How to Build a Concrete Swimming Pool?
Concrete is the most commonly used material when it comes to swimming pool
construction. A concrete swimming pool is designed to take up full water load along with
the capacity to withstand large pressure loads.
The significant loads on the concrete pool structure are the weight of the earth outside
the pool and the weight of water held within the pool. The thrust created varies when
the water in the pool is emptied for cleaning purposes. It may or may not cause an effect
on the concrete based on the design efficiency.
This article explains the step-by-step procedure to construct a concrete swimming pool,
keeping into consideration the essential requirement of swimming pool construction. The
standard recommendations vary from region to region, but generally, they follow the
same principle and safety requirements.
Contents:
Procedure to Construct Concrete Swimming Pool
Step 1: Selection of Location and Design
Step 2: Excavation of Earth
Step 3: Construction of Swimming Pool Base
Step 4: Steel Cage Reinforcement
Step 5: Pump and Filter System for Swimming Pool
Step 6: Concreting in Swimming Pool Construction
Step 7: Waterproofing the Concrete Pool
Step 8: Construction of Coping
Frequently Asked Questions
Procedure to Construct Concrete Swimming Pool
As mentioned before, the design of pool side walls is carried out based on the regulations
of the region. Once the design of the pool is fixed, the construction phase is started. The
construction of a concrete swimming pool involves the following steps:
Step 1: Selection of Location and Design
The design of the swimming pool is the first step for pool construction. Choose a design
suitable for the given land or choose a land area to accommodate a design already
planned. The design of the swimming pool mainly involves the shape, depth, area of the
pool, the filtration system, and overall size.
The location selected for the pool must be ideal for facilitating regular maintenance. It is
recommended to choose a flat terrain, which can help in large cost reduction for
excavation and filling process. A land far away from trees helps to avoid pool filled with
leaves. The orientation of the swimming pool is best when constructed facing the sun.
Step 2: Excavation of Earth
Once the design and location to construct the swimming pool is fixed, the next procedure
is to excavate the area to prepare for construction. It is conducted by the following steps:
1. Mark the perimeter of the swimming pool using wooden stakes. To accurately locate the
area of the swimming pool, extend a tread along the perimeter.
2. Use a backhoe(or any earth removing equipment) to remove the earth within the
perimeter. Always make sure the area enclosed and nearby do not have any drainage,
electric line or water line crossing.
3. Dig the area, taking into consideration the space that is occupied by the swimming pool
floor. The dimension of cutting the soil is accurately followed as per the design plan in
hand. It can help to get a pool as per desired dimensions.
Excavation for Swimming Pool
Construction
Step 3: Construction of Swimming Pool Base
Construction of the pool base is one of the essential phases that influences the life of the
swimming pool. The excavation is conducted so that the bottom face becomes flat and
uniform. If the site has loose soil, then it must be filled and compacted with firm soil.
Compaction can be performed by natural soil or by using gravels. Use aggregates of size
between 12 to 40 mm to compact and prepare the base. After adequate filling of compact
materials, the base must be compacted with respect to the terrain. Do compaction using a
roller or similar equipment based on the area of compaction.
Once the pool base is compacted correctly, pour a small layer of cleaning concrete to the
bottom. The thickness of the concrete layer is generally 5 cm.
Always provide the pool base with a pool gradient or slope for easy emptying of water to
the filter system. The slope selected must be such that it does not affect the balance of the
swimmers. A maximum gradient of 1 in 40 is recommended for a pool that is used by
children and non-swimmers. Efficient emptying requires a grade of 1 in 80(As per British
and Euro Codes).
Step 4: Steel Cage Reinforcement
Once the excavation of the pool walls and the preparation of the base is finished, the next
step is to provide steel reinforcement for the pool wall and the bottom. Here, the
shotcrete procedure is followed in which a single steel cage reinforcement is provided
throughout the interior surface of the swimming pool. In guniting or shotcrete procedure,
the concrete structure is constructed in one piece without any gap between the wall and
the floor.
Note: The concrete can be placed either through shotcreting or by concrete
formworks. While constructing using formworks, the walls and the floor base are
made as two parts. A gap is left to allow the flow of water.
