 pages

Saf-keci-cp12-Me-152-Proposed Electrical Layout of Fans & Blowers 24th Floor-Signed (R)

Uploaded by

Benjelou Breis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views5 pages

Saf-keci-cp12-Me-152-Proposed Electrical Layout of Fans & Blowers 24th Floor-Signed (R)

Uploaded by

Benjelou Breis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

THE YUCHENGCO CENTRE Submittal Transmittal

333 Sen. Gil Puyat Ave., Cor. Nicanor Garcia and Jupiter
St., Brgy. Bel-Air, Makati City, Philippines SUT NO. : SAF-KECI-CP12-ME-152
CP NO. : MECHANICAL WORKS
* Refer to approved Submittal Schedule dated _____________

Transmittal to : LANDEV CORPORATION From : KECI Date: August 19, 2025


Project Managers Contractor Drwg No. 152

Reference No. :
[ X ] New submittal date :
[ ] Resubmittal ( )1 ( )2 ( ) 3

Sample Qty.: Title / Description:


5 sheets including top sheet and lists Title: PROPOSED ELECTRICAL LAYOUT OF FANS FOR 24TH FLOOR

Description: Layout & Section Views

Specs. Section, Title & Paragraph / Drawing, Detail Reference:

By: Date Received +/-


from Contractor from Contractor: *
22-Aug-2025 (E-mail)
REYJAY MARTIN A. OCAMPO
PROJECT MANAGER Received by: LANDEV CORPORATION
Kalayaan Engineering Co., Inc Project Managers
Other Remarks on above Submission:

Transmittal to : MULTI ENGINEERING COLLABORATIVE Date Received Received by:


Consultant by Consultant
From: LANDEV CORPORATION Consultant
Project Managers
Other Remarks on above Submission:

Transmittal to : From :
LANDEV CORPORATION Consultant
III Project Managers
Action: (Pls. encircle one)
A Approved B Approved as Noted C Revise & Resubmit as Noted D Disapproved / New Submittal Required
Notes:
NOTED.

Consultant: Date Returned Date Required from +/-


by Consultant Consultant: *
Ferdie Trajano 09.07.25
D.EVANGELISTA-WVCA
08 SEPTEMBER 2025
Received by: LANDEV CORPORATION
Project Managers
Other Remarks on above Submission:

Transmittal to : KALAYAAN ENGINEERING CO, INC Date Returned Date Required +/-
Contractor to Contractor by Contractor: *
IV
09-Sep-2025 (E-mail)
From: LANDEV CORPORATION KALAYAAN ENGINEERING CO, INC
Received by:
Project Managers Contractor

Copies : Owner Architect Quantity Surveyor Others _________________


REFER TO BLOW UP PLAN "B" REFER TO BLOW UP PLAN "E"
REFER TO BLOW UP PLAN "A" REFER TO BLOW UP PLAN "F"
E E
ACCU
LEDGE

D D
C VIPE C
ACCU 2-3.5mm 2+1 - 3.5mm² in EE ROOM PE PE
LEDGE 15mmØ imc Pipe

LCP ECB

SERVER UTILITY HIGH ZONE


ACCU ELEVATOR SE

ECB
AUXILIARY ROOM / MALE FEMALE PE PE
OFFICE

LCP
ROOM PIPE ROOM TOILET TOILET LOBBY
2-3.5mm 2+1 - 3.5mm² in DN UP

UNIT - 2 15mmØ imc Pipe


2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in FE STAIR
2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe
15mmØ imc Pipe -3
15mmØ imc Pipe UTILITY

ECB
UP ss SE
ROOM

LCP
PE PE 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
PIPE

ECB
DN
FE STAIR -
UP
UTILITY NON-BINARY PWD
2-3.5mm 2+1 - 3.5mm² in CHASE ROOM

LCP
4 15mmØ imc Pipe ROOM
DN
FE STAIR - TOILET TOILET
ECB LCP ECB LCP
2 LCP ECB
CHASE

H A L L W A Y 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe

LCP ECB LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP

2-3.5mm 2+1 - 3.5mm² in


B 15mmØ imc Pipe
EL.+103.00 M @ 25TH FL
B
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe 15mmØ imc Pipe
EL.+98.50 M @ 24TH FL 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

UNIT - 1 UNIT - 7
B' B'

