0% found this document useful (0 votes)
19 views32 pages

DDD and Requirements For Tower CME

The document outlines the detailed design drawings for the PHILTOWER/MIDC rollout project at an outdoor greenfield site in San Luis, Batangas, Philippines. It includes architectural, structural, and electrical details, as well as site location, layout, and construction notes. The project is scheduled for completion by the end of June 2025, with specific design parameters and standards outlined for construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views32 pages

DDD and Requirements For Tower CME

The document outlines the detailed design drawings for the PHILTOWER/MIDC rollout project at an outdoor greenfield site in San Luis, Batangas, Philippines. It includes architectural, structural, and electrical details, as well as site location, layout, and construction notes. The project is scheduled for completion by the end of June 2025, with specific design parameters and standards outlined for construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

PHILTOWER / MIDC ROLLOUT PROJECT

PHILIPPINES
DETAILED DESIGN DRAWINGS FOR OUTDOOR GREENFIELD SITE
SITE ID: E03247-C08 / OPERATOR SITE ID: NS-TER24-C518

SHEET No. DRAWING No. DESCRIPTION SITE RING NAME: HTM_BrgyBanoyo_SanLuis_Batangas


ARCHITECTURAL LONGITUDE: 120.9163431°
0 AR_000_TABLE OF CONTENTS TABLE OF CONTENTS LATITUDE: 13.8282733°
1 AR_001_COVER PAGE COVER PAGE BTS TYPE: OUTDOOR
2 AR_002_SITE LOCATION/SITE DEVELOPMENT PLAN LOCATION MAP AND SITE DEVELOPMENT PLAN
DATE SURVEYED: February 27, 2025
3 AR_003_SITE LAYOUT SITE LAYOUT
PROPERTY NAME: Emelita Corales
4 AR_004_TOWER/SITE ELEVATION TOWER / SITE ELEVATION
PROPERTY ADDRESS: Brgy. Banoyo, San Luis, Batangas
STRUCTURAL
AREA TYPE: GREENFIELD
5 ST_001_TOWER DESIGN DRAWING TOWER DESIGN DRAWING (TOWER KEY PLAN)
WIND ZONE 290KPH
6 ST_002_TOWER FOUNDATION DETAILS TOWER FOUNDATION DETAILS

7 ST_003_TOWER REBAR DETAILS TOWER REBAR DETAILS

8 ST_004_FOUNDATION RE-BAR SCHEDULE FOUNDATION RE-BAR SCHEDULE DISTANCE FROM < 3Km (BEACONING PAINTING REQUIRED FOR TOWER)
NEAREST AIRPORT: √ > 3Km
9 ST_005_TOWER FOUNDATION TEMPLATE TOWER FOUNDATION TEMPLATE
EXPOSURE CLASSIFICATION: "B"
10 ST_006_GENERAL NOTES AND LEGENDS GENERAL NOTES AND LEGENDS
"C"
11 ST_007_SYMBOLS AND ABBREVIATIONS SYMBOLS AND ABBREVIATIONS √ "D" IF DISTANCE FROM COASTLINE < 2Kms

OUTDOOR BTS PAD DETAILS


HEIGHT ABOVE SEA LEVEL: 19m
12 ST_008_OUTDOOR BTS PAD DETAILS
NSCP 2015 WIND LOADS (kph): 290KPH
13 ST_009_DG PAD DETAILS DG PAD DETAILS
EXPECTED MAXIMUM FLOOD WATER 0m
14 ST_010_CABLE LADDER DETAILS CABLE LADDER DETAILS HEIGHT ABOVE EGL:

15 ST_011_FENCE AND GATE DETAIL 1

16 ST_012_FENCE AND GATE DETAIL 2 FENCE AND GATE DETAILS

17 ST_013_FENCE AND GATE DETAIL 3

18 ST_014_SERVICE ENTRANCE PEDESTAL SERVICE ENTRANCE PEDESTAL DETAILS


NOTE:
19 ST_015_PERIMETER LIGHT DETAILS PERIMETER LIGHT DETAILS
The tower materials for the new
20 ST_016_PANEL BOX FRAME PANEL BOX FRAME DETAILS
Pylon 2 design are scheduled to
21 ST_017_ANTENNA MOUNTING BRACKET ANTENNA MOUNTING BRACKET arrive in the Philippines by the end
22 ST_018_MICROWAVE MOUNTING BRACKET MICROWAVE MOUNTING BRACKET of June 2025.
ELECTRICAL
REVISION :
23 EL_001_ELECTRICAL SINGLE LINE DIAGRAM ELECTRICAL SINGLE LINE DIAGRAM

24 EL_002_ELECTRICAL SITE LAYOUT ELECTRICAL SITE LAYOUT APPROVED FOR CONSTRUCTION 1.


25 EL_003_SITE EARTHING LAYOUT SITE EARTHING LAYOUT & EARTHING ELEVATION

26 EL_004_EARTHPIT AND BUSBAR DETAILS EARTH PIT & BUSBAR DETAILS


2.
27 EL_005_TEST PIT DETAILS TEST PIT DETAILS
3.
28 EL_006_TOWER DOWN CONDUCTOR TOWER DOWN CONDUCTOR

29 EL_007_FIBER DUCTING DETAILS FIBER DUCTING DETAILS 4.


FOUNDATION
LEGEND
30 ST_019_SOIL BEARING TEST REPORT SOIL BEARING TEST REPORT
REV - REVISION NO
NTS - NOT TO SCALE
AR - ARCHITECTURAL
ST - STRUCTURAL
EL - ELECTRICAL

CIVIL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08
NAME: GREENFIELD G. PATINO
PRC No: 0061767
PTR No: 2782765
TIN No: 109-386-751-000
ISSUE DATE: 02/20/2025
ISSUE AT: LGU BACOOR
MIDC
MIESCOR Infrastructure Development Corporation
VDC APT NDG
MUNICIPALITY: SAN LUIS
PROVINCE: BATANGAS
REGION: REGION IV-A
LONGITUDE: 120.9163431°
LATITUDE: 13.8282733°
TABLE OF CONTENTS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. AR_000 DATE: 19TH AUG 2025 REV. NO.: 0
0

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
PHILOTWER / MIDC ROLLOUT PROJECT REPUBLIC OF PHILIPPINES
DEPARTMENT OF INTERIOR AND
PHILIPPINES LOCAL GOVERNMENT

DETAILED DESIGN DRAWINGS FOR OUTDOOR GREENFIELD SITE


LAND USE / ZONING
SITE ID: E03247-C08 / OPERATOR SITE ID: NS-TER24-C518

LIGHTNING ARRESTOR

BASIC WIND SPEED 290km/h @ 15m ABOVE GROUND, WHICH EQUATES THE FOLLOWING;
AVIATION LIGHT
3-SECOND GUST WIND SPEED @ 10m ABOVE GROUND. FOR 50YEAR
RECURRENCE INTERVAL
DESIGN STANDARD NATIONAL STRUCTURAL CODE OF THE PHILLIPINES (NSCP 7TH EDITION) LINE AND GRADE
DESIGN PARAMETERS

TIA/EIA-222-G STRUCTURAL STANDARD FOR STEEL ANTENNA TOWER &


ANTENNA SUPPORTING STRUCTURES & AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC 9TH EDITION) GLOBE ANTENNAS
TWIST AND SWAY TOWER HAS BEEN DESIGNED FOR A MAXIMUM COMBINED TWIST & SWAY TRI-SECTOR TYPE
OF 1.0' UNDER THE SERVICEABILITY LIMIT STATE WIND SPEED FOR EACH ANTENNA MOUNTING BRACKETS
ANTENNA LOADING COMBINATION

TOPOGRAPHIC CATEGORY 1: NO ABRUPT CHANGES IN GENERAL TOPOGRAPHY, eg FLAT OR ROLLING


TERRAIN NO WIND SPEED-UP, CONSIDERATION SHALL BE REQUIRED
OB-LIGHT
EXPOSURE CATEGORY D: FLAT, UNOBSTRUCTED AREAS AND WATER SURFACES. THIS
CATEGORY INCLUDES SMOOTH MUD FLATS, SALT FLATS, AND
UNBROKEN ICE.
BUILDING
STRUCTURAL CLASS II: STRUCTURES THAT DUE TO HEIGHT USE OR LOCATION REPRESENT A
HIGH HAZARD TO HUMAN LIFE AND/OR DAMAGE TO PROPERTY IN THE
EVENT OF FAILURE AND/OR USED PRIMARILY FOR ESSENTIAL COMMUNICATION

DIMENSIONS ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS IN METER UNLESS
OTHERWISE NOTED.
DIMENSIONS ARE NOT TO BE OBTAINED BY SCALING GSM 40m (3 LEGGED)
SELF SUPPORTING TOWER
SHOP DRAWINGS THESE ARE NOT SHOP DRAWINGS AND IT IS UP TO THE SUPPLIER TO CREATE
THEIR OWN SHOP DRAWINGS AND VERIFY THE DIMENSIONS SHOWN, ANY 100kPA - 290kph
DISCREPANCIES ARE TO BE REPORTED TO THE VENDOR.
STEEL SPECIFICATIONS ALL STEEL IS TO COMPLY WITH ASTM STANDARDS AND IS TO MEET THE
FOLLOWING MINIMUM YIELD STRENGTH PLUMBING
· LEGS - 355 MPa
· DIAGONALS - 310 MPa
· PLATES AND OTHER COMPONENTS - 310 MPa
· ALL MEMBERS TO BE USED SHALL BE HOT ROLLED AND SEAMLESS PIPE
BOLT SPECIFICATION ALL BOLTS/NUTS SHALL COMPLY TO ASTM A325 OR GRADE 8.8 UNLESS CLIMBING LADDER
STATED OTHERWISE
ALL BOLTED CONNECTIONS ARE TO HAVE A SINGLE WASHER AND DOUBLE
NUT ARRANGEMENT
A SINGLE WASHER IS ALSO TO BE PROVIDED UNDER THE HEAD OF THE BOLT
FABRICATION, ALL FABRICATION, HANDLING, ERECTION & TESTING IS TO BE DONE IN
HANDLING, ERECTION & ACCORDANCE WITH ASTM & AISC STANDARDS. A PROTOTYPE IS TO BE ELECTRICAL
TESTING PRE-ASSEMBLED AND CHECKED BY VENDOR/ PRIOR TO MASS PRODUCTION
MATERIAL SPECIFICATIONS

WELDING ALL WELDING IS TO COMPLY WITH THE AMERICAN WELDING SOCIETY (AWS) RF FEEDER CABLE
AND BE AS FOLLOWS UNLESS NOTED OTHERWISE; LADDER BRACKET
· E70XX ELECTRODES TO BE USED
· MINIMUM TENSILE STRENGTH OF 490MPa GLOBE AMB
· MINIMUM FILLET WELD IS TO BE 6mm
· ALL WELDS TO BE CONTINUOUS
· ALL SHOP CONNECTIONS ARE TO BE WELDED AND ALL SITE CONNECTIONS
ARE TO BE BOLTED
CABLE LADDER
GALVANIZATION ALL STEEL WORK INCLUDING HOLD-DOWN BOLTS,BOLTS AND NUTS ARE
MECHANICAL
TO BE HOT DIPPED GALVANIZED. GALVANIZATION IS TO BE IN ACCORDANCE PERIMETER LIGHT
OUTDOOR BTS PAD
TO ASTM STANDARDS
· MEMBERS/PLATES UP TO 6.4mm ARE TO HAVE A GALVANIZATION
THICKNESS OF 85
DG PAD
· MEMBERS/PLATES THICKER THAN 6.4mm ARE TO HAVE A
GALVANIZATION THICKNESS OF 100 m
· BOLTS, NUTS AND WASHERS ARE TO BE GALVANIZED AT 50 m
· EXCESSIVE ZINC IS TO BE REMOVED FROM THE THREADED PARTS SERVICE ENTRANCE POLE
OF NUTS AND BOLTS
2m HIGH STEEL OTHERS
AVIATION PAINTING PAINTING OF THE TOWER IS NOT A STANDARD PRACTICE AND IS ONLY TO
PANEL FENCE
BE DONE ONCE APPROVAL IS OBTAINED FROM THE VENDOR MANGER/CONTRACT
WITH MESH WIRE
MANAGER.
AND BARBED
IF THE TOWER IS TO BE PAINTED IT IS IN ACCORDANCE WITH THE FOLLOWING; WIRE ON TOP
· STEELWORK IS TO BE THOROUGHLY CLEANED OF OIL AND DIRT BEFORE
APPLYING THE PRIMER.
3m WIDE
· PAINT IS TO BE APPLIED IN 3 COATS, 1 PRIMER COAT AND 2 TOP COATS
PEDESTRIAN GATE
· PAINT IS TO BE ALL-WEATHER LEAD FREE INDUSTRIAL TYPE APPROVED
BY VENDOR.
REV DATE DESCRIPTION

SITE SIGNAGE ISOMETRIC VIEW


CIVIL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08
NAME: GREENFIELD G. PATINO
PRC No: 0061767
PTR No: 2782765
TIN No: 109-386-751-000
ISSUE DATE: 02/20/2025
ISSUE AT: LGU BACOOR
MIDC
MIESCOR Infrastructure Development Corporation
VDC APT NDG
MUNICIPALITY: SAN LUIS
PROVINCE: BATANGAS
REGION: REGION IV-A
LONGITUDE: 120.9163431°
LATITUDE: 13.8282733°
DRAWING No. AR_001
COVER PAGE
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 19TH AUG 2025 REV. NO.: 0
1

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
THIS SITE
NS-TER24-C518

VICINITY MAP
SCALE: NTS

SITE LOCATION PLAN


SCALE: NTS

CIVIL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08 LOCATION MAP AND


NAME: GREENFIELD G. PATINO
PRC No: 0061767
PTR No: 2782765
TIN No: 109-386-751-000
ISSUE DATE: 02/20/2025
ISSUE AT: LGU BACOOR
MIDC
MIESCOR Infrastructure Development Corporation
VDC APT NDG
MUNICIPALITY: SAN LUIS
PROVINCE: BATANGAS
REGION: REGION IV-A
LONGITUDE: 120.9163431°
LATITUDE: 13.8282733°
SITE LOCATION PLAN
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. AR_002 DATE: 19TH AUG 2025 REV. NO.: 0
2

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
15.0m x 15.0m LEASED AREA
NOTED.
2. ALL ELEVATIONS ARE IN METERS.
3. HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGES DURING
EXCAVATION BY PROVIDING PROPER SHORING.
4. COMPRESSIVE STRENGTH OF CONCRETE SHOULD BE AS PER
FOUNDATION DESIGN.

