0% found this document useful (0 votes)
2 views2 pages

06 - 20230927 - Escmária de Lec. DRWG - Rev 02

The document outlines electrical layout plans for toilets at the Escola Primária de Buji in Mozambique, detailing specifications for switches, conduits, and cables. It emphasizes the importance of verifying dimensions on-site and reporting discrepancies to the engineer. The design is proprietary to UNOPS-KEMC and cannot be reproduced without consent.

Uploaded by

Daniel Jorge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views2 pages

06 - 20230927 - Escmária de Lec. DRWG - Rev 02

The document outlines electrical layout plans for toilets at the Escola Primária de Buji in Mozambique, detailing specifications for switches, conduits, and cables. It emphasizes the importance of verifying dimensions on-site and reporting discrepancies to the engineer. The design is proprietary to UNOPS-KEMC and cannot be reproduced without consent.

Uploaded by

Daniel Jorge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Kenya Multi-Country Office (KEMC)

UNOPS Building, UN lane,


Off UN Avenue P.O. Box 783,
Village Market, 00621
Nairobi, Kenya.

NOTES
A B C A B C 1. All dimensions are in
millimetres,unless otherwise stated.

2. All dimensions to be checked and


confirmed on site before commencement
of any work.
S1
3 3
1000W PHOTO 3. Written dimensions overrides scaled
ELECTRIC SWITCH FOR dimensions,thus all dimensions are to
EXTERNAL LIGHTS pec be read and not at any time scaled
D1 D1 D1 D1 D1 D1 from the drawing.
toilet disabled
disabled toilet 4. Any discrepancy to be reported to
2 the Engineer promptly before
2
proceeding.

ramp up

ramp up
CU-02

ramp up
ramp up

10A OVERRIDE SWITCH FOR D1 D1 D1 D1


EXTERNAL LIGHTS, MOUNTED
AT HIGH LEVEL-1800MM AFFL 1 NO. REVISION DATE APPR.
1
S1

32MMØ HG
PVC DUCT IN FLOOR
SLAB

CLIENT

Government of mozambique

PROJECT
6mm 2/C
PVC/SWA/PVC 10A SP Northern Crisis Recovery
32MMØ PVC HG 3*1.5 SQ. MM SC CABLES IN Ø20MM PVC CONDUIT TO Project-(NCRP)
CONDUIT LIGHTING CCT 02/1 Mocimboa da Praia District
10A SP Escola Primária de Buji
3*1.5 SQ. MM SC CABLES IN Ø20MM PVC CONDUIT TO
LIGHTING CCT 02/2
30mA
RCD

DRAWING TITLE
40A SP/N
ISOLATOR spare way
Toilets- Electrical Layout
spare way
TECHNICAL SERVICES UNIT
4 WAY, 32A SPN SIGN DATE
CONSUMER UNIT CU-2 FOR DRAWN BY OkothM
TOILET
CHECKED BY AnthonyA
APPROVED BY PhilipM
P.M.
ISSUE DATE: Sept 2023 Signature

DRAWING NUMBER: REV.

EE/08
TENDER DRAWINGS

COPYRIGHT RESERVED
THIS DESIGN AND DETAILS ARE, AND AT ALL TIMES
THE EXCLUSIVE PROPERTY OF THE
UNOPS-KEMC-TSU,NAIROBI.
AND CANNOT BE USED OR REPRODUCED WITHOUT
WRITTEN CONSENT.
Kenya Multi-Country Office (KEMC)
UNOPS Building, UN lane,
Off UN Avenue P.O. Box 783,
Village Market, 00621
Nairobi, Kenya.

NOTES
1. All dimensions are in
millimetres,unless otherwise stated.

2. All dimensions to be checked and


confirmed on site before commencement
STUDENT'S of any work.
Toilet 1200 MM LONG X 12.5
3. Written dimensions overrides scaled
MM DIAMETER
block 3 MULTIPLE AIR dimensions,thus all dimensions are to
COPPER TERMINAL be read and not at any time scaled
from the drawing.
2.5M STEEL PIPE FOR 4. Any discrepancy to be reported to
MOUNTING 25 X 3 MM COPPER the Engineer promptly before
ARRESTOR-FIRMLY TAPE CONDUCTOR
disabled
toilet
disabled
toilet proceeding.
ANCHORED +7.24 SADDLED ON STEEL
CU-2 PIPE
male
female

NO. REVISION DATE APPR.


CLASSROOM +6.00

32MMØ HG
BLOCK 1 RC BEAM ALL TO
STRUCTURAL ENGINEER
DETAILS

PVC CONDUITS 25 X 3 MM COPPER


LINK TO
B TOILETS TAPE CONDUCTOR
C
SADDLED ON COLUMN
A RC BEAM ALL TO
STRUCTURAL ENGINEER
DETAILS

+3.15
1

250MMx250MMx
-0.20
RAMPA- 5%
RAMP - 5%
1
STAFF 50MM CABLE DRAW RC COLUMNS ALL TO
ramp up

2
Toilet 32MMØ HG BOX
STRUCTURAL ENGINEER
DETAILS
2
PVC DUCT IN CLIENT

3
block 2 FLOOR SLAB
New Overhead 3 Government of mozambique
Water Tank Ground Slab (±0.00)
C
B
A MB
GL

2.5MM 2/C CU-1 PROJECT


PVC/SWA/PVC Northern Crisis Recovery
(ARMOURED CABLE) CONCRETE EARTHING Project-(NCRP)
TO THE WATER PUMP TERMINAL WITH Mocimboa da Praia District
300x300x200 Escola Primária de Buji
INSPECTION PIT WITH
INCOMING LIGHTNING COPPER ROD
POWER PROTECTION SYSTEM DRAWING TITLE
SUPPLY
LIGHTNING PROTECTION SYSTEM Toilets- Electrical Layout
(FOR THE EXISTING WATER TOWER)
New 0,000 litr
Grou1
nd Water T es
ank TECHNICAL SERVICES UNIT
SIGN DATE
DRAWN BY OkothM
CHECKED BY AnthonyA
APPROVED BY PhilipM
P.M.
ISSUE DATE: Sept 2023 Signature

DRAWING NUMBER: REV.

EE/08
TENDER DRAWINGS

COPYRIGHT RESERVED
THIS DESIGN AND DETAILS ARE, AND AT ALL TIMES
THE EXCLUSIVE PROPERTY OF THE
UNOPS-KEMC-TSU,NAIROBI.
AND CANNOT BE USED OR REPRODUCED WITHOUT
WRITTEN CONSENT.

You might also like