This radiographic inspection report, dated June 23, 2022, for SINOTCC Singapore PTE LTD, assesses the welding quality of a gasification plant project using ASME B 31.3 criteria. The inspection found no apparent defects (NAD) in the tested joints, all of which were accepted. The report was conducted by CAST Laboratories Pte Ltd, with results reviewed by qualified personnel.

Uploaded by

vijayasanthartcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

RT 2961

This radiographic inspection report, dated June 23, 2022, for SINOTCC Singapore PTE LTD, assesses the welding quality of a gasification plant project using ASME B 31.3 criteria. The inspection found no apparent defects (NAD) in the tested joints, all of which were accepted. The report was conducted by CAST Laboratories Pte Ltd, with results reviewed by qualified personnel.

Uploaded by

vijayasanthartcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Trusted For Testing

and Inspection Since 1981

RADIOGRAPHIC INSPECTION REPORT SERIAL NO. 18750 REPORT NO : RT-2961

CLIENT : SINOTCC SINGAPORE PTE LTD JOB NO : CUSINOTCC/NGP/2206/RT-258

ADDRESS: 18 BOON LAY WAY,# 06-122 TRADEHUB 21, SINGAPORE-609966 . DATE TESTED : 23-06-2022

PROJECT: NEW GASIFICATION PLANT PROJECT NO : 291 OBX58

PROCEDURE: TCC-W-PE-2500 .001(EN) ACC CRITERIA : ASME B 31.3 (2018 Ed)

LOCATION : SECTOR C

TECHNIQUE : DWSI IQI :ASTM 18 SOURCE: Ir 192 MATERIAL: A106 Gr.B


'
SENSITIVITY: WIRE N0.6(0.25 mm) SOURCE SIZE: 2x3mm ACTIVITY : 29.3 Ci FILM CLASS : AGFA D4

DENSITY: 2.0 - 4.0 SCREEN: 0.005"pb SOD /THICK : 3" / 11.1 mm FILM SIZE: 10" X 4"

IDENTIFICATION JOINT NO SEGMENT PIPE DIA WALL THK W/PROCESS FINDING RESULT REMARK(S)

(1 C7120A)-0-8001-116-02.001 /4 F8
,,-,,; 0-1 3" 11 .1mm GTAW NAD ACC ,·
,......
WELDER NO : W117 /"' 1-2 3" 11 .1mm GTAW NAD ACC /

TCC-WPS-P1/P1-04 2-3 3" 11.1mm GTAW NAD ACC r

FLUDE CODE : - BFWU 3-0 3" 11.1mm GTAW NAD ACC -,,,·

PIPE CLASS : - SEBR70

JOINT STATUS G ;"'

,_ - -----
...-- ------
~

---
l,..---"" ----
__________
---- ------

---
--
l---""
~

__________ ------
__________
------- REJECT
RES HOOT
0
0
ACCEPT 4
BT: BURNT THROUGH WH: WORM HOLE EP: EXCESS PENETRATION TOTAL 4
NAD: NO APPARENT DEFECT CON : CONCAVITY SI : SLAG INCLUSION REJ: REJECT
LOP: LACK OF PENETRATION CRK: CRACK Tl: TUNGSTEN INCLUSION ACC:ACCEPT
LOF: LACK OF FUSION POR: POROSITY UC:UNDERCUT C.POR:CLUSTER POROSITY FM: FILM MARK
RADIOGRAPERS : SHANMUGA I FADHIL (ASNT LEVEL II) INTERPRITATION: S.SASIKALA I (PCN LEVEL II RTFI)
REVIEWED : M.MAHESH REDDY Contractor : SINOTCC Company : LINDE Third party : SGS CLIENT :
Deputy Manager-Technical
'l · , n1:;"
NDT&l'.:1: o!"· ~ NAME4 ~ v
NAME: (·if.UhGIY
J
' .PE iROV ni<--2.I
NAME: NAME:

9712 ~ 18 L

·~-~
CSWl!i_N ~\

~
(Rl;i
;~
P
{!
~ 1~- ·~~ '•S,\ ~ ~r ~
~!.,
' <!. ,_ ~~
'"' ,1cit.1 1, C (~
..) il•"d }orl ~·•'• 19
••Tr~ ....,,t1l•" c:-.""( ti,(2r ,
~totaJJ-
.:<.
I!>
~ •'y
~ Y>/
DATE: 2?r-0s-;;ga -'-< -~·· DATE : DATE : DATE : DATE :
PAGE 1 OF 1
The results reported herein have been performed in accordance with the terms of accreditation under the Singapore Accreditation Council.

CAST Laboratories Pte Ltd


l@NMlll·§@l•IIUfii•M
llr41NdMt·IPt:l:01UfJCO:O,j
17 Tuas Avenue 8, Singapore 639232
T: (65) 6801 6000 F: (65) 6801 6004
www.castlab .com .sg
Co. Reg No.: 198100652N
hitW-E S T¢"R
_J_ /edlled
~~i~ralory
SAC · SINGLAS
i!i!iiiifili:ii

You might also like