0% found this document useful (0 votes)
6 views967 pages

Breakdowns

The document contains multiple maintenance order job tickets from Kirby Building Systems KSA, dated July 17 and July 19, 2025. Each ticket details specific equipment issues, responsible personnel, and maintenance tasks, including problems with machinery such as the KD mill stacker, phi press wheel bearing, and various compressors. The tickets include release dates, start times, and descriptions of the work required for each maintenance task.

Uploaded by

HARIPRASAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views967 pages

Breakdowns

The document contains multiple maintenance order job tickets from Kirby Building Systems KSA, dated July 17 and July 19, 2025. Each ticket details specific equipment issues, responsible personnel, and maintenance tasks, including problems with machinery such as the KD mill stacker, phi press wheel bearing, and various compressors. The tickets include release dates, start times, and descriptions of the work required for each maintenance task.

Uploaded by

HARIPRASAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 967

I

h
Pj
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327770 Order No: 20203146 Description: KD mill stacker not
working properly
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time ___________________

0010 KD mill stacker not working properly


___ ___________________________ _____

/5'rdjts I5q.9j _______________

?pw' a 4w ___ ____ ___________

Release Date: 17.07.2025 Basic Start Date: 15.07.2025


Release Time: 16:33:07 Basic End Date:
/ j "07
Employee Codes Employee Names Operation No Hrs

l7J) f H'

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327840 Order No: 20203144 Description: phi press wheel bearing
stuck upplz chec
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010 phi press wheel bearing stuck upplz chec


-'___ ____________________________ _____ !iV7- 23 /6-o72 ________________

15
Chtthic/ poer/ ç/ _________________

Cf
,foc;d 7/v t: 7)urnO

Release Date: 17.07.2025 Basic Start Date: 16.07.2025


Release Time: 16:30:21 Basic End Date: -v7. 2c' 2.5'
Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327949 Order No: 20203143 Description: usi need 1-50 die

Functional P301- DT/AIL Description: DETAIL SECTION


Location:
Equipment No: 12000296 Description: USl MECHANICAL PRESS MACHINE

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tim¬. ______________________

0010 usi need 1-50 die


___ ___________________________ _____
11-0725 /7o72 _______________

*
dt ____ _________ ___________

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 16:27:44 Basic End Date: fry di'


Employee Codes Employee Names Operation No Hrs

________
A,, ____________
2f/n

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327981 Order No: 10137716 Description: DENAIR Air
compressoer Oil &
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000300 Description: AIR COMPRESSOR L75 BLAST
- -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 15:32:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327281 Order No: 20203158 Description: iron worker punch block
damage
Functional P301-CFORM- Description: OFF LINE PURLIN PUNCHING LINE
Location: OFLIN
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______

Date/Time Date/Time ____________________

0010 iron worker punch block damage


O7.q O77z
) ____________

__
c(4i7ýd
Lk cf Chktp&
s1 ___

___
_______

________
_________

__________

Release Date: 17.07.2025 Basic Start Date: 09.07.2025


Release Time: 16:54:29 Basic End Date: 'Q79O2S

Employee Codes Employee Names Operation No Hrs


__________
P'wo Wclar f) 2 w

Maintenance Department User Department


ur Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327986 Order No: 10137725 Description: USI 1-50 die blade
replace & Repair work
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 12000296 Description: USI MECHANICAL PRESS MACHINE

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _________________________________ ______
DateiTime Date/Time. __________________

0010 USI 1-50 die blade replace & Repair work


-\___ __________________________ _____ I7.o72s I7.07.Q5 _______________

15nd 4sm/Jtd_cAt_d ____ _____ ____ ___________

,f_ChnukI44 ____ _____ _____ _____________

Release Date: 17.07.2025 Basic Start Date: 17.07.2025


Release Time: 16:16:08 Basic End Date: 17. o7
Employee Codes Employee Names Operation No Hrs

,Aq,_t,;cl ______________

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327987 Order No: 10137726 Description: SPT Blasting machine
dust filter clean
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______

Date/Time Date/Tim( ____________________

0010 SPT Blasting machine dust filter clean


/S'o7z5 /Soflc
___ __________________________ _____

/eove_c// ___ ________ __________

___
chatt tt ____ _____ _____ _____________

Release Date: 17.07.2025 Basic Start Date: 17.07.2025


Release Time: 16:25:34 Basic End Date: 17 ZY7n

Maintenance Department I User Department


Kirby Building Systems KSA
i b MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327864 Order No: 20203142 Description: sanli 6m1r shear not
cuffing full I plz
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 17.07.2025 / / Basic Start Date: 16.07.2025

Release Time: 16:26:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327984 Order No: 10137721 Description: Sanli 4mtr shearing
Blade grinding & Rot
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 16:01:14 Basic End Date:

Employee Codes Employee Names Operation No Hrs


____________________ ___________

f__/7"O7v5
U
El
_____ _________________

_______ ___________
(19 ___________

_____
i9iv ________
V

Maintenance Department I User Department


"' .h
M
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327985 Order No: 10137722 Description: Compair L-45
comperssor not working
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000301 Description: AIR COMPRESSOR L45 BLAST
-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Time. ____________________

0010 Compair L-45 comperssor not working


_________________________ _____

I5t725 1S'o7 ______________

(1ot/fl2e 2ttO ef ______________

9,iru, &1LQ/ trnouel ckt _____ ______ ______ _______________

___ v2il,e ____ _________ ___________

cV 9./)O}ETPCI czii;/ ________ ____ ___________

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 16:07:45 Basic End Date: ft 07 2-oi'


-

Employee Codes Employee Names Operation No Hrs

M2)A/ 7 a' <ffn /5.07.2023

___________

/S'o7z
________ ____________
& / lth /'O72n-r

Maintenance Department User Department


1 Kirby Building Systems KSA
& MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327983 Order No: 10137720 Description: Sanli 6mtr shearing
blade roted work
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Binu Vatayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 15:52:46 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327982 Order No: 10137718 Description: Station B Air Compressor
Sapider caplin
Functional P301- UTLTV- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -1
-

Plant Section: Comprsr Room- i Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID:

Release Date: 17.07.2025 Basic Start Date: 17.07.2025

Release Time: 15:47:36 Basic End Date:


/ 7o7' 202h
Employee Codes Employee Names Operation No Hrs

5? 2iir
)

Maintenance Department User Department


Kirby Building Systems KSA

t MAINTENANCE ORDER JOB TICKET

Date: 19.07.2025
Notification No: 100328089 Order No: 20203219 Description: blasting sbt coveyor
chain damage.
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ ______
DateiTime Date/Timc ____________________

0010 blasting sbt coveyor chain damage.


___ ____________________________ _____
I'o725 /'o7zj ________________

%nteJ 'fly Cun' ___ ________ __________

Release Date: 19.07.2025 Basic Start Date: 19.07.2025


Release Time: 08:54:42 Basic End Date: I q 07 l' i-s

Employee Codes Employee Names Operation No Hrs

fr¼/ourt.AJuL1-f? ______________

J /

Maintenance Department User Department


" St Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 19.07.2025
Notification No: 100328095 Order No: 20203240 Description: spt blasting machine
breakdown
Functional P301- FIN IS-SHOT1 Description: SI-JOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 19.07.2025 Basic Start Date: 19.07.2025

Release Time: 08:55:07 Basic End Date: /cf 07 '2) 2


Employee Codes Employee Names Operation No Hrs

_____________ Ks Yin ,ouM __________________ 1k/ti


A2m1 0 f1/

Maintenance Department I User Department


fl S r Kirby Building Systems KSA
n irnnp
I %fl
MAINTENANCE ORDER JOB TICKET

Notification No: 100328053 Order No: 20203242 Description: plant-2 cleaning area
AG4' need repair
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Brijesh Kumar Main Work Electrical Maintenance


Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 plant-2 cleaning area AG4' need repair


(P

Release Date: 19.07.2025 Basic Start Date: 18.07.2025

Release Time: 08:57:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 21 .07.2025
Notification No: 100328345 Order No: 20203324 Description: Station D desert cooler
water pipe leak
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCCCL
Equipment No: Description:

Plant Section: Person Muhannad Mubarak Main Work Electrical Maintenance


Responsible: Al Jubayri Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Timt ___________________

0010 water leacking


-___ ______________________ ____ _____ _____
te
I
2 c-nr .r)497

Release Date: 21.07.2025 Basic Start Date: 21.07.2025


Release Time: 14:20:48 Basic End Date:
\
Employee Codes Employee Names Operation No Hrs

_________
24-26 _____________ ______________

fl4M9hJ) S74 lb ____________

El ) /

Mainten4nce Department User Department


'-
ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 27.07.2025
Notification No: 100328832 Order No: 20203578 Description: EP1001 FORKLIFT 10
TONS FLAT TIRE
Functional P301- MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Time ____________________

0010 EP1001 FORKLIFT 10 TONS FLAT TIRE 7.-4JL c,'43k.9P-

Release Date: 27.07.2025 Basic Start Date: 27.07.2025

Release Time: 14:45:16 Basic End Date:

Employee Codes Employee Names Operation No Hrs


______
ItwNVAMaI _________
J3o-kks
pta?) zaaMø) -4Y1'u4.q
Li
_____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.07.2025
Notification No: 100328841 Order No: 20203580 Description: EP-501 break not
working
Functional P301 -MTH DL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 27.07.2025 Basic Start Date: 27.07.2025

Release Time: 15:14:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs


__________________ __________ i-Hfl
4Fflflft ,9dWVS3
r

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.07.2025
Notification No: 100328805 Order No: 20203581 Description: Side loader starter need
repair SL-6001
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 27.07.2025 Basic Start Date: 26.07.2025

Release Time: 15:17:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

2UflIL kuMcflL

Maintenance Department I User Department


Kirby Building Systems KSA
ubi MAINTENANCE ORDER JOB TICKET

Date 27.07.2025
Notification No: 100328783 Order No: 20203582 Description: EP502 FORKLIFT
DIESEL LEAKAGE
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start compl Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 EPGO2 FORKLIFT DIESEL LEAKAGE P)p-st- j_ P)PF


-\___ ___________________________ _____ ______ ______ _______________

Release Date: 27.07.2025 Basic Start Date: 26.07.2025

Release Time: 15:18:35 Basic End Date:

Employee Codes Employee Names Operation No Hrs


IH1s
flRsMS /J)rnA4Mb

Maintenance Department I User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 28.07.2025
Notification No: 100326939 Order No: 20203610 Description: Fork Lift T-301 starter
motor problum
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301-

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
DateiTime DatelTimc ____________________

0010 Fork Lift T-301 starter motor problum


ç5E.ia_. -ti,

Release Date: 28.07.2025 Basic Start Date: 26.07.2025

Release Time: 16:49:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2025
Notification No: 100328745 Order No: 20203652 Description: ag4 grander new cable
need to extend
Functional P301- BUILT Description: BUILT-UP SECTION
Location:
Equipment No: Description:

Plant Section: ; -
Person Brijesh Kumar Main Work CONRAC
P Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 ag4 grander new cable need to extend


cup- fOc 1Cr ,4fii4t_bcu.tayt_

Release Date: 29.07.2025 Basic Start Date: 26.07.2025

Release Time: 12:18:05 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ ___________________ k MI-f--

, L( c-An OcD
toik 0 UCA,-t_

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2025
Notification No: 100328766 Order No: 20203651 Description: Ptant-2 F-6 Holder
change
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: JD!a&..9- r2_ Person Brijesh Kumar Main Work Fabrication Table- i
Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
DateiTime Date/Time ___________________

0010 Plant-2 F-6 Holder change


__ &UI4- 1 Lpr4o ________

_ ___
cLt-

Release Date: 29.07.2025 Basic Start Date: 26.07.2025

Release Time: 12:17:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

gjcg, %cano- ___________


'?t

4GdLJ £3t7 c1La1t k


o

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2025
Notification No: 100328767 Order No: 20203650 Description: Plant-2 F-52 need to fix
Gouging holder
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: bIn AJ- Person Brijesh Kumar Main Work Fabrication Table- i
r.,....
-Y Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

0010 Plant-2 F-52 need to fix Gouging holder


& f'e4,.- ,1-.-t ..41,'.Qj....

_________________ ______
ceu&c ('o1ek,

Release Date: 29.07.2025 Basic Start Date: 26.07.2025

Release Time: 12:16:37 Basic End Date:

Hrs

ii, 4,r4coJs'&rfl tethlt LAktY q coJM-


cft4 4ev cv\U cs-'h, coioVc- S4-c4- ft

Maintenance Department User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date: 31 .07.2025
Notification No: 100329264 Order No: 20203753 Description: pencil grinder not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section:

Tech ID:
ftt,F £49f Person
Responsible:
Brijesh Kumar Main Work Electrical Maintenance
Chauhan Centre:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

010 pencil grinder not working :4.t OC4Ar%4.4...


,

____________________ ___ ________


*'re-

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:35:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

J4 i'-vrnLv _________________

0______ ____________ ___________ ____________

to
c,jo\-

ke- Do-c-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31 .07.2025
Notification No: 100329213 Order No: 20203760 Description: grinding machine not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: -2. Person Vitthal Narayan Main Work Electrical Maintenance
Responsible: Ambure Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 grinding machine not working


IO'3t .-_t-f-o v%4ifr
__

___ _________________________
___

_____
___

_____
co-Ma-
JQeC-&cflv)
I

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:48:46 Basic End Date:

Employee Codes Employee Names Operation No Hrs

-S _ ____________ _______________________

tvtJ &

cQ r2cwn&eJ-'--d rtC-4o4-- Dt"&

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.07.2025
Notification No: 100329186 Order No: 20203758 Description: ag4 grander not working

Functional P301-BUILT Description: BUILT-UP SECTION


Location:
Equipment No: Description:

Plant Section: p4a'4- 33" Person Vitthal Narayan Main Work CONRAC
Responsible: Ambure Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 ag4grandernotworking
\2Q . s- i.,
________ ____
ot.

