WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
Condition Monitoring Cell, Kolkata Zonal Testing
Sub-Station Name:- Mahinagar Division Baruipur Region S 24 Parganas Control Room Temp 25.6OC
Inspection Date:- 10.12.2024 Zone Kolkata Switch yard temp
Location_1 Panel Front Side Left Location_2 Panel Front side Right Location_3 Panel Back Side Left Location_4 Panel Back Side Right
Air Air Air 1 Air 2
Metal Metal Metal 5 Metal 7
Observation Observation Observation Observation
Note:-F1= Panel Front, b1= CT chamber, b2=Cable chamber, s1=Panel right side, s2= left side, T=TEV, U=Ultrasonic
MEASUREMENT OF PARTIAL DISCHARGE AT IN DOOR PANELS AND TEMPERATURE RECORDED
Transient Earth Voltage in Temperature in
Panel Load Ultrasonic (20-40kHz)
Sl No
Designation
CB State
(Amp) dB oC Remarks
TF1 Tb1 Tb2 TPT TS1 TS2 F1 b1 b2 UF1 Ub1 Ub2 UPT Us1 Us2
Hotspot has been detected at VCB
chamber of the panel. Necessary
1. Incoming -3 ON 138 --- 9 10 --- 7 --- 30.2 29.9 28.5 --- --- --- --- --- ---
checking of breaker Male-Female
contact points are to be done.
Hotspot has been detected at VCB
chamber of the panel. Necessary
2. Atlas ON 51 --- 9 10 --- --- --- 30.6 29.5 29.7 --- --- --- --- --- ---
checking of breaker Male-Female
contact points are to be done.
Hotspot has been detected at VCB
chamber of the panel. Necessary
3. Rajpur --- 8 11 --- --- --- 30.2 29.4 29.6 --- --- --- --- --- ---
checking of breaker Male-Female
ON 81 contact points are to be done.
Hotspot has been detected at VCB
chamber of the panel. Necessary
4. Bus Coupler OFF --- --- 9 10 --- --- --- 30.8 27.8 27.9 --- --- --- --- --- ---
checking of breaker Male-Female
contact points are to be done.
5. Adaptor --- --- 10 11 27.2 27.8 --- --- --- --- --- --- --- ---
6. South Garia ON 66 --- 9 10 --- --- --- 28.4 27.7 27.7 --- --- --- --- --- --- ---
7. Incoming -2 ON 132 --- 10 11 --- --- --- 26.9 27.7 27.0 --- --- --- --- --- --- ---
8. Hariharpur ON 45 --- 9 9 --- --- --- 26.9 26.4 26.5 --- --- --- --- --- --- ---
9. Gobindapur ON 21 --- 9 10 --- --- --- 26.2 26.2 26.2 --- --- --- --- --- --- ---
10. Bus Coupler OFF --- --- 9 11 --- --- -- 28.1 26.8 26.2 --- --- --- --- --- --- ---
-2
11. Adaptor --- --- 10 10 --- --- -- 26.4 26.9 --- --- --- --- --- --- --- ---
12. Nandan ON 63 10 11 --- --- -- 28.2 27.1 26.8 --- --- --- --- --- --- ---
13. Sonarpur ON 42 10 11 --- --- -- 28.9 27.1 27.1 --- --- --- --- --- --- ---
14. Incoming -1 ON 107 10 10 --- --- -- 27.7 26.6 26.7 --- --- --- --- --- --- ---
15. Beltala ON 0 9 9 --- --- -- 26.9 27.2 26.2 --- --- --- --- --- --- ---
OFF (NO
16. Krishna 0 9 10 --- --- 8 25.3 26.0 25.4 --- --- --- --- --- --- ---
VCB)
Note: Dust and spider web deposited on 11KV panel surface must be cleaned thoroughly to prevent entry of dust inside panel through openings as this may increase leakage current &
thereby affecting insulation.
ULTRASONIC PD MEASUREMENT ON OUTDOOR EQUIPMENTS
Sl Equipment Details Location "R" Ph db "Y" Ph db "B" Ph db "N" db
Remarks
No
R Phase: Oil checking as well as necessary cleaning and
maintenance of this CT should be done. Necessary
checking of tightness of the said CT secondary
wires is also required. Insulation resistance in
between CT primary to earth and Primary to
secondary by 5KV megger and CT secondary to
Tongtala via earth by 500Volt megger are to be measured and
1. 2 dB (destructive if found low then appropriate action is to be
33KV CT Baruipur Ckt. 33KV
corona) 2 dB (Tracking) 11 dB (Tracking) ---
taken.
CT Y Phase: Necessary cleaning and maintenance are required.
Insulation resistance in between CT primary to
earth and Primary to secondary by 5KV megger
and CT secondary to earth by 500Volt megger are
to be measured and if found low then appropriate
action is to be taken.
B Phase: The CT is to be replaced with a new/healthy one.
Beruipur 220KV ---
2. Cleaning, treatment of cable termination joint and
Ckt 33KV Cable --- 0 dB (corona) 0 dB (corona) subsequent application of amalgamated tape of HV
(near VCB) insulation grade must be carried out.
33KV Cable If possible, avoid the cable crossing by rearrange the cable at
3. Sonarpure circuit-1
--- both side and increase the electrical clearance between the
4 pole structure 0 dB (corona) 0 dB (corona) 0 dB (corona) phases of cable crossing.
33KV Cable
4. Station Service Thorough maintenance, cleaning and release of tapped air
Bushing Transformer HV
--- 0 dB (corona) 0 dB (corona) ---
(if any) from the said bushing should be carried out.
Bushing
5. PTR-3 isolator before 18 dB (destructive
-- --- ---
VCB (CT Side) corona)
6. PTR-2 isolator 18 dB (destructive 18 dB (destructive 18 dB (destructive ---
before CT (CT Side) corona) corona) corona)
7. PTR-1 isolator 16 dB (destructive 16 dB (destructive 16 dB (destructive ---
before CT (CT Side) corona) corona) corona) Binding of the pin insulators should be done properly. IR
measurement of these pin insulators is to be done. If the IR
8. 33KV Pin Station Service 18(destructive 18(destructive 18(destructive --- value is found low then these pin insulators may be
Transformer (6 nos.) corona) corona) corona) replaced.
9. Sonarpur circuit-1
0 dB (corona) 0 dB (corona) 0 dB (corona) ---
4 pole structure
10. Tongtala via
14 dB (destructive 14 dB (destructive 14 dB (destructive ---
Baruipur Ckt
corona) corona) corona)
(Lower Pin)
11. LV LA 24 dB (destructive --- The LA is to be replaced
PTR-3 LV LA --- ---
corona)
HOT SPOT DETECTED BY THERMAL IMAGING
Sl Hot spot Location Ambient "R" Ph "Y" Ph "B" Ph Image code Remarks
No
PTR-2 CT connector R phase both side ,B phase PTR-2 side 26.5 83 --- 99.5 12268
1.
PTR-1 CT connector R phase VCB side ,B phase LA side 26.9 52 --- 65.6 12269
2.
PTR-1 LV bushing connector 27.6 102.1 --- --- 12270
3.
Subhasgram Ckt 33KV VCB upper Pad connector 28.0 40.8 --- --- 12271
4. All the hotspots detected
PTR -2 isolator after VCB female dropper connector(B Phase) flexible cord lower at switchyard must be
5. 28.1 --- 56 42.1 12272
side (Y Phase) rectified to avoid
PTR-3 isolator VCB flexible cord lower side Connector 28.5 --- 48.3 --- 12273 unplanned outage of
6.
supply and emergency
Low Buss isolator beside 33kv Besco circuit flexible cord lower side and flexible shutdown. The IR Images
7. 28.8 --- 114.2 53 12274
cord upper side Connector – Y phase PTR-3 side, B Phase Bus side are attached for ready
Sonarpur-2 Ckt CT connector (R Phase) - VCB side , Y phase isolator side 29.3 61.7 57 --- 12275 reference.