4825

2747

°
4a.READY MIX OF SPECIFIED STRENGTH SHOULD BE USED WHERE

73
15000 AVAILABLE.
4b.IF READY MIX IS NOT AVAILABLE NORMAL CONCRETE MIX AS
1000 10400 3600 PER FOLLOWING TABLE SHOULD BE USED.
1100 8200 1100 Minimum No. of Minimum Characteristic
Mix By Volume
Cement Cement Compressive Compressive
Designation Mix
3500 5400 6100 Content Bags Strength at Strength at
(Kg/cum) (50Kg/bag) 7 days 28 days
(N/mm²) (N/mm²)

M25 1:1:2 565 13 14.7 21


4c. ALL CONCRETE SHALL DEVELOP A 28 DAYS MINIMUM COMPRESSIVE

1263
1085 8230 1085 STRENGTH, Fc' = 21 MPa. TOWER INSTALLATION IS NOT ALLOWED
EARLIER THAN 7 DAYS AFTER POURING AND THE 7-DAYS OLD

1148
00
115 2000 2000 2000 2000 115 CONCRETE SHALL HAVE ATTAINED 70% OF THE MINIMUM

22
COMPRESSIVE CONCRETE STRENGTH, (FC'= 0.7 x 21 = 14.7 MPa)

168 250
FROM LABORATORY TEST RESULT.

115

115
250
LOCATION OF OB LIGHT 5. USE OF IMPORTED BACKFILLING MATERIALS OR ANY OTHER
LOCATION OF SUITABLE MATERIALS SUBJECT FROM APPROVAL FROM
LIGHTNING SPIKE

543

816
VERTICAL CABLE TRAY FOR PHILTOWER ENGINEERING DEPARTMENT.
652 250
100mm THICK GRAVEL FILL ON 3RD TENANT 6. BACKFILL MATERIALS TO BE PLACED IN 300mm LAYERS AND
SITE WITH 0.4mm BLACK COMPACTED TO 95% OF MAX. DRY DENSITY WITH RAMMER/
2000 VERTICAL CABLE TRAY FOR

2000
POLYETHYLENE SHEET JUMPING JACK COMPACTOR.
2ND TENANT 7. CABLE TRAY LADDER & SUPPORTS SHALL BE HOT DIP GALVANIZED.

2630
UNDERNEATH. CRUSHED
AGGREGATES 19mm TO 25mm VERTICAL CABLE TRAY FOR 8. HOT WORKS LIKE WELDING ON TOWER FOUNDATIONS IS NOT
OR 3/4 TO G1 MAXIMUM 1ST TENANT (GLOBE) ALLOWED ON SITE UNLESS APPROVED BY ENGINEERING
250 653 DEPARTMENT.

1563
600mm WIDE 9. ALL CONCRETE FINISH SHALL BE CHAMFERED ON ALL EDGES OF
3-LEGGED TOWER EARTH PIT CABLE LADDER RESTING COLUMNS AND PADS.
2550

40m - 290kph - 100kPA ON SUPPORT POLES 10. BTS AND DG PADS SHALL BE ELEVATED IF THERE IS FLOOD
750

2038
CABLE TRAY HISTORY AS PER SITE REQUIREMENTS. REFER TO BTS AND DG
∅50mm PVC PIPE SUPPORT DRAWINGS FOR MORE DETAILS
WEEP HOLE

SPILLAGE
11. EQUIPMENT PADS THAT ARE IN THE EXCAVATED AREA WILL

FUEL
1850 HAVE THEIR FOUNDATION RAISED FROM THE TOWER RAFT.

PIT
2000

2000
TOWER RAFT 12. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH

4677
FOUNDATION RELEVANT STANDARD DRAWINGS.
BTS PAD / SECTION 1
15000

CYCLONE FENCE SPARE 13. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
(TENANT 1) PULL WIRE INSIDE.
WITH BARBED WIRE
ON TOP 32 HOLE BUS-BAR
MATERIAL NOTES

3000
DG PAD 600mm WIDE
BTS THE FOLLOWING MATERIALS NEED TO BE HOT DIPPED GALVANIZED:
82

CABLE LADDER
00

2x∅50mm HDPE INSERTED INTO RESTING ON 1. CABLE LADDER MATERIALS


∅114mm PVC PIPE U/G SIDE BRACKETS 2. CABLE LADDER BRACKETS, BOLTS AND NUTS

9730
1500

1500
BURIED 350mm FROM FGL 3. CABLE LADDER SPLICING PLATES
(FOR 1ST TENANT) RECTIFIER 4. CABLE LADDER SUPPORT POLE
GENSET

36W PROPOSED C.O. LOCATION 5. BUSBAR TOWER, BUSBAR BRACKET AND ALL GROUND BUSBAR
4000

4000

32 HOLE BUS-BAR 6. ALL BOLTS AND NUTS

6000
7. FENCE AND GATE
2x∅50mm PVC PIPE 8. BARED WIRE HOLDERS
BURIED 450mm 9. BARBER WIRE AND TENSIONER
∅60mm PVC PIPE WITH POWER CABLE & BTS BELOW THE FGL 10. CONNECTOR PLATE FOR GROUNDING CONNECTION
∅20mm PVC PIPE WITH CONTROL CABLE AT TOWER LEG AND LIGHTNING ROD
TO GENERATOR PAD 250 650 1300 650 790 750 790 600 2000 100 250
2000

2000
BTS PAD / SECTION 2
(TENANT 2)
SPARE

3000
SOLAR POWERED
SITE PERIMETER LIGHTS
FIXED ON TOWER LEG
3873

32 HOLE BUS-BAR

100 1000 1600 ∅20mm CONDUIT FOR


2200 CONTROL CABLE MDP
2x∅50mm HDPE INSERTED INTO 2600 TO RECTIFIER
∅114mm PVC PIPE U/G
∅20mm PVC PIPE
2250

2000

2000
BURIED 350mm FROM FGL
2000

FOR FUTURE USE


FOR 2ND TENANT
BURIED 450mm BELOW THE FGL
SERVICE ENTRY POST ATS MDP 850
WITH MAIN KWHR METER, ECB
PANEL BOX FRAME
ECB 250AT 2P WITH WIRE GUTTER
250

250

250
115

115
3000x1500x200mm THICK
R/C ACCESS RAMP WITH 148 BRC MESH,
115 3000 500 30 440 30 2000 2000 115
WITH WELL COMPACTED
AND STABILIZED BASE UNDERNEATH,
1375

AND ALL LAID ON TOP OF 100mm THICK


LEAN CONCRETE BEDDING

DRIVE IN ACCESS RAMP 15.0m x 15.0m LEASED AREA

SITE LAYOUT

CIVIL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08
NAME: GREENFIELD G. PATINO
PRC No: 0061767
PTR No: 2782765
TIN No: 109-386-751-000
ISSUE DATE: 02/20/2025
ISSUE AT: LGU BACOOR
MIDC
MIESCOR Infrastructure Development Corporation
VDC APT NDG
MUNICIPALITY: SAN LUIS
PROVINCE: BATANGAS
REGION: REGION IV-A
LONGITUDE: 120.9163431°
LATITUDE: 13.8282733°
DRAWING No. AR_003
SITE LAYOUT
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 19TH AUG 2025 REV. NO.: 0
3

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION NOTES
AVIATION LAMP LIGHTNING SPIKE 1. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
+ 40.0m BE FROM TRUE GEOGRAPHIC NORTH.
+ 40.0m AS14517R3V06 2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
AS14517R3V06 S3 Az = 235° SPECIFIED.
+ 38.5m S3 =235° H = 38.5m 3. ALL ELEVATIONS ARE IN METERS.
H = 38.5m 4. MAGNETIC NORTH TO BE VERIFIED ON SITE BY THE CONTRACTOR
AS14517R3V06 AS14517R3V06 PRIOR TO INSTALLATION OF ANTENNA MOUNTS.
5000

S2 = 60°

°
S1 = 355°

73
H = 38.5m 5. ANTENNA ELEVATIONS SHOULD BE MEASURED FROM TOWER BASE
H = 38.5m
PLATE.
1.2m∅ MICROWAVE 6. HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGE DURING
MW1 Az = 0.57° EXCAVATION BY PROVIDING PROPER SHORING.
+ 35.0m HT = 37.0m 7. USE IMPORTED BACKFILLING MATERIALS OR ANY OTHER
1000

32 HOLE BUS BAR SUITABLE MATERIALS SUBJECT FROM APPROVAL FROM


+ 34.0m GLOBE RF ANTENNAS PHILTOWER ENGINNERING DEPARTMENT.
(500mm BELOW 8. HOT WORKS LIKE WELDING ON TOWER FOUNDATIONS IS NOT
ANTENNA BRACKET) ALLOWED ON SITE UNLESS APPROVED BY ENGINEERING
DEPARTMENT.
9. ANYONE CLIMBING THE TOWERS SHOULD HAVE "WORKING AT
5000

HEIGHT PERMIT" SHOULD BE SUFFICIENTLY EXPERIENCED TO


CARRY OUT INSTALLATION/INPECTION WORKS ON TOWERS.
AS14517R3V06 1.2m∅ MICROWAVE 10. ALL SAFETY MEASURES HAVE TO BE TAKEN WHILE WORKING ON
S2 Az = 60° MW1 Az = 0.57° HEIGHT AS PER PHILTOWER SAFETY NORMS.
+ 29.0m
H = 38.5m HT = 37.0m 11. FALL ARREST SHOULD BE AT THE MIDDLE OF THE MAN LADDER.
1000

12. LIGHTNING ARRESTER DOWN CONDUCTOR MUST NOT ON THE SAME


+ 28.0m LEG AS VERTICAL CLIMBING LADDER
MW ANTENNAS
NOTE:
TRANSPORT SOLUTION 1: MICROWAVE
5000

SIZE: 1.2M DIAMETER


AS14517R3V06 AZIMUTH: 0.57°
S1 Az = 355° HEIGHT: 37M
H = 38.5m
+ 23.0m

3-LEGGED
GSM TOWER
RF ANTENNAS
40m - 290kph - 100kPA

32 HOLE FALL ARREST


BUS BAR
SYSTEM
STAINLESS TIE
@ EVERY 1.5m

LIGHTNING ARRESTER DOWN 3-LEGGED TOWER


CONDUCTOR WILL BE INSTALL 40M - 290kph - 100kPA
IN THE TOWER LEG WHERE THE
50mm² ALUMINUM LIGHTNING SPIKE IS INSTALLED
(NOT ON SAME LEG AS VERTICAL BUSBAR TO BUSBAR
INSULATED CABLE (POLY CABLE
ACSR 1/0) CONNECTED TO CLIMBING LADDER)
LIGHTNING ROD
TO BE TERMINATED AT THE
450

GROUND ROD INSIDE THE 600mm WIDE


EARTH-PIT USING CAD-WELD CABLE LADDER
RESTING ON
CYCLONE FENCE SIDE BRACKETS
WITH BARBED WIRE & SUPPORT POLES
50mm² ALUMINUM ON TOP
INSULATED CABLE (POLY
2000

ACSR) CONNECTED TO
BUS-BARS ALONG THE
TOWER
DG PAD OUTDOOR BTS PAD
ELEVATED 0.50m ELEVATED 0.50m

700 100 100 600


200 500

600 100 500

200 500
ABOVE THE FGL FGL +0.20 ABOVE THE FGL

WELL COMPACTED NGL ±0.00

500 300 100150 350


350

BACKFILL MATERIAL
32 HOLE UP TO 95% @ EVERY 200mm, 32 HOLE BUSBAR
700

700
BUS BAR STABILIZED TO 250
550

1450

ENGINEER'S APPROVAL
∅20mm PVC PIPE
200

1500
BURIED PASSING THROUGH
50 500

TOWER RAFT THE TOWER RAFT


FOUNDATION
∅16mmx1500mm LONG
450

EARTH ROD
NGL ±0.00 FGL +0.20 IN THE EARTH PIT,
1085 8230 1085 BURIED BELOW
THE TOWER RAFT
10400

1085 8230 1085


10400 SITE ELEVATION
TOWER ELEVATION
CIVIL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08
NAME: GREENFIELD G. PATINO
PRC No: 0061767
PTR No: 2782765
TIN No: 109-386-751-000
ISSUE DATE: 02/20/2025
ISSUE AT: LGU BACOOR
MIDC
MIESCOR Infrastructure Development Corporation
VDC APT NDG
MUNICIPALITY: SAN LUIS
PROVINCE: BATANGAS
REGION: REGION IV-A
LONGITUDE: 120.9163431°
LATITUDE: 13.8282733°
TOWER & SITE ELEVATION
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. AR_004 DATE: 19TH AUG 2025 REV. NO.: 0
4

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION








TOWER DESIGN DRAWING


STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
40M TOWER KEY PLAN
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_001 DATE: 28TH MAY. 2025 REV. NO.: 0
5

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
DESIGN NOTES GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


· ALLOWABLE SOILBEARING CAPACITY: 100 kPa AND ABOVE NO GROUND WATER. NOTED.
2. ALL ELEVATIONS ARE IN METERS.
· REINFORCEMENT QUALITY: MIN 415 MPa. 3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
· REINFORCEMENT WEIGHT: 3429 kg, EXCL. FOUNDATION BOLTS. OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
· CONCRETE GRADE: 21Mpa DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
· CONCRETE VOLUME: 31.0 m³ 4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
· EXCAVATION VOLUME: 83.0 m³ FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
· CONCRETE COVERS TO BE 50 mm FOR FOOTING, 75 MM FOR COLUMN. MANAGER
5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
· DENSITY OF SOIL : 17 kN/m^3 CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
· ANGLE OF FRUSTRUM 25 DEGREES. PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
SHALL BE PART OF SITE FOLDER

A. FOUNDATION:
CONSTRUCTION NOTES

1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE


OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
STRUCTURES.
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL

TOP BAR BE FROM TRUE GEOGRAPHIC NORTH.


5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER

PERSPECTIVE VIEW LOCATIONS AFTER WORK COMPLETION.

DESIGN NOTES
A. FOUNDATION:
1. THE FOOTING WAS DESIGNED BASED FROM THE INDICATED NET
ALLOWABLE SOIL BEARING CAPACITY, SBC. CONTRACTORS SHALL
REPORT IN WRITING TO THE DESIGNER THE ACTUAL SOIL CONDITION
UNCOVERED AND CONFIRMED BEARING CAPACITY OF SOIL BEFORE
DEPOSITING THE CONCRETE. NO FOOTING SHALL REST ON FILL.

B. CONCRETING:
1. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT
SEGREGATION, RE-HANDLING OR FLOWING. POURING SHALL BE
TYPICAL SECTION MONOLITHIC DONE PREFERABLY WITH BUGGIES, BUCKETS OR
CONCRETE PUMP.
2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 21 MPa (3000psi)
AT 28-DAY TEST OF STANDARD CYLINDRICAL COUPON. IF REQUIRED,
7-DAY TEST RESULT SHALL YIELD AT LEAST 70% OF f'c.