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:46:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

-' ______ ___________ _____________________

efC S4}
I, ,*ç 1
tcX-%'Ct) IC kC.JO(Tfl %S%1s4t3

Maintenance Department User Department


Kirby Building Systems KSA

U MAINTENANCE ORDER JOB TICKET

Date: 31.07.2025
Notification No: 100329246 Order No: 20203754 Description: Plant-2 F9 AG7" Not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Voucef Othman Main Work Fabrication Table-I


r Responsible: Jotaim Centre:
Tech 10 '

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Tim( _____________________

0010 Plant-2 F9 AG7" Not working


TI___ __________________________ _____
p. - av
______
2r
______
,(.LLJtk._£k4'flO.9t
_______________

_____________________ ___ ________


-&'- Cal4c
____ ____________________________ _____ _______ ______

LW-

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:36:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______

__________

;f" çrr4rtiv c--- rf0 vof t3tt4t1 Aa2j4

eoick- o - O&-c

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31 .07.2025
Notification No: 100329242 Order No: 20203755 Description: primo auto welding
machine sensor not wo
Functional P301-BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:
4,
Plant Section: Q, Person Brijesh Kumar Main Work Electrical Maintenance
Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Timt ______________________

.010 primo auto welding machine sensor not wo


-

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:38:23 Basic End Date:

Employee Codes Employee Names Operation No His

¼4tSkctflu ___________
-3c Al'-9--

Ph'x PccrJv-1 t'Ac'tctv ?4Jo1 4L,.\eA St


_Ava &&c- a P-'j-t-c4

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.07.2025
Notification No: 100329236 Order No: 20203756 Description: portable oven need
industrial pluge
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section:
p f cwJ Person
Responsible:
Brijesh Kumar Main Work Fabrication Table- i
Chauhan Centre:
Tech ID:

0010

Release Date: 31.07.2025 Basic Start Date: 31.07.2025

Release Time: 17:39:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fXcn+d4e coMe- agKo4 Qlfr1 4+t4


2 )%Sq
O\C--)

5>frt4

Maintenance Department User Department


Kirby Building Systems KSA
a'
It
MAINTENANCE ORDER JOB TICKET

Date: 02.08.2025
Notification No: 100329378 Order No: 20203805 Description: 5Mt crane paint line
plant3 not working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID: .p6- ,')n.fr L4Lt.
Opr Description Status Start Compl Remarks
No ____________________________________ _______
Date/Time Date/Time _____________________

0010 5Mt crane paint line plant3 not working coin)tt fl'.- j. 3 IQ.&.rn4-,c c cc
_________________________
sfr4-
____ _____ ______ _____

C-kA-Ltf
___ ____________________ ____ _____ ____ elci
f?D3j- t'%-P At(r
%ft3.cv42;Qc
(orrt - It c r 3c SvE4-cL
4-t. el-?-fl4( 's
tic.
Release Date: 02.08.2025 Basic Start Date: 02.08.2025

Release Time: 12:06:37 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ s41'ff-LcJ Uj_*ISTDfr3r ZOAý)v4-

J5flc1a....
-*ç

;> cgZC tfe+ft (ckVe\c'v) OIc_D4

2-) 4-t pe4\ok1 c'j-d,

ov'I'c1t- tLc1tt -1°

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 02.08.2025
Notification No: 100329400 Order No: 20203834 Description: prom flange welding area
grainding m g c
Functional P301-BUILT- Description: WELDING MACHINES
Location: FWELD
Equipment No: Description:

Plant Section: C4-QJ\2Y) Person Vishnu Venugopalan Main Work Electrical Maintenance
Responsible: Nair Centre:
Tech ID:

Remarks

0010

Release Date: 02.08.2025 Basic Start Date: 02.08.2025

Release Time: 16:45:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
\ttShnu _______________________

D __________________________ ______________

c&tribj
Cs-k' tkt_ vC-c Co\-\ v% td-t c b tn- Ø%(

Maintenance Department User Department


/7 "17 N
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.06.2025
Notification No: 100329306 Order No: 20203828 Description: Plant-2 AG7 not wo

Functional P301-UTLTY- Description: ELECTRICAL POWER SYSTEM


Location: ELECT
Equipment No: Description:

Plant Section: Person Brijesh Kumar Main Work Electrical Maintenance


\ r
Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date!Timc _____________________

0010 Plant-2AG7notworking cG c ci4_ c%e..oic


Cw4-c
____________

+S

Release Date: 02.08.2025 Basic Start Date: 01.08.2025

Release Time: 15:37:20 Basic End Date:

Employee Codes Employee Names Operation No Hrs

éI2q _____________________ ___________

. q-" tcUok_ t'r&o4c. 4 to


et_.

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 02.08.2025
Notification No: 100329412 Order No: 20203836 Description: ptant-2 Ag4" not wo

Functional P301-POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant section: 2. Person Vishnu Venugopalan Main Work Fabrication Table- i


Fc-tCflWMResponsible: Nair Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 plant-2 Ag4" not work


___ _____________________ ____
i*r20
_____
\br- 2j3Q
_____
-&ýxia\.t Gwta.JE..

cc4Aaç ccJAc

±0 La-& 9n'Q_

Release Date: 02.08.2025 Basic Start Date: 02.08.2025

Release Time: 16:46:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs


Vt

) ____________________________________________

* A- L,' at.- It tsi,)t ttt&

Maintenance Department I User Department


h Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET


44
4

Date: 02.08.2025
"MulflraDI*flMhu 20203835 Description: pencil grinder not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:
?
Plant Section: 4o....nV.4r- L'-.t_ Person '*'ishnu Veegopa3an Main Work Electrical Maintenance
Responsible: NSr Centre:
Tech ID: 4or.11. kwta'v.

Opr Description Status Start Compl Remarks


No _______________________________________ _______ Date/Time DateiTim ______________________

0010 pencil grinder not working


cc -zc -PQ.4A¬
______________ ________
'9-&.

_____ __________________________________ _______ ________ ________


Q.-t ccflflv\tkj-%tcl

Release Date: 02.08.2025 Basic Start Date: 02.08.2025

Release Time: 16:46:18 Basic End Date:

Employee Codes Employee Names Operation No Hrs


°

5G5IS ____________ ___________


2o toio4&

cc'Jo\c t(t&&tc q

Maintenance Department User Departme


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 06.06.2025
Notification No: 100329750 Order No: 20204008 Description: dama cnc machine
lubrication oil level I
Functional P301-DTAIL-DTLN4 Description: DETAIL LINES CNC DRILL
-

Location:
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 06.08.2025 Basic Start Date: 06.08.2025

Release Time: 09:02:23 Basic End Date: Q


Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 07.08.2025
Notification No: 100329745 Order No: 20204075 Description: new scm punching
machine conveyor clarnc
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
DatelTime DateiTims ____________________

0010 new scm punching machine conveyor clarnc


)__ _______________ ___ _______ _________

Snpuchej 4 _____ __________

iS ___ ________ __________

______ kn cthg _______ _________ ________ ______________________

£g 9pJ c//&cJ _______________

chio Thropeil
Release Date: 07.08.2025
r "
. sic Start Date: 06.08.2025

Release Time: 17:21:42 Basic End Date: C 6r

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 07.08.2025
Notification No: 100329828 Order No: 20204079 Description: dama cnc rn/c not
working
Functional P301- DTAIL-DTLN4 Description: DETAIL LINES CNC DRILL
-

Location:
Equipment No: 12000298 Description: CNC DRILLING MACHINE

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 07.08.2025 Basic Start Date: 07.08.2025

Release Time: 17:30:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________________ ___________
1)73

tfri
_____________________ ____________

Maintenance Department I User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date : 07.08.2025
Notification No: 100329710 Order No: 20204070 Description: Conrac 1 Operator side
welding wire stuc
Functional P301-BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 07.08.2025 Basic Start Date: 06.08.2025

Release Time: 17:17:07 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Cac4Feq C UI
_____
#Zwtj. Ut

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329690 Order No: 20204071 Description: graco spray paint
machine problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010 graco spray paint machine problem


___ __________________________ _____

O5tt.c.2.

,V)O(SPd fr)CJ hrrjprl 1v _____ ______ _____ ______________

____ W)cun1fflQflCo Q/ jca'jnl-,i,hy

__
4& pJ r/hj c/ _________________

g O(anecsdc/p1'od I - .1. ________

k4 ci 17SeiflbW4 W
Release Date: 07.08.20 Basic Sfart Date: 05.08.2025

Release Time: 17:17:48 Basic End Date: 06 -c'2o


Employee Codes Employee Names Operation No Hrs
___________

8MJ JOhV*J ________________


c5.9fl
_______
Noetro1czila
[I )
__________ ___________

Maintenance Department I User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 07.08.2025
Notification No: 100329669 Order No: 20204072 Description: old scm holding clamp
not working plz ch
Functional P301-DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 07.08.2025 Basic Start Date: 05.08.2025

Release Time: 17:18:35 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________________
& 'Hi'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329767 Order No: 20204076 Description: Bldg Al hang cm bearing
broken
Functional P301 -MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000661 Description: UNDERSLUNG CRANE 2TON A201
-

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description

0010

Release Date: 07.08.2025 Basic Start Date: 06.08.2025

Release Time: 17:22:25 Basic End Date:

Employee Codes Employee Names Operation No Hrs

211)
S__________ ;ohp _______________ _________________

Maintenance Department User Department


" , v
t
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 07.08.2025
Notification No: 100329823 Order No: 20204078 Description: darna cnc rn/c not
working
Functional P301-DTAIL-DTLN4 Description: DETAIL LINES CNC DRILL
-

Location:
Equipment No: 12000298 Description: CNC DRILLING MACHINE

Plant Section: Person Sibin John Main Work Electrical Maintenance


Responsible:. Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timf ____________________

0010 dama cnc rn/c not working


__ _____________________ ____

t6'ovzf O6cc ____________

Chothsl q &QH Domoje


nrr,ed *t MI Cj&)actA
___
c$e Aell rl !HSJ ____ _________ ___________

t9ý grAnrel Wehuhd -r


_____ _____ ____________

Release Date: 07.08.2025 Basic Start Date: 06.08.2025

Release Time: 17:29:20 Basic End Date: b b2V 2.5


Employee Codes Employee Names Operation No Hrs

2j Al))
_________ '0M,a'9 _______________ tin
"1nkk't'fu//. 13

Maintenance Department I User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329835 Order No: 20204060 Description: New scm push conveyor
bolt broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DateiTimc ____________________

0010 New scm push conveyor bolt broken


__ _____________________ ____

Co82¬! o7au
¶P w than ________ _______________

___ Lcsd c,/ 4J'ç1AtcLaJ


____
4tw? cPjJ _____ ______ _____ ______________

___
cf c'ha&ot _________ _______________

Release Date: 07.08.2025 Basic Start Date: 07.08.2025

Release Time: 17:31:40 Basic End Date: o7 o -tO-5


Employee Codes Employee Names Operation No Hrs

'TV
________ _____________ ____________

I_tIn
1

Maintenance Department User Department


Kirby Building Systems KSA
"
I
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329845 Order No: 10138555 Description: 6 mtr krass press brake
cooler bearing c
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 07.08.2025 Basic Start Date: 07.08.2025

Release Time: 17:32:19 Basic End Date: 07 £t


Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


irk Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329863 Order No: 20204081 Description: wood cutter machine bolt
fixing
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

I'Th1UU1'11d4-
I I ni iWf$i ,

IkzrSh -

Release Date: 07.08.2025 Basic Start Date: 07.08.2025

Release Time: 17:33:06 Basic End Date: °B 2o

Employee Codes Employee Names Operation No Hrs

_________
g,81_clQwtJ _____________ ______________

S___________________ ________________________________

Maintenance Department User Department


irb & Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329901 Order No: 20204083 Description: old scm oil leak pls chk

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCN& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time DateiTimc ____________________

0010 old scm oil leak pls chk


____________________ ____

0Ion&O7z ___________

_(¬4 _____ ______ ______ _______________

____
/0.4k

fn,n Oqf,Mo t1( Ri/ ____ _____ _____ ____________

r-Jiyh Id q OkSJth ef ___ ________ _________

g C14&dok ____ ____ ____ ___________

1
Release Date: 07.08.2025 Basic Start Date: 07.08.2025

Release Time: 17:34:41 Basic End Date:


O7.o. W26
Employee Codes Employee Names Operation No Hrs

__________ ________________ ______________

8 &t
() ____________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.08.2025
Notification No: 100329900 Order No: 20204082 Description: old scm clam bolt
removed pis chk
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Time____________________

0010 old scm clam bolt removed pis chk


___ _________________________ _____

¬fl"O5 Q7
___ nil of ks ____ _____ ____ ___________

cf 4)vhJ _________________

rnoAnrlenon,. c[
ffo(tj_b2a.& ___ ____ _____________

Release Date: 07.08.2025 Basic Start Date: 07.08.2025


Release Time: 17:34:12 Basic End Date: D7'o82o -

No

Maintenance Department j User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.06.2025
Notification No: 100325956 Order No: 20202399 Description: T501 oil pan changed

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description . Status Start Compi Remarks


No .

. _______ Date/Time Date/Tim( _____________________

0010 T501panchaned _______ ________ ________ ____________________

__

g''J __. ______

CM 'f 1-{ /2&z


__
i-If, t?'%4
/ 7
tL tc5'i,'JE ft/L (%i
1t . _____ _________________

,"1'
ft
I-)
cse- t 1'I (C i
Release Date: 25.06.2025 Basic Start DateP 24.06.2025
Release Time: 17:22:10 Basic End Date:

/o: ho '0

A P

D/ .,j/ / t' ?u4PCkc

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 13.07.2025
Notification No: 100327526 Order No: 20202964 Description: t301 fork lift front tyre
puncher
Functional P301-MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 130006B7 Description: FORKLIFT TOYOTA 3 TON T301-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 t301 fork lift front tyre puncher


________________________ ____ _____ _____

C44WIj9

Release Date: 13.07.2025 Basic Start Date: 13.07.2025

Release Time: 11:14:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs


'.30-nra

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date; 13.07.2025
Notification No: 100327532 Order No: 20202962 Description: Grit blasting machine
breakdown
Functional P301-FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 13.07.2025 Basic Stan Date:

Release Time: 11:12:02 Basic End Date: /3 O72oz


Employee Codes Employee Names Operation No Hrs

12#9Yt/

Maintenance Department I User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2025
Notification No: 100327531 Order No: 20202963 Description: spt blasting machine
breakdown
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______
Date/Time Date/Time ____________________

0010 spt blasting machine breakdown

__ AF] A/gA,nt "Iwo 9ctt4) ____ _________

___ tL 4nnne C/Z&2cL4?/ ________ ____ __________

1c'Api (r.myong S)dt fsxs


wpaily g rfhk ________ ______________

gs
Release Date: 13.07.2025 Basic Start Date: 13.07.2025

Release Time: 11:12:29 Basic End Date:

Employee Codes I Employee Names Operation No I Hrs


5os H S3QeA, 704i.

iirt

Maintenance Department I User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date: 13.07.2025
Notification No: 100327536 Order No: 20202961 Description: sanhi 4mtr shear full
down please check
Functional P301- DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 13.07.2025 Basic Start Date: 13.07.2025

Release Time: 11:11:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs


__________

C?r,&) Eoe 2-1-10


(%IAfl7Dh'lJ,/ 9 2- ftI)

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.07.2025
Notification No: 100327214 Order No: 20202996 Description: t301 forklift tyre puncher

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301 -

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DatelTimc ____________________

0010 t301 forklift tyre puncher


cflpbtag

Release Date: 14.07.2025 Basic Start Date: 09.07.2025

Release Time: 14:05:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs


I 3O fl)
3901 PJ'PMMP

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.07.2025
Notification No: 100327379 Order No: 20202982 Description: T302 forklift tyre puntura

Functional P301 -MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

0010

Release Date: 14.07.2025 Basic Start Date: 10.07.2025

Release Time: 08:40:51 Basic End Date:

Employee Codes Employee Names Operation No Hrs

a,zss,91Po.I i9 th9MW
y'cWs.s -saul'?

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.07.2025
Notification No: 100327566 Order No: 20202980 Description: scm die change error pls
check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 14.07.2025 Basic Start Date: 13.07.2025

Release Time: 08:34:48 Basic End Date: 13 oj 2øç


Employee Codes Employee Names Operation No Hrs

________ Q '7w4 ____________ i Ito

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 14.07.2025
Notification No: 100327395 Order No: 20202981 Description: SCM push cylinder not
wokring
Functional P301-DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DateiTimf ____________________

0010 SCM push cylinder not wokring

c zuch,Ai ('qhr ___________ __________

___ CAnkd h1 cfMt.


,infl h7/,J Jv ____ _____ _____ ____________

___
frbtfiohJtLnca__ef_thka"W ____ _____ _____ ____________

AJCQ 'I' mrm6kc1 4/ CAakdvL hQT!