UNIT - 3 UNIT - 4 UNIT - 5 UNIT - 6

A A

1 2 3 4 5 6 7 8 9 10 11 12 13 13' 14 15 16

REFER TO BLOW UP PLAN "C" REFER TO BLOW UP PLAN "D"

ME-17 PROPOSED ELECTRICAL LAYOUT OF FANS & BLOWERS 24TH FLOOR


01

FCD
CONSTRUCTION MANAGEMENT MECHANICAL CONTRACTOR PROJECT OWNER PROJECT TITLE SHEET CONTENT REVISION AS
SCALE
SHOWN
REF.
NO.:
ME-17
SINCE The Yuchengco CHECKED BY : MJG, & DRA DATE CONTENT
SHEET NO.
19 66
PROPOSED ELECTRICAL DATE : AUG 18, 2025
MANUFACTURERS
ENGINEERING CO., INC.

ENGINEERS CONTRACTORS
SAN LORENZO RUIZ INVESTMENT
HOLDINGS AND SERVICES, INC.
Centre LAYOUT OF FANS & 01 of 04
333 SEN. GIL J. PUYAT AVENUE CO. NICANOR DRAWN BY : HGA
4253 EMILIA ST., PALANAN, MAKATI CITY
TEL. NOs. : 369-9771 TO 75 FAX NO. : 843-5749 GARCIA AND JUPITER STREETS, BLOWERS 24TH FLOOR
C O R P OR A T I O N BRGY. BEL-AIR, MAKATI CITY DATE : AUG 18, 2025 DRW REF : 152
2-3.5mm 2+1 - 3.5mm² in
E
ACCU
LEDGE
E 15mmØ imc Pipe
D D
C C

2-3.5mm 2+1 - 3.5mm² in


VIPE
ACCU 2-3.5mm 2+1 - 3.5mm² in EE ROOM PE PE
LEDGE 15mmØ imc Pipe

LCP ECB

SERVER UTILITY HIGH ZONE


ACCU ELEVATOR SE

ECB
AUXILIARY ROOM / MALE FEMALE PE PE
OFFICE

LCP
ROOM PIPE ROOM TOILET TOILET LOBBY
2-3.5mm 2+1 - 3.5mm² in DN UP

15mmØ imc Pipe


15mmØ imc Pipe FE STAIR
UNIT - 2 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe
15mmØ imc Pipe -3
15mmØ imc Pipe UTILITY

ECB
UP ss SE
ROOM

LCP
PE PE 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
PIPE
PWD

ECB
DN
FE STAIR -
UP
UTILITY NON-BINARY CHASE
2-3.5mm 2+1 - 3.5mm² in ROOM

LCP
4 15mmØ imc Pipe ROOM
DN
FE STAIR - TOILET TOILET
ECB LCP ECB LCP
2 LCP ECB
CHASE

H A L L W A Y 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe

LCP ECB LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP

2-3.5mm 2+1 - 3.5mm² in


B 15mmØ imc Pipe
EL.+103.00 M @ 25TH FL
B
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe 15mmØ imc Pipe
EL.+98.50 M @ 24TH FL 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

UNIT - 1 UNIT - 7
B' B'

UNIT - 3 UNIT - 4 UNIT - 5 UNIT - 6

A A

2-3.5mm 2+1 - 3.5mm² in UTILITY


1 2 3 4 5 6 7 8 9 10 11 12 13 13' 14 15 16

15mmØ imc Pipe ROOM


ECB LCP ECB LCP

KEYPLAN

LCP ECB LCP ECB LCP ECB

2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe

2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

ME-17 BLOW UP PLAN "A"


02

ACCU 2-3.5mm 2+1 - 3.5mm² in


LEDGE 15mmØ imc Pipe

LCP ECB

SERVER UTILITY
ACCU

ECB
NOTE: AUXILIARY ROOM / MALE

LCP
ROOM PIPE ROOM TOILET
REFER TO APPROVED SAF - KECI - CP12 - 2-3.5mm 2+1 - 3.5mm² in
ME - 142 FOR TYPICAL FANS ELECTRICAL 15mmØ imc Pipe

LAYOUT 2-3.5mm 2+1 - 3.5mm² in


UP

LEGEND:
UTILITY NON-BINARY CHASE
2 - 3.5mm 2+1 - 3.5mm² in 15mmØ Imc Pipe ROOM
DN
FE STAIR - TOILET
2
ECB / LCB

ME-17 BLOW UP PLAN "B"


03

FCD
CONSTRUCTION MANAGEMENT MECHANICAL CONTRACTOR PROJECT OWNER PROJECT TITLE SHEET CONTENT REVISION AS
SCALE
SHOWN
REF.
NO.:
ME-17
SINCE The Yuchengco CHECKED BY : MJG, & DRA DATE CONTENT
SHEET NO.
19 66
PROPOSED ELECTRICAL DATE : AUG 18, 2025
MANUFACTURERS
ENGINEERING CO., INC.

