Project: ETAP Page: 1
Location: 19.0.1C Date: 25-04-2025
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: UGHELLI EAST FIELD POWER NTWK Config.: Normal
Sequence-of-Operation Event Summary Report
Symmetrical 3-Phase Fault at Bus16.
Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition
140 CB08 7.642 80.0 140 Phase
200 CB03 7.642 140 200 Phase
1543 Relay2 0.095 1543 Phase - OC1 - 51
1563 CB02 20.0 Tripped by Relay2 Phase - OC1 - 51