PELAKSANAAN BIM DI
JABATAN KERJA RAYA
29APRIL
SYAMIL MUSADDIQ BIN MOHD.ASHHAR
GRADUATE ARCHITECT
BUILDING INFORMATION MODELING UNIT,
2017
BPPK, CPAB,
JABATAN KERJA RAYA
why
not
Typical Problems in Construction Project Delivery
Reasons
• Lack of Proper Planning
• Lack of Coordination
• Lack of Professional Specialised Education
• Poor Decision Making
• Inefficient dispute resolution mechanism
• Lack of Mediation
• Diffculty in responsibility fixation
• Lack of Project Monitoring/ Programme Monitoring
• Reluctance in Adoption of New Technology
• Lack of Integrated Project Delivery
PWD’s Strategic Initiative for…
RMK-11
• Improving work process & system
• Driving productivity (IBS & BIM)
how
+ +
Human
Knowledge ICT
resource
=
+ +
On-time Effective Cost Fulfilling the
project Management Quality as per
delivery Expected
CLIENT
Ministry
End Users
Public
OF
BIM in JKR
2008 2011
Projek Perintis
Pemilihan
BIM (In-house)
Autodesk
- Blok akademik
sebagai
SMK Meru Raya
platform BIM di
Ipoh Perak
JKR
2007 2012
BIM • Penubuhan Unit BIM PROKOM
diperkenalkan • Projek Perintis BIM II (In-house)
di JKR 2010 - SPRM Selangor
Penubuhan JK Teknikal BIM JKR - Klinik Kesihatan Maran Pahang
Projek BIM Reka dan Bina
- Institut Kanser Negara Putrajaya
2013
• Studio Latihan BIM 2015
• JKR BIM Roadmap Engagement Day • Pengukuhan JK Teknikal BIM JKR
• Projek BIM RP3 RMK10 (In-house) • JKR BIM Day
- Kolej MARA Banting Selangor • Manual Proses Kerja BIM
• Perjanjian MoU BIM JKR-UMP
• Projek BIM Reka dan Bina
- Hospital Putrajaya
WAY FORWARD
2017 -
2016 2020
• Garis Panduan Pengunaan Template JKR
2014 • Projek BIM Konvensional Dalaman –
• Garis Panduan dan Piawaian BIM JKR Hospital Parit Buntar
• Projek BIM Konvensional Perunding – MBKT
Terengganu
Autodesk was chosen as BIM
Platform Software in JKR
Disiplin Kegunaan model
Generate Virtual Building Model
Generate Drawing
Analyse and Design
Revit Inter-discipline Coordination(Interference management)
Architecture, Facility Management
Structural, Cost estimation
Mechanical &
Electrical
Disiplin Kegunaan model
Earth Work(Existing ground modeling, Site analysis,
Platform design and modeling & Volume calculation)
Road and Drainage (Profile design & Volume calculation)
Sanitary System(Gravity pipe network design)
AutoCAD Water Supply System (Pressure pipe network design)
Civil3D
Civil
Disiplin Kegunaan model
Design Validation and Verification (Model review)
Inter-Discipline Coordiantio (Interference management)
Model Visualisation (walkthrough)
4D Building Construction Simulation (Visualisasi 3D + Jadual
general program kerja)
Other Software
STUDIO LATIHAN
BIM
JKR BIM
KEY
RESULT
AREAS
JKR BIM STANDARD & GUIDELINES
JKR BIM standard and guidelines including processes
developed
PEOPLE
Objectives : Create awareness & buy in.
Develop competent managers & designers / modelers
PROCESS
Objective :
Reengineer the processes for Integrated project delivery
TECHNOLOGY
Objective : Provide adequate & sufficient software,
hardware & infrastructure
Unit BIM
CPAB JKR
Construction
Industry
Construction Industry (Sunway, Sime
Darby, Brunsfield & HSS)
• BIM
Model Analisis & Koordinasi Lukisan
Rekabentuk
• Kaedah Konvensional
Model Analisis & Koordinasi Lukisan
Rekabentuk
Faktor utama : Informasi dan keputusan yang tepat, awal dan mencukupi
ADVANTAGE
OFIMPLIMENTING
BIM FOR JKR
PROJECTS
Facilitate design review process as well as
managing clients expectation and needs through 3D
visualization.
Clearer Site Visualisation and Improving Earth Work
Calculation.
Helps to verify Contractor’s work programme
Minimising design conflicts, clashes and
construction errors.
Asset information can be recorded in the model.