Release Date: 14.07.2025 Basic Start Date: 11.07.2025

Release Time: 08:38:17 Basic End Date:

Hrs
2wrj

Maintenance Department I User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 14.07.2025
Notification No: 100327589 Order No: 20202979 Description: 20 feet shear jack up &
down not work.
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: - Person Mohid MulIa Main Work Mechanical Maintenance


Responsible: Centre:
-

Tech ID: KJSH-0601

Release Date: 14.07.2025 Basic Start Date: 14.07.2025

Release Time: 08:34:06 Basic End Date:


' o7 2oz-S
Employee Codes Employee Names Operation No Hrs
___________
s-/ping_fl4cILC ________________ _________________

[1 -I

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 17.07.2025
Notification No: 100327294 Order No: 20203157 Description: EP1 001 Tyre puncture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time. ____________________

0010 EP1001 Tyre puncture

c 9

Release Date: 17.07.2025 Basic Start Date: 09.07.2025

Release Time: 16:51:07 Basic End Date:

Employee Codes Employee Names Operation No Hrs


ttt24 ____________ _______________________

) _ ______________ ___________________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327286 Order No: 10137728 Description: 6 mtr krass press brake
stopper loose
Functional P301-SHEET Description: SHEET TRIMS AND ACCESSORIES
Location: ACCSR
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Timc _____________________

0010 6 mtr krass press brake stopper loose


-___ ___________________________ _____ vt25 flo7tj _______________

cft, i%pti
__
So fJ / dnkeloc ____ ____________

Release Date: 17.07.2025 Basic Start Date: 09.07.2025

Release Time: 16:51:47 Basic End Date: . of Va-S

Employee Codes Employee Names Operation No Hrs

__________ gA/il. (5) _________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327333 Order No: 20203156 Description: conrac line 1 hydrulic oil
leacking plz
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ DateiTime Date/TimE ___________________

0010 conrac line 1 hydrulic oil leacking plz


___ _________________________ _____
!o.i7 (Vv7.t ______________

/1'LTh//PQb L1¬d
/*il c/ &L&a1 ntd ____ __________ ____________

___ bbi dztth,d t ____ _________ ___________

Release Date: 17.07.2025 Basic Start Date: 10.C7.2025

Release Time: 16:50:35 Basic End Date: /0' 07'- 2o zj


Employee Codes Employee Names Operation No Hrs

_______ 2.., t71,thAJ _______________________

C)

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 17.07.2025
Notification No: 100327323 Order No: 20203155 Description: OLD SCM sensor angle
broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 17 07.2025 Basic Start Date: 10.07.2025

Release Time: 16:49:48 Basic End Date:

Employee Codes Employee Names Operation No Hrs

A11k'J us/n/Icy

Maintenance Department User Department


7 Kirby Building Systems KSA

a MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327322 Order No: 20203154 Description: PHI tack stn conveyor
chain loose & not
Functional P301- BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 PHI tack stn conveyor chain loose & not


Th___ /Ut72s- lv O7.2

a901t
___________________________ _____ _______________

chaih _________________

£ptir'I £' _______ _____________

Release Date: 17.07.2025 Basic Start Date: 10.07.2025

Release Time: 16:48:20 Basic End Date: Iv'

Maintenance Department j User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327834 Order No: 20203145 Description: T 302 forklift lifter chain
pin broken
Functional P301-MTHDL- Description: FOF1KLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 T 302 forklift lifter chain pin broken "zi-1 CH kM


]

\
N _______________________ ____ _____ _____ _____________

Date: 17.07.2025 Basic Start Date: 16.07.2025

16:32:08 Basic End Date:

's Employee Names Operation No Hrs


_____________ ___________

2- )-flLS

User Department
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327334 Order No: 20203153 Description: EP-701 battery for forklift
change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ DateiTime Date/Timc ____________________

0010 EP-701 battery for forklift change BPrT'ft-. -7\A!


c)/,4,fjJ)
Ii ____ __________________________________ _______ ________ _______ -

Release Date: 17.07.2025 Basic Start Date: 10.07.2025

Release Time: 16:47:19 Basic End Date:

Employee Codes Employee Names Operation No Hrs

flsyj9 A9I9bM;Etp

I.,

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327377 Order No: 20203151 Description: EP1001 Tyre puncture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 EP1 001 lyre puncture


cJJPèJt.pj.

Release Date: 17.07.2025 Basic Start Date: 10.07.2025

Release Time: 16:39:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_______ _______________________
)-36 W)Zs

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327344 Order No: 20203152 Description: Paintline wood cuff
machn brakdown
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ DateiTime DateiTime ___________________

0010 Paintline wood cuff machn brakdown


___ __________________________ _____ tv-eu' /o'07 ______________

* "°',t ___ ___________

ôw'n g/r c/ LY7aLJ ____ _____ _____ ____________

___
£/I)roccQli/ ç4j ___ ____ ____ ___________

Release Date: 17.07.2025 Basic Start Date: 10.C7.2025

Release Time: 16:40:28 Basic End Date: v 7' to .-5


Employee Codes Employee Names Operation No Hrs

________ ,bha ___________ _____________

__________ ________________
0 / I/ /1t

Maintenance Department User Department


Kirby Building Systems KSA

I MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327642 Order No: 20203149 Description: new scm punching m
conveyor chaine b
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ DateiTime DateiTimt ____________________

0010 new scm punching m conveyor chaine b


___ ____________________________ _____
/JJ-072a 1tt6725

___
cM, A7in ________ ____ ___________

___ th cj cYzw¬e Is ____________ ___________

Release Date: 17.07.2025 Basic Start Date: 14.C7.2025

Release Time: 16:36:46 Basic End Date: 14 7' 2ozs


Employee Codes Employee Names Operation No Hrs

______ I2-qn F/In


__________

-/oh41c4'-L,/t _______________
/) )

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.07.2025
Notification No: 100327705 Order No: 20203148 Description: OLD SCM conveyor not
working
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 OLD SCM conveyor not working


-'__ _____________________ ____ _____ _____ ____________

&Xkj,n rha,o tO ___ ____ _____________

1' oh9 fr ___ ____ ______________

Release Date: 17.07.2025 Basic Start Date: 14.07.2025

Release Time: 16:36:00 Basic End Date: I',.n. 2p.&5


Employee Codes Employee Names Operation No Hrs

(9 /
p2ain ____________
/ tJ'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323475 Order No 20201268 Description: manual blasting machine
problem
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Date/Time _____________________

0010 manual blasting machine problem


__________________________ _____
cqic D.3Ikh.

- ?cm+ \iak nJ ____ _____ ____ ___________

r'-'-jt ,tm&1ctf1er
__
p

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 17:56:06 Basic End Date: 2- oc

Employee Codes Employee Names Operation No Firs

" 7ZPtcr4\ _________________ ___________________

Maintenance Department User Department


Sycrs
h Kirby Buildhig KSA II

MAINTENANCE ORDER JOB TICKET

Date : 26.05.2025
Notification No: 100323600 Order No: 20201361 Description: ag7 grander not working

Functional P301-BUILT-OFLIN Description: BUILT-UP OFF LINE


Location:
Equipment No: Description:

Plant Section: -

f ccf1
279 Person Vishnu Venugopalan Main Work CONRAC
Responsible: Nair Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

I,
0010 ag7 grander not working
fr4-r ,¬ g Js-v
___ _____________________ ____
!c °°prç 2- °po (o-toIt.

_______________________________ I4t 49t


____________________________
ffc4 r

Release Date: 26.05.2025 Basic Start Date: 26.05.2025

Release Time: 18:00:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________ Vsbno ___________ 30 rn'M
2

* t'o"u -çeJ4) j ---


--*---

ppt- vtt'-tl to (0's!.- )&AJ

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 26.05.2025
Notification No: 100323625 Order No: 20201358 Description: weld line grinder
repiairng
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT 4;yt
Equipment No: Description: £'rrjny iflO
Plant Section: j t " Person Vitthal Narayan Main Work Electrical Maintenance
T Responsible: Ambure Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time
________
Date/TimE ______________________

0010 weld line grinder repiairng


It.i_'av çç u cjdoIcc.a*t q
__ _________________
'-'1ç1c acfr _________

Release Date: 26.05.2025 Basic Start Date: 26.05.2025


Release Time: 17:54:53 Basic End Date:

Employee Codes Employee Names Operation No Firs


GilL6o ____________ ___________

3° "4-f
3

-14- M'f"' 1hci'-, to cjLtA. caAok cp kec'ibk .vpc


to lot- %)as'i-tr

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 26.05.2025
Notification No: 100323605 Order No: 20201355 Description: ag4 grinder not working

Functional P301-POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT I.'

Equipment No: Description: L3- 4flrd 4


Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance
Responsible: Ambure Centre:
Tech ID:

Release Date: 26.05.2025 Basic Start Date: 26.05.2025


Release Time: 16:15:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs


6o26o _______________________

F;

iýft to Cc

4- o:r-cx1

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.05.2025
Notification No: 100323614 Order No: 20201360 Description: ag4 grander cable
problem
Functional P301-BUILT-OFLlN Description: BUILT-UP OFF LINE
Location:
Equipment No:
t I,
Description: Pc:n4- cQ4
Plant Section: 4t- D Person Vitthal Narayan Main Work CONRAC
Responsible: Ambure Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 ag4grandercable problem


3
____________

244 ___

___ _______________________ ____

Ct-!)
______________

N '-t

Release Date: 26.05.2025 Basic Start Date: 26.05.2025

Release Time: 17:59:32 Basic End Date:

Employee Codes Employee Names Operation No His


________
t\j1ftAQJJ ____________

co #1LAU&

-x- 4%C Je_ cA&jc 4c

(2 VHS ueAttar

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 26.05.2025
Notification No: 100323580 Order No: 20201294 Description: airless spray paint
machine breakdown
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Timi ______________________

0010 airless spray paint machine breakdown

___ 0 QmLe ____ _________ ___________

Release Date: 26.05.2025 Basic Start Date: 26.C5.2025


Release Time: 09:46:43 Basic End Date: jt - t 2.c

Employee Codes Employee Names Operation No Hrs

____________

I Li
__________________ __________

tLr

IwJ

Department
I User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.05.2025
Notification No: 100323587 Order No: 20201296 Description: old scm blade bolt loose
plz check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 26.05.2025 Basic Start Date: 26.05.2025

Release Time: 10:38:07 Basic End Date:

Employee Codes Employee Names Operation No - Hrs

_____________
&e,,J. t6) s
I' P2'
Li ) _______________ ______________

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.05.2025
Notification No: 100323691 Order No: 20201389 Description: sanli 4mtr shear jack
holder oil leaking
Functional P301-DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 27.05.2025 Basic Start Date: 405.2025

Release Time: 12:39:32 Basic End Date: 2t cc. ;oý


Employee Codes Employee Names Operation No Hrs

__________ 'iZ6prcg _______________ ________________

________

fAt _____________
3n A,ts.jij,1j

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.05.2025
Notification No: 100323671 Order No: 20201376 Description: sali 4mtr shear hydraulic
oil leacking p
Functional P301- DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work CONRAC


Responsible: Shaikh Centre:
Tech ID:

Release Date: 27.05.2025 - Basic Stan Date: 27.05.2025

Release Time: 08:23:49 Basic End Date: 37 -tý 7 u 2

Maintenance Department I User Department


Kirby Building Systems KSA
Krb9J MAINTENANCE ORDER JOB TICKET

Date : 28.05.2025
Notification No: 100323779 Order No: 20201449 Description: side loder desel tank and
support damag
Functional P301-MTHDL- Description: FORKLIFTS
/
citsi
Location: FRLFT S cit (jD
Equipment No: 13000658 Description: FORKLlFP¬PONEPl
o
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______

Date/Time Date!rirnc ______________________

C '9010 side loder desel tank and support damag


______

7! ô-o
___
r40( ___ ____ ____

(;12v( QftI; I
___
oa 7 ____ _________ ___________

Am _____________

-J

Release Date: 28.05.2025 Basic Start Date: 28.05.2025

Release Time: 18:43:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______-eeokri _
___________________

fo Jc)o ci
Maintenance Department User Department çi'4(
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100323901 Order No 20201526 Description: side loader puncture &
other probims
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr I Description Status Start Compi Remarks


No _______________________________________ _______

Date/Time Date/Timc. ______________________

0010 side loader puncture & other probims


___ ___________________ ____

o ° TYIZ-eL ct&A
eq/ -___
7Dbe
/
Ax ____ _____ _____ _____________

Release Date: 31 .05.2025 Basic Start Date: 29.05.2025

Release Time: 08:58:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


"" Kirby Building Systems KSA
h
MAINTENANCE ORDER JOB TICKET

Date : 31.05.2025
Notification No: 100324019 Order No: 20201545 Description: dog clamp need to
replace
Functional P301-MTHDL- Description: GANTRY CRANES
Location: GTCRN
Equipment No: 13000676 Description: GANTRY CRANE 2TON P2203
-

Plant Section: Person Jagjeet Singh Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Remarks

Release Date: 31 .05.2025 Basic Start Date: 31.05.2025

Release Time: 14:53:52 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100324008 Order No: 10136103 Description: Sanli 6mtr shear
mavhine blade roted
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

vat qazaat
Release Date: 31 .05.2025 31 .05 2025

Release Time: 08:46:23 Basic End Date: 3/'t 2q


Employee Codes Employee Names Operation No Hrs

3rni1 _____

5)
¬7

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 31.05.2025
Notification No: 100324010 Order No: 10136104 Description: KR/KW sheet line
machine PM work
Functional P301-SHEET Description: SHEETING LINES
Location: RLFRM
Equipment No: 11000130 Description: SHEETING LINE FOR KR & KW PROFILES

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010 KR/KW sheet line machine PM work


"'1___ ________________________ _____

(S?'052tSSJ.QS4
__
ohuL_4__,t9-Q_f/c _______ ____________

Af"1' ¶1 /i,nca1tl nt? _____ _____ ____________

_
4d..%;di - _________

___

-m ____ _____ _____ ____________

' C/earu4
Release Date: 31.05.2025 Basic St'Date:T

Release Time: 08:55:11 Basic End Date: 3?- o5' 2o5


Employee Codes Employee Names Operation No Hrs
_________

ccrC)rf lv' _______________

7,7(dh $.

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100324011 Order No: 10136105 Description: DENAZ C & Z purline
machine entry roller
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: 11000131 Description: CZ PURLIN LINE

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 31.05.2025 Basic Start Date: 31.05.2025

Release Time: 08:57:36 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100323965 Order No: 20201529 Description: Plant-C punchin M/C
need Repair
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Electrical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 31 .05.2025 Basic Start Date: 30.05.2025

Release Time: 09:00:46 Basic End Date:

Maintenance Department I User Department


ib Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100324004 Order No: 20201527 Description: gutter machine heavy
burr coming
Functional P301-SHEET Description: SHEET SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ___________________

0010 gutter machine heavy burr coming


___ _______________________ ____ 3(toj)5 3f.v52 _____________

___ UM4/ c 4'ur/ (ha ____ _____ _____ _____________

___ &lctejt otp, cf


S

Release Date: 31.05.2025 Basic Start Date: 31.05.2025

Release Time: 08:59:03 Basic End Date:


3,
I Employee Codes Employee Names Operation No Hrs

________________________
I &n
NVWfD "V/I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31.05.2025
Notification No: 100324003 Order No: 20201528 Description: Purlin M/C not working
properly
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description;

Plant Section: Person Tawfeeq Shakir Main Work Electrical Maintenance


Responsible: Shaikh Centre:
Tech ID:

'I

Release Date: 31.05.2025 Basic Start Date: 31.05.2025

Release Time: 08:59:54 Basic End Date:


3,, o5 9oz-s

Maintenance Department User Department


ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 01.06.2025
Notification No: 100324102 Order No: 20201585 Description: old scm punching
machine rihgtangle pr p
Functional P301 -DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DateiTimc. ___________________

0010 old scm punching machine rihgtangle pr p


l oC 25
K! Oso.j
____ ________________________________ ______

__________________

___ LkQdtJ C,) sq/eJ c& _____ ______ _____ ______________

____
rvThnl-m c/ _____ ______ ______ ______________-

41/ C, do ___ ____ _____________

___ ci
I
ýWfr2o
cI
(%t ____ _____ _________________

Release Date: 01.06.2025 Basic Start Date: 01 .06.2025

Release Time: 12:19:45 Basic End Date:

Krs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.06.2025
Notification No: 100324111 Order No: 20201566 Description: DEAD man handle not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

0010

Release Date: 01.06.2025 Basic Start Date: 01.062025

Release Time: 12:20:29 Basic End Date:

p3

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :01.06.2025
Notification No: 100324094 Order No: 20201584 Description: 5L6002 Side loader tyre
puncture
Functional PSO1-MTHDL- Description: FORKLIFTS
Location: FRLFT '' Lo't-ý_ 2_-6
Equipment No: 13000658 Description: frURKHFfEP-?-PeN.-Epgi

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ Date/Time Date/Timc. ______________________

c sh¬oQ2-s4cIe4oaaeuxQ4ra
_____ ______

h-e4nr _______ ______________

___
__

il-i ________ -i p/Cr

Release Date: 01.06.2025 Basic Start Date: 01.36.2025

Release Time: 12:18:37 Basic End Date:

