Member Of :
SELAMAT DATANG DI
PT. JHONLIN AGRO RAYA TBK
“ t o wa rd s s u st a i n a b l e re s o u rc e s ”
01 Jan 2025
PLANT LOCATION
KALIMANTAN UTARA
KALIMANTAN SELATAN
PT JAR Tbk - BIODIESEL
KALIMANTAN TIMUR BANJARBARU
KALIMANTAN BARAT
3 JAM 30 MENIT
KALIMANTAN TENGAH
KALIMANTAN SELATAN
Coordinate :
-3.2860090902875068,
116.07895327376556
407 km From 209 km From 28 km From
IKN Banjarbaru Batulicin
PT JAR Tbk
PT. JAR Tbk berlokasi di Desa Batu Ampar, Kec. Simpang Empat,
Kab. Tanah Bumbu, Prov. Kalimantan Selatan
Sertification Systems
ISO 9001 : 2015 ISO 45001:2018 SMK3 HALAL
ISO 14001:2015 SNI 7709 : 2019 CPPOB KOSHER
PT. Eshan Agro Sentosa
Sub Holding Agro Business | EAS
Palm Oil Plantation | Downstream Industry
PT. Jhonlin Agro Raya Tbk
Tanah Bumbu, Kalsel | 25.000
HA Planted | CPO Mill 60 TPH
Agro Business Unit
PT. Kodeco Agrojaya Mandiri 3 PT. Pradiksi Gunatama
Tanah Bumbu, Kalsel | CPO Mill 30 Tanah Grogot, Kaltim | 24.000 HA
TH, Fully Operated Planted | CPO Mill 90 TH Fully
Operated
PT. Hutan Prima Jaya
Kota Baru, Kalsel | 4.000 HA Planted
PT. Kodeco Agrojaya Mandiri 1 PT. Multi Sarana Agro Mandiri
Tanah Bumbu, Kalsel | 13.000 HA Kotabaru, Kalsel | 25.000 HA Planted
Planted| CPO Mill 60 TH, Fully | CPO Mill 45 TH Fully Operated
Operated
PT. Taman Hutan Mandiri
Total EAS: 103.000 HA
Kota Baru, Kalsel | 5.000 HA Planted Planted
PT. Kodeco Agrojaya Mandiri 2
Tanah Bumbu, Kalsel | 7.000 HA
Planted| CPO Mill 60 TH, Fully
Operated CPO Mill Tertanam
Struktur Organisasi
Admin, Operator, Security, Driver
(109 Orang)
Foreman (42
Orang)
Staff/ Supervisor (20
Orang)
Asisten Manager (5
GENERAL Orang)
MANAGER
Manager (5
Orang)
KALIMANTAN SELATAN
Total 85%
Tenaga kerja lokal
181 Tenaga kerja (Kalimantan Selatan)
Milestones
• IPO saham JARR di Bursa Efek
Konstruksi projek biodiesel • Pembangunan pabrik minyak PT JAR Tbk masuk Kawasan Ekonomi
plant kapasitas 1500 TPD goreng kapsitas 450 TPD Khusus (PP No. 26 tahun 2024)
2014 2019 2021 2022 2023 2024
• Comissioning biodiesel plant • Pembangunan pabrik minyak kelapa sawit
PT. JHONLIN AGRO RAYA Tbk
• Shipment Perdana kapasitas 60 TPH
Established on 30 April 2014
• Peresmian oleh presiden RI • Merger usaha PT Jhonlin Agro Lestari, Nov 2023
Milestones
Konstruksi projek biodiesel • IPO saham JARR di Bursa Efek
plant kapasitas 1500 TPD • Pembangunan pabrik minyak
goreng kapsitas 450 TPD
2019
2022
• Pembangunan pabrik minyak
• Comissioning biodiesel plant kelapa sawit kapasitas 60 TPH
PT. JHONLIN AGRO RAYA Tbk • Shipment Perdana • Merger usaha PT Jhonlin Agro
Established on 30 April 2014 • Peresmian oleh presiden RI Lestari, Nov 2023
2014 2021 2023
Up Stream Process
DOWNSTREAM
(REFINERY, BIODIESEL, FRAKSINASI)
PLANTATION FRESH FRUIT PALM OIL MILL
BUNCH
CPO
