BITUMEN PAVEMENT
General
Contractor shall seat the surface of the
improved roads as per Company approved
design report. Surfacing material may
include Single Surface Treatment, Double
Surface Treatment, or a Hot Mix Asphalt
Concrete
Contractor shall furnish all plant, labor,
materials, tools, equipment, transportation,
and perform all operations and incidentals
necessary for completing the Services.
Materials
All bitumen used in the Services shall be the
grade specified for the purpose; prime coat,
tack coat, double surface treatment, or hot
‘mix asphalt, Contractor shall submit copies
of material test reports signed by the
manufacturer. Test reports shall indicate the
vendor's name, type and grade of bitumen,
quantity delivered, ticket number, purchase
@
®)
©
©)
81
(A)
@
82
(Ay
ASTMC39 Test Method —_ for
Compressive Strength of Cylindrical
Concrete Specimens
ASTMCHS3 Test Method for Shonp
of Hydraulic Cement Concrete
ASTMCT80 Test Method for
Preconstruction and Construction
Evaluation of Mortars for Plain and
Reinforced Unit Masonry
ASTMDISST Test Method for
Laboratory Compaction Characteristics
of Soil Using Modified Effort (56,000 ft-
b6/83)2,700 KN.M/M3)
PERKERASAN BITUMEN
Umum
Kontraktor harus melapisi permukaan
Jalan yang ditingkatken berdasarkan
Taporan desain yang disetujui oleh
Perusaliaan. Material pelapis dapat
berupa Single Surface Treatment, Double
Surface Treatment, atau Aspal Beton Hot
Mix.
Kontraktor harus menyediakan semua
fasilitas, tenaga kerja, material,
perlengkapan, peralatan pengangkutan,
dan melakuken semua operasi dan
ebutuhan yang diperlukan untuk
‘menyelesaikan Jasa-jasa,
Bahan-bahan
Semua baben bitumen yang digunakan
pada pelaksanaan Jasewjasa_harus
Imerupakan tingkatan yang diperuntukkan,
sesuai tujuannya; prime coat, tack coat,
double surface treatment, atau aspal ot
mtx, Kontraktor harus menyerahkan salinan
Japoran—pengujian material yang
ditandatangani oleh. pabriken. Laporan
order number, and the results of specified pengujian’ harus menunjukkan nama
‘Simatra Operations (SMO) Road & Well Pad Improvement Long Term Contract Package 1 No, SPHROOSTOA
General Template (igh Risk) (Rev Merch 2022)
196
Porsahean | Kontaktor®)
©
@)
wo
a
tests. The test reports shall be kept on file
and given a project control number. ‘The
project control number shall be shown on
the “As-built” drawings indicating the
bitumen manufacturing batch used for each
completed road section.
Bitumen shall be homogeneous and free
from water and residues ftom distillation
‘The bitumen shall not be heated during it’s
manufacture, storage, transport, or during,
‘construction to form carbonized particles,
not shall it be heated higher than five (5)
degrees Celsius below the actual flashpoint
of the Bitumen,
The temperature of the Bitumen shall not
exceed one hundred and ninety (190)
degrees Celsius during transpor. At no
‘time during heating of the bitumen shall
steam or oils be introduced, Keep a
calibrated thermometer on the site at all
times suitable for determining the
‘temperature ofthe bitumen,
Prime Coat
Prime Coat shall be slow curing liquid
asphalt, with a viscosity of 250 to 500
mm2/sec at 60 degrees Celcius. The
product shall consist of natural crade oils oF
residual oils refined from crude asphalt
petroleum, or steam refined bitumen fluxed
with light oi
Upon delivery, the manufacturer or sup}
shall certify in writing that the Prime Coat
is in general accordance with the following:
@)
©
©
(8)
@)
vendor, jenis dan. tingkatan bitumen,
jumlah yang dikirimkan, nomor tiket,
omor perintah pembelian, dan hasil dari
pengujian tersebut. Laporan pengujian
haus disimpen dan diberikan nomor
Kontrol proyek, Nomor Kontrol proyek
hharus ditunjukkan pada gambar terbangun
yang menjelaskan kelompok produksi
bitumen yang digunakan untuk setiap
bagian jalan yang dikerjakan,
Bitumen harus homogen dan bebas dai air
dan residu dari distilast. Bitumen tidak
boleh dipanaskan sclama pembuatannya,
penyimpanan, pengangkutan, atau selama
onstruksi sehingga membentuk partikel
‘karbonasi, den juga tidak boleh dipanaskan
dalam suhu 5 (lima) decajat Celsius dari
titik nyala bitumen tersebut.