Employee Codes Employee Names Operation No I Hrs

________ 2- aec'kc ___________ _____________

t"
koLcf-

____________________________

Maintenance Department User Department


Vushtfl Kirby Building Systems KSA
t%Jt
MAINTENANCE ORDER JOB TICKET

Date : 01.06.2025
Notification No: 100322335 Order No: 20201589 Description: EP1001 Tube need to be
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

0010 EP1001 Tube need to be change

__
/-C Vuc ___ ______ ________

Release Date: 01.06.2025 Basic Start Date: 12.05.2025

Release Time: 13:35:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ 2QQ9kk _
_________ __________

Maintenance Department I User Department


Kirby Building Systems KSA
KwbVJ MAINTENANCE ORDER JOB TICKET

Date: 01 .06.2025
Notification No: 100323703 Order No: 20201590 Description: please change the tyre
for forklift 1002
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTim¬. ______________________

0010 please change the tyre for forklift 1002


C 3, 3 o LC s f2tý (, c' ci
TY-tc L&j71. ___ ___________

t
Ct fe;) ___
a

- 61 ____________________

Release Date: 01.06.2025 Basic Start Date: 27.05.2025

Release Time: 13:58:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Scctc'9 __________________________

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 02.06.2025
Notification No: 100324130 Order No: 20201608 Description: SL-6001 side loader rear
tyre punchr
Functional P301-MTHDL- Description: FORKLIFTS

Equipment No: 13000658 Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010
___
SL-6001 side loader rear tyre punchr
___________________ ____

c,'oo (o3o /zlbc

Release Date: 02.06.2025 Basic Start Date: 01 .C5.2025

Release Time: 08:27:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs


A
________ ______________

Maintenance Department User Department


Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date: 03.06.2025
Notification No: 100324241 Order No: 20201639 Description: EP7O1 forklift lyre
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
DateiTime DateiTimt ____________________

0010 EP7O1 forklift lyre puncture r


3o fo 'CO (

Release Date: 03.06.2025 Basic Start Date: 03.06.2025

Release Time: 14:19:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ _______________________
/3
_
c flR- _____________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.06.2025
Notification No: 100324558 Order No: 20201771 Description: 1501 back sdie
punchered
Functional P301-MThDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON 1501
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 10.06.2025 Basic Start Date: 10.06.2025


Release Time: 08:55:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

rn9i _________ ________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.06.2025
Notification No: 100324559 Order No: 10136333 Description: T-303 forklift back side
lyre Puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateiTimc ______________________

0010 T-303 forklift back side tyre Puncher


r /b a-
P
___ ____ ____ ____

__ ________
__

4P- 3--t- /e-Ce


Ckt /iýL4 __ __________

__ hô7 rv)(2+ AiR,r',r _________

V (3
Release Date: 10.06.2025 Basic Start Date: 10.06.2025

Release Time: 08:52:37 Basic End Date:

Employee Codes Employee Names Operation No Its

________________ _________
'o t461b{/'

Ck
2
;7 P/ t//' fuf Ck9

7 44Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.06.2025
Notification No: 100324675 Order No: 10136404 Description: EP1 002 front tyre
puncher need repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 11.06.2025 Basic Start Date: 11.06.2025

Release Time: 15:00:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

St1- Rn
\1c";cy/
_________

g)/9 _________________

-C

Maintenance Department User Department


ir Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11 .06.2025
Notification No: 100324669 Order No: 20201823 Description: ep5ol rediator water
leackage
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

" Release Date: 11.06.2025 Basic Start Date: 11.06.2025

Release Time: 14:59:33 Basic End Date:

p.

Maintenance Department I User Department


Kirby Building Systems KSA
1

MAINTENANCE ORDER JOB TICKET

Date: 11.06.2025
Notification No: 100324663 Order No: 20201822 Description: FORKLIFT 10 TONS EP-
FLAT TIRE
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time ____________________

0010 FORKLIFT 10 TONS EP- FLAT TIRE

C Pf%JL'1

Release Date: 11 .06.2025 Basic Start Date: 11.05.2025

Release Time: 14:59:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

t'stfl ___________________

jo -pc

Maintenance Department User Department


"h Kirby Building Systems KSA

'p MAINTENANCE ORDER JOB TICKET

Date: 11.06.2025
Notification No: 100324711 Order No: 20201828 Description: 6002 Side Loader lyre
Puncher PIs. Rip.
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

DateiTime Date/Timc ____________________

0010 6002 Side Loader Tyre Puncher PIs. Rip.

CHRSJU6

Release Date: 11 .06.2025 Basic Start Date: 11 .C6.2025

Release Time: 15:10:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

I crr _____________________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 11.06.2025
Notification No: 100324682 Order No: 20201825 Description: t301 forklift tyre puncher

Functional P301 -MTH DL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON -1301

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ Date/Time
_______

Date/Time. ____________________

0010 t301 forklift tyre puncher

cJJRNLfl1S

Release Date: 11.06.2025 Basic Start Date: 11.06.2025

Release Time: 15:01:26 Basic End Date:

Hrs

Maintenance Department User Department


1 Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11 .06.2025
Notification No: 100324728 Order No: 10136411 Description: EP-503 forklift 2 frount
tyre puncher p1
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr
No
ÔOi 0

Release Date: 11.06.2025 Basic Start Date: 11.06.2025

Release Time: 16:41:46 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 12.06.2025
Notification No: 100324811 Order No: 20201882 Description: SL-6002 Side loader
back side tyre punch
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ DateiTime Date/Time ___________________

SL-6002 Side loader back side tyre punch

_________________ ___ ______ ((PV/fr?CfA


Release Date: 12.06.2025 Basic Start Date: 12.06.2025

Release Time: 14:32:34 Basic End Date:

Hrs
, I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.06.2025
Notification No: 100324977 Order No: 10136510 Description: T-301 frount tyre puncher
repair
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description

0010

CCcJ&VIC-Q I
Release Date: 14.06.2025 Basic Start Date: 14.06.2025

Release Time: 11:34:04 Basic End Date:

'a;

Maintenance Department j User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.06.2025
Notification No: 100324979 Order No: 10136512 Description: EP-502 front tyre new
changework
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TO'pTA
STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 14.06.2025 Basic Start Date: 14.06.2025

Release Time: 11:39:27 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 14.06.2025
Notification No: 100324937 Order No: 20201952 Description: T501 torklit tyre punture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501
-

Plant Section: Person '81b1rrdthn-.... Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

[II,",]

Release Date: 14.06.2025 Basic Start Date: 14.06.2025

Release Time: 14:15:28 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.06.2025
Notification No: 100324895 Order No: 20201953 Description: SL-6001 side
loaderstating problem
Functional
Location:
P301- MTHDL-
FRLFT
Description: FORKLIFTS jc j 4 -

Equipment No: 13000660 Description: -FeRKttFtCTFRPtttEW!1tN ---e591

Plant Section: Person Zeeshan Abmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 14.06.2025 Basic Start Date: 13.06.2025

Release Time: 14:18:06 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.06.2025
Notification No: 100325091 Order No: 20202004 Description: EP1001 Tyre puncture

Functional P301 -MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 16.06.2025 Basic Start Date: 15.06.2025

Release Time: 13:45:42 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.06.2025
Notification No: 100325184 Order No: 20202081 Description: SL-6001 Side loader
front tyre puncher
Functional P301-MTHDL Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 18.06.2025 Basic Start Date: 16.06.2025

Release Time: 08:59:15 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
ib MAINTENANCE ORDER JOB TICKET

Date: 18.06.2025
Notification No: 100325289 Order No: 20202076 Description: paint line side loader
tube puncture
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON ¶SU2
- 6cc -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 18.06.2025 Basic Start Date: 17.06.2025

Release Time: 08:53:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.06.2025
Notification No: 100325383 Order No: 20202092 Description: EP-701 forklift tyre
replace work
Functional P301-MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000657 Description: FORKLIFT HYSTER 7 TON HY7O1
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 18.06.2025 Basic Start Date: 15.06.2025

Release Time: 14:03:19 Basic End Date:

:; 1-'

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.06.2025
Notification No: 100325401 Order No: 10136692 Description: 1-303 forklift back side
tyre Puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

0010

/ U

Release Date: 18.06.2025 Basic Start Date: 18.06.2025

Release Time: 15:18:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs

172.9! ______________

Lcfl P- 4 ___________________

___________________

______ __________
H __________

Wke-eQ eJt' &/

go4
".&A&d itti

c&ttlýe-ii.3r
'---r
Maintenance Department -
- User Department
" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 19.06.2025
Notification No: 100322816 Order No: 20202134 Description: pre forklift t-502 tyre
puncter please c
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 19.06.2025 Basic Start Date: 18.05.2025

Release Time: 11:10:44 Basic End Date:

'a

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 19.06.2025
Notification No: 100325402 Order No: 20202135 Description: Toyota T-303 back side
tyre puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 19.06.2025 Basic Start Date: 18.06.2025

Release Time: 11:23:06 Basic End Date:

I -

9*

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21.06.2025
Notification No: 100325430 Order No: 20202215 Description: ep7ol forklift diesel pipe
broken
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON -'EP.64 X' F- Co \
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
DateiTime Date/Timc ____________________

0010 ..epO1-forklift diesel pipe broken


Li __ ___ ____ ____
r,t?e C'---3
_ tPS' ____________

?4 d'%- JtE'it4t
P/Pp
D4
L-' _____ __________

-J

Release Date: 21.06.2025 Basic Start Date: 19.06.2025

Release Time: 13:48:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.06.2025
Notification No: 100325508 Order No: 20202214 Description: EP1001 hydraulic oil
leakage
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 21.06.2025 Basic Start Date: 19.06.2025

Releaáe Time: 12:07:21 Basic End Date:

I.ThyLqa.fl [*tTh'L4 -I Mi it3. pnn tm " :1-

_ p

Maintenance Department User Department


Kirby Bufji..: SA chy Euflding System
Kwb MAINTENANCdiiEi JOB flCKET £ ORDER ic

Date : 22.06.2025
Notification No: 100325767 Order No: 'r £0202269 Description: Forklift punenre T&02
fornt
Functiona! P301-MTHDL- Descriptiollu, flaFáRKL IFIS
Location: FRLFT
Equipment No: 13000672 Descriptioii'inE¬JRKLIFT TOYOTA STON T502 -

Plant Section: Person .Zaeshan Ahmed Main Work CONRAC


Responsibk: Centre:
Tech ID:

Cpr Description
______________________
j Status Start
Date/Time
Compl
Date/Time
Remarks
-___
-

ft punchre T502 fornt Doe .

____-- ____- ____

LILT
Pelease Date:
iLL 1±___
22.06.2025 ze 'Rasic Start Date:
I ITT
22.06.2025

1 me: 08:53:28 W elo End Date:

codes Employee Names Ca Hrs


______________

-1-3
's2-- -qUee'
-__

Maintenance Department l
thYser Department
Kirby Building Systems KSA
Ks b MAINTENANCE ORDER JOB TICKET

Date : 22.06.2025
Notification No: 100325714 Order No: 20202271 Description: Forklift punchre-T 502

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 22.06.2025 Basic Start Date: 21.06.2025

Release Time: 08:55:47 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S 9fl.- ¶ýt3 _______________ _________________

) _________________ _______________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
"
" ,
MAINTENANCE ORDER JOB TICKET

Date: 22.06.2025
Nbtification No: 100325640 Order No: 20202273 Description: H304 30 Starting issue

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Timt ______________________

0010 H304 30 Starting issue

____ _____ _____

Release Date: 22.06.2025 Basic Start Date: 21.06.2025

Release Time: 08:57:19 Basic End Date:

Employee Codes Employee Names Operation No Hrs

1- ctt =eamttt ___________ ____________

(p __ _________________________

Maintenance Department J User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 23.06.2025
Notification No: 100325844 Order No: 20202303 Description: Prim machine roller
bearing damage
Functional P301-BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 23.06.2025 Basic Start Date: 23.06.2025

Release Time: 08:36:39 Basic End Date: -

Employee Codes Employee Names Operation No Hrs

____________________ ___________
if/n

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 23.06.2025
Notification No: 100325823 Order No: 20202304 Description: primo flange jolt area
conveyor chaine b
Functional P301- BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 23.06.2025 Basic Start Date: 22.06.2025

Release Time: 08:37:16 Basic End Date: 22 %-2D25


Employee Codes Employee Names Operation No Hrs
btrj
!cLuJC&t ____________ /

Maintenance Department I User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 23.06.2025
Notification No: 100325852 Order No: 10136845 Description: Station B 1004L1
Gearbox installation
Functional P301- MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000654 Description: Overhead Crane 10 Ton- B1004

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 23.06.2025 Basic Start Date: 23.06.2025

Release Time: 08:43:41 Basic End Date: 23 t&2,5


Employee Codes Employee Names Operation No Hrs

_________
ý?R,AA 7os-,J _____________ ______________

-'__________ A/(JL,I9 (9 .i

Maintenance Department I User Department


Kirby Building Systems KSA
"
" a MAINTENANCE ORDER JOB TICKET

Date: 03.05.2025
Notification No: 100321510 Order No: 20200389 Description: EP1001 Tyre puncture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
DateiTime Date/Time ____________________

0010 EP1 001 Tyre puncture


7?1t 'l1IjS7Pte
)

_____ __________________________________ _______ ________ ________


1t
r4
Release Date: 03.05.2025 Basic Start Date: 03.05.2025

Release Time: 08:40:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______2 -Okci _________ __________

C
Maintenance Department User
"I #9 '__ f- c/ct? rjo,
Kirby Building Systems KSA
U MAINTENANCE ORDER JOB TICKET

Date: 03.05.2025
Notification No: 100321524 Order No: 10135108 Description: TOYOTA T-502 Break &
Tyre repair work
Functional P301-MTHDL- Description: FORKL S
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

[1

enn-a

Oy flattc,ý ot_2LVV C.ti


Release Date: 03.05.2025 N-c-P
asic Start Date:

Release Time: 09:44:00 Basic End Date:

Maintenance Department User Department


hi -..Li') - /
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.05.2025
Notification No: 100321457 Order No: 20200388 Description: EP1001 Tyre puncture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 03.05.2025 Basic Start Date: 01.05.2025

Release Time: 08:40:03 Basic End Date:

Maintenance Department User Department


raQC'cT
Kirby Building Systems KSA
UI MAINTENANCE ORDER JOB TICKET

Date : 04.05.2025
Notification No: 100321630 Order No: 20200456 Description: EP1 001 Tube need to be
change
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 04.05.2025 Basic Start Date: 04.05.2025

Release Time: 15:34:00 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs


c29/
Le

Maintenance Department User Department 4


VjnH'aooa
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 05.05.2025
Notification No: 100321685 Order No: 20200476 Description: forklift tyre need to
replace
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301
-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Release Date: 05.05.2025 Basic Start Date: 05.05.2025

Release Time: 08:25:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


a..IiJ 1çt)4
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 07.05.2025
Notification No: 100321900 Order No: 20200603 Description: EP1 001 Tube need to be
change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

0010

Release Date: 07.05.2025 Basic Start Date: 07.05.2025

Release Time: 14:10:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs


______ _

2aej9tu&t-, _________ __________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 07.05.2025
Notification No: 100321887 Order No: 20200602 Description: EP1001 FrontTyre need
to be change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 07.05.2025 Basic Start Date: 07.05.2025

Release Time: 14:10:03 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 10.05.2025
Notification No: 100322107 Order No: 10135360 Description: EP-502 Paint line forklift
break & Fuel
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 310N TSOQ

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

- *If- an
Release Date: 10.05.2025 Basic Start Date: 10.05.2025 4

Release Time: 08:42:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

5fl9; __________________________ ______________

crn-- __________________________

Maintenance Department User Department


60ct(,c
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.05.2025
Notification No: 100322325 Order No: 20200857 Description: forklift ep501 heating
problem
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 14.05.2025 Basic Start Date: 12.05.2025

Release Time: 13:39:32 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.05.2025
Notification No: 100322504 Order No: 20200656 Description: fabrication fork lift breake
leak
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT g-p Sot
Equipment No: 13000672 Description: FORKLIFT-F&rot*-59eN---+eee

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 14.05.2025 Basic Start Date: 14.05.2025

Release Time: 13:38:37 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 14.05.2025
Notification No: 100322397 Order No: 20200855 Description: side loader tyre tube
puncture
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT it
Equipment No: 13000672 Description: FORKLIFT TO'.'OTA 5W0N- T502- bj.

