AM - BH PKG-2 - Avenue & Median Plantation GFC - (18.07.2025)

The document outlines the specifications for the development of a 6-lane highway, including details on right-of-way, carriageway dimensions, and utility corridors. It also provides guidelines for median and avenue plantations, specifying tree species, planting distances, and maintenance requirements. The project is part of the Amritsar-Bathinda Greenfield Section under the Bharatmala Pariyojna initiative.

Uploaded by

abhp2moga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

AM - BH PKG-2 - Avenue & Median Plantation GFC - (18.07.2025)

The document outlines the specifications for the development of a 6-lane highway, including details on right-of-way, carriageway dimensions, and utility corridors. It also provides guidelines for median and avenue plantations, specifying tree species, planting distances, and maintenance requirements. The project is part of the Amritsar-Bathinda Greenfield Section under the Bharatmala Pariyojna initiative.

Uploaded by

abhp2moga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

70000 RIGHT OF WAY

14000 14000
3000 3000
5000
6000 VARIES EARTHEN 10500 CARRIAGEWAY 10500 CARRIAGEWAY EARTHEN VARIES 6000
MEDIAN
2000 SHOULDER SHOULDER 2000
500 500 500 500

CORRIDOR
4000

UTILITY
CORRIDOR
EDGE EDGE STRIP C EDGE STRIP EDGE
L

UTILITY
600 STRIP STRIP 600
4000

100mm DIA. 1500 1000 1500


THRIE BEAM PIPE @20M W- BEAM CRASH BARRIER W- BEAM CRASH BARRIER 100mm DIA. THRIE BEAM
FRL LHS FRL RHS PIPE @20M
-3.0% -2.5% -2.5%
-3.0%

2
1 EARTH FILL 2
B
BC-40mm BC-40mm 1
200MM THICK 200MM THICK SLOPE PROTECTION
SLOPE PROTECTION A DBM-50mm DBM-50mm
BOUNDARY COMPACTIED GSB-150mm COMPACTIED BOUNDARY
6250

6250
WALL
EARTH FILL WMM-175mm WMM-175mm WALL
GRANULAR GEOGRID GEOGRID GRANULAR
4000 MATERIAL GSB-200mm GSB-200mm MATERIAL 4000

GSB-150mm SUBGRADE-500mm SUBGRADE-500mm GSB-150mm

Varies Varies
1500 1000 1000 1500

EARTHEN DRAIN TCS-1 EARTHEN DRAIN


L
C
SLOPE 2:1 SLOPE 2:1

EARTHEN SHOULDER

UNLINED DRAIN
UNLINED DRAIN

MEDIAN
UTILITY CORRIDOR

UTILITY CORRIDOR
TO RHS

12000
BERM
12000

EDGE STRIP

EDGE STRIP

EDGE STRIP

EDGE STRIP

BERM
3000
MAIN CARRIAGEWAY LME RME MAIN CARRIAGEWAY
A e% e% A

EDGE STRIP

EDGE STRIP

EDGE STRIP

EDGE STRIP

EARTHEN SHOULDER
3000
TO LHS
12000

12000
e% 1000
e%

SLOPE 2:1 SLOPE 2:1

PLAN OF MEDIAN & AVENUE PLANTATION

A -Specifications for median Plantations :- (IRC: SP:21-2009 , Cl.11.19) B -Specifications for Avenue Plantations :- LEGEND :-
(IRC:SP:21-2009 Cl.11.14.1) Plantation
1. The species to be planted in median should be of low or medium height with TREE
Types of Plantation Location (Km) Remark
ornamental value to enhance the visual experience of the road corridor. It will also 1. Distance from embankment shall be 1.5m away from the PLANT
1.Shrubs 1.In Median except Ornamental type plantation
act as a screen to prevent glare from the incoming vehicles. embankment toe. Structure shall be provided
2. One row of shrubs is recommended on medians of upto 3m width. Two rows of 2. Spacing between tree to tree shall be 12m. 2.All Interchanges /
2. Land Scaping Ornamental type plantation
shrubs should be planted on 4.5 to 5m wide median, at a spacing of 1.5m from the 3. size of the pits 60x60x60 cm. service area/ toll plaza/ shall be provided
O&M Centers.
inner edge of the median. 4. No. of plants per km 84. Minimum 40708 nos. of trees
3. The Plants Should be at Spacing of 3 x 3m and size of the pits for Planting Should 5. Height of the saplings at the time of planting shall be 1.5m to 2m. of desired type (As per Schedule
D) shall be planted .
3.Plantation 3.Available open land
be 60 X 60 X 60m, There fore, total no, of plants per km will bi 333 In case where 6. Survival percentage of plantation 90% at any time. with ROW The type of species of tree shall
be finalized in consultation with
single row Is proposed, and 666 in case of two rows. IE/ Authority.