Suhu bitumen tidak boleh melebihi 190
derajat Celsius selama pengangkutan,
Selma pemanasan, tidak boleh ada
penguapan atau pencampuran dengan
minyak, Kontraktor harus menyediakan
termometer yang terkalibrasi pada lokasi
kerja setiap saat, yang dapat digunekan
‘untuk menentwkan suhu bitumen.
Prime Coat
Prime coat hatus berupa aspal cair slow
curing, dengan kekentalan 250 hingga
500 mm2/sec pada suhu 60 derajat
Celsius. Produk harus terbuat dari
minyak mentah alami atau resid minyak
yang direfinasi dari aspal minyak mentah
tau bitumen refinasi wap yang dialii
minyak encer.
Pada saat pengiriman, pabrikan atau
penyuplai harus menjetaskan secara
fertulis bahwa prime coat secara umum
sesuai dengan persyaratan berikut:
‘Sumatra Operations (SMO) Road & Well Pad Improvement Lang Term Contract Pack 1 No, SPHRDDSTOA
General Template (igh Risk) (Rev March 2022)
197
Penusaian | KoarakiorFlash Point | Viscosity | Residual Viscosity | Solubility Water | Ductility of
at 60°C at 360°C in TCE Residue at
25°C
‘ASTM D92 [ ASTMD2170 | _ASTMD2I70_| ASTM D2042 | ASTMDSS | _ASTMDII3
80°C 250-500 *800-8500, 99.5%, Min | 0.5%, Max [1000 mm, Min
um2/s mm/s
(©) Tack Coat © — Tack Coat
(1) Tack coat shall be a paving asphalt either (1) Tack coat harus berupa aspal perkerasan
penetration graded at sixty (60) to seventy
(70) tenths of @ millimeter, or viscosity
graded between 2000 to 3000 Poise or 4000
to 10000 Poise when using the Thin Film
Oven Test ASTM DI754, All materials to
‘be used require approval from Company.
dengan tingkst penetrasi 60 (enam putub)
hingga 70 (tujuh pulu) per sepuluh
rillimeter, atau tingkat kekentalan antara
2000 hingga 3000 Poise atau 4000 hingga
10000 Poise jika menggunakan pengujian
Thin Film “Oven berdasarkan ASTM
DI754, Semva material yang digunakan
harus disetujul oleh Perusahaan.
@) — Upondelivery, the manufacturer or supplier (2) Pada saat pengiriman, pabrikan atau
shall certify in writing that the tack coat is penyuplai harus menjelaskan secaratertulis
in general accordance with the following: bahwa tack coat secara umum sesuai
‘dengan persyaratan berikut:
Flash Viscosity] Penetration | Solubility | Viscosity Thin] Ductl
Point at 60°C at 25°C inTCE — | Film Oyen60°C | Thin Film
‘Oven 25°C
‘ASTM “ASTM ‘ASTM DS “ASTM ASTMDITS$ | ASTMDI7S4
Dez 2170 2042
232°C | ~2000-3000 | 60-70 | 99.0%, min | 4000-10000 30-75 em
mm’is mm/s
(F) Hot Mix and Cold Mix Asphalt (F)—Aspal Hot Mix dan Cold Mix
(1) Bitumen Binder. The bitumen binder (1) Bitumen Pengikat. Bitumen pengikat
shall be paving asphalt and the grade shall hharus berupa spel perkerasan dan
bbe proposed by Contractor according to tingkatan kualitasnya harus diusulkan oleh
the job mix formula and approved by Kontraktor sesuai dengan formula desain
Company. pencampuran dan disetujui_— oleh
Perusahaan,
2) Aggregate (2) Agregat
(@) Aggregate for hot mix asphalt concrete (a) — Agregat untuk aspal beton hot mix harus
shall consist of coarse aggregate, fine
terdiri dari agregat kasar, agregat halus dan
‘Sumatra Operaions (S6O) Road & Well Pad Improvenoni Lang Term Contract Package 1 Nox SPHROOSTOA
General Template (igh Rist) (Rev March 2022),
198,
Penwsaheas | Koatlioe
L&)
©
@
©
©
aggregate and mineral filler as required in
jobmix formula. All aggregate shall be free
from clay, dust, organics, or any other
deleterious materials. A 20 (twenty)
Kilogram sample of each aggregate; coarse,
fine, & mineral filler, shall be submitted to
Company for Approval
Coarse aggregate shall be screened crushed
rock, angular in shape with at least three
manufactured faces. It shall have a
weighted loss of not greater than 12
(twelve) percent when subjected to five
eycles of the soundness test, ASTM C88,
using sodium sulfate, or 18 (eighteen)
percent when using magnesium sulfate.
Fine aggregate shall be non-plastic and
shall be either clean sand or quarry
sereenings.
Mineral filler shall be rock dust, limestone
dust, hydrated lime, hydraulic cement, or
other material approved by Company with
at least 70 (seventy) percent by weight
passing the number 200 sieve.
‘The gradation of the mix shall be dependent
‘on the design thickness and purpose of the
finished product. The maximum aggregate
size shall not be greater than one half the
design thickness of the pavement. The
gradation shall be proposed by Contractor
along with the job mix formula and shall be
approved by Company.
Anti Stripping Agent. Contractor saall use
Portland cement as anti-stripping and
adhesion agent, which shall conform to the
requirements of ASTM C150. Contractor
may propose alternate anti-stripping agents
ith the approval of Company.
®)
(©)
@
©
®
mineral pengisi sesuai_yang disyaratkan
dalam formula desain pencampuran,
Semua agregat harus bebas dari lempung,
debu, bahan organik, atau material lath
yang merusak. Sampel seberat 20 (dua
uluh) Kilogram dari setiap agregat; kasar,
hhalus dan mineral pengisi, harus diserabkan
Kepada Perusahaan untuk memperoleh
Persetujuan,
Agregat kasar harus berupa batu_pecah
terpili, dengan bentuk bersudut setidaknya
memiliki tiga permukean. Agreget harus
tidak boleh kehilangan berataya lebih dari
12 Gua belas) persen jika dilakukan lima
siklus pengujian soundness, ASTM C88,
menggunakan sodium sulfet, atau 18
(Gelapan belas) persen jika menggunakan
magnesium sulfat,
Agregat halus harus berupa material non-
plastis dan herus berupa pasir bersih atau
dari quarry pilihan.
Mineral pengisi harus berupa debu batu,
debu batu Kapur, kapur berhidrasi, semen
hidraulik, atau material lain yeng disetyjui
oleh Perusahaan dengan setidaknya 70
(tajuh puluh) persen berat lolos saringan
snomor 200,
Gradasi campuran harus _bergantung
Kepada ketebalan desain dan tujuan dari
produk akhir. Ukuran agregat maksimum
tidak boleh lebih besar dati satu setengah
desain ketebalan perkeresan. Gradasi harus
diusulkan oleh Kontraktor bersama dengan
formula desain pencampuran dan haras
800 Ke
Flow ‘ASTM D-1559. <2.0 mm
Voids in Mix ‘ASTM D-3203 3.0=5.0%,
Bitumen Content | ASTM D-2172 65%
(®) The following table is given only as a (b) Tabel berikutini diberikan hanya sebagai
reference to assist Contractor with referensi untuk membantu Kontraktor di
developing the job mix formula and the dalam —membuat formula desain
grading of the combined aggregates, peneampuran dan gradasi dari agregat
kombinasi
25.0mm 1” 7 =
19.0mm | 100 100
¥2.5mm | 4 90-100, 95-100
9.5mm [A 72-88 72-88
475mm [Nos | 40-54 46-60
236mm | Nos 18-34 28-42
600 No30__[ 8:20
300 No.SO | 4-14
75 No.200__[ 1-6
83 Plant 83 Fasilitas
(A) Distributor Truck (A) Truk Distributor
(1) The distributor truck for placing hot (1) Truk distributor untuk menempatkan
bitumen for single and double surface
bitumen panas untuk single dan double
Simnatra Operations (SMO) Road & Wall Pad Inprovenent Lang Term Contract Package 1 No, SPHROUSIOA
General Template High Risk) (Rev March 2022)
200
Perusahaan | Koniaiior@)
@)
@)
©)
()
treatments shall be the pressure type with,
insulated tanks.
Distributor truck shall be equipped with a
tachometer of the auxiliary wheel which
registers speed in meters per minute,
calibration charts and devices to provide for
accurate and rapid determination of the
amount of bitumen being applied, 2 hose
and nozzle attachment to be used for areas
inaccessible to the spray bar, a pressure
gauge for determining the application
pressure, and a thermometer to determine
the temperature of the bitumen.
Contractor shall maintain distributors and
booster tanks to prevent any dripping of
bitumen from any part of the equipment.
Spray bars shall have a minimum length of
2.7 (two and seven tenths) meters and shall
be adjustable to permit varying the height
above the surface to be treated.
‘The nozzles attached to the bar shall be
either conical or flat slotted and shall not
exceed 150 (one hundred and fifty)
millimeters from center to center.
The distributor equipment shall be capable
of spreading a uniform application of
bitumen ranging from 0.1 (one tenth) of a
liter per square meter to 4.5 (four and one
half) liters per square meter, and the
pressure shall range from 170 (one hundred
and seven) to 515 (five hundred and fifteen)
kilopascals.
Aggregate Spreader. Contractor shall
spread the single and double surface
treatment aggregate by means of a self
propelled chip spreader equipped with a
mechanical device which shall spread the
aggregate at a uniform rate over the fall
@
@
@
©)
(B)
surface treaament barus jenis bertekanan
dengan tangki berinsulasi.
‘Truk distributor hatus dilengkapi dengan
tachometer dengan roda tambahan yang
mencatat Kecepatan dalam meter. per
menit, grafik kalibrasi dan peralatan
untuk’ menyediakan penentuan jumlah
bitumen yang akurat dan cepat, selang
dan penyemprot untuk digunakan pada
daerah yang tidak dapat diakses dengan
batang penyemprot, pengukur tekanan
untuk mengetabui tekanan aplikasi, dan
termometer untuk mengetahui suhu
bitumen.
Kontraktor harus merawat distributor dan
booster tank untuk mencegah tumpahnya
Bitumen dari setiap bagian deri peralatan,
Batang penyemprot harus/memiliki
‘minimal 2.7 (dua koma tujuh) meter dan
harus dapat —disesuaikan untuk
memvariasikan ketinggian di stas
permukaan yang akan dikerjakan,
Penyemprot. yang tersambung pada
batang tersebut dapat berbentuk konikal
atau flat slotted dan tidak boleh lebih
berjarak 150 (Seratus lima puluh)
smilimeter dari titik pusat ke titik pusat.
Peralatan distributor harus memiliki
kkemampuan untuk menyebar aplikasi
bitumen secara seragam mulai dari 0.
(aol koma satu) liter per meter persegi
hhingge 4.5 (empat koma lima) liter per
meter persegi, dan tekanamiya harus
berkisar antara 170 (seratus tujub puluh)
hhingga 515 (lima retus lima belas)
Kilopaseals.
Penyebar Agregat. Kontraktor arus
menyebarkan agregat single dan double
surface treatment dengan menggunakan
self propelled chip spreader yang
dilengkapi dengan peralatan mekanis
yang harus dapat menyebarkan agregat
‘Sumatra Operations (SW(O) Road & Well Pad improvement Long Term Contract Package 1 No. SPHRDOSI9A
General Tenplate (High Risky (Rev March 2022),
201
Perusahaan | Konwaitor©
©)
a)
@
@)
“
width of a traffic lane in one application.
‘The spreader shall be capable of varying the
spreading width to accommodate variable
road widths.
Self Propelled Paver. Contractor shall
spread hot mix asphelt concrete with a self
propelled paving machine in a single
continuous operation. The machine shall be
purpose built and shall be equipped with a
sereed or strike-off assembly which is
capable of being accurately regulated and
adjusted to distribute a layer of the material
to a definite predetermined thickness.
Asphalt concrete shall not be laid in layers
exceeding 100 (one hundred) millimeters
when compacted.
Rollers
Three axle tandems, two axle tandems, and
three wheeled rollers used for breakdown
rolling shall be of such weight that the
compression load on the drive wheels is at
least 57 (fifty seven) Newtons/millimeter
Vibratory rollers used for breakdown or
imermediate rolling shall have a dynamic
force of not less than 93 (ninety three)
kiloNewtons.
tandem rollers used for
fe and finish rolling shall weigh
not less than 8 (eight) tons.
axle
Pneumaticctired rollers used for
intermediate rolling shall be the oscillating
‘ype having a width of not less than one and
1.2 (two tenths) meters and equipped with
pneumatic ties of equal size and diameter.
Wobble-wheel rollers shall not be
©
©)
a)
@
@)
@
pada laju yang seragam selebarlajur jalan
dalam sekali aplikasi, Peralatan penyebar
hharus dapat memvariasi lebar penyebaran
untuk mengakomodasi lebar jalan yang
bervariasi.
‘Self Propelled Paver. Kontraktor harus
‘menyebarkan aspal beton hot mix dengan
mesin self propelled paving dalam satu
operasi yang Kontinu, Mesin tersebut
fharus dibuat khusus dan harvs dilengkapi
dengan mal atau pengatur yang dapat
secara akurat diatur dan_disesuaikan
untuk mendistribusikan lapisan material
pada Ketebalan tertentu. Aspal beton
tidak diperbolehkan untuk diaplikasikan
pada lapisan dengen ketebalan lebih dari
100 (Seratus)milimeter_setelah
dipadatkan.
Penggilas
Penggiles dengan tiga sumbu tandem,
dua sumbu tandem, dan tiga roda yang
digunakan untuk penggilasan pemecahan
hharusmemiliki berat tertentu. dimane
beban kompresi pada roda penggeraknya
setidaknya 57 (lima puluh tujuh)
Newton/milimeter.
Penggilas dengan penggetar yang