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ ______
Date/Time Daté/Timc ____________________

0010 side loader tyre tube puncture


4

/D 0d-

Release Date: 14.05.2025 Basic Start Date: 13.05.2025

Release Time: 13:37:26 Basic End Date:

0
I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.05.2025
Notification No: 100322557 Order No: 20200891 Description: old scm sensar problum

Functional P301-DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BARJPLATE PUNCH& SHEAR

Plant Section: Person Sunil Kumar Main Work CONRAC


Responsible: Krishnankutty Centre:
Tech ID:

Release Date: 15.05.2025 Basic Start Date: 15.05.2025

Release Time: 11:55:14 Basic End Date:

i,ntJJ- g0
-31--' eAc !A'Acrv Ockl-V- CjrC

(Vt4 o 1a

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 16.05.2025
Notification No: 100322665 Order No: 10135566 Description: EP- 1002 FORKLIFT PM
& OIL CHANGE
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010
7 LJf
//
J /Jr- tk'
Cl? YLCAAIt4
__ 6 4- U
___ ________

Release Date: 16.05.2025 Basic Start Date: 16.05.2025

Release Time: 09:36:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ _________
9
L &' _________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE DER JOB TICKET

Date: 16.05.2025
Notification No: 100322635 Order No: 20200927 Description: fab side loader rear tyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahrned Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 16.05.2025 Basic Start Date: 15.05.2025 4


Release Time: 08:05:34 Basic End Date:

Maintenance Department User Department


Kirby Building Systens KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.05.2025
Notification No: 100322752 Order No: 20200962 Description: EP1 001 lyre need to be
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 EP1 001 lyre need to be change


T /
0dy
____ _________________________ _____ ______ _____ C r.n.j- f
Release Date: 17.05.2025 Basic Start Date: 17.05.2025

Release Time: 12:06:46 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby BuHd!ng Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 21 .05.2025
Notification No: 100323062 Order No: 20201104 Description: forklift t301 redietor water
leackage
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON -1301

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ________________________________ ______ Date/Time Date/Time_________ ______

0010 forklift t301 redietor water leackage


__ ___________________
-.___ ____ ____ 4ur
!c:a
__
C& ___ ____ _____________

.!_cie ______ ___________

ki ,

__ _________________ ________
&eJ
Release Date: 21.05.2025 Basic Start Date:
ktotfl-
20.05.2025
c&ei4q
Release Time: 08:42:43 Basic End Date:

Emplcyee Codes Employee Names Opration No Hrs -

s8z1) _______________________ s kouJcL

Maintenance Department User Department


(MW to2Q2
it Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :21.05.2025
Notification No: 100323130 Order No: 20201103 Description: SL6002 Sde loader
grece problam
Functional P301-MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21.05.2025 Basic Start Date: 21 .05.2025


Release Time: 08:41:47 Basic End Date:

Employee Codes Employee Names Operation No Hrs

9JCdJ _
________ _________

Maintenance Department I User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 22.05.2025
Notification No: 100323289 Order No: 20201172 Description: T502 forklift tyre
puncture plz check
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr
No
0010

Release Date: 22.05.2025 Basic Start Date: 22.05.2025

Release Time: 16:22:38 Basic End Date:

r
a.

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 22.05.2025
Notification No: 100323228 Order No: 20201151 Description: plant2, mig welding
machine not working
Functional P301-BUILT- Description: WELDING MACHINES
Location: FWELD
Equipment No: Description:

Plant Section: Person Vishnu Venugopalan Main Work CONRAC

Tech ID:
f L Responsible: Nair Centre:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time DatelTims ______________________

3010 p1ant2, mig welding machine not working tcrn)k4 sjoc c 2-jctbr M q k9dcl Th-d1
___ Ioo- t0 JO.- 2o 1°-s c- Ho-to

____
___________________________
__________________________ _____ ______
____

______
Th-d, -*r S1?k
p;p.c_t4- o
tQcn
_

&t4 tv o

Release Date: 22.05.2025 Basic Start Date: 22.05.2025

Release Time: 09:31:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_______

v;s. _________
30 mM4-P-

"1___________ ____________________ __________________ ____________________

* M; dcA VY)tt
-d- S?k.c ?tr Po-y c Fe

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 22.05.2025
Notification No: 100323068 Order No: 20201159 Description: magnetic drill machine
new connection
Functional P301-BUILT-OFLIN Description: BUILT-UP OFF LINE
Location:
Equipment No: Description:

Plant Section: L 2- Person Sunil Kumar Main Work Electrical Maintenance


Responsible: Krishnankutty Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

010 magnetic drill machine new connection 1,4j4-


44c Kit-O '1 It tgitok
___

(Br \03o
____________________ ___

Otc-.

Release Date: 22.05.2025 Basic Start Date: 20.05.2025

Release Time: 09:55:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________
301-IlL jCUMA,Z ___________

30 MMIIU
)_______ ________________________ _____________

4- r- MM'- 1n mC Von'- cn-t.M $l- J


rho cot-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.05.2025
Notification No: 100323173 Order No: 10135773 Description: p1an12 paint line grinder
not working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section:
p Person Vishnu Venugopalan Main Work Electrical Maintenance

Tech ID:
f.j',4-
(.1%øJ_. Responsible: Nair Centre:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DateiTime Date/Timc. ____________________

-0010 p1ant2 paint line grinder not working


tcaviId 2-$ Iosc o-soçjg si''c R-c '

___ ___________________ ____ fl- frO \ior (pvaJ'c4br'v4

Release Date: 22.05.2025 Basic Start Date: 21.05.2025

Release Time: 09:33:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs


cs29'- Vicb'u. _________
ri-c i'ýi4r
-'I___________ ____________________ __________________ ____________________

-F

1
9o It
4
DeQ

Maintenance Department User Department


Kirby Building Systems KSA
[Li MAINTENANCE ORDER JOB TICKET

Date: 24.05.2025
Notification No: 100323261 Order No: 20201217 Description: T502 buttery changing
plz check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Zeeshan Ahmed Main Work CONRAC


Responsible: Centre:
Tech ID:

0010

Release Date: 24.05.2025 Basic Start Date: 22.05.2025

Release Time: 12:33:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

rfl9
Jrce _________ __________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.05.2025
Notification No: 100323259 Order No: 20201218 Description: please change the
batteryforforklift
Functional P301-MTHDL- Description: FORKLIFTS IOOL4?
Location: FRLFT -

Equipment No: Description: - /

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______ Date/Time DateiTimc
0010 please change the battery for forklift

__
/ 7.. ___ ___

_____ _______________________________ ______ _______ _______

ý:, oa/'t_ _S'cnj-,


C-
ct

yi'i<aJ/ _ itZi

Release Date: 24.05.2025 Basic Start Date: 22.05.2025

Release Time: 12:34:04 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs


I

Si Li Jt..,&,

Maintenance Department User Department


Kirb ,
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323465 Order No: 20201248 Description: EP 1502 Bearing
damage nd repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N 1502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 EP T502 Bearing damage nd repair


1""""

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 09:40:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.05.2025
Notification No: 100323465 Order No: 20201246 Description: EP T502 Bearing
damage nd repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502 -

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Tim. ______________________

0010 EP T502 Bearing damage nd repair


C

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 09:40:23 Basic End Date:

Employee Codes Employee Names Operation No Firs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.05.2025
Notification No: 100323499 Order No: 20201249 Description: ep5Ol forklift rear tyre
puncher
Functional PSO1-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______
Date/Time DatelTimc. ______________________

0010 ep501 forklift rear tyre puncher

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 09:41:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323504 Order No: 20201267 Description: EP1001 Tyre need to be
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

apr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/TimE. _____________________

0010 EP1 001 Tyre need to be change

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 17:54:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323496 Order No: 20201255 Description: magnetic drill machine
not working
Functional P301-BUILT-OFLIN Description: BUILT-UP OFF LINE
Location:
Equipment No: Description:

Plant Section: Person Sunil Kumar Main Work CONRAC


2-
Tech ID:
p Responsible: Krishnankutty Centre:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

)0010 magnetic drill machine not working &mpiJ- fr5-c -p v.'-' tJ-i
Il-'io I2cr ___________

___ ____________________ ____

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 14:12:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs


&wv) V-tgh1oA( _________________

* .4Git&¬Ae CCAAJ1J\tt1 -- pAoJotaw\ _co


r'-'
o'c- fl&.-t.--

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323522 Order No: 20201254 Description: mig welding swicth
problem
Functional P301-BUILT- Description: WELDING MACHINES
Location: FWELD
Equipment No: Description:

Plant Section: 'P L- 2- Person


Responsible:
Sunil Kumar Main Work CONRAC
Krishnankutty Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

r )0010 migweldingswicth problem


:cs-opk '--frc(c stoshc mc,'-c2- cWYlFC/t)
________________________
Lt.tr '-r- 3c __________

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 14:12:13 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323400 Order No: 20201259 Description: p1ant2 paint line grinder
cable damage
Functional P301 -POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT is
Equipment No: Description: p oz4 (g e# 4ni
2
Plant Section:
f L- Person Vitthal Narayan Main Work Electrical Maintenance
Responsible: Ambure Centre:
Tech ID:

Release Date: 25.05.2025 Basic Start Date: 24.05.2025


Release Time: 14:19:28 Basic End Date:

Employee Codes Employee Names Operation No Hrs


C02_c0 ____________ ___________

(_a_to\.e_
* t°""
v614
awcti cc
cc (jrriOfl) ItAtc4,

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323307 Order No: 20201261 Description: Plant-2 AG7 need
repair
Functional P301- UTLTY- Description: ELECTRICAL POWER SYSTEM
Location: ELECT 0 '-

Equipment No: Description:

Plant Section: pL 2- Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID:

0010

Release Date: 25.05.2025 Basic Start Date: 22.05.2025

Release Time: 14:23:41 Basic End Date:

4-c to-n.- Oc9-tst_

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323282 Order No: 10135844 Description: PLANT 62 COLMN
grinder not working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sunil Kumar Main Work Electrical Maintenance


Responsible: Krishnankutty Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/TimE ____________________

PLANT 62 COLMN grinder


notworking iseçc t,jia-#c- c4- 'o

Release Date: 25.05.2025 Basic Start Date: 22.05.2025

Release Time: 14:24:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

"I',___________ ____________________ __________________ ____________________

Maintenance Department I User Department


Kirby Building Systems KSA
Kirbt1'MAINTENANCE ORDER JOB TICKET

Date: 25.05.2025
Notification No: 100323475 Order No: 20201268 Description: manual blasting machine
problem
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 manual blasting machine problem

Release Date: 25.05.2025 Basic Start Date: 25.05.2025

Release Time: 17:56:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320563 Order No: 10134841 Description: purlin rn/c NO1 punch
need to change
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: 11000131 Description: CZ PURLIN LINE

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 21.04.2025

Release Time: 09:34:22 Basic End Date: 2 I. o4 2.o2-c


Employee Codes Employee Names Operation No Hrs

[1

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320783 Order No: 20200002 Description: sanly 4 mtr oil leakage

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 24.04.2025

Release Time: 08:36:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs

j,1&ro..

.'t ic- cry _________________________ ______________________

I -'-

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320600 Order No: 20200016 Description: old scm conveyor chaine
loose plz check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 09:36:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ccc- L, f4u3ftC% 2
________
2AP- ____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320723 Order No: 20200000 Description: Conrac 1 flange tacking
oil leakage
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID: KJAWL-01

Remarks

Release Date: 24.04.2025 Basic Start Date: 23.04.2025

Release Time: 08:24:56 Basic End Date: oo 2c21

Employee Codes Employee Names Operation No Hrs

If

4 PcVrrt _____________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 27.04.2025
Notification No: 100321043 Order No: 20200130 Description: Forklift *I4 T501
REAKDOWN
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

ázet ,/
a"
Release Date: U 2 .04.20 'f Basic rt Date:
. 27.04.2025
Release Time: 09:36:56 Basic End Date:
7/

I!

Maintenance Department User Department


Kirby Building Systems KSA

UI
MAINTENANCE ORDER JOB TICKET

Date :-2.04.2025
Notification No: 100321038 Order No: 20200139 Description: EP503 BACK TYRE
CHANGE
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Datelrimc. _____________________

0010 EP5O3BACKTYRECHANGE
)ecs (J'3 ofejk/(_3?-
T Xe6P oLvt
? yta4a CflfVt__ cM1 p'- -e dap
__
UkeeQ_ u&f _ w
AdT
I- C' c_i
7
Release Date: _2?.04.2025 Basic Start Date: -.04.2025

Release Time: 14:08:36 Basic End Date:

EmployeeCodes EmployeeNames OperationNo Hrs

0
(
V

Maintenance Department User Department


Kirby Building Systems KSA
Kirbfl MAINTENANCE ORDER JOB TICKET

Date : 27.04.2025
Notification No: 100321037 Order No: 20200144 Description: please change oil for
forklift 7 ton.
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tim¬ ______________________

0010 please change oil for forklift 7 ton.


/3o ajj-L41

(yz//d

Release Date: 27.04.2025 Basic Start Date: 27.04.2025

Release Time: 14:17:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

a-?-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 27.04.2025
Notification No: 100321039 Order No: 20200138 Description: T303 HYDRALIC OIL
LEAKAGE
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No . Date/Time Date/Time ______________________

0010 T3O3HYDRALICOILLEAKAGE
-____________-- _____________

6&1J (7L&u*

-P-0t--- A

Release Date: 27.04.2025 Basic Start Date: 27.04.2025

Release Time: 14:08:10 Basic End Date:

Epyee Codes Employee Names - Operation No Hrs

Sfl-( leoLq _______________

52fl Oeiz' -______ -

Maintenance Department User Department -


Kirby Bukffiçj Sy;rw KSA Systc-
"Kirbj MAINTENANCE ORDER JOB TICKET

Date : 27.04.2025
Notification No: 100321059 Order No: 20200142 Description: EPSO1 forklift desel filter
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON -5G1 j' STh \
Plant Section: Person Rajendran Main Work Mechanical Maintenance
Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tims ______________________-

0010 EP5O1 forklift desel filter change


(2 Q
4_i

___- _________

Release Date: 27.04.2025 Basic Start Date: 27.04.2025

Release Time: 14:11:44 Basic End Date:

Employee Codes Employee Names Operation No Firs

Maintenance Department User Department .

_____ _______________________ ___ ______i--i


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 27.04.2025
Notification No: 100320950 Order No: 20200140 Description: EP1001 Tyre need to be
change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No
0010
__________________________________
EP1 001 Tyre need to be change
_______
DateiTime DateiTimc.
e7j .6
____________________

L04v
se_9' b- I&(
Release Date: 27.04.2025 Basic Start Date: 26.04.2025

Release Time: 14:09:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

LPP9I z2L _________________

sCg--- sflct _________________

cv' ftBoo

Maintenance Department User Department

___________ ___________
;19-95g
ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 27.04.2025
Notification No: 100320866 Order No: 20200141 Description: Fab side loader Have
starting problum
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start compl Remarks


No __________________________________ ______
Date/Time DateITimc ____________________

0010 Fab side loader Have starting problum


7! c St_(/.