20
3. BLINDING/BEDDING CONCRETE STRENGTH SHALL BE 7MPa(1000psi)
4. CONCRETE SLUMP SHALL NOT BE MORE THAN 75mm.
5. WATER-CEMENT RATIO BY WEIGHT SHALL BE NOT MORE THAN 0.50
WITH WORKABLE CONCRETE SLUMP BETWEEN 40 AND 75mm.
300
C. REINFORCING STEEL BARS
1. ALL REINFORCEMENTS SHALL BE SUPPORTED, SPACED EQUALLY
AND SECURED IN THEIR LOCATION IN ACCORDANCE WITH THE
BLOW-UP REQUIREMENTS OUTLINED IN THE LATEST EDITION OF THE BLDG.
REBAR OFFSET DETAIL CODE AND THE STANDARD PRACTICE FOR REINF. CONC. STRUCTURES.
2. ALL REINFORCING BARS SHALL BE THOROUGHLY CLEANED PRIOR
AT MID-LENGTH TO POURING OF CONCRETE.
3. REINFORCING BARS SHALL BE DEFORMED CONFORMING TO
ASTM A615.
4. REINFORCING BAR 16MM OR LARGER IN DIAMETER SHALL BE
GRADE 60, YIELD STRESS (fy) 414 MPa BILLET STEEL, EXCEPT AS
INDICATED.
5. TIE/STRIP REINFORCEMENT YIELD STRESS (fy) SHALL BE 276MPa
GRADE 40.

D. BACKFILL
80 80 1. BACKFILL SHALL BE PLACED NOT MORE THAN 200mm THICK
EACH LIFT.
2. EACH LIFT SHALL BE COMPACTED TO NOT LESS THAN 95% MDD.
3. CONFIRM COMPACTION BY CONDUCTING FDT ON EVERY FOURTH
80

80
LIFT, OR AS REQUIRED.

50
4. COMPACTED BACKFILL SOIL DENSITY SHALL BE NOT LESS THAN
75

17KN/CU.M.
5. SOIL MATERIAL IS SUITABLE FOR BACKFILL WHEN IT CAN BE
PROVIDE TIE-WIRE READILY COMPACTED TO SPECIFIED DENSITY AT OPTIMUM MOISTURE
PROVIDE TIE-WIRE CONTENT. MATERIAL CONTAINING ORGANIC MATTER, SUCH AS MUCK,
PEAT, ORGANIC SILT OR SOD IS CONSIDERED UNSUITABLE FOR
COLUMN BAR SPACER FOOTING BAR SPACER
BACKFILL. SUITABLE MATERIAL MAY BE OBTAINED FROM CLASSIFIED
(PLAIN CONC.) (PLAIN CONC.) EXCAVATION, UNCLASSIFIED EXCAVATION OR BORROW.
7xM24x1600 anchor bolts
26mm Thk. Base Plate E. EXCAVATION
1. EXCAVATION PIT WILL REQUIRE CONTINUOUS DEWATERING AND
SHORING.
TYPICAL BASE PLATE 2. WATER SHALL NOT BE ALLOWED TO ACCUMULATE IN THE OPEN
EXCAVATION.
3. BOTTOM OF EXCAVATION PIT SHALL BE THOROUGHLY DRY DURING

FOUNDATION LAYOUT POURING OF CONCRETE.

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
TOWER FOUNDATION DETAIL
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_002 DATE: 28TH MAY. 2025 REV. NO.: 0
6

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
GENERAL NOTES
NOTES: 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.
SEE NUMBER TAGGING OF DELIVERED REBARS 2. ALL ELEVATIONS ARE IN METERS.
FOR REBAR INSTALLATION AND PLACEMENT. 3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
LEGEND : 4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
TB - TOP BAR MANAGER
BB - BOTTOM BAR 5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
ER - EXTRA RE-BAR CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
SHALL BE PART OF SITE FOLDER

CONSTRUCTION NOTES

1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE


OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
STRUCTURES.
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
BE FROM TRUE GEOGRAPHIC NORTH.
5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.

DESIGN NOTES
A. FOUNDATION:
1. THE FOOTING WAS DESIGNED BASED FROM THE INDICATED NET
ALLOWABLE SOIL BEARING CAPACITY, SBC. CONTRACTORS SHALL
REPORT IN WRITING TO THE DESIGNER THE ACTUAL SOIL CONDITION
UNCOVERED AND CONFIRMED BEARING CAPACITY OF SOIL BEFORE
DEPOSITING THE CONCRETE. NO FOOTING SHALL REST ON FILL.
TB ER B. CONCRETING:
1. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT
FOUNDATION REINFORCEMENT DETAILS (TOP BAR) SEGREGATION, RE-HANDLING OR FLOWING. POURING SHALL BE
MONOLITHIC DONE PREFERABLY WITH BUGGIES, BUCKETS OR
CONCRETE PUMP.
2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 21 MPa (3000psi)
AT 28-DAY TEST OF STANDARD CYLINDRICAL COUPON. IF REQUIRED,
7-DAY TEST RESULT SHALL YIELD AT LEAST 70% OF f'c.
3. BLINDING/BEDDING CONCRETE STRENGTH SHALL BE 7MPa(1000psi)
4. CONCRETE SLUMP SHALL NOT BE MORE THAN 75mm.
5. WATER-CEMENT RATIO BY WEIGHT SHALL BE NOT MORE THAN 0.50
WITH WORKABLE CONCRETE SLUMP BETWEEN 40 AND 75mm.

C. REINFORCING STEEL BARS


1. ALL REINFORCEMENTS SHALL BE SUPPORTED, SPACED EQUALLY
AND SECURED IN THEIR LOCATION IN ACCORDANCE WITH THE
REQUIREMENTS OUTLINED IN THE LATEST EDITION OF THE BLDG.
CODE AND THE STANDARD PRACTICE FOR REINF. CONC. STRUCTURES.
2. ALL REINFORCING BARS SHALL BE THOROUGHLY CLEANED PRIOR
TO POURING OF CONCRETE.
3. REINFORCING BARS SHALL BE DEFORMED CONFORMING TO
ASTM A615.
4. REINFORCING BAR 16MM OR LARGER IN DIAMETER SHALL BE
GRADE 60, YIELD STRESS (fy) 414 MPa BILLET STEEL, EXCEPT AS
INDICATED.
5. TIE/STRIP REINFORCEMENT YIELD STRESS (fy) SHALL BE 276MPa
GRADE 40.

D. BACKFILL
1. BACKFILL SHALL BE PLACED NOT MORE THAN 200mm THICK
EACH LIFT.
2. EACH LIFT SHALL BE COMPACTED TO NOT LESS THAN 95% MDD.
3. CONFIRM COMPACTION BY CONDUCTING FDT ON EVERY FOURTH
LIFT, OR AS REQUIRED.
4. COMPACTED BACKFILL SOIL DENSITY SHALL BE NOT LESS THAN
17KN/CU.M.
5. SOIL MATERIAL IS SUITABLE FOR BACKFILL WHEN IT CAN BE
READILY COMPACTED TO SPECIFIED DENSITY AT OPTIMUM MOISTURE
CONTENT. MATERIAL CONTAINING ORGANIC MATTER, SUCH AS MUCK,
PEAT, ORGANIC SILT OR SOD IS CONSIDERED UNSUITABLE FOR
BACKFILL. SUITABLE MATERIAL MAY BE OBTAINED FROM CLASSIFIED
EXCAVATION, UNCLASSIFIED EXCAVATION OR BORROW.

E. EXCAVATION
1. EXCAVATION PIT WILL REQUIRE CONTINUOUS DEWATERING AND
SHORING.
2. WATER SHALL NOT BE ALLOWED TO ACCUMULATE IN THE OPEN
BB ER EXCAVATION.
3. BOTTOM OF EXCAVATION PIT SHALL BE THOROUGHLY DRY DURING
POURING OF CONCRETE.
FOUNDATION REINFORCEMENT DETAILS (BOTTOM BAR)
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
TOWER FOUNDATION DETAIL
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_003 DATE: 28TH MAY. 2025 REV. NO.: 0
7

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
GENERAL NOTES
NOTES: 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.
SEE NUMBER TAGGING OF DELIVERED REBARS 2. ALL ELEVATIONS ARE IN METERS.
FOR REBAR INSTALLATION AND PLACEMENT. 3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
LEGEND : 4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
TB - TOP BAR MANAGER
BB - BOTTOM BAR 5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
ER - EXTRA RE-BAR CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
SHALL BE PART OF SITE FOLDER

CONSTRUCTION NOTES

1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE


OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
STRUCTURES.
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
BE FROM TRUE GEOGRAPHIC NORTH.
5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.

DESIGN NOTES
A. FOUNDATION:
1. THE FOOTING WAS DESIGNED BASED FROM THE INDICATED NET
ALLOWABLE SOIL BEARING CAPACITY, SBC. CONTRACTORS SHALL
REPORT IN WRITING TO THE DESIGNER THE ACTUAL SOIL CONDITION
UNCOVERED AND CONFIRMED BEARING CAPACITY OF SOIL BEFORE
DEPOSITING THE CONCRETE. NO FOOTING SHALL REST ON FILL.
SECTION 1 - 1
B. CONCRETING:
1. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT
SEGREGATION, RE-HANDLING OR FLOWING. POURING SHALL BE
MONOLITHIC DONE PREFERABLY WITH BUGGIES, BUCKETS OR
CONCRETE PUMP.
2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 21 MPa (3000psi)
AT 28-DAY TEST OF STANDARD CYLINDRICAL COUPON. IF REQUIRED,
7-DAY TEST RESULT SHALL YIELD AT LEAST 70% OF f'c.
3. BLINDING/BEDDING CONCRETE STRENGTH SHALL BE 7MPa(1000psi)
4. CONCRETE SLUMP SHALL NOT BE MORE THAN 75mm.
5. WATER-CEMENT RATIO BY WEIGHT SHALL BE NOT MORE THAN 0.50
WITH WORKABLE CONCRETE SLUMP BETWEEN 40 AND 75mm.

C. REINFORCING STEEL BARS


1. ALL REINFORCEMENTS SHALL BE SUPPORTED, SPACED EQUALLY
AND SECURED IN THEIR LOCATION IN ACCORDANCE WITH THE
REQUIREMENTS OUTLINED IN THE LATEST EDITION OF THE BLDG.
CODE AND THE STANDARD PRACTICE FOR REINF. CONC. STRUCTURES.
2. ALL REINFORCING BARS SHALL BE THOROUGHLY CLEANED PRIOR
TO POURING OF CONCRETE.
3. REINFORCING BARS SHALL BE DEFORMED CONFORMING TO
ASTM A615.
4. REINFORCING BAR 16MM OR LARGER IN DIAMETER SHALL BE
GRADE 60, YIELD STRESS (fy) 414 MPa BILLET STEEL, EXCEPT AS
INDICATED.
5. TIE/STRIP REINFORCEMENT YIELD STRESS (fy) SHALL BE 276MPa
GRADE 40.

D. BACKFILL
1. BACKFILL SHALL BE PLACED NOT MORE THAN 200mm THICK
EACH LIFT.
2. EACH LIFT SHALL BE COMPACTED TO NOT LESS THAN 95% MDD.
3. CONFIRM COMPACTION BY CONDUCTING FDT ON EVERY FOURTH
LIFT, OR AS REQUIRED.
4. COMPACTED BACKFILL SOIL DENSITY SHALL BE NOT LESS THAN
17KN/CU.M.
5. SOIL MATERIAL IS SUITABLE FOR BACKFILL WHEN IT CAN BE
READILY COMPACTED TO SPECIFIED DENSITY AT OPTIMUM MOISTURE
CONTENT. MATERIAL CONTAINING ORGANIC MATTER, SUCH AS MUCK,
TYPICAL SECTION PEAT, ORGANIC SILT OR SOD IS CONSIDERED UNSUITABLE FOR
BACKFILL. SUITABLE MATERIAL MAY BE OBTAINED FROM CLASSIFIED
THROUGH COLUMN EXCAVATION, UNCLASSIFIED EXCAVATION OR BORROW.

E. EXCAVATION
1. EXCAVATION PIT WILL REQUIRE CONTINUOUS DEWATERING AND
SHORING.
2. WATER SHALL NOT BE ALLOWED TO ACCUMULATE IN THE OPEN
EXCAVATION.
3. BOTTOM OF EXCAVATION PIT SHALL BE THOROUGHLY DRY DURING
POURING OF CONCRETE.

SCHEDULE OF REINFORCEMENT
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
FOUNDATION RE-BAR SCHEDULE
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_004 DATE: 28TH MAY. 2025 REV. NO.: 0
8

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
Member list

M24

200
Ø26

Ø14
Ø371

Ø2
99

91
Ø2

1600
Ø26

Ø371

200
Ø2
99

TOWER FOUNDATION TEMPLATE

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
TOWER FOUNDATION TEMPLATE
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_005 DATE: 28TH MAY. 2025 REV. NO.: 0
9

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
A. GENERAL NOTES

D. REINFORCED CONCRETE NOTES

B. CIVIL NOTES

E. FORMWORKS

C. FOUNDATION
TYPICAL BENDING
F. REINFORCING STEEL

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
TOWER FOUNDATION DETAIL
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_006 DATE: 28TH MAY. 2025 REV. NO.: 0
10

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
G. CONSTRUCTION JOINTS
ABBREVIATIONS:

H. STRUCTURAL STEEL

LEGEND:

I. MASONRY AND CONCRETE BLOCKS WELDING SYMBOL

F
A
R

S(E) L-P SYMBOLS:


T

(N)
J. SAFETY NOTES

REFERENCES:

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
FOUNDATION RE-BAR SCHEDULE 11
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_007 DATE: 28TH MAY. 2025 REV. NO.: 0 30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
3000 3000

900

2000
300

RECTIFIER
36W

200
3100 770 2130

6000

EQUIPMENT PAD PLAN

ISOMETRIC VIEW

FRONT ELEVATION

SECTION DETAIL

STEP DETAIL STIFFENER COLUMN (C-1) FOUNDATION LAYOUT

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC OUTDOOR BTS PAD


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. ST_008
0.50m HEIGHT
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 28TH MAY. 2025 REV. NO.: 0
12

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION NOTES
4000 300 4000
B C 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
12mm∅ REBARS - -
340 3320 340 NOTED.
SPACED @ 250 O.C 2. ONLY WRITTEN FIGURES SHALL BE FOLLOWED, NEITHER THE DRG
SHALL BE SCALED NOR THE No. OF BARS..
3. ANY DISCREPANCY BETWEEN THE GENERAL ARRANGEMENT DRG.

