0% found this document useful (0 votes)
1 views1 page

Lus CP28B QDSBG SDW Me 16205 001 Cad - 00 01

The document contains detailed engineering drawings and plans for a storm water tank installation, including various sections, layouts, and material specifications. It outlines the proposed locations for equipment such as diesel generator sets and GSM towers, as well as drainage and valve installation details. The document is part of a larger project for infrastructure and landscape works in Lusail, Qatar.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1 views1 page

Lus CP28B QDSBG SDW Me 16205 001 Cad - 00 01

The document contains detailed engineering drawings and plans for a storm water tank installation, including various sections, layouts, and material specifications. It outlines the proposed locations for equipment such as diesel generator sets and GSM towers, as well as drainage and valve installation details. The document is part of a larger project for infrastructure and landscape works in Lusail, Qatar.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12

001 002 003 004

SS-PS-01
DDS-ND-01 DDS-ND-02
MV PANEL ROOM MV PANEL ROOM

BUS
STOP

SHELTER
AC BUS
S20-R9A S20-R9B DDS-ND-03
DDS-ND-04
S20-R9C

DDS-ND-05

M2 - R29B

S11 - R30B

S12 - R32B
S11 - R31B
009 010 011 012 013 014

S10 - R28B
S10 - R27B
S8 - R25B

S9 - R26B
S43 - R55

S7 - R8B
S4 - R4

S5 - R6

S6 - R7
S4 - R5
DDS-ND-07

MV PANEL ROOM

DDS-ND-06

S21 - R10 S22 - R56 S46 - R50


MV PANEL ROOM

MV PANEL ROOM

DDS-ND-08

S2 - R2

S3 - R3
S1 - R1
S23 - R11
S47 - R51
MV PANEL ROOM

DDS-ND-22

S24 - R12

S10 - R28A
S10 - R27A
S25 - R13

S9 - R26A
S10 - R57

M2 - R29A

S11 - R30A

S12 - R32A
S7 - R8A

S11 - R31A
DDS-ND-09

S8 - R25A

S39 - R47

S40 - R48
S38 - R46
MV PANEL ROOM

DDS-ND-11

MV PANEL ROOM
S9 - R58 MV PANEL ROOM

S4 - R59 DDS-ND-10 S11 - R60

S26 - R36
S26 - R14

018 019 020 021 DDS-ND-19 022 023

S38 - R45
DDS-ND-15

S39 - R47
MV PANEL ROOM

S38 - R46
MV PANEL ROOM

DDS-ND-21

S27 - R21 S27 - R37 MV PANEL ROOM

S50 - R52

MV PANEL ROOM

DDS-ND-14
PA DT 7575 D
DUCTILE FOUL SEWER DRAINAGE FOUL
PA
DUCTILE SEWER
DT 7575 D DRAINAGE

EN 124 D400

EN 124 D400
INDIA
xx/xx/xx INDIA
xx/xx/xx

DDS-ND-13

BUS
STOP

SHELTER
AC BUS
MV PANEL ROOM S49 - R53

S13 - R17
A A

S40 - R49
DDS-ND-12
MV PANEL ROOM

S28 - R22 S28 - R38

S40 - R48
S1 - R15

S18 - R34
S14 - R18
S30 - R39A

S17 - R33

S35 - R41

S36 - R42

S36 - R43
M1 - R20

S37 - R44
S29 - R23 S31 - R39B

DDS-ND-16
MV PANEL ROOM

MV PANEL ROOM

DDS-ND-17
PROPOSED LAY-BY AREA FOR
DIESEL GENERATOR SET REFUEL.
ALTERNATIVE SHOWN SUBJECT
TO NOC FROM VODAFONE.

PROPOSED
RELOCATED
10x10m GSM
PLOT
TOWER

APPROXIMATE PROPOSED
POSITION OF DIESEL
GENERATOR SET REACHABLE
FROM LAY-BY AREA (15m MAX.)

S19 - R35
S15 - R16

S16 - R19
028 029 030 031 032 033
S36 - R61 S38 - R62 S40 - R63

L
C

B
L
C

B
R nrrn R nrrn R nrrn rn
yb SIDE
LV R
Y SIDE
L
C
HV rLV
n
yb SIDE R
Y SIDE
L
C
HV

Y
B yy
b
b Y
B yb
by Y
B yb
by

TPE

TPE

TPE
S33 - R54
PSS-ND-01
S33 - R40
S1 - R24 80MVA
66/11kV
(FUTURE)
(TO BE CONVERTED TO
SUPER SUBSTATION AT
LATER STAGE 120Mx120M)
MV PANEL ROOM

DDS-ND-20

DDS-ND-18

A KEY PLAN

NOTES:
11 14
14
13
12
B
UPVC FLAP VALVE
7 11
SURGE VESSEL 13
B LOCATION B
2 15
3
CB

4 6
5 7 8 7 8 7 8 9 A
04

S
B
M

AT
0A
CC

16
-0
2
04
PL
C-
FS

BA

BA
0

ER
2
C

AT

DI 250
TT

W
M
P

OR
ST
ER
Y
RA
K C

R
WATE

STORM
C C
P

Minor change in top and bottom levels shall be


reconfirmed by BHR

SW-TANK-02
PLAN - TOP VIEW
SCALE - 1:40

D D

LAYOUT PLAN VIEW Minor change in chamber


SCALE - 1:75 Certified for co-ordination with contract documents (QD-SBG)
PIPING MATERIALS SCHEDULE: area shall be reconfirmed by CIVIL ELECTRICAL MECHANICAL
NO. MATERIAL DESCRIPTION QTY SIZE MATERIAL TYPE MATERIAL SUBMITTAL
DRAIN VALVE MATERIAL LIST BHR SIGN SIGN SIGN

DATE DATE DATE

DRAWINGS REFERENCE

E E

DRAIN VALVE INSTALLATION DETAIL

DETAIL-A

00 09AUG25 ISSUED FOR APPROVAL JI RO AS


Rev Date Revision Details Drawn Chkd Appd

Client

QATARI DIAR REAL ESTATE


INVESTMENT COMPANY
F F
Lusail:
Lusail Real Estate Development Co
10
Doha, State of Qatar

PM/CM/CS :

Contractor :

Instrument hook up drawings


Design Sub-Consultant :
shall be submitted separately
9 8 7

Project Name:
G 7 G
CP28B: DESIGN AND BUILD OF
4 3 INFRASTRUCTURE AND LANDSCAPE
WORKS FOR HUZOOM
7 8
Project Code:
CP28B
1 12 13 11
1 Status:
SHOP DRAWING
2 Drawing Title:
6 5 PHASE-1
STORM WATER TANK 02
SURGE VESSEL INSTALLATION DETAIL
SHEET 01 OF 02
H Drawn:
JIMSHID
Checked:
R.OMRAN H

Designed: Approved:
KEO A.SHAWKY
Date: Scale:
AUGUST 2025 AS SHOWN
SECTION A-A SECTION B-B
SCALE - 1:40 Plinth details shall be submitted separately. SCALE - 1:40 Drawing Number: Revision:

LUS-CP28B-QDSBG-SDW-PW-16205-001 00
1 2 3 4 5 6 7 8 9 10 11 12

You might also like