_________________ ___ _______

Ct\¼Q .- 4-
C)
body
&e'z-t't1' kV-
_________________________________

Release Date: 27.04.2025 Basic Start Date: 25.04.2025


ci
Release Time: 14:10:31 Basic End Date:

9c\0>t

Maintenance Department User Department

A
- L
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.04.2025
Notification No: 100320974 Order No: 20200143 Description: Purlin M/C roller issue
need to check
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Description

0010

Release Date: 27.04.2025 Basic Start Date: 26.04.2025

Release Time: 14:17:14 Basic End Date:


)$O1 '202=5

(Pt,)
fUn
I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.04.2025
Notification No: 100321080 Order No: 20200183 Description: '(513 SHEAR wire cut

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 28.04.2025 Basic Start Date: 27.04.2025

Release Time: 08:42:44 Basic End Date: 9-7 04 2o


Employee Codes Employee Names Operation No Hrs

'I _____________________ _______________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.04.2025
Notification No: 100321075 Order No: 20200184 Description: Plant-2 dock clamp need
repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 28.04.2025 Basic Start Date: 27.04.2025

Release Time: 08:45:15 Basic End Date:


To I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.04.2025
Notification No: 100321072 Order No: 20200185 Description: Plant-2 dock clamp need
repair
" Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
\: Location: LFTNT
"\ Equipment No: Description:

'!1ant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 28.04.2025 Basic Start Date: 27.04.2025

Release Time: 08:46:57 Basic End Date: 2-7 oq'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.04.2025
Notification No: 100320917 Order No: 20200186 Description: SPT Elevator not working

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Description

0010

Release Date: 28.04.2025 Basic Start Date: 27.04.2025

Release Time: 08:47:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________ ______________ _____________ tk$t

Maintenance Department User Department


Kirby Building Systems KSA
Ii MAINTENANCE ORDER JOB TICKET

Date : 28.04.2025
Notification No: 100321135 Order No: 20200187 Description: sheet mill break need to
check
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Remarks

Release Date: 28.04.2025 Basic Start Date: 28.04.2025

Release Time: 08:49:15 Basic End Date: 2-9


Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________


(&f-vl

)_______ ____________ ___________


((hi

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.04.2025
Notification No: 100321177 Order No: 20200223 Description: FORKLIFT 10 TONS EP-
FLAT TIRE
Functional P301-SI-IIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.04.2025 Basic Start Date: 28.04.2025

Release Time: 09:06:01 Basic End Date: 2401 29)5


Employee Codes Employee Names Operation No Hrs

________ _____________ ____________


2m.i
__________ _________________ C) 2 (/
j

Maintenance Department User Department


Kirby Building Systems KSA
" 7
" MAINTENANCE ORDER JOB TICKET

Date : 29.04.2025
Notification No: 100321225 Order No: 20200226 Description: Plant-3 need Welding
M/C need Repair
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.04.2025 Basic Start Date: 29.04.2025

Release Time: 09:44:30 Basic End Date: 2q o4 .2o


Employee Codes Employee Names Operation No Hrs

____________________________ _______________
Iftv
________________ _________ (frr

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.04.2025
Notification No: 100321226 Order No: 20200225 Description: OVER HEAD CRANE
NOT WORKING
Functional P301- MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000654 Description: Overhead Crane 10 Ton-B1004

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.04.2025 Basic Start Date: 29.04.2025

Release Time: 09:36:07 Basic End Date: 234o1 '2Q23.


Employee Codes Employee Names Operation No Hrs
_________

SLJL @7
1________ _____________ ____________ ( frcj

Maintenance Department User Department


Kirby Building Systems KSA
Kirbyt. MAINTENANCE ORDER JOB TICKET

Date : 29.04.2025
Notification No: 100321227 Order No: 20200224 Description: side loader tube puncher
SL-6001
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON - T502

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

I Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Time ______________________

0010 side loader tube puncher


'A.J -Të. ?-
-

Release Date: 29.04.2025 Basic Start Date: 29.04.2025

Release Time: 09:32:11 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fç9)- L &_7e_t&g ________________

Maintenance Department User Department


____________
,frv' ,7(vVE
Kirby Building Systems KSA
ibj MAINTENANCE ORDER JOB TICKET

Date: 29.04.2025
Notification No: 100321220 Order No: 20200227 Description: Purlin M/C roller nut
loose
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 29.04.2025 Basic Stan Date: 29.04.2025

Release Time: 09:53:52 Basic End Date: )4 OL Z2A

Employee Codes Employee Names Operation No Hrs

________ _____________ ____________


_s
61'-"
SASEC Th _____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 30.04.2025
Notification No: 100321349 Order No: 10135047 Description: Cf angle punch need to
fix
Functional P301-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Remarks

Re!ease Date: 30.04.2025 Basic Start Date: 30.04.2025

Release Time: 17:59:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________
LJU ______________ _______________

_______
AM'7O __________ ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 30.04.2025
Notification No: 100321346 Order No: 10135046 Description: purlin rn/c NO1 punch
need to change
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 30.04.2025 Basic Start Date: 30.04.2025

Release Time: 17:58:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

flor - aD _____________

rL

Maintenance Department User Department


Kirby Building Systems KSA
1
MAINTENANCE ORDER JOB TICKET

Date: 30.04.2025
Notification No: 100321351 Order No: 20200339 Description: Primo tack station switch
broken
Functional P301- BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Electrical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Remarks

Release Date: 30.04.2025 Basic Start Date: 30.04.2025

Release Time: 18:02:41 Basic End Date: 3t.ct '2-


Employee Codes Employee Names Operation No Hrs

___________
V,t4t , ; _______________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
It
MAINTENANCE ORDER JOB TICKET

Date: 30.04.2025
Notification No: 100321352 Order No: 20200336 Description: SCM PLATE STUCK

Functional P301-DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 30.04.2025 Basic Start Date: 30.04.2025

Release Time: 17:57:36 Basic End Date: ato4 20-1


Employee Codes Employee Names Operation No Hrs
__________

C3U.AJ (75) I ft
)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.04.2025
Notification No: 100321256 Order No: 20200313 Description: OLD SCM DIA BOTTOM
LOCK BROKEN
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

0010

Release Date: 30.04.2025 Basic Start Date: 29.04.2025

Release Time: 11:57:33 Basic End Date: 2q.0 2,2.-s

Employee Codes Employee Names Operation No Hrs

______________ ______________________ ____________________


ffr
__________ _________________ _______________

(_I-fr)

Maintenance Department User Department


Kirby Building Systems KSA
Kirbgj MAINTENANCE ORDER JOB TICKET

Date: 30.04.2025
Notification No: 100321259 Order No: 20200285 Description: please check & repair
side loadar 3L6002
Functional P301-MTHDL- Description: FORKLIFTS U

Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Tims _____________________

0010 please check & repair side loaclar SL6002


Jo tJJ1 -7T g
p
"1

______________________ _________
cceJi2t4'C C 4
Release Date: 30.042025 Basic Start Date: 29.04.2025

Release Time: 08:48:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs

&sA'l3
Maintenance Department User Department
Kirby Building Systems KSA
Kbij MAINTENANCE ORDER JOB TICKET

Date : 30.04.2025
Notification No: 100321326 Order No: 20200337 Description: t-302 forklift water pump
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302 -

Plant Section: Person Zeeshan Ahmed Main Work CON RAC


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 t-302 forklift water pump change


__________________ ___
7:,c J,sU]kji(

Release Date: 30.04.2025 Basic Start Date:

Release Time: 17:58:14 Basic End Date:

Employee Codes Employee Names Operation No Hrs


C12%/ _________________ ( kow4v<
r I-

Maintenance Department User Department


ott WI
It%fl: Kirby Building Systems KSA
I
MAINTENANCE ORDER JOB TICKET

Date :tS.05.2025
Notification No: 100321519 Order No: 20200391 Description: I-langcha 7ton forklift
lieght reair work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000656 Description: FORKLIFT TON EP7O-1 -

7-°9
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateITimc. ______________________

0010 Hangcha 7ton forklift1t cairTh


/Uh4
__
CJvi t

r.e,4, c
L)-.-(--"I Cti.

Release Date: 03.05.2025 Basic Start Date: La5 #aj4JA

Release Time: 09:45:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department

-
Kirby Building Systems KSA
Kwb%\ MAINTENANCE ORDER JOB TICKET

Date: 03.05.2025
Notification No: 100321441 Order No: 20200390 Description: side loader oil leak

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000672 Description: FORKLlFTPetlf5TOttrT5e2_ 6cc, / c
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 side loader oil leak

____ _____________________________ ______ _______ ______


e2? jVt

Release Date: 03.05.2025 Basic Start Date: 01 .05.2025

Release Time: 08:41:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs

r
t

Maintenance Department User Department

___________
1a- çio
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 12.04.2025
Notification No: 100319768 Order No: 10134403 Description: EP-503 PM & break froni
both repair work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT P -03
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/TimE _____________________

)0010 EP-503 PM & break front both repair work


4/ s$'jo ;a o Ic- p..'
ç4j&Q fl.&s
w4etQ CWI&L ' g b2° FiWi
'tt&-4+o s- ýuu _____________

c)
-f
fri9 C- lct&t
-
1- ___________

Release Date: 12.04.2025 Basic Start Date: 12.04.2025

Release Time: 15:50:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fl9t _____________________

-çcR>?- nueeI ________________

&1CC1
c/c + od

(-ic)

Maintenance Department User Department


w Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319864 Order No: 20199508 Description: krass standard
1-28toG4replace
Functional P301- POWER- Description: POWER TOOLS PNEUMATIC
Location: PNEUT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:26:44 Basic End Date: t? 'OLD

Employee Codes Employee Names Operation No Hrs

pprCO _______________
i c L...-.
___________ I\NsTc _________________
I Ln

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319840 Order No: 20199512 Description: scm plate holding clamp
bolt Iooose
Functional P301-DIAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Description

0010

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:31:34 Basic End Date: \ to 2 ç--

Employee Codes Employee Names Operation No Hrs

C1-frc ___________ ___________

-'__________ r1prr &,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319839 Order No: 20199513 Description: Conrac #1 Auto weld
earthing damage
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID: KJAWL-01

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:43:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ A-p-no _______________ ________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320188 Order No: 20199635 Description: conrac 1 welding wite
stuck up
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Releass Date: 17;04.2025 Basic Start Date: 17.04.2025

Release Time: 15:14:39 Basic End Date: tC3 eq 'za


.

Employee Codes Employee Names Operation No Hrs

Ct-k H flPrtsaOfr17Q ________________


LsC

cl%-r.. A2ti-rv -c r -J"'-


Ii
_______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320189 Order No: 20199634 Description: Sainly 6 mtr Shear Jack
holder Bolt loos
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description. SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr
No I
fDescription Status.] Start Compl Remarks
_____________________________ Date/Time Date/Time __________

0010 Sainly B mtr Shear Jack holder Bolt loos I

_________________ ___
5- ___--__

\01&A 4tA TönLr.,La

____
Till
Release Date- 17.04.2025 - anab Start Date: 17.04.2025

Release Tme- 15:14:10 rasicEndoate: .ot42-t2j

Employee Co' es Employee Names -


Hrs

--I-- _____-.__

-______

Maintenance Department User Department


Kirby Building Systems KSA
111 MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320098 Order No: 20199640 Description: Geeco mc blade broken

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 17.04.2025 Basic Start Date: 16.04.2025

Release Time: 15:27:43 Basic End Date: lb 01.4 ictç-

Employee Codes Employee Names Operation No Hrs

01-i ________________ ______________


'2
4. C'75c-c PnAa. ___________________
t-yç

_________
PpJTD ______________
2

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320105 Order No: 20199638 Description: htc punching machine
blade broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawteeq Shakir Main Work CONRAC


Responsible: Shaikh Centre:
Tech ID:

uz-t i4t L&x.p 0m crtjj'p


Release Date: 17.04.2025 Basic tart Date: 1 16.04.2025

Release Time: 15:17:30 Basic End Date: V Li zo ç- -

Employee Codes Employee Names Operation No Hrs

ç
_____________ 3 L,
S_icc- k-c
Ii _____________ ______________

CA'.. ________________ ______________


Lrc

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320072 Order No: 20199641 Description: htc flange punching
machine blade bolt b
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 17.04.2025 Basic Start Date: 16.04.2025


Release Time: 15:28:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________ _________________ _______________

9 k,,c
)_________ ______________________________ ________________

I!

Maintenance Department User Department


U
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100319880 Order No: 20199643 Description: FORKLIFT 7 tons
Hangcha replace tire
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time ____________________

0010 FORKLIFT 7 tons Hangcha replace tire


, 3o
___ _____________________ ____ _____ _____
't44"
('-'t bet
_____________________ ____ ____

___________________________ ____
Se.tlL- 7 CtJLe3
____ ___________________________ _____ ______ ______

ttt( JLJ
- ¼!
Release Date: 17.04.2025 Basic Start Date: 13.04.2025

Release Time: 15:30:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

sfl9i Ze.pt __________ ___________

51fl9 4LM¬9 ___________________

Maintenance Department User Department


Kirby Building Systems KSA
K bS, MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320035 Order No: 20199642 Description: side loader preventive

maintenace
Functional P301- POWER-
Location: ELECT
Description: POWER TOOLS ELECTRICAL
dccl
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Timc. ____________________

0010 side loader preventive maintenace


i i: 4'c ,e°a>,/,',.

hit
________________________

Release Date: 17.04.2025 Basic Start Date: 15.04.2025

Release Time: 15:29:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________________ _________
ti/ic

C ccg c/ta _______________________

Maintenance Department User Department

____________
,ýr>
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320170 Order No: 20199636 Description: Fork Lift T-301 need to
change hazard Ii
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Release Date: .17.04.2025 Basic Start Date: 17.04.2025

Release Time: 15:15:10 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
rIru
it

MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320383 Order No: 20199811 Description: EP7O1 TYRE
REPLAICEMNT 8.25-15
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFTE&TOttt.¬P?8+-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 EP7O1 TYRE REPLAICEMNT 8.25-15


1gt (-%t /Up
__
&c _________________

___
- ___ _____ _____ Sen&-?ce (
t79LaQA 1>7

Release Date: 20.04.2025 Basic Start Date: 19.04.2025

Release Time: 08:37:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______________________

C __________________________

K..

Maintenance Department ,Dpartment


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320380 Order No: 20199810 Description: Sainly 6 mtr Shear Jack
holder oil leak
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 20.04.2025 Basic Start Date: 19.04.2025

Release Time: 08:36:21 BasicEndDate: Ni 014 2°2ç

Employee Codes Employee Names Operation No Hrs

I!