650
& THIS DRG. SHALL BE RECONCILED BEFORE THE EXECUTION.

1000
4. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE:
FOUNDATION, COLUMN, BEAM, SLAB - 50mm

1850
5. ALL STEEL REINFORCEMENT SHALL BE HIGH YIELD STRENGTH
COLD DEFORMED BARS (GRADE Fe 415Mpa)

2600
1300
GENSET 6. CONCRETE FOR ALL RCC WORK SHALL BE OF GRADE M25, LEAN

2600
A CONCRETE SHALL BE BE OF GRADE 10
- 7. ALL LAP/DEVELOPMENT LENGTH FOR REINFORCEMENT SHALL BE

1600
50 x DIA. OF BAR
8. ALL CIVIL WORK AT SITE SHALL BE CARRIED OUT STRICTLY IN
FUEL ACCORDANCE WITH TECHNICAL SPECIFICATION USED BY
750

PHILTOWER.

650
SPILLAGE
PIT 9. STAIRCASE SLAB REINFORCEMENT SHOULD BE TAKEN 600mm
INTO RCC SLAB OF PAD
10.HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGES DURING
750 100 100 3800 100 EXCAVATION BY PROVIDING PROPER SHORING.
11.USE OF IMPORTED BACKFILLING MATERIALS OR ANY OTHER
12mm∅ REBARS SUITABLE MATERIALS SUBJECT FROM APPROVAL FROM
SPACED @ 250 O.C PHILTOWER ENGINEERING DEPARTMENT.
BTS PAD LAYOUT REINFORCEMENT PLAN 12.BACKFILL MATERIALS TO BE PLACED IN 300mm LAYERS AND
COMPACTED TO 95% OF MAX. DRY DENSITY WITH RAMMER/
SCALE 1:30 SCALE 1:30 JUMPING JACK COMPACTOR.
13. ALL CONCRETE FINISH SHALL BE CHAMFERED ON ALL EDGES OF
COLUMNS AND PADS.
14.BTS AND DG PADS SHALL BE ELEVATED IF THERE IS FLOOD
HISTORY AS PER SITE REQUIREMENTS. REFER TO BTS AND DG
DRAWINGS FOR MORE DETAILS
15.EQUIPMENT PADS THAT ARE IN THE EXCAVATED AREA WILL
HAVE THEIR FOUNDATION RAISED FROM THE TOWER RAFT.
GENERAL NOTES

1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE


OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
GENSET GENSET DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
GENSET CONCRETE PAD
100 100 3800 100 CONCRETE CURB
GENSET CONCRETE PAD
CONCRETE CURB 3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
100 2400 100
USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT

50

50
300
CONCRETE STEP STRUCTURES.

500

500
50mm LEAN
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL

700
CONCRETE
100 100 250
FGL +0.20 FGL +0.20
BEDDING BE FROM TRUE GEOGRAPHIC NORTH.
50

50

NGL ±0.00 NGL ±0.00

100 200
5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
50

50
LOCATIONS AFTER WORK COMPLETION.
450

FUEL SPILL
WALL HORIZONTAL REINFORCEMENT
CONTAINMENT
50mm LEAN WELL COMPACTED
100 4000 100 CONCRETE BACKFILL MATERIAL 6. TOP SLAB SHOULD HAVE A TOP FINISH SLOPING TOWARDS THE
150 100

UP TO 95% @ EVERY 200mm, 100 2600 100


BEDDING
STABILIZED TO
OUTLET PIPE.
WELL COMPACTED ENGINEER'S APPROVAL
BACKFILL MATERIAL
UP TO 95% @ EVERY 200mm,

FRONT ELEVATION RIGHT SIDE ELEVATION


STABILIZED TO
ENGINEER'S APPROVAL

SCALE 1:40 SCALE 1:40


TOP SLAB 180° HOOK
12mm∅ REBARS SPACED
@ 250 O.C 4000
CONCRETE STEP
10mm∅ REBARS SPACED
@ 250 O.C

140
4-12mm∅ DOWEL
300 BARS

500
2 LAYERS OF 205mm COMPACTED
ENGINEERING FILL

410
700

250
FGL +0.20 (SUITABLE BACKFILL COMPACT MINIMUM
95% MDD)

NGL ±0.00

200

100 150
50

50
WELL COMPACTED
50mm LEAN WALL & BOT SLAB 90° HOOK
CONCRETE
BACKFILL MATERIAL BEDDING
UP TO 95% @ EVERY 200mm,
STABILIZED TO
ENGINEER'S APPROVAL 100 150 3700 150 100
10mm∅ REBARS SPACED CONCRETE CURB
@ 250 O.C
12mm∅ REBARS SPACED
@ 250 O.C
2600
CONCRETE CURB

10mm∅ REBARS SPACED


SECTION A-A WALL & BOT
SLAB 90° HOOK 100
2600 TOP SLAB
180° HOOK
100
@ 250 O.C SCALE 1:40

50
50
140

10mm∅ REBARS SPACED

500
@ 250 O.C
500

2 LAYERS OF 205mm COMPACTED

700
FGL +0.20
410

ENGINEERING FILL
700

FGL +0.20 (SUITABLE BACKFILL COMPACT MINIMUM


95% MDD)

100100
NGL ±0.00
NGL ±0.00
200

50 150

50
50mm LEAN
50mm LEAN WELL COMPACTED CONCRETE
WELL COMPACTED CONCRETE BACKFILL MATERIAL
BACKFILL MATERIAL BEDDING
BEDDING UP TO 95% @ EVERY 200mm,
UP TO 95% @ EVERY 200mm, STABILIZED TO 100 150 2300 150 100
STABILIZED TO 100 150 2300 150 100
ENGINEER'S APPROVAL
ENGINEER'S APPROVAL
SECTION B-B SECTION C-C
SCALE 1:30 SCALE 1:30

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC DG PAD 2.6mx4m


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. ST_009
0.50m HEIGHT
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: - REV. NO.: 0
13/1

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION NOTES

STEEL COVER WITH 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.
DROP-DOWN HANDLE 2. ONLY WRITTEN FIGURES SHALL BE FOLLOWED, NEITHER THE DRG
SHALL BE SCALED NOR THE No. OF BARS.
750 & LOCKING SYSTEM 3. ANY DISCREPANCY BETWEEN THE GENERAL ARRANGEMENT DRG.
& THIS DRG. SHALL BE RECONCILED BEFORE THE EXECUTION.
750 4. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE:
150 450 150 FOUNDATION, COLUMN, BEAM, SLAB - 50mm
5. ALL STEEL REINFORCEMENT SHALL BE HIGH YIELD STRENGTH
350 100 50 650 50 COLD DEFORMED BARS (GRADE Fy 415Mpa)
PROPOSED 25mm∅ 6. CONCRETE FOR ALL RCC WORK SHALL BE OF GRADE M25, LEAN
PVC PIPE (SCHED.40) CONCRETE SHALL BE BE OF GRADE M10

100
7. ALL LAP/DEVELOPMENT LENGTH FOR REINFORCEMENT SHALL BE

100 100
150 50 x DIA. OF BAR
FGL 8. ALL CIVIL WORK AT SITE SHALL BE CARRIED OUT STRICTLY IN
ACCORDANCE WITH TECHNICAL SPECIFICATION USED BY
CHB PHILTOWER.
WALLING FUEL SPILL 9. STAIRCASE SLAB REINFORCEMENT SHOULD BE HOOKED

212 25 212
INTO RCC WALL OF PAD
CONTAINMENT 10.HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGES DURING
CHB WALLING EXCAVATION BY PROVIDING PROPER SHORING (IF NECESSARY).
450
750

11.USE OF IMPORTED BACKFILLING MATERIALS OR ANY OTHER


C SUITABLE MATERIALS SUBJECT FROM APPROVAL FROM

650
PHILTOWER ENGINEERING DEPARTMENT.

750
12.BACKFILL MATERIALS TO BE PLACED IN 200mm LAYERS AND
PROPOSED 25mm∅

650
COMPACTED TO 95% OF MAX. DRY DENSITY WITH RAMMER/
PVC PIPE (SCHED.40) FUEL SPILL JUMPING JACK COMPACTOR.
CONTAINMENT 13. ALL CONCRETE FINISH SHALL BE CHAMFERED ON ALL EDGES OF
COLUMNS AND PADS.
150

14.BTS AND DG PADS SHALL BE ELEVATED IF THERE IS FLOOD


HISTORY AS PER SITE REQUIREMENTS. REFER TO BTS AND DG
DRAWINGS FOR MORE DETAILS
STEEL COVER WITH 15.EQUIPMENT PADS THAT ARE IN THE EXCAVATED AREA WILL

150 100
HAVE THEIR FOUNDATION RAISED FROM THE TOWER RAFT.
PLAN VIEW DROP-DOWN HANDLE MASS CONCRETE GENERAL NOTES

100
SCALE 1:20 & LOCKING SYSTEM STRIP FOOTING
1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
50mm 250 350 250 DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
LEAN CONCRETE STRICTLY IMPLEMENTED DURING CONSTRUCTION.
3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING

100 ELEVATION VIEW A-A USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
L 50x50x5mm SCALE 1:20 STRUCTURES.
50 50 4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
BE FROM TRUE GEOGRAPHIC NORTH.
10mm∅ 5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.
DOWEL
SEE HINGE
10

DETAIL 35
MATERIAL NOTES

ALL MATERIALS TO BE HOT DIPPED GALVANIZED:

18
1. SPILLAGE PIT COVER
Ø15 2. HINGE
3. ALL STEEL MATERIALS
SPILLAGE PIT COVER
4mm THICK

80
CHECKERED PLATE SEE DOOR HANDLE DETAIL PLATE
3mm THK.
HOT DIP GALVANIZE
LOCKING PLATE
L 50x50x5mm

HINGE DETAILS
10mm∅
ROUND BAR

TO BE FULLY

106
SPILLAGE PIT CONCRETE
WELD
CASE

150

HANDLE DETAILS
EXPLODED VIEW
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
FUEL SPILLAGE PIT DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. PT_ST_001 DATE: - REV. NO.: 0
13/2

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
25

45 SIDE VIEW
HORIZONTAL CABLE TRAY
600
300 113
23 23 56
U Bolts M12
CABLE TRAY L45X45X4mm Flat 40mmX4mm CABLE TRAY M 12 Bolts CABLE TRAY CABLE TRAY

50

12 55 12
SUPPORT SUPPORT SUPPORT SUPPORT

200
2000 1800 2000
50mm

400
∅14mm HOLE
SUPPORT PIPE
L50x50x4mm

600
L50x50x4mm L50x50x4

150 150
3000 3000
6100

PLAN VIEW 600


HORIZONTAL CABLE TRAY L50x50x4mm

50
U Bolt 12mm
Thickness

500
TOP SUPPORT POLE
600mm CABLE ∅50mm Pipe CLOSED WITH
600 STEEL PLATE

100
LADDER FGL

100 100
50
125

50
L50x50x4mm

250

500
3/8 x 4" EXPANSION Concrete Footing
BOLT

125
X
Lean Concrete

50
50mm
200

SECTION X-X SUPPORT POST


X EXPANSION BOLT
L50x50x4mm
TOP OF SUPPORT POST
DETAIL
600mm CABLE TRAY
L45x45x4mm

Flat 40mmX4mm ∅ 14mm HOLE


DETAIL A 180
M 12 Bolts
L50x50x4mm L45x45x4mm PLATE
45

200
28mm² GROUNDING
JUMPER CABLE
Y Y
200
SPLICING PLATE
SCALE 1:10 POST
LIP OF ANGLE
CONCRETE
TO BE REMOVED FOOTING
..\..\..\Desktop\PHILIPPINES\Standard Site drws\electrical drws\Screenshot_20211116-193514_Google - Copy.jpg

(SEE GENERAL NOTES #7)

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
CABLE LADDER DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_0010 DATE: 28TH MAY. 2025 REV. NO.: 0
14

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
3000
C 8230

115 2000 2000 2000 2000 115

115

115
2000 0.4MM BLACK POLYETHYLENE
SHEET UNDERNEATH. CRUSHED
AGGREGATES 19mmTO 25mm OR
B

2000
3/4 TO G1 MAXIMUM

50mm PVC PIPE


WEEP HOLES

∅2mm BARBED WIRE WITH


EYE BOLT, SUPPORTED WITH
CHS 60x4mm BS PIPE/HDG

2000
2000

2000
FENCE POSTS 60x60x2mm,
EMBEDDED IN R/C GRADE BEAM
WITH 50x4mm FLAT BARS
BOLTED FOR MESH WIRE FIXING

12

9730
1500

1500
74
WELDED MESH 4
55x150x6.0mm
SEE FENCE COLUMN
DETAIL

350
250x350mm R/C
2000

2000
GRADE BEAM

GATE DETAILS
SCALE NTS

D 440x300mm
2000

2000
SERVICE ENTRANCE POST

45
WITH SEPARATE R/C FOOTING

450
115

115

115 3000 500 30 440 30 2000 2000 115

3000x1500x200mm THICK
A
R/C ACCESS RAMP WITH 148 BRC MESH,
60x2mm TUBULAR/HDG
WITH WELL COMPACTED FENCE POST WITH
AND STABILIZED BASE UNDERNEATH,
DRIVE IN ACCESS RAMP AND ALL LAID ON TOP OF 100mm THICK WELDED SIDE CLEATS
LEAN CONCRETE BEDDING FOR PANELS BOLTING
CYCLONE FENCE LAYOUT CONNECTION, AND
SCALE NTS 82 CASTED IN CONCRETE
GRADE BEAM

2000
16x360mm
SLIDING BOLT 200
5mm GUARD 40x10x50mm
325 PLATE TAB WITH 18mm HOLE
245
250

100mm THICK GRAVEL FILL


40x10x60mm
ON SITE WITH 0.4mm BLACK
50x38x3mm TAB WITH POLYETHYLENE SHEET
177

GATE FRAMES 18mm HOLE UNDERNEATH. CRUSHED


250

40x5x40mm TABS WELDED TO


16x1250mm AGGREGATES 19mm TO 25mm
3835

DROP BOLT FGL +0.20


GATE FRAME WITH 20mm OR 3/4 TO G1 MAXIMUM
HOLE FOR 16mm PIN.
624

163

150 200
250 50x38x3mm
NGL ±0.00
200
GATE FRAME 350 WEED BARRIER
∅50mm PVC PIPE
40

50x38x3mm 369 334 WEEP HOLE


GATE FRAMES 25x50mm HOUSING 250
125

APRON 75mm 250x350mm


125mm LONG 50mm LEAN
25 R/C GRADE BEAM WITH
CONCRETE BEDDING
OUTSIDE VIEW LOCKING SYSTEM 745 4-16mm∅ TOP & BOTTOM BARS,
FENCE COLUMN Y10mm @150mm c/c STIRRUPS
INSIDE VIEW LOCKING SYSTEM DETAIL
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC FENCE 8m x 9.5m