KERNEL CRUSHING PLANT
KERNEL
JANKOS
SHELL FIBER
CPKO
BUNGKIL
APLIKASI KE LAHAN/
KOMPOSTING BAHAN BAKAR BOILER
PAKAN TERNAK
Down Stream Process
PRE-TREATMENT PLANT
FRESH FRUIT PALM OIL MILL
BUNCH
SOLAR
BIODIESEL PLANT
CPO FOSIL BLENDING
TANK
KERNEL
PFAD RBDPO FAME
CPO : Crude Palm oil
PFAD : Palm Fatty Acid Distillate
RBDPO : Refined Bleached Deodorized Palm Oil
FAME : Fatty Acid Methyl Ester FRACTIONATION PLANT CRUDE GLYCERINE B35/B40
STEARIN
FATTY MATTER
COOKING OIL - Pertamina WAYAME BAU-BAU
- - AKR Kota Baru
- APE Stangga
Process Flow Diagram – Pre Treatment, Biodiesel & Cooking Oil Over ALL Plant PT JAR
PRE TREATMENT PLANT 1600 TPD
CPO Spent BE PFAD PFAD
REFINERY Plant Tank
CPO
CPO Tank
HomogenizerTank RBDPO
PA
RBDPO Storage
Phosporic Acid Clean Dirty Tank
BE Cooling Cooling
NaOH Tank
NaOH Fatty Matter
Fatty Matter
HCl Tank Tank Glycerine
Glycerine
HCl Tank
FAME / B30
Catalyst Tank Tank FAME / B30
Catalyst
BIODIESEL PLANT
Methanol Tank Biodisel Cooling Stearin
Methanol
✓ 0,5 Liter
Cooking Oil Packaging
✓ 1 Liter
System
✓ 2 Liter Warehouse Finish
Product
Stearin Tank
Packaging
Retail
Material
Olein Tank
FRACTIONATION PLANT
(COOKING OIL)
Sea Water Proses
Tank Fractionation Cooling Ancillary Building
✓ Pre Treatment River
Water Basin ✓ Office ✓ Biodiesel Plant
✓ Laboratorium ✓ Fractionation Plant Waste Water
BWRO ✓ Prayer Room ✓ OSBL (All) Waste Water
Tank ✓ Rest Room dll Package
✓ CPO
✓ Methanol
Demin Tank Fire Fighting Pigging System ✓ Product Plant
✓ Pre Treatment
WTP PLANT ✓ Biodiesel Plant
SWRO Tank ✓ Fractionation Plant
Heating ✓ OSBL (All)
Coal ✓ Pre Treatment Compressor Air
✓ Biodiesel Plant
Coal Shelter Coal Conveyor ✓ Fractionation Plant ✓ Pre Treatment
✓ OSBL (All) ✓ Biodiesel Plant
✓ Fractionation Plant
BOILER PLANT ✓ Methanol dll
Refinery Capacity : 1600 TPD Nitrogen Package
Biodiesel Capacity : 1500 TPD
FractionationCapacity: 250 TPD
Lay Out and Facility Plant
Workshop and
Sparepart Warehouse
Jetty Product Storage
Packagaing
Fractionation Tank Refinery Station Boiler Station WTP and WWTP
Station
Station Station
Bleaching earth
Laboratory Main Office and Chemical
CPO Storage Unloading CPO Musholla Warehouse Boiler Station
Tank
COMMODITY PT JAR TBK
THANK YOU
PABRIK BIODIESEL
Pada 21 Oktober 2021, peresmian pabrik biodiesel JAR oleh
Presiden Joko Widodo
di Tanah Bumbu, Kalimantan Selatan.
16
3. MONITORING AREA SALES KAL-SEL
TANJUNG
KAL-TENG 2 jam
BARABAI
6-7
jam
COVERAGE SALES
Banjarmasin : Kota Banjarmasin, Marabahan, Landasan Ulin
Banjarbaru : Kota Banjarbaru, Martapura, Binuang, pelaihari, Jorong, Kintab
Barabai : Kota Barabai, Rantau, Kandangan, Negara, Alabio, Amuntai, Paringin, Batu Mandi/Birayang
Batulicin : Kota Batulicin, Kota Baru, Pagatan, Sebamban, Sungai Danau, Sungai Durian, Serongga.