After providing steel reinforcement, place the essential plumbing lines, drainage lines,
etc. within the cage arrangement. The provision for stairs on the sides are also as per the
design.
Swimming Pool Steel Reinforcement-Image Courtesy: River Pool Sand Spas
Step 5: Pump and Filter System for Swimming Pool
A filter system and pump, together, are arranged on a large tank, either made of concrete,
metal, etc. Before concreting, the plumb lines are provided to take water from the
swimming pool to the filter system and back to the swimming pool.
The filter system and pump are also connected to the municipal water line to take fresh
water to the pool. The arrangement is necessary to replace the water lost from the pool
due to splash out or evaporation.
Step 6: Concreting in Swimming Pool Construction
Perform the shotcreting or guniting of walls and floors by a concrete of standard mix. Use
special tools to shape the surface as per the design. After finishing the concrete, it must be
cured twice a day for 14 days.
Concreting in Swimming Pool Construction
Generally, the thickness of the concrete base and walls of the pool determines the
durability. More the thickness, less is its exposure to fissures and cracks. Generally, the
thickness of the bottom of the pool is provided greater than the walls. For safety, a
standard pool shell requires a minimum thickness of 6 inches, excluding the plaster(As
per The American National Standards Institute (ANSI)).
Among the construction methods (Using formwork and shotcrete), the most optimal
option is the construction by shotcreting. This method develops a monolithic structure
that holds the force better. In the formwork method, walls and floor have a gap which has
chances to get separated. Providing more thickness to the formwork can help to avoid this
problem.
Step 7: Waterproofing the Concrete Pool
The most popular ways to waterproof concrete pool are by using tiles, glass, ceramic, or
use of epoxy-cement system or any waterproofing membrane. The selection of the
waterproofing method is performed based on the water table level of the area and
moisture conditions of the soils. The waterproofing of walls and floors is done to make it
watertight.
Step 8: Construction of Coping
Coping is the walking room provided around the pool’s edge. It can be made either by
concrete, marble, tile, or stone. Always wait for two to three days after the construction of
coping to fill the pool.
Coping Installation for Swimming Pools
Frequently Asked Questions
1. How to construct a concrete swimming pool structure?
The concrete swimming pool structure can be constructed either by shotcrete or guniting
or formwork methods. The shotcrete and guniting process constructs the walls and base
of the pool as a single unit. The formwork method creates the wall and pool base as two
units. The first method is more popular.
2. How to choose the location for Swimming Pool?
The location selected for the pool must be ideal for facilitating regular maintenance. It is
highly recommended to choose a flat terrain, which can help in large cost reduction for
excavation and filling process. A land far away from trees helps to avoid pool filled with
leaves. The orientation of the swimming pool is best when constructed facing the sun.
Read More: Basic Requirements for swimming pool construction
3. Why is shotcrete concreting preferred over the formwork method?
Among the construction methods (Using formwork and Shotcrete), the most optimal
option is the construction by shotcreting. This method develops a monolithic structure
that holds the force better. In formwork method, walls and floor have a gap which has
chances to get separated. Providing more thickness to the formwork can help to avoid this
problem.
4. How much slope should be provided to swimming pools?
The pool base is provided with a pool gradient or slope for easy emptying of water to the
filter system. The grade selected must be such that it does not affect the balance of the
swimmers. A maximum gradient of 1 in 40 is recommended for a pool that is used by
children and non-swimmers. Efficient emptying requires a grade of 1 in 80 (As per British
and Euro Codes).
5. How thick must be a swimming pool?
For safety, a standard pool shell requires a minimum thickness of 6 inches, excluding the
plaster. The thickness of the concrete base and walls of the pool determines the durability.
More the thickness, less is its exposure to fissures and cracks. Generally, a thickness of the
bottom of the pool is provided greater than the walls.
Read More:
1. What is Shotcrete?
2. Waterproofing Methods in Building Construction
3. Concrete Waterproofing
Categories: How To Guide
Tags: Construct swimming pool, How to Construct Concrete Swimming Pool, Procedure to Construct Concrete
Swimming Pool, swimming pool
View Comments
The Constructor Back to top
Exit mobile version