ENGINEERS CONTRACTORS
SAN LORENZO RUIZ INVESTMENT
HOLDINGS AND SERVICES, INC.
Centre LAYOUT OF FANS & 02 of 04
333 SEN. GIL J. PUYAT AVENUE CO. NICANOR DRAWN BY : HGA
4253 EMILIA ST., PALANAN, MAKATI CITY
TEL. NOs. : 369-9771 TO 75 FAX NO. : 843-5749 GARCIA AND JUPITER STREETS, BLOWERS 24TH FLOOR
C O R P OR A T I O N BRGY. BEL-AIR, MAKATI CITY DATE : AUG 18, 2025 DRW REF : 152
NON-BINARY PWD
CHASE
DN
FE STAIR - TOILET
E E

D
C

LCP ECB
ACCU
LEDGE
2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
EE ROOM PE
ACCU
LEDGE

PE
VIPE
D
C TOILET
2
SERVER UTILITY HIGH ZONE
ACCU ELEVATOR SE

ECB
AUXILIARY ROOM / MALE FEMALE PE PE
OFFICE

LCP
ROOM PIPE ROOM TOILET TOILET LOBBY
2-3.5mm 2+1 - 3.5mm² in DN UP

15mmØ imc Pipe FE STAIR


UNIT - 2 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe
15mmØ imc Pipe -3
15mmØ imc Pipe UTILITY

ECB
UP ss SE
ROOM

LCP
PE PE 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
PIPE

ECB
DN
FE STAIR -
UP
UTILITY NON-BINARY PWD
2-3.5mm 2+1 - 3.5mm² in CHASE ROOM

LCP
4 15mmØ imc Pipe ROOM
DN
FE STAIR - TOILET TOILET
ECB LCP ECB LCP
2 LCP ECB
CHASE

H A L L W A Y 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe

LCP ECB LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP

2-3.5mm 2+1 - 3.5mm² in


B 15mmØ imc Pipe
EL.+103.00 M @ 25TH FL
B
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe 15mmØ imc Pipe
EL.+98.50 M @ 24TH FL 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

UNIT - 1 UNIT - 7
B' B'

UNIT - 3 UNIT - 4 UNIT - 5 UNIT - 6

H A L L W A Y
A A

1 2 3 4 5 6 7 8 9 10 11 12 13 13' 14 15 16

LCP ECB LCP ECB

KEYPLAN

2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe
2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

ME-17 BLOW UP PLAN "C"


04

OFFICE

2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe 15mmØ imc Pipe

ECB
LCP
NOTE: LCP ECB

REFER TO APPROVED SAF - KECI - CP12 -


ME - 142 FOR TYPICAL FANS ELECTRICAL 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
LAYOUT
ECB LCP LCP ECB

LEGEND:
EL.+103.00 M @ 25TH FL
2 - 3.5mm 2+1 - 3.5mm² in 15mmØ Imc Pipe
2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
EL.+98.50 M @ 24TH FL 2-3.5mm 2+1 - 3.5mm² in

ECB / LCB

ME-17 BLOW UP PLAN "D"


05

FCD
CONSTRUCTION MANAGEMENT MECHANICAL CONTRACTOR PROJECT OWNER PROJECT TITLE SHEET CONTENT REVISION AS
SCALE
SHOWN
REF.
NO.:
ME-17
SINCE The Yuchengco CHECKED BY : MJG, & DRA DATE CONTENT
SHEET NO.
19 66
PROPOSED ELECTRICAL DATE : AUG 18, 2025
MANUFACTURERS
ENGINEERING CO., INC.