COMMON
BIM
OBJECTIVES IN
JKR PROJECTS
OPTIMIZED EARTHWORK QUANTITIES
Detailed site model
FACILITATE DESIGN REVIEW PROCESS & MANAGE
CLIENT’S EXPECTATIONS THROUGH VISUALIZATIONS
VERIFY WORK PROGRAM VIA 4D CONSTRUCTION
Construction model
Architectural model Structural model
Mechanical model Electrical model
Architecture detailed model
Structure detailed model
Mechanical detailed model
Electrical detailed model
Combined detailed model
MINIMISE CONFLICTS & REWORKS AT CONSTRUCTION
SITE
Interference checking
Electrical component vs
Mechanical component
Structural component vs
Mechanical component
3D Coordination
3D Coordination
Visualize designs more clearly through 3D visualization of
BIM model
3D Coordination
CASE STUDIES
Institut Kanser Negara, Putrajaya
(a)Clash detection between structure with M&E system
(b) Clash detection between structure with architecture
(c) Clash detection between M&E system with M&E system
CLASH ANALYSIS REPORTS
CLASH ANALYSIS REPORTS
AIR TERMINAL vs LIGHTING FIXTURES
DUCT vs CABLE TRAY
MECH. EQUIPMENT vs CABLE TRAY
DUCT vs ELECTRICAL FIXTURES
FURNITURES vs COLUMN
Pengubahsuaian perabot dapat ditentukan di peringkat
awal sebelum kerja pembinaan dimulakan
PIPE vs GROUND BEAM
Kedudukan ruang bukaan (opening) yang perlu disediakan pada
rasuk dapat ditentukan di peringkat awal rekabentuk sebelum kerja
pembinaan dimulakan
3D coordination conducted
- Punching through beam structure during construction work can
be avoided when the opening/sleeve in the beam are provided
earliear
- Structural integrity is assured
Record Modeling
Family Type :
Structural Trusses
Family Type : Structural
Framing-Beam
Family Type :
Structural Column
Parameter
Family Type : Structural
Framing-Slab
Family Type :
Family Type : Structural
Structural Foundation
Framing-Others
Record
Modeling
Mechanical –Family Type
Electrical – Family Architectural –
Type Family Type
• 4D simulation allow monitoring of actual physical
progress vs planned
CASE STUDY – SPRM PROJECT
Model Pembinaan
Jadual Program Kerja
FINDINGS
• Stumps is constructed
earlier than pile cap
• Staircase construction
at Level 3 starts earlier
than the frame
structure
FINDINGS
• Furniture assembly at
each level starts early
than structural
framework
• Construction of
columns at level 7 is
not included in
contractor’s work
program
COMMON BIM OBJECTIVES
JKR PROJECTS
SPATIAL ANALYSIS & ROOM SCHEDULE GENERATION
Quantity
Estimation
Drawing documentation
Structure Drawing
Mechanical Drawing
Electrical Drawing
BAB 1 : PENGENALAN
BAB 2 : KEGUNAAN BIM
BAB 3 : PERANAN DAN TANGGUNGJAWAB
BAB 4 : PELAN PELAKSANAAN PROJEK BIM
BAB 5 : MODEL BIM
BAB 6 : PROSES KERJA
BAB 7 : PENGURUSAN DATA
BAB 1 : TEMPLATE
BAB 2 : KONVENSYEN PENAMAAN
BAB 3 : SYARAT PEMATUHAN
WAY FORWARD
1. Menyediakan beberapa dokumen rujukan seperti berikut :
Manual Proses Kerja BIM
Penggunaan Template Perisian
Kaedah Konvensyen Penamaan
2. Menghasilkan Revit Apps (JBIM Library)
3. Mengurus pengumpulan komponen families dari masa ke
semasa
4. Menambahbaik JKR Revit Template mengikut keperluan dan
teknologi semasa
JABATAN KERJA RAYA MALAYSIA
https://www.jkr.gov.my/cawarkitek/paprmk11/
B I M &
BEYOND
Maintenance Scheduling
Maintenance Scheduling
Maintenance Scheduling
Asset Management
Asset Management
B I M
INDUSTRY
FEEDBACK
BIM users (38)
Advantages
• Improve quality
• Improve
communication
• reduce time
Difficulties:
• lack of trained personnel
165
respondents
• high cost of technology
BIM non users (127)
Why
• No requirement
• Unaware
• Not competent
When
• 73% plan to use BIM
within 1-3 years
AVOID
FRUSTRATION
Source: Internet
INCREASE
SATISFACTION
Source: Internet
BIM
THE FUTURE IS HERE
THANK YOU