0% found this document useful (0 votes)
10 views6 pages

TBT Aug 24-26

The document outlines toolbox training records for the 400 kV New Damauli Substation Project, detailing training sessions on machinery and waste management, hand tools safety, and biodiversity conservation. It includes discussions on various hazards and mitigation controls related to physical, health, mechanical, and human/behavioral risks, as well as waste management practices. Emergency contact information and attendance sheets for the training sessions are also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views6 pages

TBT Aug 24-26

The document outlines toolbox training records for the 400 kV New Damauli Substation Project, detailing training sessions on machinery and waste management, hand tools safety, and biodiversity conservation. It includes discussions on various hazards and mitigation controls related to physical, health, mechanical, and human/behavioral risks, as well as waste management practices. Emergency contact information and attendance sheets for the training sessions are also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

400 kV New Damauli Substation Project Toolbox Training Record

Vyas 13, Tanahun TBT-NDSP-DCS-HS/F02

Project Name: 400 kV New Damauli Substation Client Name: MCA-Nepal


Consultant/Engineer: WAPCOS Contractor: TEECL
Location/Activities: Project Site – Ground Levelling and Trainer: Lokendra Subba & Taranath
Foundation Works Lamichhane

Total Attendee
TBT To Duration Date & Time: Topic Covered in the
Attendees Date To Date
TBT
8 Worker xx xx 10m 24.08.2025 09:10 Machinery & Waste
(Total 13) Management

Training in Brief
Machinery: Backhoe Loader and Tractor and Topic of Waste Management

Hazards Discussion Mitigation Control


A. Physical Hazard – Risk of machine overturning on Measures
 Ensure ground is stable before operation, avoid steep slopes,and
uneven/sloping ground; Collision with workers, vehicles, or
operate at safe speed.
nearby structures and Noise and vibration exposure from  Install reverse alarms, and provide high-visibility PPE to workers .
prolonged machine use  Limit operating hours with proper rest, provide ergonomic seating,
and maintain suspension systems.
B. Health Hazard – Whole-body vibration from prolonged
 Conduct daily pre-use inspections, follow preventive maintenance
machine operation and Heat stress schedules, and remove defective equipment from service.
C. Mechanical Hazard – Unexpected equipment failure (brake  Employ licensed/trained operators only, provide refresher training,
and enforce rest breaks.
failure, hydraulic leaks)
 Conduct toolbox talks, enforce supervision, and encourage
D. Human/Behavioral Hazards– Operator fatigue leading to reporting of unsafe practices.
 Provide shaded rest areas, hydration breaks in hot weather.
unsafe operation
 Littering around the project site is strictly prohibited.
E. Waste Generation- pollution  Burning of waste is strictly prohibited at site.
 Segregate recyclable materials, such as plastics, metals, and
paper at the source
 Adopt reduce, reuse and recycle approach in waste management.
TBT Participants and Activity Photos

Emergency Contact : Health & Safety Manager, Subash Adhikari-9869323231, Social Safeguard Manager Taranath Lamichhane-9855058676

OBSERVED BY
Company Name Position Signature Date
WAPCOS

TEECL
Attendance Sheet
400 kV New Damauli Substation Project Toolbox Training Record
Vyas 13, Tanahun TBT-NDSP-DCS-HS/F02

Project Name: 400 kV New Damauli Substation Client Name: MCA-Nepal


Consultant/Engineer: WAPCOS Contractor: TEECL
Location/Activities: Project Site – Foundation Works Trainer: Lokendra Subba & Taranath
Lamichhane

Total Attendee
TBT To Duration Date & Time: Topic Covered in the
Attendees Date To Date
TBT
12 Workers xx xx 10m 25.08.2025 09:10 Hand Tools & materials
(Total 16) and Biodiversity
Conservation

Training in Brief
Hand & Power Tools Safety and Biodiversity Conservation

Hazards Discussion Mitigation Control


A. Physical Injury – Cuts, punctures, abrasions, or crush Measures
 Wear gloves for handling sharp or rough materials.
injuries from improper tool and material use during barbed
 Keep cords away from water, sharp edges, and traffic paths.
wire handling and pole shifting  Always wear hand gloves safety goggles/face s hield while cutting
B. Flying Debris – Eye injuries from hammering or grinding and handling of barbed wire.
 Warn nearby workers before striking or hammering.
C. Improper Manual handling – Repetitive use or poor grip
 Choose tools with ergonomic design and comfortable grips.
causing musculoskeletal issues  Maintain correct posture while working.
D. Tool Malfunction – Breakage or failure due to misuse or  Rotate tasks or take short breaks to reduce strain.
 Ask for team support for heavy or repetitive work.
poor maintenance
 Do not use defective or damaged tools.
E. Trip & Fall Risks – Tools left in walkways or improper  Tag and remove faulty tools immediately.
storage  Keep blades sharp, replace worn-out parts.
 Store tools in clean, dry designated storage.
F. Biodiversity – Hunting wild animals, fishing, purchasing of  Maintain housekeeping at all times.
banned NTFPs  Do not hunt, fish, keep animals or gather forest products, except in
line with the law and the rules of local communities.
 Do not to collect or purchase NTFPs on site or in local bazaars
within 10 km of work sites
 Do not introduce of invasive plant or animal species during the
construction process, which can disrupt the local ecosystem.
 Use of firewood is strictly prohibited.
 If wildlife activities is detected at project site, immediately inform to
Environmental Manager
TBT Participants and Activity Photos

Emergency Contact : Health & Safety Manager, Subash Adhikari-9869323231, Social Safeguard Manager Taranath Lamichhane-9855058676

OBSERVED BY
Company Name Position Signature Date
WAPCOS

TEECL
Attendance Sheet
400 kV New Damauli Substation Project Toolbox Training Record
Vyas 13, Tanahun TBT-NDSP-DCS-HS/F02

Project Name: 400 kV New Damauli Substation Client Name: MCA-Nepal


Consultant/Engineer: WAPCOS Contractor: TEECL
Location/Activities: Project Site – Foundation Works Trainer: Taranath Lamichhane

Total Attendee
TBT To Duration Date & Time: Topic Covered in the
Attendees Date To Date
TBT
12 Workers xx xx 10m 26.08.2025 09:00 Hand Tools & materials
(Total 15)

Training in Brief
Hand & Power Tools Safety During Foundation Work

Hazards Discussion Mitigation Control


A. Physical Injury – Cuts, punctures, abrasions, or crush Measures
 Wear gloves for handling sharp or rough materials.
injuries from improper tool and material use during barbed
 Keep cords away from water, sharp edges, and traffic paths.
wire handling and pole shifting  Always wear hand gloves safety goggles/face s hield while cutting
B. Flying Debris – Eye injuries from hammering or grinding and handling of barbed wire.
 Warn nearby workers before striking or hammering.
C. Improper Manual handling – Repetitive use or poor grip
 Choose tools with ergonomic design and comfortable grips.
causing musculoskeletal issues  Maintain correct posture while working.
D. Tool Malfunction – Breakage or failure due to misuse or  Rotate tasks or take short breaks to reduce strain.
 Ask for team support for heavy or repetitive work.
poor maintenance
 Do not use defective or damaged tools.
E. Trip & Fall Risks – Tools left in walkways or improper  Tag and remove faulty tools immediately.
storage  Keep blades sharp, replace worn-out parts.
 Store tools in clean, dry designated storage.
 Maintain housekeeping at all times.

TBT Participants and Activity Photos

Emergency Contact : Health & Safety Manager, Subash Adhikari-9869323231, Social Safeguard Manager Taranath Lamichhane-9855058676

OBSERVED BY
Company Name Position Signature Date
WAPCOS

TEECL
Attendance Sheet