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320439 Order No: 20199808 Description: sainly 4mtr oil leakage at
jack holder
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

rii.ins

Release Date: 20.04.2025 Basic Start Date: 20.04.2025

Release Time: 08:27:40 Basic End Date: O 0 Lj 20 2-1

Employee Codes Employee Names Operation No Hrs

ci __________
2.firtv\ ________________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100319322 Order No: 20199870 Description: Sanli Shearing 4mtr oil
leak please che
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:21:38 Basic End Date: 0q O4 W2S

Employee Codes Employee Names Operation No Hrs

__________ 7.'PEEQ _______________


2- 'S
)________ ______________ _____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320535 Order No: 20199867 Description: SCM Sensor loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:59:25 Basic End Date: '-

Employee Codes Employee Names Operation No Hrs

ç-cn4 _______________ ________________

"I________________ ____________________________ _________________________ ____________________________

-1

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320534 Order No: 10134760 Description: threading wheel stuck Oil
Pump
Functional P301-CFORM- Description: ROD LINE
Location: RODLN
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:46:34 Basic End Date: 2\ t9 2o2- c

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320454 Order No: 20199863 Description: SCM air pipe ken

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:53:45 Basic End Date: ').t oU 2-c

Employee Codes Employee Names Operation No Hrs


"
'4 -

C'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100319324 Order No: 20199873 Description: SCM machine bolt loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:24:56 BasicEndDate: 01 OLa.2czç

Employee Codes Employee Names Operation No Hrs

-U __________________ ________________ __________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320131 Order No: 10134762 Description: OIL PUMP MOTOR NOT
PUMPING OIL
Functional P301-CFORM- Description: ROD LINE
Location: RODLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 16.04.2025

Release Time: 15:05:24 Basic End Date: /6 o4


Employee Codes Employee Names Operation No Hrs

_______________________'Hi'

LI

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100319321 Order No: 20199872 Description: andsaw convyer cahine
broken
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:23:52 Basic End Date:


07v '20L3
I
Employee Codes Employee Names Operation No Hrs

/t/n

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No; 100319336 Order No: 20199874 Description: PIant2 Dock clamp need
repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible; Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:32:01 Basic End Date: O7t o '2o-3

Maintenance Department User Department


r Kirby Building Syst

MAINTENANCE ORDER JOB TICKET


in KSA

Date: 21.04.2025
Notification No: 100319333 Order No: 20199871 Description: Pacific ShearHydraulic
press not work
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No __________________________________ _______
DatelTime Date/Tims ____________________

)001O Pacific ShearHydraulic press not work


eq 01 'is 07 o4 'i-s _______________________

y
LfrIup I1DC4 /
c7Qc4letlp' font! ___ ____ ____ __________

__ qLr_t/&CA________ _____________

I V
( (
oct11 &. e
Release Date: 2l.04.2oh1t706 Basic art 'ate: 07.04.2025

Release Time: 15:23:07 Basic End Date:


oM 3-5

Cf/P

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320243 Order No: 20199868 Description: spt motor S ROTORS
PROBLEM
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: 21.04.2025 Basic Start Date: 17.04.2025

Release Time: 15:03:56 Basic End Date:

ti-/i,

Maintenance Department User Department


K Kirby Building Systems KSA

- MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320553 Order No: 10134734 Description: Plant # 3 CompAir
compressor Pm & repair
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000301 Description: AIR COMPRESSOR L45 BLAST
-

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

O010 Plant #3 CompAir compressor Pm & repair


____ _______________________________ ______

2/°fs 2-lDtit __________________

/JaJyPf c2j (3gq,rQ 9pltvt(


__ c7lit od Ppcmi/o c/
(inn/zr ( a
;a
____ _____ _____ ____________

____ Lnd ci
I
c3'1,s _____ ______ _____ ______________

t2
Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:03:28 Basic End Date:


21

I-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320554 Order No: 10134735 Description: Station B 10 Ton Crane
Installation work
Functional P301-MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000670 Description: Overhead Crane 10 Ton-Bi 002

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

*0
Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:06:29 Basic End Date: ____

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET
Date : 21.04.2025
Notification No: 100320556 Order No: 10134736 Description: PHI conrac tack station
hyd. pump change
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:16:41 Basic End Date: 2-/'vq 2tO-J

2-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320536 Order No: 10134737 Description: New station C Angle line
Angle Die jam
Functional P301 -CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:43:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs

)_____ . _______
'It,

Maintenance Department User Department


Kirby Building Systems KSA
U MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320541 Order No: 20199859 Description: KRASS PUNCHINE
MAchine
Functional P301-POWER- Description: POWER TOOLS PNEUMATIC
Location: PNEUT
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025


Release Time: 14:36:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(V

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320479 Order No: 20199665 Description: STN C Angle machine up
&down stuck
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Description

0010

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:57:03 Basic End Date: 2-c' o 2aLS


Employee Codes Employee Names Operation No Hrs

21 __________

)______

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320484 Order No: 20199866 Description: Plant- D Dock clamp
need repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:58:27 Basic End Date:

Maintenance Department User Department


Kirby
KrrbjJ
Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320466 Order No: 20199862 Description: EP7O1 TYRE
REPLAICEMNT
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DateiTime DatelTimc. _____________________

0010 EP7O1 TYF1E REPLAICEMNT


____________________

/c!'?t /.'b7iuae

__ _________________________

cf
U

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:49:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(.
n>

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21 .04.2025
Notification No: 100320451 Order No: 20199664 Description: Fabrication forklift tyre
need changeSt
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON -SS1

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time DatelTimc. ______________________

0010 Fabrication forklift tyre need change


-, / fbot 33° fub
,Y_e
/ /vka
Ar9471't5

Release Date: 21 .04.2025 Basic Start Date: 20.04.2025

Release Time: 14:56:01 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ALMQO _
(
__________ ___________

______

P.
User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21 .04.2025
Notification No: 100320528 Order No: 201 99861 Description: Fabrication side loader
desel filter sup
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT 6oe cde Lødt.
Equipment No: 13000673 Description: FORKLlFT1tYtDTWwe*-p5e1

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 Fabrication side loader desel filter sup


__ _______________________ ____ ____
JDQ

61y

Release Date: 21 .04.2025 Basic Start Date: 21 .04.2025

Release Time: 14:48:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S22,9;
(

Maintenance Department User Department


Kirby Building Systems KSA
flu.
MAINTENANCE ORDER JOB TICKET

Date :21.04.2025
Notification No: 100319291 Order No: 20199869 Description: Fork Lift 1-gQ2 Hydrolic
oil leakage
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Tims ______________________

0010 Fork Lift4-¬02 Hydrolic oil leakage

( \3 ('c- ?es2, 'f

___________________________
ct- ''-1/
C.)
____ _____ ______ ______

Release Date: 21 .04.2025 Basic Start Date: 06.04.2025

Release Time: 15:19:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs

31 Lep.
ir Ff

Maintenance Department User Department

___________ k'e7
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.04.2025
Notification No: 100320615 Order No: 10134794 Description: TOYOTA T-501 tyre
puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTimE. _____________________

0010 TOYOTAT-501 tyre puncher


C '7ii ¼
_______

g:3°

Release Date: 22.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:39:08 Basic End Date:

Employee Codes Employee Names Operation No Firs

___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320565 Order No: 20200013 Description: SCM side push chylinder
not working
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

'T0l0

Release Date: 24.04.2025 Basic Start Date: 21.04.2025

Release Time: 09:35:19 Basic End Date: 27' Dl '2O2-!


Employee Codes Employee Names Operation No Hrs

__________ ______________________________ I
) _____________ ____________
/Its

Maintenance Department User Department


Kirby Building Systems KSA
Ii MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320787 Order No: 20200003 Description: Purlin M/C nol burr
coming need to chang
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 24.04.2025

Release Time: 08:42:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____
ç7 _________________

i9AI7O 4t)
/

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320752 Order No: 20200004 Description: primo liner wire stuc
please check
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Vishnu Venugopalan Main Work Mechanical Maintenance


Responsible: Nair Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 23.04.2025

Release Time: 08:43:40 Basic End Date: 2g

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320721 Order No: 20200001 Description: Bandsaw blade change

Functional P301-CFORM- Description: ROD LINE


Location: RODLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

I4aII]fll[.], ____________________________

_____
I9rimnI.YiThlrr
U:flTET,ji .1"[-

Release Date: 24.04.2025 Basic Start Date: 23.04.2025

Release Time: 08:29:44 Basic End Date: 04'

/ I)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320640 Order No: 20200008 Description: vertical clamp problem
paint line p3
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:47:14 Basic End Date: 22101t2nç

Employee Codes Employee Names Operation No Hrs

J7kr1 S) I fib

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320647 Order No: 10134839 Description: purlin rn/c NO1 punch
need to change
Functional P301 -CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Moharnmad Sahbaz Main Work Mechanical Maintenance


Responsible: Moharnmad Jahagir Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 06:46:40 Basic End Date: 22 ct2o5

Employee Codes Employee Names Operation No Hrs

_______ ____________ (2 ____________

:1

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320670 Order No: 20200007 Description: conrac 01 welding wire
stuckup please ch
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Vishnu Venugopalan Main Work Mechanical Maintenance


Responsible: Nair Centre:
Tech ID:

II

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:46:07 Basic End Date: 92.t4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320681 Order No: 20200006 Description: conrac 01 welding wire
stuckup please ch
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

p r
h

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:45:40 Basic End Date: 2 z .o9 '22_5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320581 Order No: 20200015 Description: old scm p machine base
down please check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description

''10

Release Date: 24.04.2025 Basic Start Date: 21.04.2025

Release Time: 09:36:28 Basic End Date:

!tr

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320566 Order No: 20200014 Description: scm air Ieagkage

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: 24.04.2025 Basic Start Date: Fe4RiiWZóTe1

Release Time: 09:35:51 Basic End Date:


94.o4 '20ý5
I
Employee Codes Employee Names I Operation No

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 12.04.2025
Notification No: 100319768 Order No: 10134403 Description: EP-503 PM & break froni
both repair work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT P -03
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/TimE _____________________

)0010 EP-503 PM & break front both repair work


4/ s$'jo ;a o Ic- p..'
ç4j&Q fl.&s
w4etQ CWI&L ' g b2° FiWi
'tt&-4+o s- ýuu _____________

c)
-f
fri9 C- lct&t
-
1- ___________

Release Date: 12.04.2025 Basic Start Date: 12.04.2025

Release Time: 15:50:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fl9t _____________________

-çcR>?- nueeI ________________

&1CC1
c/c + od

(-ic)

Maintenance Department User Department


w Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319864 Order No: 20199508 Description: krass standard
1-28toG4replace
Functional P301- POWER- Description: POWER TOOLS PNEUMATIC
Location: PNEUT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:26:44 Basic End Date: t? 'OLD

Employee Codes Employee Names Operation No Hrs

pprCO _______________
i c L...-.
___________ I\NsTc _________________
I Ln

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319840 Order No: 20199512 Description: scm plate holding clamp
bolt Iooose
Functional P301-DIAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Description

0010

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:31:34 Basic End Date: \ to 2 ç--

Employee Codes Employee Names Operation No Hrs

C1-frc ___________ ___________

-'__________ r1prr &,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.04.2025
Notification No: 100319839 Order No: 20199513 Description: Conrac #1 Auto weld
earthing damage
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID: KJAWL-01

Release Date: 15.04.2025 Basic Start Date: 13.04.2025

Release Time: 09:43:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ A-p-no _______________ ________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320188 Order No: 20199635 Description: conrac 1 welding wite
stuck up
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Releass Date: 17;04.2025 Basic Start Date: 17.04.2025

Release Time: 15:14:39 Basic End Date: tC3 eq 'za


.

Employee Codes Employee Names Operation No Hrs

Ct-k H flPrtsaOfr17Q ________________


LsC

cl%-r.. A2ti-rv -c r -J"'-


Ii
_______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320189 Order No: 20199634 Description: Sainly 6 mtr Shear Jack
holder Bolt loos
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description. SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr
No I
fDescription Status.] Start Compl Remarks
_____________________________ Date/Time Date/Time __________

0010 Sainly B mtr Shear Jack holder Bolt loos I

_________________ ___
5- ___--__

\01&A 4tA TönLr.,La

____
Till
Release Date- 17.04.2025 - anab Start Date: 17.04.2025

Release Tme- 15:14:10 rasicEndoate: .ot42-t2j

Employee Co' es Employee Names -


Hrs

--I-- _____-.__

-______

Maintenance Department User Department


Kirby Building Systems KSA
111 MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320098 Order No: 20199640 Description: Geeco mc blade broken

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 17.04.2025 Basic Start Date: 16.04.2025

Release Time: 15:27:43 Basic End Date: lb 01.4 ictç-

Employee Codes Employee Names Operation No Hrs

01-i ________________ ______________


'2
4. C'75c-c PnAa. ___________________
t-yç

_________
PpJTD ______________
2

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320105 Order No: 20199638 Description: htc punching machine
blade broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawteeq Shakir Main Work CONRAC


Responsible: Shaikh Centre:
Tech ID:

uz-t i4t L&x.p 0m crtjj'p


Release Date: 17.04.2025 Basic tart Date: 1 16.04.2025

Release Time: 15:17:30 Basic End Date: V Li zo ç- -

Employee Codes Employee Names Operation No Hrs

ç
_____________ 3 L,
S_icc- k-c
Ii _____________ ______________

CA'.. ________________ ______________


Lrc

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320072 Order No: 20199641 Description: htc flange punching
machine blade bolt b
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 17.04.2025 Basic Start Date: 16.04.2025


Release Time: 15:28:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________ _________________ _______________

9 k,,c
)_________ ______________________________ ________________

I!

Maintenance Department User Department


U
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100319880 Order No: 20199643 Description: FORKLIFT 7 tons
Hangcha replace tire
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time ____________________

0010 FORKLIFT 7 tons Hangcha replace tire


, 3o
___ _____________________ ____ _____ _____
't44"
('-'t bet
_____________________ ____ ____

___________________________ ____
Se.tlL- 7 CtJLe3
____ ___________________________ _____ ______ ______

ttt( JLJ
- ¼!
Release Date: 17.04.2025 Basic Start Date: 13.04.2025

Release Time: 15:30:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

sfl9i Ze.pt __________ ___________

51fl9 4LM¬9 ___________________

Maintenance Department User Department


Kirby Building Systems KSA
K bS, MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320035 Order No: 20199642 Description: side loader preventive

maintenace
Functional P301- POWER-
Location: ELECT
Description: POWER TOOLS ELECTRICAL
dccl
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Timc. ____________________

0010 side loader preventive maintenace


i i: 4'c ,e°a>,/,',.

hit
________________________

Release Date: 17.04.2025 Basic Start Date: 15.04.2025

Release Time: 15:29:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________________ _________
ti/ic

C ccg c/ta _______________________

Maintenance Department User Department

____________
,ýr>
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.04.2025
Notification No: 100320170 Order No: 20199636 Description: Fork Lift T-301 need to
change hazard Ii
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Release Date: .17.04.2025 Basic Start Date: 17.04.2025

Release Time: 15:15:10 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
rIru
it

MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320383 Order No: 20199811 Description: EP7O1 TYRE
REPLAICEMNT 8.25-15
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFTE&TOttt.¬P?8+-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 EP7O1 TYRE REPLAICEMNT 8.25-15


1gt (-%t /Up
__
&c _________________

___
- ___ _____ _____ Sen&-?ce (
t79LaQA 1>7

Release Date: 20.04.2025 Basic Start Date: 19.04.2025

Release Time: 08:37:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______________________

C __________________________

K..

Maintenance Department ,Dpartment


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320380 Order No: 20199810 Description: Sainly 6 mtr Shear Jack
holder oil leak
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 20.04.2025 Basic Start Date: 19.04.2025

Release Time: 08:36:21 BasicEndDate: Ni 014 2°2ç

Employee Codes Employee Names Operation No Hrs

I!