ENGINEERS CONTRACTORS
SAN LORENZO RUIZ INVESTMENT
HOLDINGS AND SERVICES, INC.
Centre LAYOUT OF FANS & 03 of 04
333 SEN. GIL J. PUYAT AVENUE CO. NICANOR DRAWN BY : HGA
4253 EMILIA ST., PALANAN, MAKATI CITY
TEL. NOs. : 369-9771 TO 75 FAX NO. : 843-5749 GARCIA AND JUPITER STREETS, BLOWERS 24TH FLOOR
C O R P OR A T I O N BRGY. BEL-AIR, MAKATI CITY DATE : AUG 18, 2025 DRW REF : 152
PE PE
E E
ACCU
LEDGE

D D
C VIPE C
ACCU 2-3.5mm 2+1 - 3.5mm² in EE ROOM PE PE
LEDGE 15mmØ imc Pipe

LCP ECB

SERVER UTILITY HIGH ZONE


ACCU ELEVATOR SE

ECB
AUXILIARY ROOM / MALE FEMALE PE PE
OFFICE

LCP
ROOM PIPE ROOM TOILET TOILET LOBBY
2-3.5mm 2+1 - 3.5mm² in DN UP
15mmØ imc Pipe FE STAIR
UNIT - 2 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe
15mmØ imc Pipe -3
15mmØ imc Pipe UTILITY

ECB
UP ss SE
ROOM

LCP
PE PE 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
PIPE
PWD

ECB
DN
FE STAIR -
UP
UTILITY NON-BINARY CHASE
2-3.5mm 2+1 - 3.5mm² in ROOM

LCP
4 15mmØ imc Pipe ROOM
DN
FE STAIR - TOILET TOILET
ECB LCP ECB LCP
2 LCP ECB
CHASE

H A L L W A Y 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe

LCP ECB LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP LCP ECB LCP ECB LCP ECB LCP ECB ECB LCP

2-3.5mm 2+1 - 3.5mm² in


B 15mmØ imc Pipe
EL.+103.00 M @ 25TH FL
B
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in 15mmØ imc Pipe 15mmØ imc Pipe
EL.+98.50 M @ 24TH FL 2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe

UNIT - 1 UNIT - 7
B' B'

UNIT - 3 UNIT - 4 UNIT - 5 UNIT - 6

A A

1 2 3 4 5 6 7 8 9 10 11 12 13 13' 14 15 16

KEYPLAN LCP ECB LCP ECB

2-3.5mm 2+1 - 3.5mm² in 2-3.5mm 2+1 - 3.5mm² in


15mmØ imc Pipe 15mmØ imc Pipe

ME-17 BLOW UP PLAN "E"


06

-3
SE 2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe
PIPE

ECB
ROOM

LCP
CHASE

NOTE:
REFER TO APPROVED SAF - KECI - CP12 - LCP ECB ECB LCP

ME - 142 FOR TYPICAL FANS ELECTRICAL


LAYOUT

LEGEND:
2-3.5mm 2+1 - 3.5mm² in
15mmØ imc Pipe 2-3.5mm 2+1 - 3.5mm² in
2 - 3.5mm 2+1 - 3.5mm² in 15mmØ Imc Pipe 15mmØ imc Pipe

ECB / LCB

ME-17 BLOW UP PLAN "F"


07

FCD
CONSTRUCTION MANAGEMENT MECHANICAL CONTRACTOR PROJECT OWNER PROJECT TITLE SHEET CONTENT REVISION AS
SCALE
SHOWN
REF.
NO.:
ME-17
SINCE The Yuchengco CHECKED BY : MJG, & DRA DATE CONTENT
SHEET NO.
19 66
PROPOSED ELECTRICAL DATE : AUG 18, 2025
MANUFACTURERS
ENGINEERING CO., INC.

ENGINEERS CONTRACTORS
SAN LORENZO RUIZ INVESTMENT
HOLDINGS AND SERVICES, INC.
Centre LAYOUT OF FANS & 04 of 04
333 SEN. GIL J. PUYAT AVENUE CO. NICANOR DRAWN BY : HGA
4253 EMILIA ST., PALANAN, MAKATI CITY
TEL. NOs. : 369-9771 TO 75 FAX NO. : 843-5749 GARCIA AND JUPITER STREETS, BLOWERS 24TH FLOOR
C O R P OR A T I O N BRGY. BEL-AIR, MAKATI CITY DATE : AUG 18, 2025 DRW REF : 152

You might also like