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DETAILED DRAWING
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_0011 DATE: 28TH MAY. 2025 REV. NO.: 0
15

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
SEE BARBED WIRE HOLDER
115 8000 115
SERVICE ENTRANCE
4 STRANDS OF PEDESTAL
3000 500 30 440 30 2000 2000
HD BARBED WIRES

450
GATE POST
80x80x2mm CURVE MESH
55x150x6.0mm
MESH PANEL CURVE MUST SHOW OUTSIDE
MUST SHOW DIRECTION
OUTSIDE

2450
DIRECTION

2000
50x50x5mm
LOCKING MECHANISM ANGLE BAR BRACING
FROM INSIDE
900 900
F.G.L 350x250mm
N.G.L R/C GRADE

200

50 350
BEAM

50mm LEAN
CONCRETE BEDDING
FRONT VIEW
∅16mm HOLE
60X60X2mm TUBULAR

∅12mm HOOK BOLT W/ NUTS

50
BARBED WIRE

SINGLE ARM:

120
LENGTH 450mm

MESH SIZE:
55x150x6.0mm

BREAK OFF NUT

120
431
POST SIZE 60x60x2mm

FLAT BAR PROPOSED


BREAK OFF NUT

141
MESH PANEL CURVE
MUST SHOW OUTSIDE
FULLY WELD
DIRECTION

PERSPECTIVE OF
BARBED WIRE HOLDER
58x58x2mm
HT. 225mm BARBED WIRE HOLDER
100
BASE PLATE 60 58
100x100mm
TUBULAR
80x80x2mm

100
60

58
FOR 4 STRANDS
MESH PANEL DETAIL POST SIZE 60x60x2mm POST SIZE 58x58x2mm BASE PLATE 100x100mm

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC FENCE 8m x 9.5m


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DETAILED DRAWING
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_0012 DATE: 28TH MAY. 2025 REV. NO.: 0
16

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
115 8000 115
SERVICE ENTRANCE
4 STRANDS OF PEDESTAL
3000 500 30 440 30 2000 2000
HD BARBED WIRES
2000

450
GATE POST
80x80x2mm CURVE MESH
55x150x6.0mm
MESH PANEL CURVE MUST SHOW OUTSIDE L50X5 ANGLE BAR,
MUST SHOW DIRECTION 2600mm LONG
OUTSIDE
2450

DIRECTION

2000
50x50x5mm
LOCKING MECHANISM ANGLE BAR BRACING
FROM INSIDE
900 900
F.G.L 350x250mm
N.G.L R/C GRADE
200

26

50 350
36
BEAM
∅50mm PVC PIPES

50
WEEP HOLES 50mm LEAN
CONCRETE BEDDING SEE DETAIL A DETAIL A
ELEVATION A
9730
4 STRANDS ∅2mm
115 2000 2000 1500 2000 2000
115
BARBED WIRE WITH
L50X5
FRONT VIEW
450

450
CURVE MESH
50x50x5mm 55x150x6.0mm
ANGLE BAR BRACING MUST SHOW
FENCE POSTS OUTSIDE
DIRECTION
2000

2000
60x60x2mm,
EMBEDDED IN R/C ISOMETRIC VIEW
GRADE BEAM
WITH 50x4mm 350x250mm FENCE DETAIL 1
900 900 900 900 900 R/C GRADE
FLAT BARS F.G.L
BEAM
BOLTED FOR MESH N.G.L

150 200
50 350

WIRE FIXING
50mm LEAN
∅50mm PVC PIPES CONCRETE BEDDING
WEEP HOLES
ELEVATION B
SEE FENCE
SEE FENCE
8230 DETAIL 2
DETAIL 1 115
115 2000 2000 2000 2000

4 STRANDS ∅2mm
450

450
BARBED WIRE WITH
50x4mm FLAT BARS
CURVE MESH
BOLTED FOR MESH
55x150x6.0mm
WIRE FIXING
MUST SHOW OUTSIDE
DIRECTION
FENCE POSTS
2000

2000

350x250mm 60x60x2mm,

150 100 50
R/C GRADE EMBEDDED IN R/C
BEAM GRADE BEAM
900 900 900 900
50mm LEAN F.G.L
CONCRETE BEDDING N.G.L LINE POST
150 200

50 350

60x60x2.0m

∅50mm PVC PIPES


ELEVATION C WEEP HOLES

9730
115

150
115 2000 2000 1500 2000 2000

4 STRANDS ∅2mm
450

450

BARBED WIRE WITH


50x4mm FLAT BARS
CURVE MESH BOLTED FOR MESH
55x150x6.0mm WIRE FIXING
MUST SHOW OUTSIDE
DIRECTION
FENCE POSTS
2000

2000

350x250mm 60x60x2mm,
R/C GRADE EMBEDDED IN R/C
BEAM GRADE BEAM
900 900 900 900 900
50mm LEAN F.G.L
CONCRETE BEDDING N.G.L LINE POST
150 200

50 350

60x60x2.0m

∅50mm PVC PIPES FENCE DETAIL 2


ELEVATION D WEEP HOLES

STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC FENCE 8m x 9.5m


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DETAILED DRAWING
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_0013 DATE: 28TH MAY. 2025 REV. NO.: 0
17

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
NOTES : ∅16mm 5/8" OVAL EYEBOLT
CABLE LEADS FROM SERVICE HEAD 300 MESSENGER WIRE 380 440 380
TO BE 1.5 METER TO FORM AN TO ELECTRICAL POLE 440
ADEQUATE DRIP LOOP.

250 100
3Y12mm

75
50 340 50
REBARS FOR
D D REINFORCED

300
CONTINUOUS

500
CONCRETE POST

50 200 50
COLUMN CASTING
∅10mm STIRRUPS

300
SERVICE @ 150mm C/C
ENTRANCE POST
SPOOL INSULATOR 6Y16mm REBARS
REINFORCEMENT
(IF REQUIRED

1200

1050
PROVIDE
DRIP LOOP)
6Y16mm REBARS
A-A

900
BOTHWAYS
2-1/2" LL CONDULET

SERVICE 20 400 20
A A ENTRANCE POST
MAIN ECB 250AT 2P
MOUNTED ON
R/C FOOTING 0 SERVICE ENTRANCE POST

75
Ø6 FROM OUTSIDE

200
75 1050 75 REINFORCED CONCRETE
BARE NEUTRAL SERVICE ENTRANCE POST
1200

300
SECTION C-C

5500
TWO INSULATE
HOT WIRES FOOTING DETAIL B-B
UTILITY SPLICES SCALE 1:20
SE CABLE LEADS COLUMN DETAIL
SCALE 1:20
B B

SERVICE
ENTRANCE
POST

5500
1-60mm./2 1/2
PVC RIGID
∅114mm EXPOSED RSC PIPE
CONDUIT
MOUNTED WITH
WALL CLAMPS
SERVICE ENTRANCE
CAP
FGL
ECB
200

NGL

750
FGL
NGL
1800

MAIN ECB 250AT 2P


MOUNTED ON
SERVICE ENTRANCE POST

1700
3Y12mm REBARS
C
1350
900 300
REINFORCED FOR CONTINUOUS C
CONCRETE POST COLUMN CASTING
50 300

6Y16mm REBARS
BOTH WAYS
SPOOL INSULATOR FGL
50mm THICK 1200
(IF REQUIRED PROVIDE LEAN CONCRETE
DRIP LOOP)

50 300
∅16mm 5/8" OVAL EYEBOLT
MESSENGER WIRE SERVICE ENTRANCE POST
TO ELECTRICAL POLE
SECTION & ELEVATIONS INTERNAL
SCALE 1:30
ELEVATION D-D ELEVATION EXTERNAL
ELEVATION
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC SERVICE ENTRANCE


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. ST_0014
PEDESTAL
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 28TH MAY. 2025 REV. NO.: 0
18

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
DESIGN NOTES

1. ALL MATERIALS FOR PERIMETER LIGHT TO BE HOT DIPPED


GALVANIZED INCLUDING PIPE, BRACKET, BOLTS & NUTS, U-BOLT.
LIGHTNING ARRESTER 2. SPECIFICATION OF PERIMETER LIGHT
· BRAND: Bosca
AVIATION LIGHT · Item no: BOSCA-90W
· Solar panel: Polysilicon 6V/15W
· Battery: LiFePO4 3.2V 24AH
· Chip source: SANAN5730, 120pcs CCT:6500-7000K
Total lumen:1400LM
TOWER LEG SEE DETAIL A · Material: ABS Plastic housing with Black color
· IP rating: IP65
LIGHT LAMP · Charge time: 6-8H
(VERTICAL DIRECTION · Working time: 12-15hrs
· Control mode: Human sensor, light control and time
TO THE GROUND)
control
· Installation height: 4-5meter
12mm∅ U-BOLT

50mm∅ LIGHT HOLDER


BRACKET

500
CH160X300

M12 DOUBLE NUTS


AND WASHERS LAMP

BLOW UP
65 M12 DOUBLE NUTS
CH160X300
AND WASHERS

50mm∅ LIGHT
HOLDER BRACKET

249
219
CH160X300

12mm∅ U-BOLT 12mm∅ U-BOLT

TOWER LIGHT
M12 DOUBLE NUTS
AND WASHERS

LIGHT LAMP TOP VIEW


TOWER LEG 150 65
8
3 50
6500

300

41

160°
PERSPECTIVE VIEW
91

32 85 67 85 31
192

8
12mm∅ 96 96 THREAD Ø14
500
700

U-BOLT

139°
300

219

160

160
144
34 22
12
55
225

50mm∅ PIPE

8
110

ISOMETRIC VIEW 12mm∅ 11 42 43 42 25 42 43 42 10


12

160°
U-BOLT 300

41
THREAD LIGHT HOLDER BRACKET
FRONT
DETAIL TOP
U-BOLT DETAIL DETAIL A C-CHANNEL DETAIL
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC SOLAR PERIMETER


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. ST_015
LIGHT DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 28TH MAY. 2025 REV. NO.: 0
19

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
BILL OF MATERIALS
NOTES :
CONCRETE
DESCRIPTION MATERIAL QTY. W D L VOLUME (m³)
ALL MATERIALS TO BE SUPPLIED HOT DIP GALVANIZED. CB1 CONCRETE 1 0.5 0.5 2.00 0.50
ALL PANEL BOX HOLES TO BE DRILLED ON SITE. PLATE CAP CE1 CONCRETE 2 0.125 0.125 0.9 0.014
TOTAL 0.51 (m³)
1875
100 100 600 75 800 100 100 BILL OF MATERIALS
L63x5mm
STEEL

5
50
DESCRIPTION MATERIAL QTY. LENGTH (m) WEIGHT(kg)
PIPE 1 73mm∅ SCH40 2 3.1 51.99
ANGULAR BAR L63x5 4 1.9 36.08
PLATE 1 150x45x5mm THK. 6 1.59 1.59
PLATE 2 550x50x5mm THK. 2 0.55 2.16
PROVISION
CAP PLATE 1 83mm∅ x 5mm THK.
950

2 83 0.425
ATS MDP U-BOLT 12mmØ 10 420 2.46
12mmØ TOTAL 94.7kg
U-BOLT
BILL OF MATERIALS
STEEL REINFORCEMENT
100

DESCRIPTION MATERIAL QTY. LENGTH (m) WEIGHT(kg)

200 200
250 50

MAIN BARS 16mm∅ REBARS 6 1.9 17.9

WIRE GUTTER BLOW-UP TIES 10mm∅ REBARS 8 1.83 7.9


25.8kg
540

TOTAL

DETAIL CAP PLATE


190
3100

238 1400 238 PLATE CAP


83mm DIA. 5mm THK.
550
SEE DETAILS 1

900
125x125mm 12mmØ
560

CONCRETE 180
125 125 U-BOLT
ENCASEMENT
100

FGL

87
300
NGL 4
450
900

300
U-BOLT 2.5" PIPE

A-A 150 FRONT VIEW


300

500x500mm
DETAILS 1 ADDITIONAL
CONCRETE BLOCK PLATE 5mm THK.
200

44 44

45

45
L63x5mm
163 1675 163 ANGLE BAR
2000 34 82 34
ELEVATION PLAN ADDITIONAL PLATE 5mm THK.
4

PLATE 1
4
PROVISION ATS ADDITIONAL
500 PLATE 5mm THK.
PROPOSED MPD
L63x5mm
ANGLE BAR

10mmØ TIES PLATE PLATE


250 O.C PERSPECTIVE VIEW PERSPECTIVE VIEW
550

500
50 250 89 50

25 25

50
6-16mmØ REABARS ADDITIONAL
REBAR 5mm THK. FLAT BAR

ELEVATION DETAILS PLATE 2 - FIRE EXTINGUISHER


HOLDER DETAIL
2000 6-16mmØ REABARS
500

PANEL BOX FRAME


PERSPECTIVE PLAN 10mmØ TIES
REBAR DETAILS 250 O.C
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
PANEL BOX FRAME DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. ST_016 DATE: 28TH MAY. 2025 REV. NO.: 0
20

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
MEMBER LIST
Length Weight(kg)
Hard stamp No. Size QTY Remark
(mm) Unit Total

HF1 HF1 CH160 300 2 5.93 11.9


1420 1000
HF2 CH160 300 2 5.93 11.9
HF3 PL10 350X125 2 3.43 6.9
HF2
HF4 PL6 80X100 2 0.38 0.8
B HF5 PL6 80X300 2 1.13 2.3
HF6 HF6 Q355 Ø89X4 2770 2 23.23 46.5
HF7 HF7 Ø76X4 3500 3 24.86 74.6
HF8 HF6
HF8 HF8 PL10 156X196 6 2.40 14.4
PL10X196X156 Q355 ∅89X4X2770
HF9 HF9 M12 360 16 0.32 5.1
HF10 HF10 M12 320 12 0.28 3.4
HF11 HF11 M12 320 8 0.28 2.2
HF12 HF12 M12 130 10 0.14 1.4

TOTAL 181.2
3500

3000

TOWER LEG
∅60~∅121
HF7 HF7
∅76X4X3500 ∅76X4X3500

HF6
Q355 ∅89X4X2770

C C AMB
ISOMETRIC VIEW
NTS

HF12
M12X130 B
A-A B-B
HF4 PL6X80X100

HF3 PL10X350X125
HF1 CH160X300 300 HF11
M12X320

78
HF9

85
M12X360
HF3 PL10X350X125
HF10 HF5 PL6X80X300
175 M12X320 175 HF1 CH160X300 300 50
HF6
HF2 CH160X300
350

B-B
A A 350

40
1420 1000

14
2770
34

170
PLAN VIEW
150 150

40
D D
C-C
ANTENNA MOUNTING BRACKET
STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC ANTENNA MOUNTING BBRACKET


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DETAILS

DRAWING No. ST_017


21
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 28TH MAY. 2025 REV. NO.: 0 30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
Members list
Length Weight(kg)
No. SPEC QTY Remark
(mm)
1500