4 Tanjung : Kota Tanjung, Murung Pudak, Paringin, Kalua, Tamiyang Layang, Pasar Panas, Ampah, Buntok, Jaro,
4 jam
jam Solan.
1 jam Kota Baru : Kota Baru, Serongga, Cantung, Lontar, Siring Laut
1 jam 3-4
BANJARMASIN jam
6-7 jam
KOTA BARU
BANJARBARU
BATULICIN
AREA KAL-TENG
COVERAGE SALES
• Muara Teweh : Kota Muara Teweh, Sikui, Kandui, Patas, Puruk Cahu,
MUARA TEWEH • Kuala Kapuas : Kota Kuala Kapuas, Anjir-Serapat, Catur (Tamban), Palingkau, Besarang, Pulang Pisau,
• Palangkaraya : Kota Palngkaraya, Kasongan, Kereng Pange, Gunung Mas
• Sampit : Kota Sampit, Samuda, Kuala Pembuang, Parenggean
• Pangkalan Bun : Kota Pangkalan Bun, Kumai, Pembuang Hulu, Nanga Bulik, Sukamara, Kotawaringin Lam
Puruk Cahu
SAMPIT
MUARA TEWEH
Kandui
Kasongan Patas
Parenggean
PALANGKARAYA
PALANGKARAYA
SAMPIT
Sukamara
PANGKALAN BUN Pulang Pisau
Besarang
Samuda Kuala Kapuas
Kuala Pembuang
PANGKALAN BUN KAPUAS
Kepuasan
Grafik
Pelanggan
Keberhasilan pemasaran
tidak bisa dipisahkan dari
kepuasan pelanggan guna
keberlangsungan bisnis
(Sell In Januari – September 2024)
yang berkelanjutan
70,000 Migor JAR 1 Liter
60,000
Migor JAR 2Liter
50,000
By Karton/ dus
40,000
Total By Dus
30,000
20,000
AVG Kontribusi All Area :
10,000
Kalimantan Selatan 70%
0
Jan Feb Mar Apr Mei Juni Juli Aug Sep
Sales Bulanan
Kalimantan Tengah 30%
JAR 1 LITER JAR 2 LITER TOTAL
Perfomance bulan Januari – September 2024. Penurunan penjualan sebagian besar dipengaruhi faktor meluapnya produk “Minyak Kita” yang
harganya relatif murah diseluruh area, sehingga banyak kompetitor berlomba-lomba menarik minat beli konsumen dengan “Diskon / Promo”
kecuali minyak goreng JAR. Meskipun demikian Marketing dan Distributor tetap optimis mencari peluang yang ada, sehingga angka penjualan di Distributor Area KAL-SEL-TENG
bulan September 2024 masih lebih baik dibandingkan bulan sebelumnya.
IPO PT JAR Tbk
On August 4th 2022, become public listed company
at Jakarta Stock Exchange
PT. Jhonlin Agro Raya Tbk (JARR)
13 Maret 2024, Presiden RI Prabowo Subianto melakukan
kunjungan ke PT. Jhonlin Agro Raya Tbk
Materials Balance Biodiesel
• First Process(Cap. 1,600 TPD)
Pre-Treatment Plant
RBDPO 1500 Ton (93.85%) as input Biodiesel Plant
PFAD 88 Ton
CPO 1598 Ton INPUT OUTPUT (5.5%)
LOSSES 10 Ton
(0.65%)
• Second Process (Cap.1,500TPD)
Biodiesel Plant
FAME 1497 Ton
RBDPO 1500 Ton (88.3%)
Methanol 165 Ton CRUDE GLYCERINE
INPUT OUTPUT
(11%) 187 Ton (11.1%)
Other 30 Ton FATTY MATTER 11 Ton
(2%) (0.62%)
Total Input : 1695 Ton Total Output : 1695 Ton