4. The species recommended for median are mainly Bougainvillea spectabilis, C -No Plantations Zone :-
Tecoma stans, Nerium oleander,Thevetia nerifolira, Ixora coccinea. Bouganvillia (IRC:SP:21-2009 Cl.11.26.1)
is considered as the most suitable species as it has a great aesthetic value and it is 1. Within 1.5m from the toe of the carriageway. GOOD FOR CONSTRUCTION
Chaitanya Projects M/S Amritsar Bhatinda
found in various colours and shades. 2. At median cut and grade separator,at least 5m blank space shall be left Consultancy Pvt. Ltd.
in Association With
Highways PKG-2
Private Limited
5. The surface should have sufficient layer of good quality soil so as to have a better for clear view of the traffic. Infrailluminations LLP
K&J Projects Pvt. Ltd.
growth and survival of grasses and shrubs. 3. At curve,dense and tall height tree reduce visibility in plain terrain, a
6. The height of the plants will not be less than 0.6m and need to be in polythene stopping sight distance of corresponding to the design speed should be
bags until the planting. ensured on all curved sections,on the innermost lane of the curve NOTE:
7. All plants supplied must be planted within three days of removal from the nursery. 4. Screen plantation as a visual barrier in schools,hospitals,residential 1. All dimensions are in millimeter unless specified do not scale.
8. The plantation should be watered in case of insufficient rains after planting. colonies,etc. 2. Camber shall be taken as per approved plan and profile.
CLIENT: INDEPENDENT ENGINEER: CONCESSIONAIRE: EPC CONTRACTOR: DESIGN CONSULTANT: NAME OF PROJECT: DRAWING TITLE: DWG. NO.: NNCS-KCPL-AM-BH-PKG-2 HGH-T.P
NATIONAL HIGHWAYS Development of 6-lane Amritsar-Bathinda Greenfield Section of SHEET. NO.: 1 SCALE: N.T.S.
Chaitanya Projects M/s KRISHNA
AUTHORITY OF INDIA NITYA NAYRA CIVIL NH-754A from Junction with Moga- Jalandhar Road (NH-703) near
GOVERNMENT OF INDIA
Consultancy Pvt.
in Association With
M/S Amritsar Bathinda CONSTELLATION PVT.
SOLUTIONS PVT. LTD.
TYPICAL DRAWING FOR DRAWN DESIGNED CHECKED APPROVED
Ltd. LTD. Dharmkot to Junction with Bhagta Bhai Ka-Bhadaur Road at Dyalpura MEDIAN & AVENUE
29-04-2025 AS PER AE COMMENT
(Ministry of Road Transport & Highways)
K&J Projects Infrailluminations LLP Highways PKG-2 Pvt. Ltd. 95,Golden - Avenue -III, Roorkee
H.N.-104,Indus Empire Phase-II,
Bhai ka (from km 39+000 to km 93+000) as part of Amritsar-Jamanagar PLANTATIONS D. SINGH A.PATEL A. SINGH A. SINGH
R1 E-8, Bawadiya Kala Bhopal (M.P.)
Pvt. Ltd. Road, Meerut - 250001 (Uttar
R0 22-02-2024 SUBMISSION FOR REVIEW Phone:0755-4944349 Economic Corridor in the State of Punjab on Hybrid Annuity Mode
Pradesh).
REV. DATE DESCRIPTION under Bhartmala Pariyojna (Package-II).
Following shade trees recommended for 1st ROW in roadside avenues.

GOOD FOR CONSTRUCTION


TECHNICAL SPECIFICATION Chaitanya Projects
Consultancy Pvt. Ltd.
M/S Amritsar Bhatinda
Highways PKG-2
in Association With Private Limited
Infrailluminations LLP
K&J Projects Pvt. Ltd.

Techinical specification for planting along the highways are as follows :-

A. Specification of Saplings for Avenue Plantations. B. Specification of Saplings for Median Plantations.

CLIENT: INDEPENDENT ENGINEER: CONCESSIONAIRE: EPC CONTRACTOR: DESIGN CONSULTANT: NAME OF PROJECT: DRAWING TITLE: DWG. NO.: NNCS-KCPL-AM-BH-PKG-2 HGH-T.P
NATIONAL HIGHWAYS Development of 6-lane Amritsar-Bathinda Greenfield Section of SHEET. NO.: 2 SCALE: N.T.S.
Chaitanya Projects M/s KRISHNA
AUTHORITY OF INDIA NITYA NAYRA CIVIL NH-754A from Junction with Moga- Jalandhar Road (NH-703) near
GOVERNMENT OF INDIA
Consultancy Pvt.
in Association With
M/S Amritsar Bathinda CONSTELLATION PVT.
SOLUTIONS PVT. LTD. DETAILS OF DRAWN DESIGNED CHECKED APPROVED
Ltd. LTD. Dharmkot to Junction with Bhagta Bhai Ka-Bhadaur Road at Dyalpura MEDIAN & AVENUE
29-04-2025 AS PER AE COMMENT
(Ministry of Road Transport & Highways)
K&J Projects Infrailluminations LLP Highways PKG-2 Pvt. Ltd. 95,Golden - Avenue -III, Roorkee
H.N.-104,Indus Empire Phase-II,
Bhai ka (from km 39+000 to km 93+000) as part of Amritsar-Jamanagar PLANTATIONS
D. SINGH A.PATEL A. SINGH A. SINGH
R1 E-8, Bawadiya Kala Bhopal (M.P.)
Pvt. Ltd. Road, Meerut - 250001 (Uttar
R0 22-02-2024 SUBMISSION FOR REVIEW Phone:0755-4944349 Economic Corridor in the State of Punjab on Hybrid Annuity Mode
Pradesh).
REV. DATE DESCRIPTION under Bhartmala Pariyojna (Package-II).
GOOD FOR CONSTRUCTION
Chaitanya Projects M/S Amritsar Bhatinda
Consultancy Pvt. Ltd. Highways PKG-2
in Association With Private Limited
Infrailluminations LLP
K&J Projects Pvt. Ltd.

CLIENT: INDEPENDENT ENGINEER: CONCESSIONAIRE: EPC CONTRACTOR: DESIGN CONSULTANT: NAME OF PROJECT: DRAWING TITLE: DWG. NO.: NNCS-KCPL-AM-BH-PKG-2 HGH-T.P
NATIONAL HIGHWAYS Development of 6-lane Amritsar-Bathinda Greenfield Section of SHEET. NO.: 3 SCALE: N.T.S.
Chaitanya Projects M/s KRISHNA
AUTHORITY OF INDIA NITYA NAYRA CIVIL NH-754A from Junction with Moga- Jalandhar Road (NH-703) near
GOVERNMENT OF INDIA
Consultancy Pvt.
in Association With
M/S Amritsar Bathinda CONSTELLATION PVT.
SOLUTIONS PVT. LTD. DETAILS OF DRAWN DESIGNED CHECKED APPROVED
Ltd. LTD. Dharmkot to Junction with Bhagta Bhai Ka-Bhadaur Road at Dyalpura MEDIAN & AVENUE
29-04-2025 AS PER AE COMMENT
(Ministry of Road Transport & Highways)
K&J Projects Infrailluminations LLP Highways PKG-2 Pvt. Ltd. 95,Golden - Avenue -III, Roorkee
H.N.-104,Indus Empire Phase-II,
Bhai ka (from km 39+000 to km 93+000) as part of Amritsar-Jamanagar PLANTATIONS
D. SINGH A.PATEL A. SINGH A. SINGH
R1 E-8, Bawadiya Kala Bhopal (M.P.)
Pvt. Ltd. Road, Meerut - 250001 (Uttar
R0 22-02-2024 SUBMISSION FOR REVIEW Phone:0755-4944349 Economic Corridor in the State of Punjab on Hybrid Annuity Mode
Pradesh).
REV. DATE DESCRIPTION under Bhartmala Pariyojna (Package-II).