430
50
30 40 30

100
40

80
3
Ø1
430
244

80

MICROWAVE ANTENNA MOUNTING BRACKET


STRUCTURAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC MW ANTENNA


NAME: JOHN NEIL G. MITRA
PRC No: 0135258
PTR No: 3419083
TIN No: 473-651-544
ISSUE DATE: 01/14/2025
ISSUE AT: SJDM, BULACAN
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. ST_018
DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: 28TH MAY. 2025 REV. NO.: 0
22

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
GENERAL NOTES
CALCULATION:
SCHEDULE OF LOADS Load: = 221.58A 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.
PANEL : MDP
ENCLOSURE : NEMA 3R W/ GROUNDING BAR; BOTTOM FEED Protection: 1.25 x 221.58A = 276.98A 2. ALL ELEVATIONS ARE IN METERS.
3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
POWER SOURCE : 230V, 1-PHASE, 60Hz Transformer & Genset Calculation: OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
MAIN CB : 250AT / 400AF, 3P, 25 KAIC, 230 V DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
KVA Load Single Phase: = (221.58A x 230 x .8) / 1000 = 40KVA DESIGN DRAWINGS.
BRANCH CIRCUIT BREAKERS Protection: 4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
CKT. CKT. METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
NO. VOLTS LOAD DESCRIPTION VA
AMP BRANCH CIRCUIT FEEDER WIRE CONDUIT
AT POLE TYPE Used 250AT / 400AF, 25KAIC, 60Hz, 230V, 2P FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
1 230 125 225AF, QOB 2-50mm² THHN + 1-14mm² THHN AL (G) 50mmØ MANAGER
RECTIFIER INPUT 1 16000 69.57 2P Bolt on Type 5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
2 230 RECTIFIER INPUT 2 16000 69.57 125 2P 225AF, QOB 2-50mm² THHN + 1-14mm² THHN AL (G) 50mmØ
Feeder: CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
3 230 RECTIFIER INPUT 3 16000 69.57 125 2P 100AF, QOB 2-50mm² THHN + 1-14mm² THHN AL (G) 50mmØ
Used 2 - 100mm² THHN CU + 1 - 22mm² THHN CU (G) in Ø60mm IMC SHALL BE PART OF SITE FOLDER
4 230 DITO PROVISION - - - - - - - Transformer: CONSTRUCTION NOTES
5 230 PTCI LOAD 3000 13.04 30 2P 100AF, QOB 2-3.5mm² THHN + 1-3.5mm² THHN AL (G) 21mmØ Use minimum of 1 -50 KVA 1Ø Transformer 1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE
OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
6 230 C.O. - - 20 2P 100AF, QOB 2-3.5mm² THHN + 1-3.5mm² THHN AL (G) 21mmØ Generator: DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
DESIGN DRAWINGS.
7 230 SPARE - - 20 2P 100AF, QOB 2-3.5mm² THHN + 1-3.5mm² THHN AL (G) 21mmØ Use minimum of 1 - 50 KVA, 230V, 60Hz, 1Ø GENERATOR For Dual Tenant 2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
TOTAL: 51000 221.58 Use minimum of 1 -25 KVA, 230V, 60Hz, 1Ø GENERATOR For Single Tenant 3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
STRUCTURES.

SCHEDULE OF LOAD 4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
BE FROM TRUE GEOGRAPHIC NORTH.
5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.
TRANSFORMER 2 - 100mm² THW 2 - 100mm² THHN CU + 6. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
AERIAL 1 - 22mm² THHN CU (G) PULL WIRE INSIDE.
50KVA SERVICE ENTRANCE POLE ELECTRICAL GENERAL NOTES
IN 60mmØ RSC
SINGLE PHASE 230V, 1-PHASE, 60Hz 1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE
IN ACCORDANCE WITH PHILTOWER SPECIFICATIONS.
THE LATEST EDITION OF THE PHILIPPINE ELECTRIC CODE,
THE RULES AND REGULATION OF THE LOCAL MUNICIPALITY
AND POWER UTILITY COMPANY.
2. WIRING METHOD:
A. RIGID STEEL CONDUIT (RSC) FOR SERVICE
ENTRANCE AND ALL CONNECTION WITHIN THE
BTS / EQUIPMENT PAD SHOULD BE LIQUID TIGHT
2 - 100mm² THHN CU + FLEXIBLE CONDUIT.
1 - 30mm² THHN CU (G) CL 200
M
B. ALL CONDUIT FROM THE PULLBOX GOING TO THE
EQUIPMENT SHOULD BE LIQUID TIGHT FLEXIBLE CONDUIT.
IN 60mmØ RSC KWHM C. ALL PROTRUDING PVC PIPE FROM FINISHED GRADE LINE
MUST HAVE CONCRETE ENCASEMENT WITH 150MM DEPTH, 200MM
HEIGHT ABOVE FGL, 200MM HEIGHT BELOW FGL AND MINIMUM OF
300MM WIDTH DEPENDING ON THE NUMBER OF PVC'S TO BE ENCASED.
2 - 100mm² THHN CU + D. ALL UNDERGROUND PIPE SHOULD BE PVC. ALL EXPOSED PIPE SHOULD
1 - 22mm² THHN CU (G) BE RSC.
IN 60mmØ RSC E. GROUNDING WIRES SHALL BE INSULATED.
3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS
SHALL BE PROPERLY GROUNDED.
Main Circuit Breaker, 250AT, 3P 4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5MM2 TYPE

LOCATED OUTSIDE THE SITE PREMISES


THHN/THW, UNLESS OTHER WISE INDICATED.
Service Entrance Pedestal

REQUIRED IF MAIN KWH METER IS


AND USE COLOR CODING IN THIS SYSTEM.
NEW MDP- MTS (PTCI/Utility Scope) L1 - BLACK, L2-RED, L3 - BLUE, N - WHITE, G - GREEN.
5, ALL WIRES SHALL BE A BRAND APPROVED BY PHILTOWER.
6. WIRING DEVICES SHALL BE A BRAND APPROVED BY PHILTOWER.
7. BRAND MUST BE SCHNEIDER/SQUARE D
2 - 100mm² THHN CU + ENCLOSURE MUST BE RATED AT NEMA - 3R NOT IP55
SPD 1 - 22mm² THHN CU (G)

Disconnect G IN 60mmØ RSC


PHILTOWER TYPE APPROVED ENCLOSURE
8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL, 25 KAIC, WHILE
BRANCH CIRCUIT BREAKERS SHALL BE COMMERCIAL TYPE,
10 KAIC
125A, 2P Outgoing 240V,60Hz,1Phase 9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS
Genset Provision ENERGIZED AND WITNESSED BY PHILTOWER. RESISTANCE
SPD

T1,25kA + 250 AT, 2P Service Entrance Pedestal #1 SHALL BE GREATER THAN FIFTY (50) MEGA OHMS
Mobile Poly ACSR Aerial Service Cap #2 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND
T2,120kA SUITED TO THE REQUIRED USE
11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED EVEN
IF NOT INDICATED IN THE PLANS
12. ALL ACPDB'S MUST BE INSTALLED WITHIN 10METER RADIUS FROM
MAIN DISTRIBUTION PANEL
INCOMING 240V,60Hz,1Phase 13. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT
2 - 100mm² THHN CU +
Service Entrance Pedestal #2 SUPERVISION OF A DULY LICENSED AND REGISTERED
DITO PROVISION 1 - 22mm² THHN CU (G)
RECTIFIER INPUT 1 Service Cap #1 IN 60mmØ RSC
ELECTRICAL ENGINEER.
14. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC CRIMPER TOOL.

125AT, 2P 125AT, 2P Enclosed Circuit Breaker , 250AT, 3P


Service Entrance Pedestal #2
LEGEND
RECTIFIER INPUT 2 SPACE (PTCI Scope)

125AT, 2P 125AT, 2P M Main Kwh Meter

ECB ENCLOSED CIRCUIT BREAKER


NOTE: GROUND
30AT, 2P
LAMINATED COPY OF PHILTOWER SPARE PERMANENT
SERVICE ENTRANCE
MANUAL TRANSFER SWITCH
SLD TO BE INSTALLED 20AT, 2P 20AT, 2P ATS G
SHARED
GENSET
WITH TWIST LOCK OUTLET
PHILTOWER C.O 300 AMP ACPDB AC POWER DISTRIBUTION BOARD
IN MDP BOX. CIRCUIT BREAKER

ALL BREAKER TO BE MDP MAIN DISTRIBUTION BOARD


AUTOMATIC TRANSFER SWITCH
N E

LABELLED. L

SINGLE LINE DIAGRAM


N E

MANUAL TRANSFER SWITCH


L

S/M SUB KWH METER

PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: QUIRINO O. GUILLEPA JR.
PRC No: 0004644
PTR No: 0694745
TIN No: 179-296-902
ISSUE DATE: 01/04/2021
ISSUE AT: QUEZON CITY
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
ELECTRICAL INSTALLATION SLD
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. EL_001 DATE: - REV. NO.: 0
23

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.
2. ALL ELEVATIONS ARE IN METERS.
3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
8230 DESIGN DRAWINGS.
4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
115 2000 2000 2000 2000 115 METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
MANAGER

115

115
LOCATION OF OB LIGHT 5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
LOCATION OF CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
LIGHTNING SPIKE PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
VERTICAL CABLE TRAY FOR SHALL BE PART OF SITE FOLDER
100mm THICK GRAVEL FILL ON 3RD TENANT
SITE WITH 0.4mm BLACK
VERTICAL CABLE TRAY FOR

2000

2000
POLYETHYLENE SHEET CONSTRUCTION NOTES
2ND TENANT 1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE
UNDERNEATH. CRUSHED
AGGREGATES 19mm TO 25mm OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
VERTICAL CABLE TRAY FOR DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
OR 3/4 TO G1 MAXIMUM 1ST TENANT (GLOBE) DESIGN DRAWINGS.
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
600mm WIDE
STRICTLY IMPLEMENTED DURING CONSTRUCTION.
3-LEGGED TOWER EARTH PIT CABLE LADDER RESTING 3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING
40m - 290kph - 100kPA ON SUPPORT POLES USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY
CABLE TRAY AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
∅50mm PVC PIPE SUPPORT STRUCTURES.
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL

SPILLAGE
WEEP HOLE
BE FROM TRUE GEOGRAPHIC NORTH.

FUEL
1850

PIT
2000

2000
5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.
6. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
SPARE BTS PAD / SECTION 1
CYCLONE FENCE PULL WIRE INSIDE.
(TENANT 1)
WITH BARBED WIRE ELECTRICAL GENERAL NOTES
ON TOP
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE

3000
IN ACCORDANCE WITH PHILTOWER SPECIFICATIONS.
THE LATEST EDITION OF THE PHILIPPINE ELECTRIC CODE,
BTS THE RULES AND REGULATION OF THE LOCAL MUNICIPALITY
AND POWER UTILITY COMPANY.
DG PAD 2. WIRING METHOD:
A. RIGID STEEL CONDUIT (RSC) FOR SERVICE

9730
1500

1500
ENTRANCE AND ALL CONNECTION WITHIN THE
BTS / EQUIPMENT PAD SHOULD BE LIQUID TIGHT
RECTIFIER PROPOSED C.O. LOCATION FLEXIBLE CONDUIT.

GENSET
TOWER RAFT 36W B. ALL CONDUIT FROM THE PULLBOX GOING TO THE
EQUIPMENT SHOULD BE LIQUID TIGHT FLEXIBLE CONDUIT.
4000

FOUNDATION C. ALL PROTRUDING PVC PIPE FROM FINISHED GRADE LINE

6000
MUST HAVE CONCRETE ENCASEMENT WITH 150MM DEPTH, 200MM
2x∅50mm PVC PIPE HEIGHT ABOVE FGL, 200MM HEIGHT BELOW FGL AND MINIMUM OF
300MM WIDTH DEPENDING ON THE NUMBER OF PVC'S TO BE ENCASED.
BURIED 450mm D. ALL UNDERGROUND PIPE SHOULD BE PVC. ALL EXPOSED PIPE SHOULD
BTS BELOW THE FGL BE RSC.
E. GROUNDING WIRES SHALL BE INSULATED.
BTS PAD / SECTION 2 3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS
2600 SHALL BE PROPERLY GROUNDED.
2000

2000
(TENANT 2) 4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5MM2 TYPE
THHN/THW, UNLESS OTHER WISE INDICATED.
AND USE COLOR CODING IN THIS SYSTEM.
SPARE L1 - BLACK, L2-RED, L3 - BLUE, N - WHITE, G - GREEN.

