0% found this document useful (0 votes)
3 views6 pages

Mos Ceiling Jalan Gambang Kuantan KM5

Tba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views6 pages

Mos Ceiling Jalan Gambang Kuantan KM5

Tba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

METHOD OF STATEMENT

CLEAN & BRIGHT (CANOPY CEILING


OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 1 of 6

DOCUMENT TITLE: MOS CLEAN & BRIGHT

DOCUMENT NO: OWLSB/MOS-SBG/001-23

ISSUE FOR Mohamad Yazid Naufal Syafiq MEINHARDT


2 23/10/2023
REVIEW (Project Engineer) (Project Manager)
ISSUE FOR Mohamad Yazid Naufal Syafiq MEINHARDT
1 24/08/2022
REVIEW (Project Engineer) (Project Manager)
ISSUE FOR Mohamad Yazid Naufal Syafiq
0 27/12/2022 MEINHARDT
REVIEW (Project Engineer) (Project Manager)
Prepared REVIEW Review by
Rev Date Description MEINHARDT
OWLSB
METHOD OF STATEMENT
CLEAN & BRIGHT (CANOPY CEILING
OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 2 of 6

Table of Contents
1.0 PROJECT BACKGROUND .......................................................................................................... 3
1.1 INTRODUCTION ....................................................................................................................... 3
1.2 STATION LOCATION ................................................................. Error! Bookmark not defined.
2.0 DOCUMENT PURPOSE AND SCOPE OF WORK ......................................................................... 3
2.1 DOCUMENT PURPOSE ............................................................................................................. 3
2.2 GENERAL SCOPE OF WORK ...................................................... Error! Bookmark not defined.
2.3 DETAIL SCOPE OF WORK ......................................................................................................... 3
3.0 METHODOLOGY ...................................................................................................................... 5
4.0 MOBILIZATION OF MATERIALS ................................................ Error! Bookmark not defined.
5.0 PREPARATION WORK ............................................................... Error! Bookmark not defined.
6.0 SEQUENCE OF WORK ............................................................... Error! Bookmark not defined.
METHOD OF STATEMENT
CLEAN & BRIGHT (CANOPY CEILING
OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 3 of 6

1.0 PROJECT BACKGROUND


1.1 INTRODUCTION
MEINHARDT EPCM SDN BHD referred to as COMPANY (L2) has awarded OOI WAN LYE SDN BHD
(OWLSB) referred to as CONTRACTOR (L3) with 2023 Clean & Bright Projects at SH JALAN GAMBANG
KUANTAN KM5

2.0 DOCUMENT PURPOSE AND SCOPE OF WORK


2.1 DOCUMENT PURPOSE
This Document is intended to describe the method of statement for works at SH JALAN GAMBANG
KUANTAN KM5

Above is the example of phase by phase removal and installation (blue arrow showing the flow
of removal phase – orange arrow showing the flow installation phase of multi carrier joint –
green arrow showing the flow installation of strip ceiling panel)

2.2 DETAIL SCOPE OF WORK


The Detail scopes of work covered under this PROJECT are as follow: -
1. Mobilization of material & equipment
2. Dismantle existing ceiling.
3. Installation of new ceiling.
METHOD OF STATEMENT
CLEAN & BRIGHT (CANOPY CEILING
OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 4 of 6

Equipment, tools & machineries 1. Mobile Aluminum Scaffolding


2. Hand Tools (Hammers, Wrenches, Hand Saw,
Wire Cutter etc.
3. Measurement Tools (Tape)
4. Manual Lifting Rope
5. Marking Tools
Safety Equipment 1. Fire Extinguisher
2. First Aid Kit
3. Hard Barricade
4. Safety Signage
5. Anchor Post Equipment
6. Self-Retractable Lifeline
Personal Protective Equipment (PPE) 1. Hard Hat
2. High Visibility Vest
3. Safety Shoe
4. Hand Glove
5. Safety Glasses
6. Full Body Harness with Double Lanyard
METHOD OF STATEMENT
CLEAN & BRIGHT (CANOPY CEILING
OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 5 of 6

3.0 METHODOLOGY/WORK SEQUENCES

DISMANTLE EXISTING CEILING


1. Dismantle existing ceiling panel • Park scaffold at the desired location. Barricade
the work area.
• Begin at one edge or corner of the ceiling.
• Gently detach each panel or tile from the
suspension system, using a flat-head
screwdriver or removal tool if necessary
2. Dismantle existing ceiling support • Remove the existing bracket by cutting the
strip/bracket and wire hanger hanger wire from the canopy structure to the
bracket.
• Place the existing ceiling panel on the ground
by tying the panel with a rope and lower it
down from the scaffolding
3. Install Ceiling Support Strip and Wire Hangers • Install ceiling Support Strip by Hanging the
Ceiling Support Strip to the Canopy Structure
• Hang the Ceiling Support Strip using Wire
hanger.
• Make Sure the Level of Ceiling Support Strip is
at the Same Height
4. Install new ceiling panel • Attach the strip ceiling panels to the
suspension system using screws or clips
provided by the manufacturer.
• Use a level to ensure that the strip ceiling
panels are perfectly aligned and level.
• Attach back the canopy lighting to the ceiling
panel by using cordless screwdriver.
• Clean up the ceiling panel and ensure no stains
or hand marking retain on the ceiling panel
METHOD OF STATEMENT
CLEAN & BRIGHT (CANOPY CEILING
OWLSB/MOS-SBG1/01-22 REPLACEMENT) [23/10/2023]
REV.2 Page 6 of 6