Ray Aes NRHL Eal 001 - Rev 1
Ray Aes NRHL Eal 001 - Rev 1
4355 2500 4750 4160 3885 3630 3685 4525 3670 250 E EARTH PIT LOCATION POS. S
3160 CABLE CORRIDOR 11kV O/G CABLE CORRIDOR 11kV O/G W EPN-1 AUX. TR-1
2x6 Nos.
200mm DIA DUCTS
2x6 Nos.
200mm DIA DUCTS
1/1 300 Sqmm AUX. TR-1
2x6Nos.200Ø 2x6Nos.200Ø
DUCT BANK FOR
11kV O/G CABLES
DUCT BANK FOR
11kV O/G CABLES S EPN-2 AUX. TR-1 1/2 300 Sqmm AUX. TR-1
POINT-01 POINT-02
E=377262.937 E=377332.167
EPN-3 AUX. TR-2
N=2677967.874 N=2677978.143 2/1 300 Sqmm AUX. TR-1 70.00m
Y=72.000m A
A A A A C A A A A C A A A C C A A A D D A A D A A A A A EPN-4 AUX. TR-2 PROPOS
ED NRHL-PY
SUBSTA
TION
70.00m
2/2 300 Sqmm AUX. TR-1
70.00m
ER-24
11/1
EPN-5 POWER TR-1 EXISTING
NRHL-PY
SUBSTATION
DIESEL
C
TANK
FUEL
PRESSURE VESSEL
ELP-2 GATE A 29/1
D
C
EPN-7 POWER TR-2
6000
1
20/2 20/1 19/2 19/1 18/2 18/1 17/2
17/1
35/1
3/1 300 Sqmm AUX. TR-2
ELP-5 15/1 EYE WASH C
SINK 35/3
EPN-8 POWER TR-2 3/2 300 Sqmm AUX. TR-2
ER-34 JOCKEY
PUMP-2
A AC
EPN-9 POWER TR-3
4950
4/1 300 Sqmm AUX. TR-2
ELECTRICAL
ELP-1 PUMP
Y=66.000m B B B B B B B B B
A EPN-10 POWER TR-3
A
30/1 D
A B
SEPTIC TANK
6.00M WIDE ROAD FIRE PUMP ROOM
4/2 300 Sqmm AUX. TR-2
D DIESEL PUMP JOCKEY
2 - - GENERAL NOTES:
EPC
A A INTERLOCKING TILES CAGE LADDER 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED, AND
6000
CDS30-S1
5/1 300 Sqmm POWER TR-1
SILENCER
JPC
RE-CIRCULATION
3650
PUMP
AC
2. MAIN EARTH GRID (400mm² CU. CLAD STEEL CONDUCTOR) SHALL BE LAID MINIMUM
JPC
EFHC
ELP-12 EPF-1 PERIPHERAL 5/2 300 Sqmm POWER TR-1 1500MM BELOW THE GROUND, & 600MM BELOW THE BUILDING.
CONTROL
BATTERY
PANEL
ER-35 BD01
3. MINIMUM DISTANCE BETWEEN TWO VERTICAL EARTH ELECTRODES SHALL BE
DPC
A 29/2
33/2 C
Y=60.000m 3 B B B B B B B B B B
EPF-2 PERIPHERAL 5/3 300 Sqmm POWER TR-1 3000MM FOR TRANSFORMER AREA.
CP
D
A
B D B
A 4. BURIED CONDUCTORS ARE CONNECTED TO VERTICAL EARTH RODS LOCATED AT
THE CORNER OF THE MESH BY BOLTED NON-FERROUS CLAMPS TO FACILITATE
300 Sqmm
EFHC
2600
OFF LOADING
6/1 POWER TR-1
PERIPHERAL
A
ER-36 PLATFORM REMOVAL OF THE CONDUCTOR FOR TESTING THE ROD (EPF).
A C
35/2 ER-22 EPF-3 5. WHEREVER EARTH GRID/ELECTRODE IS FOULING WITH FOUNDATION, CABLE
38/1 6/2 300 Sqmm POWER TR-1
A
4 DUCTS, DRAINAGE & OTHER CIVIL WORKS, IT SHALL BE LAID 1500MM BELOW THE
D C 14/1
2x6Nos.200Ø
EPF-4 PERIPHERAL
6000
CABLE CORRIDOR 11kV O/G 6. ALL HV & LV POWER EQPTS., METALLIC PARTS OF FENCE ETC. ARE CONNECTED
2x6 Nos.
5 SWMH-01 GT
CAGE LADDER C ER-21
200mm DIA DUCTS
EPF-5 PERIPHERAL 7/2 300 Sqmm POWER TR-2
EARTH GRID.
K01
BUSCOUPLER -1
K02
BUS RISER
SECTION-1 &
K03
OUTGOING
FEEDER-1
K04
OUTGOING
FEEDER-2
K05
OUTGOING
FEEDER-3
K06
OUTGOING
FEEDER-4
K07
OUTGOING
FEEDER-5
K08
OUTGOING
FEEDER-6
K09
20MVA TRAFO
INCOMER-1
K10
500kVA AUX
TRAFO-1
K11
OUTGOING
FEEDER-7
K12
OUTGOING
FEEDER-8
K13
CAPACITOR
BANK-1
K14
BUS COUPLER-2
K15
BUS RISER
SECTION-2 &
K16
OUTGOING
FEEDER-9
K17
OUTGOING
FEEDER-10
K18
OUTGOING
FEEDER-11
K19
OUTGOING
FEEDER-12
K20
20MVA TRAFO
INCOMER-2
16/1
D 7. ALL EARTHING INTERCONNECTIONS (BURIED) TO THE MAIN GRID SHALL BE
28/2
A
35/1
BUS 1 VT BUS 2 VT
GT D
ACHIEVED BY EXOTHERMIC WELDING & ALL OTHER INTERCONNECTIONS SHALL
545
1235
5a 13/1 C
Y=54.000m A
B A B B B B B B 32/1 B MH-02 B B B
7/3 300 Sqmm POWER TR-2 BE OF BOLTED TYPE.
A
TOP BUS DUCT
A
ER-37 BD02 8. ALL VERTICAL EARTHING ELECTRODES SHALL BE PROVIDED WITH INSPECTION PIT
6 4.00M WIDE ROAD
A FIRE WATER TANK-2 8/1 300 Sqmm POWER TR-2 WITH COVER (EPF, EPN, ELP).
6.00M WIDE ROAD 9. ALL METALWORK WITHIN THE SUBSTATION PREMISES THAT DOES NOT FORM A
MH-01 K39 K38 K37 K36 K35 K34 K33 K32 K31 K30 K29
K28
K26 K25 K24 K23 K22 8/2 300 Sqmm POWER TR-2 PART OF THE ELECTRICAL EQUIPMENT IS TO BE BOUNDED TO THE EARTH GRID.
5050
CABEL FEEDER 1 TRANSFORMER-1 BUS SECTION-1 CABEL FEEDER 2 TRANSFORMER-2 CABEL FEEDER 3 BUS SECTION-2 CABEL FEEDER 4 TRANSFORMER-3 BUS RISER K27 K21
BUS DUCT CAPACITOR OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING 20MVA TRAFO OUTGOING OUTGOING 500kVA AUX OUTGOING CAPACITOR OUTGOING OUTGOING OUTGOING
20MVA, 20MVA,
33/11.5kV
BREAKER 20MVA,
33/11.5kV
PANEL BANK-3 FEEDER-24 FEEDER-23 FEEDER-22 FEEDER-21 FEEDER-20 FEEDER-19 INCOMER-3 FEEDER-18 FEEDER-17 TRAFO-2
SECTION-3 &
BUS 3 VT
BUS COUPLER-3
FEEDER-16 BANK-2 FEEDER-15 FEEDER-14 FEEDER-13
DUCT PANEL
31/1
10. THE DEEP VERTICAL ELECTRODES SHALL BE TERMINATED AT MAIN EARTH GRID
33/11.5kV
6000
D
ELP-11
9/1 300 Sqmm POWER TR-3 LEVEL (IE, 1500MM BELOW FGL LEVEL)
H01 H02 H03 & H04 H05 H06 H07 H08 & H09 H10 H11
CABLE CORRIDOR
33kV I/C CIRCUITS
2x6 Nos. 200mm DIA DUCTS 11. ALL VERTICAL RISERS SHALL BE PROTECTED FROM MECHANICAL DAMAGES.
1x4 Nos.110mm DIA FOR FO
300 Sqmm 12. THIS DRAWING SHALL BE REFEREED ONLY FOR THE MAIN EARTHING GRID
28/1
9/2 POWER TR-3 SEPARATE DRAWING SHALL BE SUBMITTED FOR INDOOR EARTHING.
7 ELP-3 ELD-9 13. MAIN EARTH GRID SHALL BE INSTALLED WITH IN THE SUBSTATION BUILDING,
Y=48.000m A
INTERLOCKING TILES
B A A B 2/1 B B B B B B B B B C
C
A 9/3 300 Sqmm POWER TR-3 600MM OFFSET FROM SUBSTATION BUILDING & 1500MM REST OF AREA.
2/2
EPN-1
14. WHEREVER EARTH GRID/ELECTRODE IS FOULING CIVIL WORKS, IT SHALL BE LAID
ER-38 2/3
27/2 10/1 300 Sqmm POWER TR-3 ADJACENT TO THE CIVIL WORKS.
5100
'2W'
'2W'
TXR-1 TXR-2 TXR-3
11/1 300 Sqmm
'1W'
'1W'
'1W'
OW MH-01 1/1 '2V'
ER-18 MAIN GATE-1
'2V'
'2V'
'1V'
'1V'
'1V'
ELD-4 1/2 A
'2U'
'2U'
'2U'
8 A
'2N'
'2N'
'2N'
'1U'
'1U'
'1U'
EPN-3 ELD-10 5/3 7/3 9/3
OW MH-02 4/1 4/2
A
ER-17
27/1
11/2 300 Sqmm MAIN GATE-1
ELD-7
ELD-6
4/3
Y=42.000m B B B B B B C A B B B B
A 7/1 9/1 A
12/1 300 Sqmm WICKET GATE-1
ELD-3
ELD-2
ELD-1
C 5/1 C
A A
4700
ELD-8
ELP-6 AUX.TXR-2
6/1 10/1
5/2 7/2 9/2
A
C 8/1 UNDER GROUND 13/1 300 Sqmm AUXILIARY MAT AT BASEMENT
EPN-4 OIL/WATER
6.00M WIDE ROAD
3/1 3/2
6/2 8/2 10/2
ER-16 COLLECTION TANK
14/1 300 Sqmm AUXILIARY MAT AT BASEMENT
6000
9 ELD-5 A EPF-3
ER-15 36/1
C 39/1 EPN-5 EPN-6 EPN-7 EPN-8 EPN-9
6.00M WIDE ROAD
A
ELP-4 C
EPN-10 C
ER-20
A
15/1 300 Sqmm AUXILIARY MAT AT BASEMENT
C
ER-19
OW MH-05 OW MH-06 OW MH-07 A
OW MH-04 A
A
16/1 300 Sqmm AUXILIARY MAT AT BASEMENT
OW MH-03 B
Y=36.000m A
B B B A
A C C A A C A A A A A A A A A A A A A A A 17/1 300 Sqmm LVAC AND DC ROOM
6.00M WIDE ROAD EXISTING ROAD
EXISTING ROAD 4.0m WIDE 4.0m WIDE 17/2 300 Sqmm LVAC AND DC ROOM
18/1 300 Sqmm RTU AND DMS ROOM
6000
A
1620
3180 1570 4110 INTERLOCKING TILES 3985 2615 4315 2750 4160 1390 1965 3600
18/2 300 Sqmm RTU AND DMS ROOM
ER-39
CABLE
A PULL PIT 19/1 300 Sqmm CONTROL AND RELAY PANEL ROOM
Y=30.000m C B C B B C C B B
A I1 H2 H1 G1 F1 E1 D2 AD1 C1 B3 B2 B1 A1
A A
ER-13 ER-14 19/2 300 Sqmm CONTROL AND RELAY PANEL ROOM
A
ELP-9 C
C
20/1 300 Sqmm BATTERY ROOM
A
26/1 25/1 24/1 23/1 22/1 21/1
20/2 300 Sqmm BATTERY ROOM
6000
D
34/2
ELP-8 34/2 23/1 300 Sqmm CAPACITOR BANK-02 0 ISSUED FOR APPROVAL K.A 01-07-2025
34/1
ER-40 23/2 300 Sqmm CAPACITOR BANK-02 REV. DESCRIPTION NAME DATE
D
A A A ER-11
ER-10
24/1 300 Sqmm REACTOR-02 CLIENT:
Y=18.000m A
A
A A A A A A A A
ER-12
A
EXISTING SUBSTATION
24/2 300 Sqmm REACTOR-02
25/1 300 Sqmm CAPACITOR BANK-03
25/2 300 Sqmm CAPACITOR BANK-03
26/1 300 Sqmm REACTOR-03
26/2 300 Sqmm REACTOR-03
27/1 300 Sqmm FIRE WATER TANK-1
CONSULTANT:
27/2 300 Sqmm FIRE WATER TANK-1
18000
A A
A A
ER-9 ER-8 ER-7 ER-6 28/1 300 Sqmm FIRE WATER TANK-2
28/2 300 Sqmm FIRE WATER TANK-2
ER-5
A ER-41 A 29/1 300 Sqmm PUMP ROOM PARSONS BRINCKERHOFF LTD
29/2 300 Sqmm PUMP ROOM PO BOX 47445, ABU DHABI, UAE
30/1 300 Sqmm STAIRCASE-1
DESIGN CONSULTANT:
EPF-1 EPF-2
A
ER-1
A 31/1 300 Sqmm STAIRCASE-2
ER-4
ER-2 ER-3
32/1 95 Sqmm STAIR CASE LADDER
Y=0.000m EXISTING ACCESS GATE DR. MAHMOOD ALI AL SAIE
POINT-04 A A A A A A A A
POINT-03 33/1 95 Sqmm OFF LOADING -1 HANDRAIL ENGINEERING CONSULTANCY & DESIGN BUREAU
E=377273.208 E=377342.436 ABU DHABI - UAE
N=2677898.632 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 N=2677908.913 33/2 95 Sqmm OFF LOADING -2 HANDRAIL TEL: 02-6272762, FAX: 026275845, P.O. BOX: 2925
X=18.000m
X=24.000m
X=30.000m
X=36.000m
X=42.000m
X=48.000m
X=54.000m
X=60.000m
X=66.000m
X=72.000m
X=0.000m
X=6.000m
CONCRETE EARTH PIT (600mm x 600mm) CU. CLAD STEEL ROD (EARTH ELECTRODE) ELP-6 106 25x3 mm AUX. TRANSFORMERS 38/1 300 Sqmm 11kV SWGR ROOM DRAWING TITLE:
EPF DIA.19mm WITH HARDENED STEEL DRIVING CAPS & TIPS 5Nos.
COPPER CLAD STEEL ROD (EARTH ELECTRODE) DIA.19mm WITH HARDENED STEEL DRIVING CAPS & TIPS FOR
ELP-7 107 25x3 mm CAPACITOR BANK-1 39/1 300 Sqmm AUX. TR-1
EPN TRANSFORMER NEUTRAL EARTHING WITH INSPECTION PIT 10Nos.
25x3 mm CAPACITOR BANK-2
NRHL 33/11kV PRIMARY SUBSTATION
ELP-8 108
ER COPPER CLAD STEEL ROD (EARTH ELECTRODE) DIA.19mm WITH HARDENED STEEL DRIVING CAPS 41Nos. OUTDOOR EARTHING LAYOUT
ELP-9 109 25x3 mm CAPACITOR BANK-3
ELP
CONCRETE EARTH PIT FOR LIGHTNING PROTECTION (315mm x 315mm) CU. STEEL ROD (EARTH ELECTRODE), DIA.19mm
12Nos.
(PLAN)
WITH HARDENED STEEL DRIVING CAPS & TIPS
ELP-10 110 25x3 mm WATER TANK-1
EDL-6 TO 10 50x4m CCS, 4WAY EQUALIZING BAR WITH TWIN DISCONNECTING LINK 5Nos.
EDL-1 TO 5 ELP-11 111 25x3 mm WATER TANK-2 DESIGNED CHECKED APPROVED DATE SCALE
50x6mm CCS, 4WAY EQUALIZING BAR WITH TWIN DISCONNECTING LINK 5Nos.
RISER FROM MAIN GRID 50Nos. ELP-12 112 25x3 mm PUMP ROOM S.G S.G K.A 01-08-2025 N.T.S
SINGLE RUN OF 50x6 CCS TAPE (AUXILIARY MAT)
No. OF
DRG. No.: 01215-RAY-AES-NRHL-EAL-001 SHEETS 1 OF 3 REV. 1
KEY PLAN N
W E
70.00m
ED NRHL-PY
PROPOS TION
SUBSTA
70.00m
70.00m
K J I H G F E D C B A EXISTING
NRHL-PY
SUBSTATION
70.00m
3160 4355 2500 4750 4160 3885 3630 3685 4525 3670 250
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED, AND
LEVELS ARE IN METERS
2. MAIN EARTH GRID (400mm² CU. CLAD STEEL CONDUCTOR) SHALL BE LAID MINIMUM
1500MM BELOW THE GROUND, & 600MM BELOW THE BUILDING.
+8.700(TOP) 3. MINIMUM DISTANCE BETWEEN TWO VERTICAL EARTH ELECTRODES SHALL BE
TOP OF PARAPET 3000MM FOR TRANSFORMER AREA.
4. BURIED CONDUCTORS ARE CONNECTED TO VERTICAL EARTH RODS LOCATED AT
THE CORNER OF THE MESH BY BOLTED NON-FERROUS CLAMPS TO FACILITATE
REMOVAL OF THE CONDUCTOR FOR TESTING THE ROD (EPF).
5. WHEREVER EARTH GRID/ELECTRODE IS FOULING WITH FOUNDATION, CABLE
1950
+7.157 (FFL) +7.157 (FFL) DUCTS, DRAINAGE & OTHER CIVIL WORKS, IT SHALL BE LAID 1500MM BELOW THE
2450
ROOF FFL VARIES 2% SLOPE IN SLAB 2% SLOPE IN SLAB FOUNDATION.
200
6. ALL HV & LV POWER EQPTS., METALLIC PARTS OF FENCE ETC. ARE CONNECTED
355
600
+6.750 (SSL)
300
BE OF BOLTED TYPE.
1950
1650
LANDING PART OF THE ELECTRICAL EQUIPMENT IS TO BE BOUNDED TO THE EARTH GRID.
+4.300 (FCL) +4.300 (FCL) +4.300(LVL) 10. THE DEEP VERTICAL ELECTRODES SHALL BE TERMINATED AT MAIN EARTH GRID
FALSE CEILING FALSE CEILING FALSE CEILING LEVEL (IE, 1500MM BELOW FGL LEVEL)
1450
4950
13. MAIN EARTH GRID SHALL BE INSTALLED WITH IN THE SUBSTATION BUILDING,
600MM OFFSET FROM SUBSTATION BUILDING & 1500MM REST OF AREA.
BATTERY ROOM CONTROL AND RELAY & RAC ROOM RTU & DMS ROOM LVAC & DC ROOM 14. WHEREVER EARTH GRID/ELECTRODE IS FOULING CIVIL WORKS, IT SHALL BE LAID
3300
ADJACENT TO THE CIVIL WORKS.
LEGENDS:
3250
1000
±0.000 (LVL) ±0.000 (LVL)
GATE/INTERNAL ROAD LEVEL GATE/INTERNAL ROAD LEVEL
995 150
375
1No. Ø100mm 1No. Ø100mm 1No. Ø100mm 1No. Ø100mm 2Nos. Ø100mm 1Nos. Ø100mm
1No. Ø100mm 1No. Ø100mm SLEEVE FOR EARTHING SLEEVE FOR EARTHING SLEEVE FOR EARTHING SLEEVE FOR EARTHING SLEEVE FOR EARTHING SLEEVE FOR EARTHING
1500
SLEEVE FOR SLEEVE FOR TOP: -0.500 TOP: -0.500 TOP: -0.500 TOP: -0.500 TOP: -0.500 TOP: -0.500
1500
-0.995(LVL) -0.995(LVL) EARTHING EARTHING BOP: -0.600 BOP: -0.600 BOP: -0.600 BOP: -0.600 BOP: -0.600 BOP: -0.600
TOP: -0.500 TOP: -0.500
LANDING BOP: -0.600 BOP: -0.600
2785
CABLE BASEMENT
2460
6Nos. Ø200mm 6Nos. Ø200mm 1No. Ø100mm
EBDL 1No. Ø200mm -1.550 (LVL)
SLEEVES IN 2 LAYERS
-1.550 (LVL)
SLEEVES IN 2 LAYERS
5m³ CAPACITY SLEEVE FOR EBDL
SLEEVE
TOP: -1.700 TOP: -1.700
WATER TANK WATER MAIN LINE
TOP: -2.000 TOP: -2.100
400mm² WIRE PVC COVERED BOP: -2.200
-2.350 (LVL)
BOP: -1.900
TOP: -2.000-2.350 (LVL)
BOP: -1.900
TOP: -2.000
BOP: -2.200 -2.460 (FFL)
STRANDED CU. CLAD STAIRCASE-1 BOP: -2.200 BOP: -2.200 BASEMENT LEVEL VARIES
STEEL CONDUCTOR (Y/G)
600
600
400mm² BARE STRANDED CU. CLAD STEEL CONDUCTOR (MAIN EARTH GRID)
6000 6000 6000 6000 6000 6000 6000 6000
SECTION A-A
SCALE 1:100
NEUTRAL EARTHING
1Cx300Sq.mm PVC INSULATED CU.
CABLE (Y/G)
NEUTRAL EARTHING 4
1Cx500Sq.mm CU. XLPE CABLE
A
F
2n 2r 2y2b
1R
CONSULTANT:
5
2W
1W
1Y
2V
C
1V 2
1B
B 11kV CABLE BOX 2x1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE 1 HV SIDE CABLE BOX EARTHING 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE (PHASE-1)
1500
C 33kV CABLE BOX 2x1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE 2 LV SIDE CABLE BOX EARTHING 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE
D CC CABINET 2x1Cx50Sq.mm CU. CLAD STEEL PVC Y/G CABLE 3 BODY EARTHING 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE
400mm² BARE STRANDED CU. CLAD STEEL CONDUCTOR (MAIN EARTH GRID) DRAWING TITLE:
E TRANSFORMER BODY 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE 4 BODY EARTHING 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE
F TRANSFORMER BODY 1Cx300Sq.mm CU. CLAD STEEL PVC Y/G CABLE FIRE WATER STORAGE TANK
NRHL 33/11kV PRIMARY SUBSTATION
5 NEUTRAL EARTHING 1Cx300Sq.mm PVC INSULATED CU. CABLE (Y/G)
EARTHING DETAILS OUTDOOR EARTHING LAYOUT
G NEUTRAL EARTH 1Cx500Sq.mm CU. XLPE CABLE
(SECTION &DETAILS)
70.00m
ED NRHL-PY
PROPOS TION
SUBSTA
70.00m
70.00m
EXISTING
NRHL-PY
SUBSTATION
70.00m
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED, AND
LEVELS ARE IN METERS
2. MAIN EARTH GRID (400mm² CU. CLAD STEEL CONDUCTOR) SHALL BE LAID MINIMUM
1500MM BELOW THE GROUND, & 600MM BELOW THE BUILDING.
3. MINIMUM DISTANCE BETWEEN TWO VERTICAL EARTH ELECTRODES SHALL BE
3000MM FOR TRANSFORMER AREA.
4. BURIED CONDUCTORS ARE CONNECTED TO VERTICAL EARTH RODS LOCATED AT
(HORIZONTAL TO (HORIZONTAL CONDUCTOR TAP TO THE CORNER OF THE MESH BY BOLTED NON-FERROUS CLAMPS TO FACILITATE
REMOVAL OF THE CONDUCTOR FOR TESTING THE ROD (EPF).
(HORIZONTAL END TO END BY CADWELD) HORIZONTAL CONDUCTOR CROSS HORIZONTAL CONDUCTOR RUN BY CADWELD) 5. WHEREVER EARTH GRID/ELECTRODE IS FOULING WITH FOUNDATION, CABLE
DUCTS, DRAINAGE & OTHER CIVIL WORKS, IT SHALL BE LAID 1500MM BELOW THE
FOUNDATION.
BY CADWELD) TYPICAL DRAWING FOR CONNECTION 6. ALL HV & LV POWER EQPTS., METALLIC PARTS OF FENCE ETC. ARE CONNECTED
EARTH GRID.
BETWEEN GROUNDING RING 7. ALL EARTHING INTERCONNECTIONS (BURIED) TO THE MAIN GRID SHALL BE
ACHIEVED BY EXOTHERMIC WELDING & ALL OTHER INTERCONNECTIONS SHALL
AND GROUND ROD 8.
BE OF BOLTED TYPE.
ALL VERTICAL EARTHING ELECTRODES SHALL BE PROVIDED WITH INSPECTION PIT
WITH COVER (EPF, EPN, ELP).
9. ALL METALWORK WITHIN THE SUBSTATION PREMISES THAT DOES NOT FORM A
PART OF THE ELECTRICAL EQUIPMENT IS TO BE BOUNDED TO THE EARTH GRID.
10. THE DEEP VERTICAL ELECTRODES SHALL BE TERMINATED AT MAIN EARTH GRID
LEVEL (IE, 1500MM BELOW FGL LEVEL)
11. ALL VERTICAL RISERS SHALL BE PROTECTED FROM MECHANICAL DAMAGES.
12. THIS DRAWING SHALL BE REFEREED ONLY FOR THE MAIN EARTHING GRID
SEPARATE DRAWING SHALL BE SUBMITTED FOR INDOOR EARTHING.
13. MAIN EARTH GRID SHALL BE INSTALLED WITH IN THE SUBSTATION BUILDING,
600MM OFFSET FROM SUBSTATION BUILDING & 1500MM REST OF AREA.
14. WHEREVER EARTH GRID/ELECTRODE IS FOULING CIVIL WORKS, IT SHALL BE LAID
ADJACENT TO THE CIVIL WORKS.
LEGENDS:
100
BRONZE NUTS AND WASHERS
CONDUCTOR 450
CLIENT:
CONSULTANT:
GROUND LEVEL
PARSONS BRINCKERHOFF LTD
PO BOX 47445, ABU DHABI, UAE
600
PVC CONDUIT FOR EARTH ROD CLAMP DESIGN CONSULTANT:
MECHANICAL PROTECTION
450
DR. MAHMOOD ALI AL SAIE
COPPER CLAD STEEL ENGINEERING CONSULTANCY & DESIGN BUREAU
ROD (19mm Dia.) ABU DHABI - UAE
TEL: 02-6272762, FAX: 026275845, P.O. BOX: 2925
CONTRACTOR :
600