3000
5, ALL WIRES SHALL BE A BRAND APPROVED BY PHILTOWER.
SOLAR POWERED 6. WIRING DEVICES SHALL BE A BRAND APPROVED BY PHILTOWER.
SITE PERIMETER LIGHTS 7. BRAND MUST BE SCHNEIDER/SQUARE D
FIXED ON TOWER LEG 600mm WIDE ENCLOSURE MUST BE RATED AT NEMA - 3R NOT IP55
CABLE LADDER PHILTOWER TYPE APPROVED ENCLOSURE
8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL, 25 KAIC, WHILE
RESTING ON BRANCH CIRCUIT BREAKERS SHALL BE COMMERCIAL TYPE,
SIDE BRACKETS 10 KAIC
9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS
ENERGIZED AND WITNESSED BY PHILTOWER. RESISTANCE
SHALL BE GREATER THAN FIFTY (50) MEGA OHMS
∅20mm PVC PIPE 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND
SUITED TO THE REQUIRED USE
2000

2000
FOR FUTURE USE 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED EVEN
BURIED 450mm BELOW THE FGL IF NOT INDICATED IN THE PLANS
12. ALL ACPDB'S MUST BE INSTALLED WITHIN 10METER RADIUS FROM
SERVICE ENTRY POST ATS MDP MAIN DISTRIBUTION PANEL
WITH MAIN KWHR METER, ECB 13. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT
PANEL BOX FRAME SUPERVISION OF A DULY LICENSED AND REGISTERED
ECB 250AT 2P WITH WIRE GUTTER ELECTRICAL ENGINEER.
14. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC CRIMPER TOOL.
115

115
3000x1500x200mm THICK
R/C ACCESS RAMP WITH 148 BRC MESH,
115 3000 500 30 440 30 2000 2000 115
WITH WELL COMPACTED
AND STABILIZED BASE UNDERNEATH,
AND ALL LAID ON TOP OF 100mm THICK
LEAN CONCRETE BEDDING LEGEND

M - MAIN KWHR METER


LEGEND DRIVE IN ACCESS RAMP
UP - MAIN POWER CABLE

KWHR - KILOWATT HOUR METER UP/1 - MAIN POWER CABLE


ECB - ENCLOSED CIRCUIT BREAKER
UP/DC - DC POWER CABLE
MDP - MAIN DISTRIBUTION PANEL
ACPDB - AC POWER DISTRIBUTION BOARD PO - AWL POWER CABLE

ECB-MTS
- ENCLOSED CIRCUIT BREAKER -
- MANUAL TRANSFER SWITCH
SITE ELECTRICAL LAYOUT Ul - SECURITY LIGHTS POWER CABLE

PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: QUIRINO O. GUILLEPA JR.
PRC No: 0004644
PTR No: 0694745
TIN No: 179-296-902
ISSUE DATE: 01/04/2021
ISSUE AT: QUEZON CITY
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
ELECTRICAL SITE LAYOUT
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. EL_002 DATE: - REV. NO.: 0
24

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION/GROUNDING NOTES
LOCATION OF 1. ALL DIMENSIONS ARE IN MILLIMETERS UNTIL OTHERWISE NOTED.
LIGHTNING SPIKE 2. ALL THE EQUIPMENT EARTHING, TOWER, HORIZONTAL CABLE
LADDERS AND FENCE SHOULD BE CONNECTED WITH EARTHING
SYSTEM.
3. THE DOWN CONDUCTOR CABLE FOR TOWER EQUIPMENT TO BE
∅50mm² (1/0) POLY ACSR (ALUMINUM CABLE).
4. ANTI-CORROSION TAPE (DENZO TAPE) SHALL BE APPLIED AFTER
8230
TERMINATION OF ANY UNDERGROUND GROUNDING CONNECTION
115 2000 2000 2000 2000 115
LOCATION OF OB (GROUNDING ROD TO COPPER CABLE, WITH COPPER CLAMP)
LIGHT OR (COPPER CABLE TO COPPER CABLE WITH COPPER CLAMP)

115

115
50mm² BARE STRANDED
50mm² ALUMINUM TAIL
ALUMINUM TAIL, PASSING AS WELL AS CONNECTION TO ROD IN EARTH PIT
THROUGH THE RAFT IN FLEX 5. LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONE OF
CONNECTED TO FENCE
HOSE INSULATOR TO BE
CORNER POST
CONNECTED TO TOWER LEG
PROTECTION TO THE ANTENNA OF THE TOWER.
6. GROUNDING RING CABLE TO BE 50mm² BARE STRANDED

2000

2000
50mm H/DFLEX HOSE INSULATOR
COPPER, UNLESS NOTED OTHERWISE
FOR BARE STRANDED ALUMINUM,
CASTED IN CONCRETE RAFT 50mm² ALUMINUM INSULATED 7. ALL GROUNDING TAIL GOING ABOVE GROUND FROM GROUND RING
FOUNDATION CABLE (POLY ACSR) CONNECTED SHALL BE 50MM2 BARE ALUMINUM WIRE (BARE ACR 1/0)
TO BUS-BARS ALONG THE TOWER
EARTH PIT 8. THE MINIMUM DEPTH OF THE BURIED EARTHING SYSTEM TO BE
50mm² ALUMINUM INSULATED CABLE 600mm FROM THE NATURAL GROUND LEVEL (NGL).
(POLY ACSR 1/0) CONNECTED FROM
LIGHTNING CABLE TO TEST PIT ∅16mmx1500mm LONG 9. AFTER THE INSTALLATION OF THE EARTHING SYSTEM, THE

SPILLAGE
GROUNDING ROD EARTH ROD, BURIED RESISTANCE TO EARTH WILL BE TESTED IN ACCORDANCE WITH

FUEL
1850

PIT
UNDER THE TOWER RAFT
2000

2000
EARTHING TEST PROCEDURE FOR PHILTOWER SITES.
∅16mmx1500mm LONG EARTH
GROUNDING TEST RESISTANCE SHOULD BE < OR = 2 OHMS.
ROD IN THE EARTH PIT, 10.*ALL EARTH ROADS BURIED UNDER THE RAFT - 1500mm LONG
BURIED ABOVE THE TOWER RAFT *ALL EARTH ROADS BURIED UNDER THE NGL AND ABOVE THE
OUTDOOR BTS PAD
RAFT - 1500mm LONG
3-LEGGED TOWER
11. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
40M - 290kph - 100kPA PULL WIRE INSIDE

9730
1500

1500
32 HOLE BUS-BAR
50mm² BARE STRANDED
12. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC
GENSET

COPPER WIRE EARTH RING, CRIMPER TOOL.


4000

32 HOLE BUS-BAR BURIED UNDER TOWER RAFT


LEGEND
TOWER FOUNDATION
COLUMNS
2600 EARTH PIT
2000

2000
WTH ∅16mm EARTH ROD, 1500mm LONG
TOWER RAFT
FOUNDATION 32 HOLE BUS-BAR 50mm² ALUMINUM INSULATED CABLE

EARTHING BUS BAR


∅16mmx1500mm LONG
EARTH ROD PANEL BOARD GROUNDING BUSBAR
∅16mm COPPER EARTH ROD, 1500mm LONG
50mm² BARE ALUMINUM
2000

2000
WIRE TAIL, Ø20mm PVC
MDP PIPE INSULATOR, TO BE MATERIAL NOTES
ATS
ECB CONNECTED AT THE BOTTOM
CORNER POST OB-LIGHT ALL MATERIALS TO BE HOT DIPPED GALVANIZED
1. TOWER & GROUND BUSBARS
115

115
115 3000 500 30 440 30 2000 2000 115 2. BUSBAR BRACKETS
3. BOLTS, NUTS & U-BOLTS
4. CABLE TRAY AND SUPPORT
LIGHTNING ARRESTER DOWN
DRIVE IN ACCESS RAMP
CONDUCTOR WILL BE INSTALL
IN THE TOWER LEG WHERE
THE LIGHTNING SPIKE IS
INSTALLED AND OPPOSITE TO
SITE EARTHING LAYOUT VERTICAL CLIMBING LADDER
SCALE 1:50 3-LEGGED TOWER
TO BE TERMINATED AT THE 40M - 290kph - 100kPA
GROUND ROD INSIDE THE
EARTH-PIT USING CAD-WELD BUSBAR TO BUSBAR
CABLE
DG PAD

450
600mm CABLE LADDER
RESTING ON
SIDE BRACKETS
CYCLONE FENCE, & SUPPORT POLES
WITH BARBED WIRE ON TOP 2000

FENCE EARTHING OUTDOOR BTS PAD


CONNECTED AT ELEVATED FOR 0.50m
THE BOTTOM OF ABOVE THE FGL

700 100 100 600

600 100 500

200 500
FGL +0.20
CORNER POST NGL ±0.00 32 HOLE BUSBAR

200

500 300 100150 350


350

WELL COMPACTED
700

700
250
550

1450
BACKFILL MATERIAL
200 UP TO 95% @ EVERY 200mm,

1500
50 500
STABILIZED TO
50mm² BARE STRANDED ENGINEER'S APPROVAL

450
ALUMINUM TAILS PASSING BURIED
1085 8230 1085
THROUGH THE TOWER RAFT TOWER RAFT
10400
IN FLEX HOSE INSULATORS FOUNDATION
CASTED IN CONCRETE
∅20mm PVC PIPE
∅16mm EARTH RODS PASSING THROUGH
1500mm LONG THE TOWER RAFT
BURIED UNDER
50mm² BARE STRANDED
THE FOUNDATION RAFT COPPER WIRE EARTH RING,
EARTHING ELEVATION SCHEME BURIED UNDER TOWER RAFT

SCALE 1:75

PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC SITE EARTHING LAYOUT


NAME: QUIRINO O. GUILLEPA JR.
PRC No: 0004644
PTR No: 0694745
TIN No: 179-296-902
ISSUE DATE: 01/04/2021
ISSUE AT: QUEZON CITY
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
& EARTHING ELEVATION
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. EL_003 DATE: - REV. NO.: 0
25

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION/GROUNDING NOTES
∅10mm HOLE 1. ALL DIMENSIONS ARE IN MILLIMETERS UNTIL OTHERWISE NOTED.
FOR M8 BOLTS 2. ALL THE EQUIPMENT EARTHING, TOWER, HORIZONTAL CABLE
LADDERS AND FENCE SHOULD BE CONNECTED WITH EARTHING

TO LIGHTNING SPIKE
SYSTEM.
3. THE DOWN CONDUCTOR CABLE FOR TOWER EQUIPMENT TO BE

Ø1
∅12mm HOLE 30 28 30 30 28 30 ∅50mm² (1/0) POLY ACSR (ALUMINUM CABLE).

Ø1

2
FOR M10 4. ANTI-CORROSION TAPE (DENZO TAPE) SHALL BE APPLIED AFTER

0
TERMINATION OF ANY UNDERGROUND GROUNDING CONNECTION
EXPANSION BOLTS
(GROUNDING ROD TO COPPER CABLE, WITH COPPER CLAMP)
TOP

20 20 50
OR (COPPER CABLE TO COPPER CABLE WITH COPPER CLAMP)
32 HOLE BUS-BAR

100
AS WELL AS CONNECTION TO ROD IN EARTH PIT
5. LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONE OF
PROTECTION TO THE ANTENNA OF THE TOWER.
50mm² ALUMINUM 280 6. GROUNDING RING CABLE TO BE 50mm² BARE STRANDED
COPPER, UNLESS NOTED OTHERWISE

10
INSULATED CABLE 340 7. ALL GROUNDING TAIL GOING ABOVE GROUND FROM GROUND RING


(POLY ACSR 1/0) SHALL BE 50MM2 BARE ALUMINUM WIRE (BARE ACR 1/0)
CONNECTED TO 8. THE MINIMUM DEPTH OF THE BURIED EARTHING SYSTEM TO BE
ISOMETRIC VIEW

32
600mm FROM THE NATURAL GROUND LEVEL (NGL).
LIGHTNING ROD 9. AFTER THE INSTALLATION OF THE EARTHING SYSTEM, THE
15 100 15 RESISTANCE TO EARTH WILL BE TESTED IN ACCORDANCE WITH
EARTHING TEST PROCEDURE FOR PHILTOWER SITES.
MID
50 50 30 280 30 GROUNDING TEST RESISTANCE SHOULD BE < OR = 2 OHMS.
32 HOLE BUS-BAR 340x100x6mm 10.*ALL EARTH ROADS BURIED UNDER THE RAFT - 1500mm LONG
HDG STEEL PLATE *ALL EARTH ROADS BURIED UNDER THE NGL AND ABOVE THE
RAFT - 1500mm LONG

40 TBD 6

40 TBD 6
INSULATOR 11. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
PULL WIRE INSIDE
50mm² ALUMINUM ∅12mm HOLE 12. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC
CRIMPER TOOL.
INSULATED CABLE FOR M10
(POLY ACSR) EXPANSION BOLT LEGEND
15 20 60 35 18 25 255 25 17
CONNECTED TO 25x4mm THICK
BUS-BARS ALONG THE 130 PRE-FORMED 340 EARTH PIT
WTH ∅16mm EARTH ROD, 1500mm LONG
TOWER HDG STEEL
50mm² ALUMINUM INSULATED CABLE
MOUNTING BRACKET
EARTHING BUS BAR
BOTTOM EQUIPMENT PAD 32-HOLE PANEL BOARD GROUNDING BUSBAR
32 HOLE BUS-BAR ∅16mm EARTH ROD, 1500mm LONG
BUS-BAR DETAILS
R/C PIT MATERIAL NOTES
MIX 15 (1:2:4) 500 ALL MATERIALS TO BE HOT DIPPED GALVANIZED
WIRE TO ROD
4 Y 10mm
ISOMETRIC TOWER EARTHING REBARS
CADWELD CONNECTION 1. TOWER & GROUND BUSBARS
2. BUSBAR BRACKETS
DIAGRAM

100
∅8mm @200mm c/c 3. BOLTS, NUTS & U-BOLTS
VIEW STIRUPS
4. CABLE TRAY AND SUPPORT

32 HOLE BUS BAR

300
GROUNDING LOOP
∅16mm EARTH ROD

100
1500mm LONG
Ø1

30 28 30 30 28 30
Ø1

∅100mm
2
0

PROVISION
SEE CONNECTOR FOR CABLES
EARTH PIT
20 20 50

50mm² BARE
100

PLATE DETAIL STRANDED COPPER


∅16mm x 1500mm
280 400x400x4.5mm
340x100x6mm WELL COMPACTED LONG EARTH ROD
GALVANIZED PLATE
340

340 HDG STEEL PLATE


HANDLE
BACKFILL
MATERIAL
BLOW-UP
CONNECTED FROM
CHS ∅48mm TOWER LOWER BUSBAR FGL DOWN CONDUCTOR
SIDE LADDER BEAM CABLE CONNECTED

100
DIRECT TO

100 150
Ø1

250 32 HOLE GROUNDING ROD


4

TOWER ACCESS
BUS-BAR
Ø

LADDER STEP
14

20 62 138 30 ∅100mm
100 R/C PIT

700
MIX 15 (1:2:4) PROVISION FOR
Ø12

350
25 25

EARTH STRIPS
50

6mm THK.
∅12mm U-BOLT ∅100mm
FLAT BAR
PROVISION
LEAN CONCRETE
FOR GROUNDING

100
CONNECTOR PLATE MATERIAL
& DRAINAGE
100 300 100

50
32-HOLE BUS-BAR 500
∅16mm x 1500mm
LONG EARTH ROD
DETAILS
TO EARTH
GRID
SECTION
THROUGH
PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: QUIRINO O. GUILLEPA JR.
PRC No: 0004644
PTR No: 0694745
TIN No: 179-296-902
ISSUE DATE: 01/04/2021
ISSUE AT: QUEZON CITY
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
EARTH PIT & BUSBAR DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DRAWING No. EL_004 DATE: - REV. NO.: 0
26

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION/GROUNDING NOTES
500 1. ALL DIMENSIONS ARE IN MILLIMETERS UNTIL OTHERWISE NOTED.
SEE DOOR HANDLE 2. ALL THE EQUIPMENT EARTHING, TOWER, HORIZONTAL CABLE
50 50 300 50 50 DETAIL LADDERS AND FENCE SHOULD BE CONNECTED WITH EARTHING
SYSTEM.
3. THE DOWN CONDUCTOR CABLE FOR TOWER EQUIPMENT TO BE
4.5mm THK. ∅50mm² (1/0) POLY ACSR (ALUMINUM CABLE).
CHECKERED PLATE 4. ANTI-CORROSION TAPE (DENZO TAPE) SHALL BE APPLIED AFTER
L 50x50x5mm THK. TERMINATION OF ANY UNDERGROUND GROUNDING CONNECTION
HOT DIP GALVANIZE

100
(GROUNDING ROD TO COPPER CABLE, WITH COPPER CLAMP)
138 SEE STAPLE BAR OR (COPPER CABLE TO COPPER CABLE WITH COPPER CLAMP)
AS WELL AS CONNECTION TO ROD IN EARTH PIT
DETAIL 5. LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONE OF
PROTECTION TO THE ANTENNA OF THE TOWER.
L 50x50x5mm 6. GROUNDING RING CABLE TO BE 50mm² BARE STRANDED
COPPER, UNLESS NOTED OTHERWISE

40
7. ALL GROUNDING TAIL GOING ABOVE GROUND FROM GROUND RING
4.5mm THK. SHALL BE 50MM2 BARE ALUMINUM WIRE (BARE ACR 1/0)

5
CHECKERED PLATE 8. THE MINIMUM DEPTH OF THE BURIED EARTHING SYSTEM TO BE
600mm FROM THE NATURAL GROUND LEVEL (NGL).
HOT DIP GALVANIZE 15 9. AFTER THE INSTALLATION OF THE EARTHING SYSTEM, THE
L 40x40x4mm RESISTANCE TO EARTH WILL BE TESTED IN ACCORDANCE WITH
EARTHING TEST PROCEDURE FOR PHILTOWER SITES.
GROUNDING TEST RESISTANCE SHOULD BE < OR = 2 OHMS.
10.*ALL EARTH ROADS BURIED UNDER THE RAFT - 1500mm LONG
*ALL EARTH ROADS BURIED UNDER THE NGL AND ABOVE THE
TESTPIT CONCRETE

300
225
500

500
SEE HANDLE DETAIL RAFT - 1000mm LONG
CASE 11. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE

A TO BE FULLY
WELD
PULL WIRE INSIDE
12. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC
SECTION A CRIMPER TOOL.