8.
11KV Nandan Feeer Isolator flexible cord lower side connector 29.5 --- 56.1 --- 12276
9.
South Garia11KV Feeder Isolator flexible cord upper side Connector 29.2 --- --- 81.7 12277
10.
Rajpur 11KV Feeder isolator Male-Female contact 29.3 --- >350 --- 12278
11.
Sonarpur 11KV Feeder Isolator Flexible Cord Lower Side Connector 29.3 --- 47.7 --- 12279
12.
Atlas f11KV Feeder Isolator Female Dropper Connector 29.3 --- 79 ---- 12280
13.
Action to be Taken by Division Authority as per Visual Inspection Findings
Sl. No. Equipment Remarks
1. Oil leakages were found from Top Sampling Valve & R Phase LV Bushing. These oil leakages must be arrested.
Low oil level has been found on main conservator tank. Action must be taken to maintain desired oil level in the transformer as per
2. PTR-1 oil filling procedure of manufacturer.
3. Main Tank Breather oil pot & OLTC Breather Oil Pot were been found empty. Appropriate action should be taken.
Oil leakages were found from-
i. Top Sampling valve
ii. HV Side Top Tank
iii. Top side Radiator Valve near B Phase HV Bushing
iv. Y phase HV Bushing
4.
v. Bottom side Radiator valve near HV Y Phase
PTR-2 vi. LV Side Top Tank
vii. Top side radiator Valve near LV R & Y Phase
viii. Bottom side Radiator valve near all LV Phases
- These oil leakages must be arrested.
It has been observed in POG that air is present in the conservator tank. The bellow of the PTR is not properly filled with air.
5.
Appropriate action to be taken to rectify the problem.
6. Oil pot of main tank breather was found empty. Appropriate action to be taken.
Oil leakages were found from-
i. HV Side Top Tank
7. PTR-3 ii. Top side radiator Valve near HV R Phase
iii. B Phase LV Bushing
-These oil leakages must be arrested.
8. Oil pot of main tank breather was found empty. Appropriate action to be taken.
9. Trip Circuit-1 & 2 Unhealthy were indicating on the Relay. Necessary action is to be taken.
TC-2 Healthy indication was not glowing. Thus, TC-2 is to be checked. Through maintenance of the auxiliary contact of the Breaker
10.
to be done.
11. Oil leakages was found from Bottom Drain valve. This oil leakage must be arrested.
12. Station Service Transformer Oil Level is to be checked. If found low, necessary action is to be taken.
13. 33KV CT Sonarpur Ckt all CTs were out of circuit. Necessary action is to be taken.
14. 33KV VCB PTR-2 VCB is to be cleaned.
33KV panel voltage drops to 24.6V when charger AC input is ON and 22.5V when charger AC input is OFF. Problem found in battery
charger. Hence the charger is unable to send the battery voltage to 33 KV panel when AC input is OFF. So, Charger output voltage to
be increased to such a value that sufficient voltage can reach to the panels. Cross section of the cables (From charger to panels) to
15.
be checked and increased if necessary.
Battery & Battery Charger Also, 1 No. of 33KV battery cell found to be defective. Specific gravity of Battery 6 & 7 were found to be 1100. Necessary action to
be taken towards replacement of the defective battery cells with the healthy one of the same rating.
100AH battery cells are charged with 16A battery charger (Charger -2). Appropriate action is to be taken to replace the charger
16.
with 35A battery charger for healthy life of cells.
17. Water top up is required at some of the cells of 11KV battery set.
Rust formation on Iron Structures, Isolator handles, CT JB, PT JB, CT Body, Station Service Transformer Conservator Tank at
18. Rusted Iron Structures switchyard were observed. The same must be cleaned and painted with red lead and Zinc.
DE /AE(Electrical), Condition Monitoring Cell
KZT, WBSEDCL.