0% found this document useful (0 votes)
27 views50 pages

Az5120 07 Cal 0006

The document outlines the calculation report for the Analyzer Shelter Package Unit foundation as part of the Dalma Gas Development Project by ADNOC. It includes project background, scope of work for offshore and onshore facilities, and the purpose of the document, which is to justify the structural analysis and design of the foundations. The report is intended for use by ADNOC and its associated contractors and consultants.

Uploaded by

gautam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views50 pages

Az5120 07 Cal 0006

The document outlines the calculation report for the Analyzer Shelter Package Unit foundation as part of the Dalma Gas Development Project by ADNOC. It includes project background, scope of work for offshore and onshore facilities, and the purpose of the document, which is to justify the structural analysis and design of the foundations. The report is intended for use by ADNOC and its associated contractors and consultants.

Uploaded by

gautam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 50

a ABU DHABI NATIONAL OIL COMPANY (ADNOC)

EPC FOR DALMA GAS DEVELOPMENT PROJECT


CONTRACT AGREEMENT NO: 6000001102(B)
PROJECT NO: P4331433
CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT
Rev Page
FOUNDATION
1 of
DOCUMENT NO: AZ5120-07-CAL-0006 01
194

ABU DHABI NATIONAL OIL COMPANY (ADNOC)


EPC FOR DALMA GAS DEVELOPMENT PROJECT
CONTRACT AGREEMENT NO: 6000001102(B)
PROJECT NO: P4331433

CALCULATION REPORT ANALYZER SHELTER


PACKAGE UNIT FOUNDATION

This document is developed from FEED document number: N/A

CONTRACTOR DOC NO: NA

01 11/09/2024 IFC Issued for Construction AN SFA/RVH AB/AAS


A01 19/03/2024 ICR Issued for COMPANY Review SR CLF/PL CAP/AAS

Rev Date Status Status Description Prepared Reviewed Approved


(DD/MM/YYYY)

This Document is intended for use by ADNOC and its nominated Consultants, Contractors, Manufacturers and Suppliers.

Page 1 of 194
a ABU DHABI NATIONAL OIL COMPANY (ADNOC)

EPC FOR DALMA GAS DEVELOPMENT PROJECT


CONTRACT AGREEMENT NO: 6000001102(B)
PROJECT NO: P4331433
CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT
Rev Page
FOUNDATION
2 of
DOCUMENT NO: AZ5120-07-CAL-0006 01
194

SUMMARY OF DOCUMENT REVISIONS

Rev. Date Section


Revision Description
No. Revised Revised

A01 19/03/2024 ICR Issued for COMPANY Review

01 11/09/2024 IFC Issued for Construction

SUMMARY OF HOLDS

Hold Section /
Hold Description
No. Page

Page 2 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

TABLE OF CONTENTS
1. INTRODUCTION......................................................................................................5
1.1 Project Background.......................................................................................5
1.2 Project Overview...........................................................................................5
1.3 Brief Project Facilities....................................................................................5
1.3.1 Offshore Facilities – Package A........................................................5
1.3.2 Onshore Facilities – Package B........................................................6
2. PURPOSE OF THE DOCUMENT............................................................................7
3. TERMINOLOGY.......................................................................................................8
3.1 Definitions......................................................................................................8
3.2 Abbreviations................................................................................................9
4. REFERENCE DOCUMENTS...................................................................................9
4.1.1 Project Documents and drawings.....................................................9
4.2 Codes & StandardsS...................................................................................10
4.2.1 COMPANY......................................................................................10
4.2.2 BP standards...................................................................................10
4.3 International codes and standards..............................................................11
4.3.1 ACI standards..................................................................................11
4.3.2 British Standards.............................................................................11
4.3.3 ISO standards.................................................................................12
4.3.4 Other references.............................................................................12
5. ORDER OF PRECEDENCE...................................................................................12
6. UNITS.....................................................................................................................12
7. DESCRIPTION.......................................................................................................13
7.1 Analyzer Shelter (AZ112-FMS-001)...........................................................13
8. LOAD CASES.........................................................................................................14
8.1 Dead load (DL)............................................................................................14
8.2 Empty load of the equipment (DL empty)....................................................15
8.3 Operation Loads (Llop)...............................................................................15
8.4 Test load (Dltest).........................................................................................16
8.5 Wind Loads (WL)........................................................................................16
8.6 Earthquake forces (EQ)..............................................................................20

Page 3 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

8.7 Friction Force (FF)......................................................................................21


9. LOAD COMBINATIONS.........................................................................................21
10. SOIL DATA.............................................................................................................21
10.1 Geotechnical soil properties and water table..............................................21
10.2 Allowable bearing pressure.........................................................................22
10.2.1 Settlement Criteria........................................................................22
11. MATERIALS...........................................................................................................24
11.1 Anchor bolts................................................................................................24
11.2 Concrete......................................................................................................25
11.3 Reinforcing steel.........................................................................................25
12. DESIGN CRITERIA................................................................................................25
12.1 SKID FOUNDATION...................................................................................25
12.2 STABILITY CHECK.....................................................................................26
12.2.1 Uplift...............................................................................................26
12.2.2 Sliding.............................................................................................26
12.2.3 Overturning.....................................................................................27
12.3 PRESSURES TO SOIL...............................................................................27
12.3.1 Allowable soil pressure (settlements).............................................27
12.3.2 Ultimate soil bearing capacity (shear failure).................................27
12.3.3 Flexure/Axial...................................................................................27
12.4 STUCTURE DESIGN..................................................................................27
12.4.1 Punching Shear..............................................................................27
12.4.2 Cracking.........................................................................................32
12.4.3 Anchor Bolt Check..........................................................................32
13. ANNEXURE 1: LOAD COMBINATIONS................................................................32
13.1 Allowable load combinations.......................................................................32
13.1 Ultimate load combinations.........................................................................40
14 ANNEXURE 2: SUMMARY OF REACTIONS........................................................46
15 ANNEXURE 3: FOUNDATION 3D REPORT................................................................49
16 ANNEXURE 4: FOUNDATION PLAN AND DETAIL
17 ANNEXURE 5: VENDOR DRAWING

Page 4 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

1. INTRODUCTION

1.1 Project Background

ADNOC has initiated development of new gas reserves, namely Dalma Gas
Development (DGD) project in northwest offshore region of Abu Dhabi. DGD Project is
an integral part of the overall efforts to develop these untapped hydrocarbon reserves,
with priority given to produce 340 MMscfd of raw gas from Satah, Hair Dalma and Bu
Haseer fields by 2024.

The overall DGD project development shall comprise of offshore facilities (PKG-A) and
onshore facilities on Arzanah Island (PKG-B) to export gas to Habshan and export
condensate to Zirku Island. The DGD project has now moved into EPC stage.

1.2 Project Overview

The overall DGD Project development comprises of the following works:


 Installation of Unmanned Wellhead Platforms in Satah (WHP-10),
Bu Haseer (BH-03) and Hair Dalma (HD-T4) fields
 Full Well Stream Transfer to Arzanah Island for Processing
 Offshore Field / Operations Support from Arzanah Island
 Gas Export to Habshan via tie-in to the 42” IGD-E gas export
Pipeline
 Condensate Export via Pipeline to Zirku Island
 Infrastructure and Enabling Facilities

1.3 Brief Project Facilities

1.3.1 Offshore Facilities – Package A

The scope of work under offshore facilities (PKG-A) comprises of:


 Three new unmanned Wellhead Platforms in Satah (ST WHP-10),
Bu Haseer (BH-03) and Hair Dalma (HD-T4) fields along with necessary
modifications on Jackets. Jacket design and installation for these three WHPs
are by OTHERS.
 Removal of existing topside and replacing it with new topsides for
Hair Dalma HD-3 Wellhead.
 New gas producer subsea pipelines including associated risers
and other appurtenances.
o Hair Dalma HD-3 platform to Hair Dalma (HD-T4) platform.
o Hair Dalma (HD-T4) Platforms to Arzanah Island.

Page 5 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

o Satah (ST WHP-10) Platform to Arzanah Island.


o Bu Haseer (BH-03) Platform to Arzanah Island.
 New subsea umbilical including associated J-tubes and shore
approach:
o Arzanah Island to Satah (WHP-10) Platform.
o Arzanah Island to Bu haseer (BH-03) Platform.
o Arzanah Island to Hair Dalma (HD-T4) Platform.
o Hair Dalma (HD-T4) platform to Hair Dalma HD-3 platform.
 New gas export subsea pipeline from Arzanah Island to existing
IGD-E tower (KP-38) including associated riser, pig receiver, and tie-in to existing
42” IGD-E pipeline along with modifications to existing topsides on the IGD-E
tower (KP-38).
 New subsea composite cable from Arzanah Island to IGD-E tower
(KP-38) including associated J-tube and shore approach.
 New condensate export subsea pipeline from Arzanah Island to
Zirku Island, Tie-in to Zirku Island Facilities, shore approaches, shore pull-in and
piggybacked Fibre Optic Cables.
 Interface with COMPANY novate LLI i.e., Pipeline Umbilicals and
associated TUTU Panels.

1.3.2 Onshore Facilities – Package B

The scope of work under onshore facilities (PKG-B) comprises of:


 Non-associated gas and condensate reception along with
produced water, separation, processing facilities including, gas dehydration, gas
export compressors, condensate stabilization and storage, condensate export
pumps, flare and relief systems, vapour recovery system, produced water
treatment and disposal to an evaporation pond on Arzanah Island.
 New utilities such as Instrument and Plant Air Packages, Nitrogen
Generation, Chemical Injection Packages, Potable Water and DM System, Hot
Oil system, Electro Chlorination unit, Diesel System, Closed and Open Drains
and HP and LP Flares.
 Electrical power network with Power generation (GTGs), Power
distribution and new Substations including facilities for fuel gas sweetening and
associated infrastructure on Arzanah Island.
 Control, safeguarding and safety systems, Permanent buildings,
Main Control Room, maintenance facilities, shelters, Fire Station and associated
Civil works to support operations of new installation on Arzanah Island.
 Main Automation Contractor (MAC) (i.e., Honeywell Middle East
Company Ltd.) as part of MAC Framework Agreement (MFWA).
 Modifications to the existing seawater intake and discharge,
replacement for Fire Water (FW) pumps, new FW network for new DGD facilities
at Arzanah Island and tie-in connection to existing FW network.
 New Admin Building, laboratory, workshops, warehouses, new
Interfaces, modifications and integration with the existing non-process buildings
on Arzanah Island.

Page 6 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

 Refurbishment of the existing Jetty, new construction Jetty, and


Harbour dredging on Arzanah Island as required to accomplish DGD Project
requirements.
 Creation of the landfall for the subsea pipeline, Installation of pig
receiver, associated piping, instrumentation, electrical and civil works on Zirku
Island.
 Connections to the Zirku Island existing systems for condensate
transfer including but not limited to control, power, instrument air, flare, vents and
drains systems along with electrical and Instrumentation as necessary.
 Interface with COMPANY novate LLIs i.e. Gas Export
Compressors (GEC), Gas Turbine Generators (GTGs), Pipeline Umbilicals and
associated TUTU Panels.

2. PURPOSE OF THE DOCUMENT

The object of this document is to justify the structural analysis and design of Analyzer
Shelter Package unit foundations.

Page 7 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

3. TERMINOLOGY
3.1 Definitions

COMPANY Means Abu Dhabi National Oil Company (ADNOC).


ADNOC PMT Means the project management team representing COMPANY during the
execution of the CONTRACT.
AGREEMENT/CONTRACT Means the SIGNATURE AGREEMENT executed by the PARTIES.
COMPANY Means any and all PERSONS (including their subcontractors), other than the
CONTRACTOR(s) EPC CONTRACTOR and CONSULTANTS contracted by COMPANY to carry
out works or services related to the PROJECT(s).
CONSULTANTS Mean any consultants appointed by COMPANY rendering services for the
PROJECT.
EFFECTIVE DATE Means date when the CONTRACT is deemed to have come into force, which
date is specified in the CONTRACT.
CONTRACTOR Means any and all PERSONS (including their subcontractors) contracted to
carry out EPC works or services related to the PROJECT(s).
GOODS Means any and all things, including but not limited to materials and
equipment (including spare parts) required for and to be incorporated in the
WORK.
INSTALLATIONS Means new / modified facilities to be installed under the PROJECT.
MARINE SPREAD Means all offshore marine units, including all VESSELS and BARGES, fully
mobilised and complete with all personnel, plant, equipment, special tools
and consumables necessary to perform the WORK.
PMC Means the entity engaged by COMPANY to provide project management
consultancy services for the PROJECT.
PROJECT Means the new / modified facilities to be designed, engineered and installed
SITE Means all offshore and onshore locations in the Emirate of Abu Dhabi where
the INSTALLATIONS are to be permanently constructed, erected, tested,
operated and maintained.
SUBCONTRACTOR Means any PERSONS (not being an employee of CONTRACTOR) engaged
by EPC CONTRACTOR for supplying services to EPC CONTRACTOR for
the performance of the WORK.
VENDOR/SUPPLIER Means any and all suppliers of materials and equipment in connection with
the PROJECT other than CONSULTANTS, EPC CONTRACTOR and
COMPANY CONTRACTORS.

Page 8 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

WORK Means all work and services to be performed and GOODS, services and
other things to be provided by CONTRACTOR or subcontractor(s) to design,
procure, construct, erect, install, commission and test the installations in
accordance with the CONTRACT.

3.2 Abbreviations

ADMA-OPCO Abu Dhabi Marine Operating Company (Part of ADNOC Offshore)

ADNOC Abu Dhabi National Oil Company

BP British Petroleum

DGD Dalma Gas Development

EPC Engineering, Procurement and Construction

FEED Front End Engineering Design

HD Hair Dalma

HSE Health Safety Environment

IGD-E Integrated Gas Development - Expansion

MMSCFD Millions Standard Cubic Feet Per Day

MOM Minutes Of Meeting

MR Material Requisition

QA/QC Quality Assurance/Quality Control

UAE United Arab Emirates

U/G Underground

4. REFERENCE DOCUMENTS

The latest versions and amendments of all applicable UAE Legislation and Environmental
Regulations, and all relevant International Codes and Standards on the EFFECTIVE DATE of
CONTRACT shall be used.
4.1.1 Project Documents and drawings

EPC will be carried out based on the following PROJECT Documents.

Ref.No. Doc.No. Document Preparation


1 AZ0000-28-PPL-0001 Arzanah Island Overall Plot Plan

Arzanah Island -Unit-20 Inlet facilities Separation & Metering.


Area 1 Unit Plot Plan (Package-B On shore Process and Utilities
2 AZ5100-28-PPL-0400 Facilities)

3 CN0000-07-BOD-0001 Civil and Structural Design Basis

Page 9 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Ref.No. Doc.No. Document Preparation


4 CN0000-07-STD-0001 Standard drawing for Concrete Works

5 CN0000-07-STD-0002 Standard drawing for Concrete Works. General Notes.

6 CN0000-07-STD0016 Standard drawing for Underground Works

7 CN0000-10-SPE-0027 Specification for Cathodic Protection

8 CN0000-07-SPE-0009 Specification for Concrete Works

9 CN0000-07-SPE-0006 Specification for Earth Works

VN0026-CN0000-16-GAS-
10 0013 GA DRAWING FOR GC CABINET AZ5112-FMS-001

11 AZ5120-07-LAY-0006 Analyzer Shelter Package Unit Foundation Layout And Details

4.2 Codes & StandardsS

EPC will be carried out based on the following Codes & Standards as a minimum.
4.2.1 COMPANY

Ref.No. Doc.No. Document Name & Details

1 STD-00 Part 1 Measurement Units

2 STD-00 Part 2 Site Conditions and Data

3 CP-00, Part 1 Plant Design - Documentation and Archiving

4 CP-00, Part 7 Plant Design - Civil

5 CP-00, Part 8 Code Practice for Plant Design - Structure

6 SP-1007 Quality Assurance & Quality Control Requirements for Construction Works

7 SP-1009 Requirements for Contractors Quality System on Major Projects

8 SP-1010, Part 1 General Specifications for Civil Engineering Works Onshore Concrete

9 SP-1015 Specification for Galvanization (Hot dip and spun) and Application of Bolts

10 SP-1031 Quality Control Personnel for Fabrication and Construction

11 HSE-102 ADMA-OPCO, Safety Regulations

12 HSE-108 ADMA-OPCO, Hearing Conservation Policy

13 HSE-110 ADMA-OPCO, “HSE-MS”, Health, Safety & Environ Management System

14 HSE-203 ADMA-OPCO, HSE Training Standard

15 PRO-131 In-house Routine Procedure for Third Party Inspection of Material / Equipment

4.2.2 BP standards

Ref. No. Doc. No. Document Description

Page 10 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

1 BP 04-20 Guidance on Practice for Civil Engineering

Page 11 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

4.3 International codes and standards


4.3.1 ACI standards

Ref.No. Doc.No. Document Name & Details

1 ACI 117 Specification for Tolerances for Concrete Construction and Materials

2 ACI 301 Specifications for Structural Concrete

3 ACI 305 Recommended practice for hot weather concreting

4 ACI 207.1R Guide to Mass Concrete

5 ACI 207.2R-07 Report on Thermal and Volume Change Effects on Cracking of Mass Concrete

6 ACI 212.3R Chemical Admixtures for Concrete

7 ACI 224.3R Joints in Concrete Construction

8 ACI 308.R Guide to Curing Concrete

9 ACI 504.R Guide to Joint Sealant for Concrete Structure

10 ACI 318-19 Building Code Requirements for Structural Concrete

11 ACI 347 Guide to Formwork for Concrete

12 ACI 350 Code Requirements for Environmental Engineering Concrete Structures

4.3.2 British Standards

Ref.No Doc.No. Document Name & Details


1 BS 4449 Steel for the reinforcement of concrete
2 BS 8110 Structural use of concrete
3 BS 8102 Code of Practice for Protection of Below Ground Structures against
Water from the Ground
4 BS 8500 Concrete
5 BS 8666 Specification for Scheduling, Dimensioning, Bending and Cutting of
Steel Reinforcement for Concrete
6 BS EN Actions on structures. General actions. Actions during execution
1991-1
7 BS EN Eurocode 2: Design of concrete structures. General rules and rules for
1992-1-1 buildings

Page 12 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

4.3.3 ISO standards

Ref.No. Doc No. Document Name & Details

Quality Management Systems-Requirements


1 ISO 9001
Managing for the Sustained Success of an Organisation – A
2 ISO 9004
Quality Management Approach

4.3.4 Other references

Ref.No. No. Document Name & Details


1 CIRIA Guide to the construction of reinforced concrete in the Arabian Peninsula (joint
C577/CS publication of CIRIA and the Concrete Society – U.K.)

2 IBC-2018 International Building Code (2018 Edition)

3 ASCE-7 2016 Minimum Design Loads for Buildings and Other Structures

4 ADIBC2013 Abu Dhabi International Building Code

5 IBC-2009 International Building Code (2009 Edition) – to be used only for Seismic Load
Generation on Staad.

5. ORDER OF PRECEDENCE

CONTRACTOR shall comply (and ensure compliance by all its SUBCONTRACTORs) with UAE
Legislation and Environmental Regulations, ADNOC Guidelines / Codes of Practice, COMPANY
Engineering Specifications, Standards and Procedures and HSE Regulations, BP Standards,
Guidance and Practice Documents and all relevant International Codes and Standards.

In case of conflict, among any referenced regulations, codes and standards and technical
specifications, CONTRACTOR shall notify COMPANY of any conflict and confirm resolution of
the same in accordance with the order of precedence specified below.
 UAE Statutory Legislation and Regulations
 ADNOC Code of Practices and new HSE Standards
 Project Data Sheets
 Project Specifications
 ADNOC Offshore (ADMA-OPCO) Engineering Specifications, Standards,
Procedures and HSE Documents
 BP Engineering Technical Practices
 International Codes & Standards

6. UNITS

As indicated in the Project Design Basis; dimensional units are in SI system.

Page 13 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

7. DESCRIPTION
7.1 Analyzer Shelter (AZ112-FMS-001)

Foundation for Analyzer Shelter(AZ112-FMS-001) consists of a reinforced concrete,


rectangular shape block foundation supported directly on ground 0.550m below HPP.

Design, analysis and Calculation of foundation were performed by Mat 3D. ACI-318-
2019 has been followed in the analysis and designing of foundations.

Package foundation design Calculation are presented in Annexure -1

Foundation Detail are Shown Below

Equipment No Dimensions Type /Shape/PD Position


Analyzer Shelter (AZ112-FMS-001) 6000X4500X700 Rectangular Block Foundation

Analyzer Shelter (AZ112-FMS-001)

Key Plan (Part Drawing of AZ5100-28-PPL-0400)

Page 14 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Analyzer Shelter (AZ112-FMS-001)

8. LOAD CASES
Design and calculations have been performed considering all the loads defined in
the vendor drawing details: VN0026-CN0000-16-GAS-0013 attached in Annexure
4 of this document.

8.1 Dead load (DL)

Dead loads are the weight of materials forming the structure (selfweight) and all
permanently attached accessories (e.g., piping, valves, lighting, electrical cable trays,
instrumentation, HVAC, sprinkler and deluge system, fireproofing, insulation….):

 Self-weight of structure.

Page 15 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

8.2 Empty load of the equipment (DL empty)


Corresponds to the weight of the equipment without fluids Taken from Vendor
Input(VN0026-CN0000-16-GAS-0013)

8.3 Operation Loads (Llop)

Includes the live load (fluids) within Equipment. Taken from Vendor Input

(Llop=Equipment Operating Weight -Equipment Empty Weight). Not Applicable

Page 16 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

8.4 Test load (Dltest)

Empty Weight plus weight of water required for hydrostatic test, generally taken from
Taken from Vendor Input. Not Applicable

8.5 Wind Loads (WL)

The operation wind load pressures are applied according to the “Civil & Structural
Design Basis” document CN0000-07-BOD-0001

Wind data parameters shall be computed in accordance with ASCE/SEI 7-16:

 Operation wind (v=60.4 m/s) ASCE 7-16


 Exposure Category is C

 Cf shall be applied to values shown on below table following ASCE-Wind Loads


for Petrochemical & Other Industrial Facilities Erection/Installation

Shape Member Type of Surface

Pipe Racks in transverse direction (as per ASCE Wind 1.8


Loads for Petrochemical section 5.2.3)
For structural
members
Process Structures and Pipe Racks on longitudinal As calculated
direction (see below note) (see attachment)

For Pipes Moderately smooth 0.8

For Cable Trays All 2

Velocity Pressure (qz):


 qz = 0,613*Kz*Kzt*Kd*Ke*V2 (eq 26.10-1 ASCE 7-16)
 α = 9.5 (table 26.11-1 ASCE 7-16)
 zg = 274.32 (table 26.11-1 ASCE 7-16)
 Kzt = 1.00 (chapter 26.8.2 ASCE 7-16)
 Kd = 0.85 / 0.90 / 0.95 (table 26.6-1 ASCE 7-16)
 Ke = 1.00 (table 26.9-1 ASCE 7-16)

Page 17 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Gust Effect Factor (G) is taken as 0.85 as the structure Hz natural frequency is greater
or equal than 1.0 Hz.

Design Wind Force (F):


 F = qz*G*Cf*Ae (Eq C26.11-16 ASCE 7-16)

qz(kN/m²) (Cf not applied)


Height Kz Kd=0.85 Kd=0.90 Kd=0.95
(Exposur
(m) (Racks & OpenStr.) (Chimneys Sq. Sec.) (Steel Towers)
e C)
4.6 0.85 1.62 1.71 1.81
6.1 0.9 1.71 1.81 1.91
7.6 0.94 1.79 1.89 2.00
9.1 0.98 1.86 1.97 2.08
12.2 1.04 1.98 2.09 2.21
15.2 1.09 2.07 2.19 2.32
18 1.13 2.15 2.27 2.40
21.3 1.17 2.22 2.35 2.49
24.4 1.21 2.30 2.44 2.57
27.4 1.24 2.36 2.50 2.63
30.5 1.26 2.40 2.54 2.68
36.6 1.31 2.49 2.64 2.78
42.7 1.36 2.59 2.74 2.89
48.8 1.39 2.64 2.80 2.95
54.9 1.43 2.72 2.88 3.04
61 1.46 2.78 2.94 3.10
76.2 1.53 2.91 3.08 3.25
91.4 1.59 3.02 3.20 3.38

Page 18 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

WL+X

WL-X

Page 19 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

WL+Z

WL-Z

Page 20 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

8.6 Earthquake forces (EQ)

Earthquake load has been considered only in site calculation Staad model.

Earthquake loads -EQx, EQEx, EQz, EQEz- are the earthquake loads coming from the
modal response spectrum analysis, mobilizing:

 At EQ loads: masses from DL, DLempty, LLop and 50% LL


 At EEQ loads: masses from DL and DLempty,

Response Spectra to be considered for the design will be as follows:

EQX & EQZ

Page 21 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

8.7 Friction Force (FF)

Thermal force shall be computed using maximum design temperature. Thermal force is
defined as the force due to expansion of horizontal vessel between supports.

The thermal force required to overcome static friction between the vessel support and
slide plate:

Fy=µ(Po)

Where,

Fy=Static friction force

µ=coefficient of friction

Po=nominal operating compression dead load on slide plate.

Not applicable for the present foundations.

The loads considered for foundation design were taken as vendor drawing

The package foundations have been designed for appropriate load combinations from
Civil and Structural basis of design and ASCE 7-16.

Load combinations used to calculate foundations are described in Annexure 1

9. LOAD COMBINATIONS

The package foundations have been designed for appropriate load combinations from
Civil and Structural basis of design and ASCE 7-16.

10. SOIL DATA

Soil properties and water table levels are taken from EPC geotechnical report
CN0000-07-REP-0006 ONSHORE GEOTECHNICAL SURVEY INTERPRETETIVE
REPORT ARZANAH ISLAND.

10.1 Geotechnical soil properties and water table

According to the EPC geotechnical report CN0000-07-REP-0006, Analyzer Shelter


foundation situated in Priority (6) presented by critical case of BH-151 and following are the
soil properties and water table for the respective area. Elevation of 100.00 m is equivalent to
10.700 m AZCD.

Page 22 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Geotechnical Survey (Part drawing of CN0000-07-REP-0006)

10.2 Allowable bearing pressure


10.2.1 Settlement Criteria

According to EPC geotechnical report CN0000-07-REP-0006, borehole test results allowable


bearing pressure values for settlement criteria are shown below:

Page 23 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

10.2.2 Shear Criteria

According to EPC geotechnical report CN0000-07-REP-0006, borehole test results


allowable bearing pressure values for shear criteria are shown below:

Based on the above table, allowable SBC for foundation as computed below:

Summary of Data used for Foundation Design

Bore Hole No BH-151 Priority (6)

Reference Level Plant Datum (m) AZCD Datum (m)

Existing ground level 97.9 +8.6(m, AZCD)


High Paving Point (HPP) 98.00 +8.7 (m, AZCD)
Ground water elevation 90.6 +1.3 (m, AZCD)
Bottom of foundaton (BOC) level 97.475 +8.175 (m, AZCD)

Page 24 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Depth of ground water with repsect to bottom of


6.85m
foundation level

Soil Unit weright 18 kN/m3

Angle of Internal friction 33 Deg

Alowable Bearing Capacity 126 kN/m2

Modules of Subgarde 10080kN/m3

Footing ID Width Depth Allowable bearing Modulus of


(B) below capacity from the subgrade
in "m" HPP in above table reaction
"m" (k N / m^2) (k N / m^3)
Analyzer Shelter 4.5 0.525 126 10080

Base Pressures are checked under STL load combinations

11. MATERIALS
11.1 Anchor bolts
 Anchor Bolts & Nuts Grade: 4.6 conforming to BS 4190
 Allowable Tensile Stress:120 N/mm2
 Allowable Shear Stress:80 N/mm2

Page 25 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

11.2 Concrete
Reinforced structural concrete shall have a minimum compressive (cube/cylinder)
strength of 40/32 MPa (150 x 150 mm cube specimen) at 28 days.

11.3 Reinforcing steel

Steel for reinforcement shall be high yield strength deformed bars type 2 of minimum
yield strength 460 MPa.

12. DESIGN CRITERIA


12.1 SKID FOUNDATION

Minimum depth of foundation below ground shall be 1m or as recommended by


Geotechnical Investigation Report. Skid foundation can be placed at 550 mm from
finished grade level.

Minimum pedestal heights excluding grout above top of adjacent paving shall be as
follows:
Structural Steel columns – 150mm

Equipment General – 150mm

Below fig shows the General idea of block foundation

Page 26 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

12.2 STABILITY CHECK

In stability analysis calculations, using un-factored working loads, foundations shall be


designed to have minimum factors of safety as noted below. The weight of soil
overburden may generally be considered when calculating factor of safety.

Minimum factor of safety against uplift = 1.50 (including overburden)

Minimum factor of safety against uplift = 1.10 (no allowance for overburden or skin
friction - e.g., construction case).

12.2.1 Uplift

Minimum factor of safety against uplift = 1.50 (including overburden)

Minimum factor of safety against uplift = 1.10 (no allowance for overburden or skin
friction - e.g., construction case).

12.2.2 Sliding

Minimum factor of safety against sliding = 1.50

The soil/foundation friction factor is equal to 0.39

In cases where Sliding resistance is developed by a combination of friction and passive


resistance, a minimum safety factor of 2.0 shall be applied.

Page 27 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Only polyethene sheets are used as foundation concrete protection and the frictional
coefficient is equal to 0.39

12.2.3 Overturning

Minimum factor of safety against overturning = 1.75 (except erection)

Minimum factor of safety against overturning = 1.50 (erection only)

12.3 PRESSURES TO SOIL

12.3.1 Allowable soil pressure (settlements)

The allowable soil bearing capacity to check settlements is as mentioned in Clause 10.2.1.

12.3.2 Ultimate soil bearing capacity (shear failure)

The allowable soil bearing capacity to check shear failure is as mentioned in Clause 10.2.2.
12.3.3 Flexure/Axial

Footings shall be designed considering two-way action. The procedures outlined in ACI 318M-19,
Chapter 15 shall be followed for footing design.

The strength method outlined in ACI 318M-19; Chapter 10 shall be used for all design.

Reinforced concrete design shall be in accordance with ACI 318M-19, using factored loads. The critical
section for moment shall be taken at the face of the pier. The moment shall be calculated for a 1-m-wide
strip as a simple cantilever from the edge of the pier. The resulting reinforcing steel shall be placed
continuously across the entire footing in a grid pattern with the minimum bottom reinforcing being Dia
12mm bars at 150mm on-centre, each way.

The minimum amount of bottom steel (grade 460 N/mm2) shall not be less than the minimum shrinkage
reinforcement as specified in ACI 318M-19 7.6.1.1.

As (min) = 0.0018*Ag

Ag- Gross Area of Concrete

The minimum total area of main pedestal steel reinforcement shall be 1% of the gross cross-sectional
area of the pedestal. Maximum spacing of main reinforcement shall be 150mm.

If a footing has uplift, there will be a moment at the heel that will cause tension in the top of footing. If top
reinforcing is required, minimum reinforcing shall be Dia 12mm bars at 150mm on centre, each way.

Page 28 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

12.4 STUCTURE DESIGN


12.4.1 Punching Shear

Both wide-beam action and two-way action shall be checked to determine the required footing depth.
Beam action assumes that the footing acts as a wide beam with a critical section across its entire width.
Two-way action for the footing checks “punching” shear strength. The critical section for punching shear
is a perimeter around the supported member with the shear strength computed in accordance with ACI
318M-19. Tributary areas and corresponding critical sections for wide-beam action and two-way action for
an isolated footing are illustrated in Figure 3 below:

Page 29 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

One way shear strength for footings is computed as per cl.22.5.5 of ACI 318-19 as
shown below:

Page 30 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Two-way shear strength for footings is computed as per cl.22.6.5.2 of ACI 318-19 as
shown below:

Page 31 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Page 32 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

12.4.2 Cracking

The occurrence of cracks in reinforced concrete elements is expected under service loads,
due to the low tensile strength of concrete.

Permissible crack widths under serviceability limit state as per Civil and Structural Design
Basis Section 12.1
 Concrete surfaces exposed to sea water and earth (even if protected) = 0.20 mm
 Liquid-retaining structures = 0.10 mm
 All other concrete surfaces (even if protected) = 0.30 mm

12.4.3 Anchor Bolt Check

Anchor bolt diameter determined by vendor has been checked for their strength to tension and
shear indicated in Standard Drawing Anchor Bolt (CN0000-07-STD-0013). Additionally,
concrete failure modes according to ACI 318M-19 has been determined for calculating the
actual capacity of anchor bolt.

Page 33 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

13. ANNEXURE 1: LOAD COMBINATIONS


13.1 Allowable load combinations

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


1 DL + DLEMPTY + TLss 1001
2 DL + DLEMPTY - TLss 1002
3 0.6 DL + 0.6 DLEMPTY + 0.63 WL+X + HY 1003
4 0.6 DL + 0.6 DLEMPTY + 0.63 WL-X + HY 1004
5 0.6 DL + 0.6 DLEMPTY + 0.63 WL+Z + HY 1005
6 0.6 DL + 0.6 DLEMPTY + 0.63 WL-Z + HY 1006
7 DL + DLEMPTY + 0.63 WL+X 1007
8 DL + DLEMPTY + 0.63 WL-X 1008
9 DL + DLEMPTY + 0.63 WL+Z 1009
10 DL + DLEMPTY + 0.63 WL-Z 1010
11 0.6 DL + 0.6 DLEMPTY + 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY + HY 1011
12 0.6 DL + 0.6 DLEMPTY - 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY + HY 1012
13 0.6 DL + 0.6 DLEMPTY + 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY + HY 1013
14 0.6 DL + 0.6 DLEMPTY - 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY + HY 1014
15 0.6 DL + 0.6 DLEMPTY + 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY + HY 1015
16 0.6 DL + 0.6 DLEMPTY - 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY + HY 1016
17 0.6 DL + 0.6 DLEMPTY + 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY + HY 1017
18 0.6 DL + 0.6 DLEMPTY - 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY + HY 1018
19 DL + DLEMPTY + LLop + TLA 1019
20 DL + DLEMPTY + LLop - TLA 1020
21 DL + DLEMPTY + LLop + TLA + HY 1021
22 DL + DLEMPTY + LLop - TLA + HY 1022
23 DL + DLEMPTY + LLop + TLA + TLF + TLss 1023
24 DL + DLEMPTY + LLop - TLA - TLF - TLss 1024
25 DL + DLEMPTY + LLop + TLA + TLF - TLss 1025
26 DL + DLEMPTY + LLop - TLA - TLF + TLss 1026
27 DL + DLEMPTY + LLop + TLA + TLF + TLss + HY 1027
28 DL + DLEMPTY + LLop - TLA - TLF - TLss + HY 1028
29 DL + DLEMPTY + LLop + TLA + TLF - TLss + HY 1029
30 DL + DLEMPTY + LLop - TLA - TLF + TLss + HY 1030
31 DL + DLEMPTY + LLop + TLA + TLF + LL 1031
32 DL + DLEMPTY + LLop - TLA - TLF + LL 1032
33 DL + DLEMPTY + LLop + TLA + TLF + LL + HY 1033
34 DL + DLEMPTY + LLop - TLA - TLF + LL + HY 1034
35 DL + DLEMPTY + LLop + TLA + TLF + TLss + LL 1035

Page 34 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


36 DL + DLEMPTY + LLop - TLA - TLF + TLss + LL 1036
37 DL + DLEMPTY + LLop + TLA + TLF - TLss + LL 1037
38 DL + DLEMPTY + LLop - TLA - TLF - TLss + LL 1038
39 DL + DLEMPTY + LLop + TLA + TLF + TLss + LL + HY 1039
40 DL + DLEMPTY + LLop - TLA - TLF + TLss + LL + HY 1040
41 DL + DLEMPTY + LLop + TLA + TLF - TLss + LL + HY 1041
42 DL + DLEMPTY + LLop - TLA - TLF - TLss + LL + HY 1042
43 DL + DLEMPTY + LLop - TLA - TLF + Lr 1043
44 DL + DLEMPTY + LLop + TLA + TLF + Lr 1044
45 DL + DLEMPTY + LLop - TLA - TLF + Lr + HY 1045
46 DL + DLEMPTY + LLop + TLA + TLF + Lr + HY 1046
47 DL + DLEMPTY + LLop + TLA + 0.75 TLF + 0.75 Lr + 0.75 TLss + 0.75 LL 1047
48 DL + DLEMPTY + LLop - TLA - 0.75 TLF + 0.75 Lr - 0.75 TLss + 0.75 LL 1048
49 DL + DLEMPTY + LLop + TLA + 0.75 TLF + 0.75 Lr - 0.75 TLss + 0.75 LL 1049
50 DL + DLEMPTY + LLop - TLA - 0.75 TLF + 0.75 Lr + 0.75 TLss + 0.75 LL 1050
51 DL + DLEMPTY + LLop + TLA + 0.75 TLF + 0.75 Lr + 0.75 TLss + 0.75 LL + HY 1051
52 DL + DLEMPTY + LLop - TLA - 0.75 TLF + 0.75 Lr - 0.75 TLss + 0.75 LL + HY 1052
53 DL + DLEMPTY + LLop + TLA + 0.75 TLF + 0.75 Lr - 0.75 TLss + 0.75 LL + HY 1053
54 DL + DLEMPTY + LLop - TLA - 0.75 TLF + 0.75 Lr + 0.75 TLss + 0.75 LL + HY 1054
55 DL + DLEMPTY + 0.75 Lr + TLss + 0.75 LL 1055
56 DL + DLEMPTY + 0.75 Lr - TLss + 0.75 LL 1056
57 DL + DLEMPTY + 0.75 Lr + TLss + 0.75 LL + HY 1057
58 DL + DLEMPTY + 0.75 Lr - TLss + 0.75 LL + HY 1058
59 DL + DLEMPTY + LLop + TLA + 0.63 WL+X 1059
60 DL + DLEMPTY + LLop - TLA + 0.63 WL+X 1060
61 DL + DLEMPTY + LLop + TLA + 0.63 WL-X 1061
62 DL + DLEMPTY + LLop - TLA + 0.63 WL-X 1062
63 DL + DLEMPTY + LLop + TLA + 0.63 WL+Z 1063
64 DL + DLEMPTY + LLop - TLA + 0.63 WL+Z 1064
65 DL + DLEMPTY + LLop + TLA + 0.63 WL-Z 1065
66 DL + DLEMPTY + LLop - TLA + 0.63 WL-Z 1066
67 DL + DLEMPTY + LLop + TLA + 0.63 WL+X + HY 1067
68 DL + DLEMPTY + LLop - TLA + 0.63 WL+X + HY 1068
69 DL + DLEMPTY + LLop + TLA + 0.63 WL-X + HY 1069
70 DL + DLEMPTY + LLop - TLA + 0.63 WL-X + HY 1070
71 DL + DLEMPTY + LLop + TLA + 0.63 WL+Z + HY 1071
72 DL + DLEMPTY + LLop - TLA + 0.63 WL+Z + HY 1072
73 DL + DLEMPTY + LLop + TLA + 0.63 WL-Z + HY 1073

Page 35 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


74 DL + DLEMPTY + LLop - TLA + 0.63 WL-Z + HY 1074
75 DL + DLEMPTY + LLop + TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ 1075
76 DL + DLEMPTY + LLop + TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ 1076
77 DL + DLEMPTY + LLop + TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ 1077
78 DL + DLEMPTY + LLop + TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ 1078
79 DL + DLEMPTY + LLop - TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ 1079
80 DL + DLEMPTY + LLop - TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ 1080
81 DL + DLEMPTY + LLop - TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ 1081
82 DL + DLEMPTY + LLop - TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ 1082
83 DL + DLEMPTY + LLop + TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ 1083
84 DL + DLEMPTY + LLop + TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ 1084
85 DL + DLEMPTY + LLop + TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ 1085
86 DL + DLEMPTY + LLop + TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ 1086
87 DL + DLEMPTY + LLop - TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ 1087
88 DL + DLEMPTY + LLop - TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ 1088
89 DL + DLEMPTY + LLop - TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ 1089
90 DL + DLEMPTY + LLop - TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ 1090
91 DL + DLEMPTY + LLop + TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ + HY 1091
92 DL + DLEMPTY + LLop + TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ + HY 1092
93 DL + DLEMPTY + LLop + TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ + HY 1093
94 DL + DLEMPTY + LLop + TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ + HY 1094
95 DL + DLEMPTY + LLop - TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ + HY 1095
96 DL + DLEMPTY + LLop - TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ + HY 1096
97 DL + DLEMPTY + LLop - TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ + HY 1097
98 DL + DLEMPTY + LLop - TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ + HY 1098
99 DL + DLEMPTY + LLop + TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ + HY 1099
100 DL + DLEMPTY + LLop + TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ + HY 1100
101 DL + DLEMPTY + LLop + TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ + HY 1101
102 DL + DLEMPTY + LLop + TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ + HY 1102
103 DL + DLEMPTY + LLop - TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ + HY 1103
104 DL + DLEMPTY + LLop - TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ + HY 1104
105 DL + DLEMPTY + LLop - TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ + HY 1105
106 DL + DLEMPTY + LLop - TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ + HY 1106
107 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL+X + 0.75 LL 1107
108 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL+X + 0.75 LL 1108
109 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL-X + 0.75 LL 1109
110 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL-X + 0.75 LL 1110
111 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL+Z + 0.75 LL 1111

Page 36 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


112 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL+Z + 0.75 LL 1112
113 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL-Z + 0.75 LL 1113
114 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL-Z + 0.75 LL 1114
115 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL+X + 0.75 LL + HY 1115
116 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL+X + 0.75 LL + HY 1116
117 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL-X + 0.75 LL + HY 1117
118 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL-X + 0.75 LL + HY 1118
119 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL+Z + 0.75 LL + HY 1119
120 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL+Z + 0.75 LL + HY 1120
121 DL + DLEMPTY + LLop + TLA + 0.75 Lr + 0.47 WL-Z + 0.75 LL + HY 1121
122 DL + DLEMPTY + LLop - TLA + 0.75 Lr + 0.47 WL-Z + 0.75 LL + HY 1122
123 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.53 EQX + 0.16 EQZ - 0.53 EQY + 0.53 EQSX + 0.16 EQSZ 1123
124 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.53 EQX - 0.16 EQZ - 0.53 EQY + 0.53 EQSX - 0.16 EQSZ 1124
125 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.53 EQX + 0.16 EQZ - 0.53 EQY - 0.53 EQSX + 0.16 EQSZ 1125
126 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.53 EQX - 0.16 EQZ - 0.53 EQY - 0.53 EQSX - 0.16 EQSZ 1126
127 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.53 EQX + 0.16 EQZ - 0.53 EQY + 0.53 EQSX + 0.16 EQSZ 1127
128 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.53 EQX - 0.16 EQZ - 0.53 EQY + 0.53 EQSX - 0.16 EQSZ 1128
129 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.53 EQX + 0.16 EQZ - 0.53 EQY - 0.53 EQSX + 0.16 EQSZ 1129
130 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.53 EQX - 0.16 EQZ - 0.53 EQY - 0.53 EQSX - 0.16 EQSZ 1130
131 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.16 EQX + 0.53 EQZ - 0.53 EQY + 0.16 EQSX + 0.53 EQSZ 1131
132 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.16 EQX - 0.53 EQZ - 0.53 EQY + 0.16 EQSX - 0.53 EQSZ 1132
133 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.16 EQX + 0.53 EQZ - 0.53 EQY - 0.16 EQSX + 0.53 EQSZ 1133
134 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.16 EQX - 0.53 EQZ - 0.53 EQY - 0.16 EQSX - 0.53 EQSZ 1134
135 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.16 EQX + 0.53 EQZ - 0.53 EQY + 0.16 EQSX + 0.53 EQSZ 1135
136 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.16 EQX - 0.53 EQZ - 0.53 EQY + 0.16 EQSX - 0.53 EQSZ 1136
137 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.16 EQX + 0.53 EQZ - 0.53 EQY - 0.16 EQSX + 0.53 EQSZ 1137
138 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.16 EQX - 0.53 EQZ - 0.53 EQY - 0.16 EQSX - 0.53 EQSZ 1138
139 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.53 EQX + 0.16 EQZ - 0.53 EQY + 0.53 EQSX + 0.16 EQSZ + HY 1139
140 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.53 EQX - 0.16 EQZ - 0.53 EQY + 0.53 EQSX - 0.16 EQSZ + HY 1140
141 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.53 EQX + 0.16 EQZ - 0.53 EQY - 0.53 EQSX + 0.16 EQSZ + HY 1141
142 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.53 EQX - 0.16 EQZ - 0.53 EQY - 0.53 EQSX - 0.16 EQSZ + HY 1142
143 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.53 EQX + 0.16 EQZ - 0.53 EQY + 0.53 EQSX + 0.16 EQSZ + HY 1143
144 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.53 EQX - 0.16 EQZ - 0.53 EQY + 0.53 EQSX - 0.16 EQSZ + HY 1144
145 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.53 EQX + 0.16 EQZ - 0.53 EQY - 0.53 EQSX + 0.16 EQSZ + HY 1145
146 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.53 EQX - 0.16 EQZ - 0.53 EQY - 0.53 EQSX - 0.16 EQSZ + HY 1146
147 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.16 EQX + 0.53 EQZ - 0.53 EQY + 0.16 EQSX + 0.53 EQSZ + HY 1147
148 DL + DLEMPTY + LLop + TLA + 0.75 LL + 0.16 EQX - 0.53 EQZ - 0.53 EQY + 0.16 EQSX - 0.53 EQSZ + HY 1148
149 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.16 EQX + 0.53 EQZ - 0.53 EQY - 0.16 EQSX + 0.53 EQSZ + HY 1149

Page 37 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


150 DL + DLEMPTY + LLop + TLA + 0.75 LL - 0.16 EQX - 0.53 EQZ - 0.53 EQY - 0.16 EQSX - 0.53 EQSZ + HY 1150
151 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.16 EQX + 0.53 EQZ - 0.53 EQY + 0.16 EQSX + 0.53 EQSZ + HY 1151
152 DL + DLEMPTY + LLop - TLA + 0.75 LL + 0.16 EQX - 0.53 EQZ - 0.53 EQY + 0.16 EQSX - 0.53 EQSZ + HY 1152
153 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.16 EQX + 0.53 EQZ - 0.53 EQY - 0.16 EQSX + 0.53 EQSZ + HY 1153
154 DL + DLEMPTY + LLop - TLA + 0.75 LL - 0.16 EQX - 0.53 EQZ - 0.53 EQY - 0.16 EQSX - 0.53 EQSZ + HY 1154
155 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL+X 1155
156 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL+X 1156
157 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL-X 1157
158 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL-X 1158
159 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL+Z 1159
160 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL+Z 1160
161 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL-Z 1161
162 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL-Z 1162
163 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL+X + HY 1163
164 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL+X + HY 1164
165 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL-X + HY 1165
166 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL-X + HY 1166
167 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL+Z + HY 1167
168 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL+Z + HY 1168
169 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.6 WL-Z + HY 1169
170 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.6 WL-Z + HY 1170
171 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ 1171
172 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ 1172
173 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ 1173
174 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ 1174
175 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ 1175
176 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ 1176
177 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ 1177
178 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ 1178
179 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ 1179
180 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ 1180
181 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ 1181
182 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ 1182
183 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ 1183
184 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ 1184
185 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ 1185
186 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ 1186
187 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ + 1187

Page 38 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ +
188 1188
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ +
189 1189
HY
190 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ + HY 1190
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.7 EQX + 0.21 EQZ - 0.7 EQY + 0.7 EQSX + 0.21 EQSZ +
191 1191
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.7 EQX - 0.21 EQZ - 0.7 EQY + 0.7 EQSX - 0.21 EQSZ +
192 1192
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.7 EQX + 0.21 EQZ - 0.7 EQY - 0.7 EQSX + 0.21 EQSZ +
193 1193
HY
194 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.7 EQX - 0.21 EQZ - 0.7 EQY - 0.7 EQSX - 0.21 EQSZ + HY 1194
0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ +
195 1195
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ +
196 1196
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ +
197 1197
HY
198 0.6 DL + 0.6 DLEMPTY + 0.6 LLop + TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ + HY 1198
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.21 EQX + 0.7 EQZ - 0.7 EQY + 0.21 EQSX + 0.7 EQSZ +
199 1199
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.21 EQX + 0.7 EQZ - 0.7 EQY - 0.21 EQSX + 0.7 EQSZ +
200 1200
HY
0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA + 0.21 EQX - 0.7 EQZ - 0.7 EQY + 0.21 EQSX - 0.7 EQSZ +
201 1201
HY
202 0.6 DL + 0.6 DLEMPTY + 0.6 LLop - TLA - 0.21 EQX - 0.7 EQZ - 0.7 EQY - 0.21 EQSX - 0.7 EQSZ + HY 1202
203 DL + DLEMPTY + LLop + TLA + 0.75 LL 1203
204 DL + DLEMPTY + LLop - TLA + 0.75 LL 1204
205 DL + DLEMPTY + DLtest 1205
206 DL + DLEMPTY + DLtest + HY 1206
207 DL + DLEMPTY + DLtest + 0.32 WL+X 1207
208 DL + DLEMPTY + DLtest + 0.32 WL-X 1208
209 DL + DLEMPTY + DLtest + 0.32 WL+Z 1209
210 DL + DLEMPTY + DLtest + 0.32 WL-Z 1210
211 DL + DLEMPTY + DLtest + 0.32 WL+X + HY 1211
212 DL + DLEMPTY + DLtest + 0.32 WL-X + HY 1212
213 DL + DLEMPTY + DLtest + 0.32 WL+Z + HY 1213
214 DL + DLEMPTY + DLtest + 0.32 WL-Z + HY 1214
215 DL + DLEMPTY + DLtest + 0.24 WL+X 1215
216 DL + DLEMPTY + DLtest + 0.24 WL-X 1216
217 DL + DLEMPTY + DLtest + 0.24 WL+Z 1217
218 DL + DLEMPTY + DLtest + 0.24 WL-Z 1218
219 DL + DLEMPTY + DLtest + 0.24 WL+X + HY 1219
220 DL + DLEMPTY + DLtest + 0.24 WL-X + HY 1220
221 DL + DLEMPTY + DLtest + 0.24 WL+Z + HY 1221
222 DL + DLEMPTY + DLtest + 0.24 WL-Z + HY 1222

Page 39 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


223 DL + DLEMPTY + LL + ML 1223
224 DL + DLEMPTY + LL - ML 1224
225 0.6 DL + 0.6 DLEMPTY + LL + ML 1225
226 0.6 DL + 0.6 DLEMPTY + LL - ML 1226
227 0.6 DL + 0.6 DLEMPTY + LL + ML + HY 1227
228 0.6 DL + 0.6 DLEMPTY + LL - ML + HY 1228
229 DL + DLEMPTY + LLop + Lr + LL 1229
230 DL + DLEMPTY + 0.24 WL+X + 0.75 LL + 0.75 CR 1230
231 DL + DLEMPTY + 0.24 WL-X + 0.75 LL + 0.75 CR 1231
232 DL + DLEMPTY + 0.24 WL+Z + 0.75 LL + 0.75 CR 1232
233 DL + DLEMPTY + 0.24 WL-Z + 0.75 LL + 0.75 CR 1233
234 DL + DLEMPTY + 0.24 WL+X + 0.75 LL + 0.75 CR + HY 1234
235 DL + DLEMPTY + 0.24 WL-X + 0.75 LL + 0.75 CR + HY 1235
236 DL + DLEMPTY + 0.24 WL+Z + 0.75 LL + 0.75 CR + HY 1236
237 DL + DLEMPTY + 0.24 WL-Z + 0.75 LL + 0.75 CR + HY 1237
238 0.6 DL + 0.6 DLEMPTY + 0.32 WL+X 1238
239 0.6 DL + 0.6 DLEMPTY + 0.32 WL-X 1239
240 0.6 DL + 0.6 DLEMPTY + 0.32 WL+Z 1240
241 0.6 DL + 0.6 DLEMPTY + 0.32 WL-Z 1241
242 0.6 DL + 0.6 DLEMPTY + 0.32 WL+X + HY 1242
243 0.6 DL + 0.6 DLEMPTY + 0.32 WL-X + HY 1243
244 0.6 DL + 0.6 DLEMPTY + 0.32 WL+Z + HY 1244
245 0.6 DL + 0.6 DLEMPTY + 0.32 WL-Z + HY 1245
246 DL + DLEMPTY + 0.63 WL+X + HY 1246
247 DL + DLEMPTY + 0.63 WL-X + HY 1247
248 DL + DLEMPTY + 0.63 WL+Z + HY 1248
249 DL + DLEMPTY + 0.63 WL-Z + HY 1249
250 DL + DLEMPTY + 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY 1250
251 DL + DLEMPTY - 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY 1251
252 DL + DLEMPTY + 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY 1252
253 DL + DLEMPTY - 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY 1253
254 DL + DLEMPTY + 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY 1254
255 DL + DLEMPTY - 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY 1255
256 DL + DLEMPTY + 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY 1256
257 DL + DLEMPTY - 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY 1257
258 DL + DLEMPTY + 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY + HY 1258
259 DL + DLEMPTY - 0.7 EQEX + 0.21 EQEZ + 0.7 EQEY + HY 1259
260 DL + DLEMPTY + 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY + HY 1260

Page 40 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ALLOWABLE LOAD COMBINATIONS L/C No's


261 DL + DLEMPTY - 0.7 EQEX - 0.21 EQEZ + 0.7 EQEY + HY 1261
262 DL + DLEMPTY + 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY + HY 1262
263 DL + DLEMPTY - 0.21 EQEX + 0.7 EQEZ + 0.7 EQEY + HY 1263
264 DL + DLEMPTY + 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY + HY 1264
265 DL + DLEMPTY - 0.21 EQEX - 0.7 EQEZ + 0.7 EQEY + HY 1265

13.1 Ultimate load combinations

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


1 1.4 DL + 1.4 DLEMPTY + 1.2 TLss 2001
2 1.4 DL + 1.4 DLEMPTY - 1.2 TLss 2002
3 0.9 DL + 0.9 DLEMPTY + WL+X + 1.6 HY 2003
4 0.9 DL + 0.9 DLEMPTY + WL-X + 1.6 HY 2004
5 0.9 DL + 0.9 DLEMPTY + WL+Z + 1.6 HY 2005
6 0.9 DL + 0.9 DLEMPTY + WL-Z + 1.6 HY 2006
7 0.9 DL + 0.9 DLEMPTY + EQEX + 0.3 EQEZ + EQEY + 1.6 HY 2007
8 0.9 DL + 0.9 DLEMPTY - EQEX + 0.3 EQEZ + EQEY + 1.6 HY 2008
9 0.9 DL + 0.9 DLEMPTY + EQEX - 0.3 EQEZ + EQEY + 1.6 HY 2009
10 0.9 DL + 0.9 DLEMPTY - EQEX - 0.3 EQEZ + EQEY + 1.6 HY 2010
11 0.9 DL + 0.9 DLEMPTY + 0.3 EQEX + EQEZ + EQEY + 1.6 HY 2011
12 0.9 DL + 0.9 DLEMPTY - 0.3 EQEX + EQEZ + EQEY + 1.6 HY 2012
13 0.9 DL + 0.9 DLEMPTY + 0.3 EQEX - EQEZ + EQEY + 1.6 HY 2013
14 0.9 DL + 0.9 DLEMPTY - 0.3 EQEX - EQEZ + EQEY + 1.6 HY 2014
15 1.4 DL + 1.4 DLEMPTY + 1.6 LLop + 1.6 TLA + 1.6 CR 2015
16 1.4 DL + 1.4 DLEMPTY + 1.6 LLop - 1.6 TLA + 1.6 CR 2016
17 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.6 TLA + 1.6 TLF + 0.5 Lr + 1.2 TLss + 1.6 LL + 1.6 CR 2017
18 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.6 TLA + 1.6 TLF + 0.5 Lr - 1.2 TLss + 1.6 LL + 1.6 CR 2018
19 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.6 TLA - 1.6 TLF + 0.5 Lr + 1.2 TLss + 1.6 LL + 1.6 CR 2019
20 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.6 TLA - 1.6 TLF + 0.5 Lr - 1.2 TLss + 1.6 LL + 1.6 CR 2020
21 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.6 TLA + 1.6 TLF + 0.5 Lr + 1.2 TLss + 1.6 LL + 1.6 CR + 1.6 HY 2021
22 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.6 TLA + 1.6 TLF + 0.5 Lr - 1.2 TLss + 1.6 LL + 1.6 CR + 1.6 HY 2022
23 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.6 TLA - 1.6 TLF + 0.5 Lr + 1.2 TLss + 1.6 LL + 1.6 CR + 1.6 HY 2023
24 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.6 TLA - 1.6 TLF + 0.5 Lr - 1.2 TLss + 1.6 LL + 1.6 CR + 1.6 HY 2024
25 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.2 TLA + 1.2 TLF + 1.6 Lr + 1.2 TLss + LL + CR 2025
26 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.2 TLA + 1.2 TLF + 1.6 Lr - 1.2 TLss + LL + CR 2026
27 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.2 TLA - 1.2 TLF + 1.6 Lr + 1.2 TLss + LL + CR 2027
28 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.2 TLA - 1.2 TLF + 1.6 Lr - 1.2 TLss + LL + CR 2028
29 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.2 TLA + 1.2 TLF + 1.6 Lr + 1.2 TLss + LL + CR + 1.6 HY 2029

Page 41 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


30 1.2 DL + 1.2 DLEMPTY + 1.6 LLop + 1.2 TLA + 1.2 TLF + 1.6 Lr - 1.2 TLss + LL + CR + 1.6 HY 2030
31 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.2 TLA - 1.2 TLF + 1.6 Lr + 1.2 TLss + LL + CR + 1.6 HY 2031
32 1.2 DL + 1.2 DLEMPTY + 1.6 LLop - 1.2 TLA - 1.2 TLF + 1.6 Lr - 1.2 TLss + LL + CR + 1.6 HY 2032
33 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL+X 2033
34 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL+X 2034
35 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL-X 2035
36 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL-X 2036
37 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL+Z 2037
38 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL+Z 2038
39 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL-Z 2039
40 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL-Z 2040
41 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL+X + 1.6 HY 2041
42 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL+X + 1.6 HY 2042
43 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL-X + 1.6 HY 2043
44 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL-X + 1.6 HY 2044
45 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL+Z + 1.6 HY 2045
46 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL+Z + 1.6 HY 2046
47 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.6 Lr + 0.5 WL-Z + 1.6 HY 2047
48 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 1.6 Lr + 0.5 WL-Z + 1.6 HY 2048
49 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL+X 2049
50 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL-X 2050
51 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL+Z 2051
52 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL-Z 2052
53 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL+X + 1.6 HY 2053
54 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL-X + 1.6 HY 2054
55 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL+Z + 1.6 HY 2055
56 1.2 DL + 1.2 DLEMPTY + 1.6 Lr + 0.5 WL-Z + 1.6 HY 2056
57 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL+X + LL + CR 2057
58 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL+X + LL + CR 2058
59 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL-X + LL + CR 2059
60 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL-X + LL + CR 2060
61 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL+Z + LL + CR 2061
62 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL+Z + LL + CR 2062
63 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL-Z + LL + CR 2063
64 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL-Z + LL + CR 2064
65 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL+X + LL + CR + 1.6 HY 2065
66 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL+X + LL + CR + 1.6 HY 2066
67 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL-X + LL + CR + 1.6 HY 2067

Page 42 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


68 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL-X + LL + CR + 1.6 HY 2068
69 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL+Z + LL + CR + 1.6 HY 2069
70 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL+Z + LL + CR + 1.6 HY 2070
71 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 0.5 Lr + WL-Z + LL + CR + 1.6 HY 2071
72 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + 0.5 Lr + WL-Z + LL + CR + 1.6 HY 2072
73 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ 2073
74 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ 2074
75 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ 2075
76 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ 2076
77 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ 2077
78 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ 2078
79 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ 2079
80 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ 2080
81 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ 2081
82 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ 2082
83 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ 2083
84 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ 2084
85 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ 2085
86 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ 2086
87 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ 2087
88 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ 2088
1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ + 1.6
89 2089
HY
90 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ + 1.6 HY 2090
91 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ + 1.6 HY 2091
92 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ + 1.6 HY 2092
1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ + 1.6
93 2093
HY
94 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ + 1.6 HY 2094
95 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ + 1.6 HY 2095
96 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ + 1.6 HY 2096
1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ + 1.6
97 2097
HY
98 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ + 1.6 HY 2098
99 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ + 1.6 HY 2099
100 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + LL - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ + 1.6 HY 2100
1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ + 1.6
101 2101
HY
102 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ + 1.6 HY 2102
103 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ + 1.6 HY 2103
104 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA + LL - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ + 1.6 HY 2104

Page 43 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


105 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL+X + CR 2105
106 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL-X + CR 2106
107 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL+Z + CR 2107
108 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL-Z + CR 2108
109 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL+X + CR 2109
110 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL-X + CR 2110
111 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL+Z + CR 2111
112 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL-Z + CR 2112
113 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL+X + CR + 1.6 HY 2113
114 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL-X + CR + 1.6 HY 2114
115 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL+Z + CR + 1.6 HY 2115
116 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + WL-Z + CR + 1.6 HY 2116
117 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL+X + CR + 1.6 HY 2117
118 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL-X + CR + 1.6 HY 2118
119 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL+Z + CR + 1.6 HY 2119
120 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + WL-Z + CR + 1.6 HY 2120
121 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ 2121
122 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ 2122
123 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ 2123
124 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ 2124
125 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ 2125
126 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ 2126
127 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ 2127
128 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ 2128
129 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ 2129
130 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ 2130
131 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ 2131
132 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ 2132
133 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ 2133
134 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ 2134
135 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ 2135
136 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ 2136
137 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ + 1.6 HY 2137
138 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ + 1.6 HY 2138
139 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ + 1.6 HY 2139
140 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ + 1.6 HY 2140
141 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + EQX + 0.3 EQZ - EQY + EQSX + 0.3 EQSZ + 1.6 HY 2141
142 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + EQX - 0.3 EQZ - EQY + EQSX - 0.3 EQSZ + 1.6 HY 2142

Page 44 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


143 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - EQX + 0.3 EQZ - EQY - EQSX + 0.3 EQSZ + 1.6 HY 2143
144 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - EQX - 0.3 EQZ - EQY - EQSX - 0.3 EQSZ + 1.6 HY 2144
145 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ + 1.6 HY 2145
146 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ + 1.6 HY 2146
147 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ + 1.6 HY 2147
148 0.9 DL + 0.9 DLEMPTY + 0.9 LLop + 1.2 TLA - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ + 1.6 HY 2148
149 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + 0.3 EQX + EQZ - EQY + 0.3 EQSX + EQSZ + 1.6 HY 2149
150 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA + 0.3 EQX - EQZ - EQY + 0.3 EQSX - EQSZ + 1.6 HY 2150
151 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - 0.3 EQX + EQZ - EQY - 0.3 EQSX + EQSZ + 1.6 HY 2151
152 0.9 DL + 0.9 DLEMPTY + 0.9 LLop - 1.2 TLA - 0.3 EQX - EQZ - EQY - 0.3 EQSX - EQSZ + 1.6 HY 2152
153 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.2 TLF + 0.5 Lr + 1.2 TLss + 0.5 LL 2153
155 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA - 1.2 TLF + 0.5 Lr + 1.2 TLss + 0.5 LL 2155
156 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA - 1.2 TLF + 0.5 Lr - 1.2 TLss + 0.5 LL 2156
157 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.2 TLF + 0.5 Lr + 1.2 TLss + 0.5 LL + 1.6 HY 2157
158 1.2 DL + 1.2 DLEMPTY + 1.2 LLop + 1.2 TLA + 1.2 TLF + 0.5 Lr - 1.2 TLss + 0.5 LL + 1.6 HY 2158
159 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA - 1.2 TLF + 0.5 Lr + 1.2 TLss + 0.5 LL + 1.6 HY 2159
160 1.2 DL + 1.2 DLEMPTY + 1.2 LLop - 1.2 TLA - 1.2 TLF + 0.5 Lr - 1.2 TLss + 0.5 LL + 1.6 HY 2160
161 1.4 DL + 1.4 DLEMPTY + 1.4 DLtest 2161
162 1.4 DL + 1.4 DLEMPTY + 1.4 DLtest + 1.6 HY 2162
163 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest 2163
164 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 1.6 HY 2164
165 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+X 2165
166 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-X 2166
167 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+Z 2167
168 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-Z 2168
169 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+X + 1.6 HY 2169
170 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-X + 1.6 HY 2170
171 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+Z + 1.6 HY 2171
172 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-Z + 1.6 HY 2172
173 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+X + LL 2173
174 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-X + LL 2174
175 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+Z + LL 2175
176 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-Z + LL 2176
177 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+X + LL + 1.6 HY 2177
178 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-X + LL + 1.6 HY 2178
179 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL+Z + LL + 1.6 HY 2179
180 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + 0.5 WL-Z + LL + 1.6 HY 2180
181 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + LL 2181

Page 45 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Sl. No ULTIMATE LOAD COMBINATIONS L/C No's


182 1.2 DL + 1.2 DLEMPTY + 1.2 DLtest + LL + 1.6 HY 2182
183 1.2 DL + 1.2 DLEMPTY + 1.6 LL + 1.6 ML 2183
184 1.2 DL + 1.2 DLEMPTY + 1.6 LL - 1.6 ML 2184
185 0.9 DL + 0.9 DLEMPTY + 1.6 LL + 1.6 ML 2185
186 0.9 DL + 0.9 DLEMPTY + 1.6 LL - 1.6 ML 2186
187 0.9 DL + 0.9 DLEMPTY + 1.6 LL + 1.6 ML + 1.6 HY 2187
188 0.9 DL + 0.9 DLEMPTY + 1.6 LL - 1.6 ML + 1.6 HY 2188
189 1.2 DL + 1.2 DLEMPTY + 0.5 WL+X + LL + CR 2189
190 1.2 DL + 1.2 DLEMPTY + 0.5 WL-X + LL + CR 2190
191 1.2 DL + 1.2 DLEMPTY + 0.5 WL+Z + LL + CR 2191
192 1.2 DL + 1.2 DLEMPTY + 0.5 WL-Z + LL + CR 2192
193 1.2 DL + 1.2 DLEMPTY + 0.5 WL+X + LL + CR + 1.6 HY 2193
194 1.2 DL + 1.2 DLEMPTY + 0.5 WL-X + LL + CR + 1.6 HY 2194
195 1.2 DL + 1.2 DLEMPTY + 0.5 WL+Z + LL + CR + 1.6 HY 2195
196 1.2 DL + 1.2 DLEMPTY + 0.5 WL-Z + LL + CR + 1.6 HY 2196
197 0.9 DL + 0.9 DLEMPTY + 0.5 WL+X 2197
198 0.9 DL + 0.9 DLEMPTY + 0.5 WL-X 2198
199 0.9 DL + 0.9 DLEMPTY + 0.5 WL+Z 2199
200 0.9 DL + 0.9 DLEMPTY + 0.5 WL-Z 2200
201 0.9 DL + 0.9 DLEMPTY + 0.5 WL+X + 1.6 HY 2201
202 0.9 DL + 0.9 DLEMPTY + 0.5 WL-X + 1.6 HY 2202
203 0.9 DL + 0.9 DLEMPTY + 0.5 WL+Z + 1.6 HY 2203
204 0.9 DL + 0.9 DLEMPTY + 0.5 WL-Z + 1.6 HY 2204

14 ANNEXURE 2: SUMMARY OF REACTIONS


Horizonta Horizonta 10 W-X 4.764 6.650 -0.509
Vertical
Node L/C l l 11 W+Z -0.005 -11.645 -8.379
Fx kN Fy kN Fz kN
12 W-Z -0.000 9.145 2.961
17 1 DS 0.097 3.938 -0.118
13 LL 0.000 0.000 0.000
2 DE 1.672 7.820 0.016
14 CR 0.000 0.000 0.000
3 LLOP 0.000 0.000 0.000
15 ML 0.000 0.000 0.000
4 DT 0.000 0.000 0.000
16 EX -4.245 -3.379 0.200
5 AF 0.000 0.000 0.000
17 EZ -0.807 -8.391 -7.998
6 FF 0.000 0.000 0.000
18 EY 0.063 0.421 -0.004
7 LR OR R 0.000 0.000 0.000
18 1 DS -0.097 3.860 -0.119
8 +T 0.000 0.000 0.000
2 DE -1.672 3.680 -0.045
9 W+X -6.576 -9.150 0.560
3 LLOP 0.000 0.000 0.000

Page 46 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

4 DT 0.000 0.000 0.000 6 FF 0.000 0.000 0.000

5 AF 0.000 0.000 0.000 7 LR OR R 0.000 0.000 0.000

6 FF 0.000 0.000 0.000 8 +T 0.000 0.000 0.000

7 LR OR R 0.000 0.000 0.000 9 W+X -4.764 6.650 0.509

8 +T 0.000 0.000 0.000 10 W-X 6.576 -9.150 -0.560

9 W+X -4.764 6.650 -0.509 11 W+Z 0.000 9.145 -2.961

10 W-X 6.576 -9.150 0.560 12 W-Z 0.005 -11.645 8.379

11 W+Z 0.005 -11.645 -8.379 13 LL 0.000 0.000 0.000

12 W-Z 0.000 9.145 2.961 14 CR 0.000 0.000 0.000

13 LL 0.000 0.000 0.000 15 ML 0.000 0.000 0.000

14 CR 0.000 0.000 0.000 16 EX -4.204 3.379 0.200

15 ML 0.000 0.000 0.000 17 EZ 0.815 3.209 -3.023

16 EX -4.204 3.379 -0.200 18 EY -0.063 0.270 0.006

17 EZ -0.815 -3.209 -3.023 29 1 DS -0.022 0.960 -0.000

18 EY -0.063 0.270 -0.006 2 DE 0.026 2.048 0.002

19 1 DS 0.097 3.938 0.118 3 LLOP 0.000 0.000 0.000

2 DE 1.672 7.820 -0.016 4 DT 0.000 0.000 0.000

3 LLOP 0.000 0.000 0.000 5 AF 0.000 0.000 0.000

4 DT 0.000 0.000 0.000 6 FF 0.000 0.000 0.000

5 AF 0.000 0.000 0.000 7 LR OR R 0.000 0.000 0.000

6 FF 0.000 0.000 0.000 8 +T 0.000 0.000 0.000

7 LR OR R 0.000 0.000 0.000 9 W+X -3.010 -6.329 -0.028

8 +T 0.000 0.000 0.000 10 W-X 1.356 6.332 0.012

9 W+X -6.576 -9.150 -0.560 11 W+Z 0.100 -3.223 -0.889

10 W-X 4.764 6.650 0.509 12 W-Z -0.080 3.221 0.043

11 W+Z -0.000 9.145 -2.961 13 LL 0.000 0.000 0.000

12 W-Z -0.005 -11.645 8.379 14 CR 0.000 0.000 0.000

13 LL 0.000 0.000 0.000 15 ML 0.000 0.000 0.000

14 CR 0.000 0.000 0.000 16 EX 2.084 9.725 0.018

15 ML 0.000 0.000 0.000 17 EZ 0.196 8.070 0.106

16 EX -4.245 -3.379 -0.200 18 EY 0.000 0.108 0.000

17 EZ 0.807 8.391 -7.998 30 1 DS -0.022 0.960 0.000

18 EY 0.063 0.421 0.004 2 DE 0.026 2.048 -0.002

20 1 DS -0.097 3.860 0.119 3 LLOP 0.000 0.000 0.000

2 DE -1.672 3.680 0.045 4 DT 0.000 0.000 0.000

3 LLOP 0.000 0.000 0.000 5 AF 0.000 0.000 0.000

4 DT 0.000 0.000 0.000 6 FF 0.000 0.000 0.000

5 AF 0.000 0.000 0.000 7 LR OR R 0.000 0.000 0.000

Page 47 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Horizonta Horizonta Horizonta Horizonta


Node L/C Vertical Node L/C Vertical
l l l l
8 +T 0.000 0.000 0.000 9 W+X -1.356 6.332 -0.012

9 W+X -3.010 -6.329 0.028 10 W-X 3.010 -6.329 0.028

10 W-X 1.356 6.332 -0.012 11 W+Z 0.080 3.221 -0.043

11 W+Z -0.080 3.221 -0.043 12 W-Z -0.100 -3.223 0.889

12 W-Z 0.100 -3.223 0.889 13 LL 0.000 0.000 0.000

13 LL 0.000 0.000 0.000 14 CR 0.000 0.000 0.000

14 CR 0.000 0.000 0.000 15 ML 0.000 0.000 0.000

15 ML 0.000 0.000 0.000 16 EX 2.084 9.725 0.018

16 EX 2.084 9.725 0.018 17 EZ 0.196 8.070 0.106

17 EZ 0.196 8.070 0.106 18 EY -0.000 0.108 -0.000

18 EY 0.000 0.108 -0.000 33 1 DS -0.000 0.353 0.001

31 1 DS 0.022 0.960 -0.000 2 DE 0.001 0.452 0.029

2 DE -0.026 2.048 0.002 3 LLOP 0.000 0.000 0.000

3 LLOP 0.000 0.000 0.000 4 DT 0.000 0.000 0.000

4 DT 0.000 0.000 0.000 5 AF 0.000 0.000 0.000

5 AF 0.000 0.000 0.000 6 FF 0.000 0.000 0.000

6 FF 0.000 0.000 0.000 7 LR OR R 0.000 0.000 0.000

7 LR OR R 0.000 0.000 0.000 8 +T 0.000 0.000 0.000

8 +T 0.000 0.000 0.000 9 W+X -1.092 -1.639 0.042

9 W+X -1.356 6.332 0.012 10 W-X 0.010 1.636 -0.026

10 W-X 3.010 -6.329 -0.028 11 W+Z -0.041 0.622 -1.981

11 W+Z -0.100 -3.223 -0.889 12 W-Z 0.021 -0.620 0.914

12 W-Z 0.080 3.221 0.043 13 LL 0.000 0.000 0.000

13 LL 0.000 0.000 0.000 14 CR 0.000 0.000 0.000

14 CR 0.000 0.000 0.000 15 ML 0.000 0.000 0.000

15 ML 0.000 0.000 0.000 16 EX 0.015 2.511 0.039

16 EX 2.084 9.725 0.018 17 EZ 0.048 1.550 2.291

17 EZ 0.196 8.070 0.106 18 EY 0.000 0.029 0.001

18 EY -0.000 0.108 0.000 34 1 DS 0.000 0.353 0.001

32 1 DS 0.022 0.960 0.000 2 DE -0.001 0.452 0.029

2 DE -0.026 2.048 -0.002 3 LLOP 0.000 0.000 0.000

3 LLOP 0.000 0.000 0.000 4 DT 0.000 0.000 0.000

4 DT 0.000 0.000 0.000 5 AF 0.000 0.000 0.000

5 AF 0.000 0.000 0.000 6 FF 0.000 0.000 0.000

6 FF 0.000 0.000 0.000 7 LR OR R 0.000 0.000 0.000

7 LR OR R 0.000 0.000 0.000 8 +T 0.000 0.000 0.000

8 +T 0.000 0.000 0.000 9 W+X -0.010 1.636 -0.026

Page 48 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

Horizonta Horizonta Horizonta Horizonta


Node L/C Vertical Node L/C Vertical
l l l l
10 W-X 1.092 -1.639 0.042 15 ML 0.000 0.000 0.000

11 W+Z 0.041 0.622 -1.981 16 EX 0.015 2.511 0.039

12 W-Z -0.021 -0.620 0.914 17 EZ 0.048 1.550 2.291

13 LL 0.000 0.000 0.000 18 EY 0.000 0.029 -0.001

14 CR 0.000 0.000 0.000 36 1 DS 0.000 0.353 -0.001

15 ML 0.000 0.000 0.000 2 DE -0.001 0.452 -0.029

16 EX 0.015 2.511 0.039 3 LLOP 0.000 0.000 0.000


17 EZ 0.048 1.550 2.291 4 DT 0.000 0.000 0.000
18 EY -0.000 0.029 0.001 5 AF 0.000 0.000 0.000
35 1 DS -0.000 0.353 -0.001 6 FF 0.000 0.000 0.000
2 DE 0.001 0.452 -0.029 7 LR OR R 0.000 0.000 0.000

3 LLOP 0.000 0.000 0.000 8 +T 0.000 0.000 0.000

4 DT 0.000 0.000 0.000 9 W+X -0.010 1.636 0.026

5 AF 0.000 0.000 0.000 10 W-X 1.092 -1.639 -0.042

6 FF 0.000 0.000 0.000 11 W+Z -0.021 -0.620 -0.914

7 LR OR R 0.000 0.000 0.000 12 W-Z 0.041 0.622 1.981

8 +T 0.000 0.000 0.000 13 LL 0.000 0.000 0.000

9 W+X -1.092 -1.639 -0.042 14 CR 0.000 0.000 0.000

10 W-X 0.010 1.636 0.026 15 ML 0.000 0.000 0.000

11 W+Z 0.021 -0.620 -0.914 16 EX 0.015 2.511 0.039

12 W-Z -0.041 0.622 1.981 17 EZ 0.048 1.550 2.291

13 LL 0.000 0.000 0.000 18 EY -0.000 0.029 -0.001

14 CR 0.000 0.000 0.000

Page 49 of 194
PROJECT NO: P4331433 EPC FOR DALMA GAS DEVELOPMENT PROJECT Rev

AZ5120-07-CAL-0006 CALCULATION REPORT ANALYZER SHELTER PACKAGE UNIT FOUNDATION 01

15 ANNEXURE 3: FOUNDATION 3D REPORT

Page 50 of 194