MATERIAL NOTES
SEE HANDLE DETAIL ALL MATERIALS TO BE HOT DIPPED GALVANIZED
SEE HANDLE 1. CHECKERED PLATE
SEE HINGE
DETAILS 2. HINGE
DETAIL 3. STEEL BAR

SEE STAPLE BAR


137

DETAIL

100
PLAN VIEW 4.5mm THK.
CHECKERED PLATE

CYLINDRICAL HINGE
SEE HINGE
DETAIL 100
L 50x50x5mm
50 50
L50X
50X 10mm∅
5 DOWEL

10
EARTHING PIT COVER
CHECKERED PLATE SEE DOOR HANDLE DETAIL
400x400x4.5mm THK.
HOT DIP GALVANIZE 40mm LONG
SHACKLE,
BLOW UP PADLOCK
L 50x50x5mm

10mm∅
ROUND BAR

HINGE DETAILS
TESTPIT CONCRETE TO BE FULLY 106
CASE WELD

150 NOTE:
HANDLE DETAILS TEST PIT COVER MUST
EXPLODED VIEW BE TURNING 180°
PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
NAME: QUIRINO O. GUILLEPA JR.
PRC No: 0004644
PTR No: 0694745
TIN No: 179-296-902
ISSUE DATE: 01/04/2021
ISSUE AT: QUEZON CITY
MIDC
MIESCOR Infrastructure Development Corporation
APT NDG
STANDARD DRAWING
DRAWING No. EL_005
TEST PIT DETAILS
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
DATE: - REV. NO.: 0
27

30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
CONSTRUCTION/GROUNDING NOTES
Member list for tower
1. ALL DIMENSIONS ARE IN MILLIMETERS UNTIL OTHERWISE NOTED.
2. ALL THE EQUIPMENT EARTHING, TOWER, HORIZONTAL CABLE
LADDERS AND FENCE SHOULD BE CONNECTED WITH EARTHING
∅16 ROD WELDED TO ANGLE SYSTEM.
3. THE DOWN CONDUCTOR CABLE FOR TOWER EQUIPMENT TO BE
∅50mm² (1/0) POLY ACSR (ALUMINUM CABLE).
4. ANTI-CORROSION TAPE (DENZO TAPE) SHALL BE APPLIED AFTER
L50X5X150
TERMINATION OF ANY UNDERGROUND GROUNDING CONNECTION
(GROUNDING ROD TO COPPER CABLE, WITH COPPER CLAMP)
A A OR (COPPER CABLE TO COPPER CABLE WITH COPPER CLAMP)
2 INSULATORS & 4XM8 BOLT AS WELL AS CONNECTION TO ROD IN EARTH PIT
5. LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONE OF
PROTECTION TO THE ANTENNA OF THE TOWER.
CABLE SHOES L110X8X150 6. GROUNDING RING CABLE TO BE 50mm² BARE STRANDED
COPPER, UNLESS NOTED OTHERWISE
7. ALL GROUNDING TAIL GOING ABOVE GROUND FROM GROUND RING
SHALL BE 50MM2 BARE ALUMINUM WIRE (BARE ACR 1/0)
8. THE MINIMUM DEPTH OF THE BURIED EARTHING SYSTEM TO BE
600mm FROM THE NATURAL GROUND LEVEL (NGL).
9. AFTER THE INSTALLATION OF THE EARTHING SYSTEM, THE
RESISTANCE TO EARTH WILL BE TESTED IN ACCORDANCE WITH
CABLE MOUNTING EARTHING TEST PROCEDURE FOR PHILTOWER SITES.
DETAILS
∅16x950 ROD WELDED TO ANGLE BAR GROUNDING TEST RESISTANCE SHOULD BE < OR = 2 OHMS.
L110X8X150 10.*ALL EARTH ROADS BURIED UNDER THE RAFT - 1500mm LONG
*ALL EARTH ROADS BURIED UNDER THE NGL AND ABOVE THE
RAFT - 1000mm LONG
11. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
PULL WIRE INSIDE
U-M12X250 12. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC
CRIMPER TOOL.

L110X8X150 LEGEND

EARTH PIT
WTH ∅16mm EARTH ROD, 1000mm LONG
2 INSULATORS W/ 4XM8 BOLT 50mm² ALUMINUM INSULATED CABLE

EARTHING BUS BAR


PANEL BOARD GROUNDING BUSBAR
LIGHTNING ARRESTER ∅16mm EARTH ROD, 1500/1000mm LONG
EXISTING LIGHTNING ROD ∅48
MATERIAL NOTES

LIGHTNING ROD CONNECTION ALL MATERIALS TO BE HOT DIPPED GALVANIZED


1. TOWER & GROUND BUSBARS

SECTION A - A 2. BUSBAR BRACKETS


3. BOLTS, NUTS & U-BOLTS
4. CABLE TRAY AND SUPPORT

STAINLESS TIE @
LIGHTNING ROD ∅48 EVERY 1.5METERS

LIGHTNING ROD BASE


PLATE SAME AS THE SIZE STAINLESS TIE
OF THE TOP BASE PLATE @ EVERY 1.5m
OF THE TOWER

TOP BASE
PLATE OF THE TOWER
TOWER BASE PLATE
50mm² CABLE

STAINLESS TIE 50mm² CABLE


@ EVERY 1.5m

CABLE MOUNTING DETAILS


BLOW UP DETAIL
CONNECTED TO GROUND ROD
INSIDE THE TEST PIT

PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
MIDC
NAME: QUIRINO O. GUILLEPA JR. TIN No: 179-296-902 TOWER DOWN CONDUCTOR 28
PRC No: 0004644 ISSUE DATE: 01/04/2021 STANDARD DRAWING B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
MIESCOR Infrastructure Development Corporation
PTR No: 0694745 ISSUE AT: QUEZON CITY APT NDG DRAWING No. EL_006 DATE: - REV. NO.: 0 30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
GENERAL NOTES
PIPE SIZES 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NOTED.
OUTSIDE DIAMETER NOMINAL SIZE NOMINAL WALL 2. ALL ELEVATIONS ARE IN METERS.
TYPE 3. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN ADVANCE
(mm) (INCH) THICKNESS OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE
DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
HDPE PIPE 50 1 - 1/2 " 4.6mm DESIGN DRAWINGS.
4. ANY CHANGES ON THE EXECUTION OF WORK AND SITE
RSC PIPE 114 4" 5.7mm METHODOLOGY SHALL BE CARRIED OUT WITH WRITTEN APPROVAL
FROM PHILTOWER SUPERVISOR/CLUSTER MANGER/REGIONAL
MANAGER
5. NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY
CONSTRUCTION PERMITS ARE OBTAINED AND APPROVED BY
PHILTOWERS/GOVERNMENT OF PHILIPPINES(WHERE REQUIRED),
SHALL BE PART OF SITE FOLDER
EQUIPMENT
CAUTION TAPE
R/C PAD
FGL CAUTION TAPE CONSTRUCTION NOTES
600mm WIDE 1. CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEERIN ADVANCE
CABLE TRAY ∅20mm TIMBLE EYEBOLT OF ANY CHANGES ON SITE THAT DO NOT CONFORM TO THE

200
MESSENGER WIRE DESIGN SPECIFICATION AND REQUIREMENTS IN THE DETAILED
SUPPORTED WITH
NGL DESIGN DRAWINGS.

350
SIDE BRACKETS TO ELECTRICAL POLE
2. ALL HEALTH AND SAFETY POLICIES AND PROCEDURES SHALL BE
(SEE CONSTRUCTION NOTE #8)

0
STRICTLY IMPLEMENTED DURING CONSTRUCTION.

Ø5
150
50

2NOS 50mm OUTSIDE 3. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES DURING


DIAMETER HDPE PIPES USE OF HEAVY TOOLS AND EQUIPMENTS ON SITE, WHICH MAY

250 100
500

INSIDE ∅114mm RSC PIPE AFFECT THE STRUCTURAL SOUNDNESS OF ANY ADJACENT
450

FGL +0.20 WITH RSC LONG RADIUS


SPOOL
STRUCTURES.
4. ALL REFERENCES FOR AZIMUTH AND ANGULAR POSITIONS SHALL
BEND

500
SERVICE

1
INSULATOR BE FROM TRUE GEOGRAPHIC NORTH.

Ø1
100mm DEEP ENTRANCE POST
NGL ±0.00 BALLAST FILL (IF REQUIRED 5. ALL EXCESS MATERIALS ON SITE SHALL BE DISPOSED TO PROPER
LOCATIONS AFTER WORK COMPLETION.
PROVIDE

900
350

AC SEP CAP
2NOS 50mm OUTSIDE DRIP LOOP) 6. ALL ELECTRICAL AND FOC PIPES INSTALLED AT SITE MUST HAVE
DIAMETER HDPE PIPES PULL WIRE INSIDE.
INSIDE ∅114mm PVC PIPE FOC SEP CAP 7. ALL TERMINAL LUGS MUST BE TIGHTEN USING HYDRAULIC

400
BURIED 350mm BELOW CRIMPING TOOLS.
8. THE MINIMUM DISTANCE OF AC CAP AND FOC CAP MUST BE
THE FGL
400mm MINIMUM.

F.O.C FOR PROPOSED 50x50x3 ∅114mm RSC PIPE


TENANT 2 ANGLE BAR
F.O.C FOR RAISER
F.O.C FOR (EVERY 1m) (EXPOSED)
TENANT 1
TENANT 1
m10 EXPANSION BOLT
MALLEABLE
440
WALL CLAMP
1.0m SPACING

FOC - BTS ELEVATION PROPOSED 12mmØ U-BOLT


SCALE 1:25 PROPOSED 12mmØ U-BOLT

300
EQUIPMENT
R/C PAD 2NOS 50mm OUTSIDE
DIAMETER HDPE PIPES
INSIDE ∅114mm RSC PIPE
600mm WIDE (PIPE RAISER EXPOSED)
CABLE TRAY
SUPPORTED WITH PROPOSED 50x50x3 FIBER OPTIC
SIDE BRACKETS ANGLE BAR CABLE
100mm DEEP
(EVERY 1m)
2NOS 50mm 50mm OUTSIDE BALLAST FILL 2NOS 50mm OUTSIDE
DIAMETER HDPE PIPES DIAMETER HDPE PIPES
INSIDE ∅114mm RSC PIPE
WITH RSC LONG RADIUS BEND
FGL INSIDE ∅114mm RSC PIPE
WITH PVC LONG RADIUS BEND

NGL
2NOS 50mm OUTSIDE
2NOS 50mm OUTSIDE

350
DIAMETER HDPE PIPES
DIAMETER HDPE
INSIDE ∅114mm PVC
PIPES INSIDE ∅114mm
PIPE BURIED 350mm
PVC PIPE
BELOW THE FGL
BURIED 350mm
BELOW THE FGL

NOTE
DRAWINGS ON THIS PAGE ARE ONLY AN ILLUSTRATION
PLANVIEW OF HOW AND WHERE THE FIBER WILL BE LAID
AS IT CROSSES THE SITE. IT IS NOT A REPRESENTATION
FOC - SERVICE ENTRANCE
SCALE 1:25
OF A DIRECT ROUTE.

PROFESSIONAL ELECTRICAL ENGINEER SHEET CONTENTS SHEET No.

PHILTOWER / MIDC
MIDC
NAME: QUIRINO O. GUILLEPA JR. TIN No: 179-296-902
FIBER DUCTING DETAILS 29
PRC No: 0004644 ISSUE DATE: 01/04/2021 STANDARD DRAWING B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
MIESCOR Infrastructure Development Corporation
PTR No: 0694745 ISSUE AT: QUEZON CITY APT NDG DRAWING No. EL_007 DATE: - REV. NO.: 0 30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
STRUCTURAL ENGINEER SITE ID: E03247-C08 OPERATOR SITE ID: NS-TER24-C518 SHEET CONTENTS SHEET No.

E03247-C08
MIDC
NAME: JOHN NEIL G. MITRA TIN No: 473-651-544
SOIL BEARING TEST 30
PRC No: 0135258 ISSUE DATE: 01/14/2025 MUNICIPALITY: SAN LUIS LONGITUDE: 120.9163431°
B21-054-001_0 FD-FTT-40-290-24-100-W-RAFT
MIESCOR Infrastructure Development Corporation PROVINCE: BATANGAS LATITUDE: 13.8282733°
PTR No: 3419083 ISSUE AT: SJDM, BULACAN VDC APT NDG
REGION: REGION IV-A
DRAWING No. ST_019 DATE: 19TH AUG 2025 REV. NO.: 0 30
DRAWN CHECKED APPROVED RELEASED
FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION