0% found this document useful (0 votes)
9 views3 pages

PGT Division Caution Order On 16-09-2025

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views3 pages

PGT Division Caution Order On 16-09-2025

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PGT DIVN TEMPORARY SPEED RESTRICTION 16.09.25 (00.

00HRS)
Line
Length of Time Extra Time
SL Up/ SR PGT DIVN TEMPORARY SPEED RESTRICTION Date of Initial Date of original date Probable date of
Section Between Station Location Cautio n Taken(M taken in
NO Dn/ in KMP H 28.02.25 (00.00HRS) Imposition change of completion Completion
in K.M ts] Minutes
SL

FREQUENT ELEPHANT CROSSING


KJKD-KTKU D/L 1 523/02-528/02 05.00 75 4 13.02.25 12.04.25
(FROM 06.00-18.00 HRS)

PTJ-PGT A/LINE PERMITTED: 3 FREQUENT ELEPHANT CROSSING


1 KJKD-KTKU D/L 2 523/02-525/04 02.00 45 3 13.04.25 NIL
ACTUAL: 3 (FROM 18.00 - 06.00 HRS)

PGT YD RD4 D/L 3 533/47-534/17 00.06 15 DAMAGED CC APRON 05.04.25 15.05.25

OTP YD RD3 & 4 TSR ON PT 65B & 61B


D/L 1 565/16-24 00.12 75 1 13.08.25 07.09.25 21.07.25 18.09.25
ONLY (CANCELLED AT 10.00 HRS)
PGT-SRR DN LINE PERMITTED:
2 NIL
3 ACTUAL: 4 OTP-MNUR D/L 2 570/30-32 0.06 30 3 CABLE CROSSING WORK 15.09.25 15.09.25
(CANCELLED AT 12.30 HRS )

UNIMAT WORK AT PT NO: 50B


TUA YD D/L 1 614/16-614/24 00.25 30 4 11.09.25 12.09.25 20.09.25 22.09.25
(FROM 08.00HRS)
SRR-CLT DN LINE PERMITTED:
3 2
7 ACTUAL: 9

TA-PGI D/L 2 636/06-16 00.36 20 5 TSR WORK 09.09.25 08.10.25

CLT-CAN DN LINE PERMITTED:


4 NIL NIL
8 ACTUAL: NIL

VAPM-KPQ D/L 1 760/46-761/16 00.50 20 5 TSR ON BR 1116 27.05.25 08.08.25 08.10.25

CAN-MAQ/MAJN DOWN LINE


PERMITTED:11, ACTUAL: 9 30.10.25
5 PAZ-PAY D/L 2 783/16-22 00.18 75 1 WEAK BRIDGE 1124 05.03.25 22.04.25 15.03.25 (WTT: TO BE ADDED NIL
CAN-MAJN- 9 IN WTT)
CAN-MAQ- 9

30.08.25
BRIDGE MAINTENANCE WORK CORRODED BRIDGE
ULL-NTVT D/L 3 881/24-881/26 00.10 45 3 SPAN+T28 WORK (FROM 10.00HRS) 11.02.25 15.03.25 (WTT: TO BE ADDED
IN WTT)

TOK-MAJN-NTVT-MAQ DN/L LAND SLIDE LOCATION (IMPOSED AT TOK-MAJN:NIL


6 JOKT-PADL D/L 1 09/22-08/18 01.12 20 5 26.05.25 14.06.25 30.05.25 30.09.25 TOK-PADL:NIL
PERMITTED: 5 ACTUAL: 5 22.30HRS)
UP

T 28 WORK
KJKD YD B/L 1 520/43-35 00.20 20 5 13.09.25 20.09.25

FREQUENT ELEPHANT CROSSING ONLY DAY


KTKU-KJKD B/L 2 528/01-523/01 05.00 75 4 13.02.25 12.04.25
(FROM 06.00-18.00 HRS) TIME
PGT-PTJ B/ INE PERMITTED: 3
7 5
ACTUAL: 8

3 02.00 45 3 FREQUENT ELEPHANT CROSSING 13.04.25


KTKU-KJKD B/L 525/03-523/01
(FROM 18.00 - 06.00 HRS)

EIDS TESTING
WRA-ETMD B/L 507/14-506/14 01.00 50 15.09.25 15.09.25
(CANCELLED AT 10.00 HRS)

CABLE CROSSING WORK FROM


MNUR-OTP U/L 570/31-29 30 15.09.25 15.09.25
(CANCELLED AT 12.30 HRS)
SRR-PGT UP LINE PERMITTED:3
8 NIL
ACTUAL: 2

PGT YD RD 4 U/L 1 534/17-533/47 00.60 15 2 DAMAGED CC APRON 05.04.25 15.05.25


CLT-SRR UP LINE PERMITTED:6 TTR WORK ON PT 50B
9 KN YD U/L 1 650/43-650/35 00.24 45 3 07.08.25 29.08.25 30.08.25 20.09.25 NIL
ACTUAL: 3 (SPEED ENHANCED @ 13.00HRS)

CAN-CLT UP LINE PERMITTED 6


10 NIL NIL
ACTUAL: NIL

MJS-KMQ U/L 1 864/19-864/07 00.35 75 1 SURFACE DEFECT AT BR:1248 04.01.25 25.08.25 TO BE ADDED IN WTT

MAJN-MAQ-CAN UP LINE
11 KGQ-KQK U/L 2 834/01-833/01 01.00 45 3 SQRS WORK (FROM 08.00HRS) 12.09.25 14.09.25 20.09.25 25.09.25 1
PERMITTED: 9 ACTUAL: 10

KGQ-KQK U/L 3 833/01-831/19 01.20 20 6 SQRS WORK (FROM 08.00HRS) 06.09.25 14.09.25 12.09.25 25.09.25

MAQ-NTVT-MAJN-TOK UP/L
12 NIL
PERMITTED: 5 ACTUAL: NIL

S/L

SRR-NIL S/L PERMITTED :5


13 SRR-AAM S/L 1 15/14-16/01 00.30 45 2 STRENGTHENING OF BR. 45 25.05.25 30.05.25 30.09.25 NIL
ACTUAL: 2

PGT-PGTN-POY S/L PERMITTED


14 PGT YD RD 4 S/L 1 533/47-534/17 00.06 15 2 DAMAGED CC APRON 05.04.25 15.05.25 NIL
: 4 ACTUAL: 2

PTJ-CNV- POY S/L PERMITTED:


15 NIL NIL
3 ACTUAL: NIL

BNTL-PADIL-MAJN S/L
16 NIL NIL
PERMITTED: 5 ACTUAL: NIL

JOKT-PNMB UP LINE
17 JOKT-PNMB U/L 1 20/07-20/11 00.12 20 3 TSR WORK (ONLY FOR GOODS) 20.03.25 13.05.25 30.03.25 30.09.25 NIL
PERMITTED: 5 ACTUAL: 3

PNMB-JOKT DN LINE
18 NIL NIL
PERMITTED: 5 ACTUAL: NIL

You might also like