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 20.04.2025
Notification No: 100320439 Order No: 20199808 Description: sainly 4mtr oil leakage at
jack holder
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

rii.ins

Release Date: 20.04.2025 Basic Start Date: 20.04.2025

Release Time: 08:27:40 Basic End Date: O 0 Lj 20 2-1

Employee Codes Employee Names Operation No Hrs

ci __________
2.firtv\ ________________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100319322 Order No: 20199870 Description: Sanli Shearing 4mtr oil
leak please che
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:21:38 Basic End Date: 0q O4 W2S

Employee Codes Employee Names Operation No Hrs

__________ 7.'PEEQ _______________


2- 'S
)________ ______________ _____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320535 Order No: 20199867 Description: SCM Sensor loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:59:25 Basic End Date: '-

Employee Codes Employee Names Operation No Hrs

ç-cn4 _______________ ________________

"I________________ ____________________________ _________________________ ____________________________

-1

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320534 Order No: 10134760 Description: threading wheel stuck Oil
Pump
Functional P301-CFORM- Description: ROD LINE
Location: RODLN
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:46:34 Basic End Date: 2\ t9 2o2- c

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320454 Order No: 20199863 Description: SCM air pipe ken

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:53:45 Basic End Date: ').t oU 2-c

Employee Codes Employee Names Operation No Hrs


"
'4 -

C'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100319324 Order No: 20199873 Description: SCM machine bolt loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:24:56 BasicEndDate: 01 OLa.2czç

Employee Codes Employee Names Operation No Hrs

-U __________________ ________________ __________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320131 Order No: 10134762 Description: OIL PUMP MOTOR NOT
PUMPING OIL
Functional P301-CFORM- Description: ROD LINE
Location: RODLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 16.04.2025

Release Time: 15:05:24 Basic End Date: /6 o4


Employee Codes Employee Names Operation No Hrs

_______________________'Hi'

LI

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100319321 Order No: 20199872 Description: andsaw convyer cahine
broken
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:23:52 Basic End Date:


07v '20L3
I
Employee Codes Employee Names Operation No Hrs

/t/n

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No; 100319336 Order No: 20199874 Description: PIant2 Dock clamp need
repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible; Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 07.04.2025

Release Time: 15:32:01 Basic End Date: O7t o '2o-3

Maintenance Department User Department


r Kirby Building Syst

MAINTENANCE ORDER JOB TICKET


in KSA

Date: 21.04.2025
Notification No: 100319333 Order No: 20199871 Description: Pacific ShearHydraulic
press not work
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No __________________________________ _______
DatelTime Date/Tims ____________________

)001O Pacific ShearHydraulic press not work


eq 01 'is 07 o4 'i-s _______________________

y
LfrIup I1DC4 /
c7Qc4letlp' font! ___ ____ ____ __________

__ qLr_t/&CA________ _____________

I V
( (
oct11 &. e
Release Date: 2l.04.2oh1t706 Basic art 'ate: 07.04.2025

Release Time: 15:23:07 Basic End Date:


oM 3-5

Cf/P

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320243 Order No: 20199868 Description: spt motor S ROTORS
PROBLEM
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: 21.04.2025 Basic Start Date: 17.04.2025

Release Time: 15:03:56 Basic End Date:

ti-/i,

Maintenance Department User Department


K Kirby Building Systems KSA

- MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320553 Order No: 10134734 Description: Plant # 3 CompAir
compressor Pm & repair
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000301 Description: AIR COMPRESSOR L45 BLAST
-

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

O010 Plant #3 CompAir compressor Pm & repair


____ _______________________________ ______

2/°fs 2-lDtit __________________

/JaJyPf c2j (3gq,rQ 9pltvt(


__ c7lit od Ppcmi/o c/
(inn/zr ( a
;a
____ _____ _____ ____________

____ Lnd ci
I
c3'1,s _____ ______ _____ ______________

t2
Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:03:28 Basic End Date:


21

I-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320554 Order No: 10134735 Description: Station B 10 Ton Crane
Installation work
Functional P301-MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000670 Description: Overhead Crane 10 Ton-Bi 002

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

*0
Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:06:29 Basic End Date: ____

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET
Date : 21.04.2025
Notification No: 100320556 Order No: 10134736 Description: PHI conrac tack station
hyd. pump change
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:16:41 Basic End Date: 2-/'vq 2tO-J

2-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320536 Order No: 10134737 Description: New station C Angle line
Angle Die jam
Functional P301 -CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025

Release Time: 14:43:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs

)_____ . _______
'It,

Maintenance Department User Department


Kirby Building Systems KSA
U MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320541 Order No: 20199859 Description: KRASS PUNCHINE
MAchine
Functional P301-POWER- Description: POWER TOOLS PNEUMATIC
Location: PNEUT
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 21.04.2025


Release Time: 14:36:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(V

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320479 Order No: 20199665 Description: STN C Angle machine up
&down stuck
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Description

0010

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:57:03 Basic End Date: 2-c' o 2aLS


Employee Codes Employee Names Operation No Hrs

21 __________

)______

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.04.2025
Notification No: 100320484 Order No: 20199866 Description: Plant- D Dock clamp
need repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:58:27 Basic End Date:

Maintenance Department User Department


Kirby
KrrbjJ
Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21.04.2025
Notification No: 100320466 Order No: 20199862 Description: EP7O1 TYRE
REPLAICEMNT
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DateiTime DatelTimc. _____________________

0010 EP7O1 TYF1E REPLAICEMNT


____________________

/c!'?t /.'b7iuae

__ _________________________

cf
U

Release Date: 21.04.2025 Basic Start Date: 20.04.2025

Release Time: 14:49:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(.
n>

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21 .04.2025
Notification No: 100320451 Order No: 20199664 Description: Fabrication forklift tyre
need changeSt
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON -SS1

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time DatelTimc. ______________________

0010 Fabrication forklift tyre need change


-, / fbot 33° fub
,Y_e
/ /vka
Ar9471't5

Release Date: 21 .04.2025 Basic Start Date: 20.04.2025

Release Time: 14:56:01 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ALMQO _
(
__________ ___________

______

P.
User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21 .04.2025
Notification No: 100320528 Order No: 201 99861 Description: Fabrication side loader
desel filter sup
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT 6oe cde Lødt.
Equipment No: 13000673 Description: FORKLlFT1tYtDTWwe*-p5e1

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 Fabrication side loader desel filter sup


__ _______________________ ____ ____
JDQ

61y

Release Date: 21 .04.2025 Basic Start Date: 21 .04.2025

Release Time: 14:48:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S22,9;
(

Maintenance Department User Department


Kirby Building Systems KSA
flu.
MAINTENANCE ORDER JOB TICKET

Date :21.04.2025
Notification No: 100319291 Order No: 20199869 Description: Fork Lift 1-gQ2 Hydrolic
oil leakage
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Tims ______________________

0010 Fork Lift4-¬02 Hydrolic oil leakage

( \3 ('c- ?es2, 'f

___________________________
ct- ''-1/
C.)
____ _____ ______ ______

Release Date: 21 .04.2025 Basic Start Date: 06.04.2025

Release Time: 15:19:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs

31 Lep.
ir Ff

Maintenance Department User Department

___________ k'e7
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.04.2025
Notification No: 100320615 Order No: 10134794 Description: TOYOTA T-501 tyre
puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTimE. _____________________

0010 TOYOTAT-501 tyre puncher


C '7ii ¼
_______

g:3°

Release Date: 22.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:39:08 Basic End Date:

Employee Codes Employee Names Operation No Firs

___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320565 Order No: 20200013 Description: SCM side push chylinder
not working
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

'T0l0

Release Date: 24.04.2025 Basic Start Date: 21.04.2025

Release Time: 09:35:19 Basic End Date: 27' Dl '2O2-!


Employee Codes Employee Names Operation No Hrs

__________ ______________________________ I
) _____________ ____________
/Its

Maintenance Department User Department


Kirby Building Systems KSA
Ii MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320787 Order No: 20200003 Description: Purlin M/C nol burr
coming need to chang
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 24.04.2025

Release Time: 08:42:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____
ç7 _________________

i9AI7O 4t)
/

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320752 Order No: 20200004 Description: primo liner wire stuc
please check
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Vishnu Venugopalan Main Work Mechanical Maintenance


Responsible: Nair Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 23.04.2025

Release Time: 08:43:40 Basic End Date: 2g

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320721 Order No: 20200001 Description: Bandsaw blade change

Functional P301-CFORM- Description: ROD LINE


Location: RODLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

I4aII]fll[.], ____________________________

_____
I9rimnI.YiThlrr
U:flTET,ji .1"[-

Release Date: 24.04.2025 Basic Start Date: 23.04.2025

Release Time: 08:29:44 Basic End Date: 04'

/ I)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.04.2025
Notification No: 100320640 Order No: 20200008 Description: vertical clamp problem
paint line p3
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:47:14 Basic End Date: 22101t2nç

Employee Codes Employee Names Operation No Hrs

J7kr1 S) I fib

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320647 Order No: 10134839 Description: purlin rn/c NO1 punch
need to change
Functional P301 -CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Moharnmad Sahbaz Main Work Mechanical Maintenance


Responsible: Moharnmad Jahagir Centre:
Tech ID:

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 06:46:40 Basic End Date: 22 ct2o5

Employee Codes Employee Names Operation No Hrs

_______ ____________ (2 ____________

:1

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320670 Order No: 20200007 Description: conrac 01 welding wire
stuckup please ch
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Vishnu Venugopalan Main Work Mechanical Maintenance


Responsible: Nair Centre:
Tech ID:

II

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:46:07 Basic End Date: 92.t4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320681 Order No: 20200006 Description: conrac 01 welding wire
stuckup please ch
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

p r
h

Release Date: 24.04.2025 Basic Start Date: 22.04.2025

Release Time: 08:45:40 Basic End Date: 2 z .o9 '22_5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320581 Order No: 20200015 Description: old scm p machine base
down please check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description

''10

Release Date: 24.04.2025 Basic Start Date: 21.04.2025

Release Time: 09:36:28 Basic End Date:

!tr

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.04.2025
Notification No: 100320566 Order No: 20200014 Description: scm air Ieagkage

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: 24.04.2025 Basic Start Date: Fe4RiiWZóTe1

Release Time: 09:35:51 Basic End Date:


94.o4 '20ý5
I
Employee Codes Employee Names I Operation No

Maintenance Department User Department


Kirby Building Systems KSA
1:H
MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100317818 Order No: 10133761 Description: niyagra rn/c rod carne out

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: Description:

Plant Section: Person Moharnmad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DateiTime Date/Timc. ______________________

0010 niyagra rn/c rod came out

Release Date: 18.03.2025 Basic Start Date: 15.03.2025

Release Time: 08:49:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

( ..

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100318042 Order No: 20198633 Description: conrac 02 graund sho
cable remove plz c
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Muhammad Ant Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 02 graund sho cable remove plz c

e.

Release Date: 18.03.2025 Basic Start Date: 18.03.2025

Release Time: 12:49:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
iLl MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Itotification No: 100317943 Order No: 20198616 Description: 20f1 shear ramp not
working properly
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work CONRAC


Responsible: Centre:
Tech ID: KJSH-0601

0010

Release Date: 18.03.2025 Basic Start bate: 17.03.2025

Release Time: 08:31:33 Basic End Date:


/ 2.0)-s

Maintenance Department User Department


iv Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100318028 Order No: 20198623 Description: conrac 02 conveyor
chain break
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Gouselazam Main Work CONRAC


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 18.03.2025 Basic Start Date: 18.03.2025

Release Time: 08:41:42 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 20.03.2025
Notification No: 100318259 Order No: 10133837 Description: Station B Air compressor
not working
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -i -

Plant Section: Comprsr Room- i Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Station B Air compressor not working


-__ __________________ ___ 2-v'b3. 2003 __________

g4o4ns-, CrtPsae APnc) ____ _________ ___________

CA.bthoj 'cPrV-,&PPIcT#LL (uti _____ ______ ______ ________________

cith..uth till ____ ____ ____ ___________

oLkJ. ci! h1 cf 70p


I F
_______ ____________

Release Date: 20.03.2025 Basic Start Date: 20.03.2025

Release Time: 16:03:08 Basic End Date:


LO'03' 2O
Employee Codes Employee Names Operation No Hrs

________ r1isiJ CJJ _____________


2Th)
I

c!j hnd4 (Art.Iut $uq;caJ ¶)it. ç (' /QA4c.. /*(CJ p/atC


(7/ stfletI cf g19L4 c]/, &nn7)tt4'10

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 20.03.2025
Notification No: 100318219 Order No: 20198691 Description: primo web seam
pressing cylender bolt lo
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 20.03.2025 Basic Start Date: 20.03.2025

Release Time: 08:51:54 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 20.03.2025
Notification No: 100316216 Order No: 20198688 Description: multi torch new clam pls
check and inst
Functional P301-OTAIL- Description: MULTITORCHES
Location: MTRCH
Equipment No: Description:

Plant Section: Person Jagjeet Singh Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 20.03.2025 Basic Start Date: 20.03.2025


Release Time: 08:35:54 Basic End Date: 2ocg 2-O2
Employee Codes Employee Names Operation No Hrs

si-i C),q)c2cdh c7/, / Ii


1'

Maintenance Department User Department


Ltirhffl Kirby Building Systems KSA
ILI
MAINTENANCE ORDER JOB TICKET

Date -O3.04.2025
Notification No: 100318448 Order No: 20199127 Description: please replace 1 lyre
forkilft 7 ton
Functional P301-MTHDL- Description: FORKLI FTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

please replace 1 lyre forkiltt 7 ton


ñb
\ 7TS'.- .e a,jy/
TJiib¬ CLt
__ ____________________

__________________
___

bdj'
&Jz-Ž
<MM '1
Release Date: 03.04.2025 Basic Start Date: 23.03.2025

Release Time: 15:16:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cVAI ___________________
i

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.03.2025
Notification No: 100318600 Order No: 20198867 Description: Plant-2 F55 Dock Clamp
need to repair
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Release Date: 25.03.2025 Basic Start Date: 25.03.2025

Release Time: 15:24:01 Basic End Date: 2.a o3t2g2

Employee Codes Employee Names Operation No Hrs


/&714)J "4/f

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.03.2025
Notification No: 100316525 Order No: 20196870 Description: conrac 01 press wheel
not working plz cli
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC


Responsible: Mohammad Jahagir Centre:
Tech ID:

Description

0010

Release Date: 25.03.2025 Basic Start Date: 24.03.2025

Release Time: 15:26:28 Basic End Date:


2-'o& 2a-5
I Employee Codes Employee Names Operation No

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date: 25.03.2025
Notification No: 100318596 Order No: 20198868 Description: new scm punch base
supportin angle bolt
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 25.03.2025 Basic Start Date: 25.03.2025

Release Time: 15:24:30 Basic End Date: tg 2o)


Employee Codes Employee Names Operation No Hrs

"-1 ci: k- U"

Maintenance Department User Department


ir Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.03.2025
Notification No: 100318593 Order No: 20198835 Description: sanli 4meter hydraulic
jack oil leake p1
Functional P301- DTAIL-DTLN1 Description: DETAIL LINES (Kirby)
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 25.03.2025 Basic Start Date: 25.03.2025

Release Time: 09:10:38 Basic End Date:


5 D-3Qø2

lhn'

Maintenance Department User Department


MtLL1BpcpcJT (1 I OoojS
Kirby Building Systems KSA VIE LG boLl c-I
MAINTENANCE ORDER JOB TICKET

Date : 25.03.2025
Notification No: 100318609 Order No: 10133960 Description: Station B Air compressor
PM & Air filter
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -1
-

Plant Section: Comprsr Room- i Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID:

¬1 £e.(&1
Release Date: 25.03.2025 / Basic Start Date

Release Time: 15:17:47 Basic End Date:

Maintenance User Department


"h Kirby Building Systems KSA
'
' MAINTENANCE ORDER JOB TICKET

Date : 26.03.2025
Notification No: 100318613 Order No: 20198890 Description: conrac 01 press wheel
slowly run plz che
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

t/Okw
Release Date: 26.03.2025 hP//i S' ' P Basic Start Date: hit,cf
it,, c/

Release Time: 09:14:19 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 26.03.2025
Notification No: 100318662 Order No: 20198666 Description: stirrer probleblem paint
line
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 26.03.2025 Basic Start Date: 26.03.2025

Release Time: 09:12:52 Basic End Date: 26& 2cns


Employee Codes Employee Names Operation No Hrs

Maintenance Depart4iit User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.03.2025
Notification No: 100318624 Order No: 20198889 Description: gecko rn/c operation not
proper ned chk
Functional P301- DTAIL-DTLN2 Description: DETAIL LINES GECKO
-

Location:
Equipment No: Description:

Plant Section: Person Gouselazarn Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 26.03.2025 Basic Start Date: 25.03.2025

Release Time: 09:1346 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 26.03.2025
Notification No: 100318586 Order No: 20198891 Description: Plant-3 Dock clamp
need repair
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

0010

Release Date: 26.03.2025 Basic Start Date: 25.03.2025

Release Time: 09:25:39 Basic End Date:


.5 'o. 'a,5

Maintenance De ailment User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.03.2025
Notification No: 100318735 Order No: 20198965 Description: new purlin rn/c oil leak

Functional P301-CFORM- Description: PURLIN LINE


Location: PURLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 27.03.2025 Basic Start Date: 27.03.2025

Release Time: 17:58:39 Basic End Date:


03 20 ),5

a,

tnceDepen User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.03.2025
Notification No: 100318733 Order No: 20198970 Description: ysd safety guard cover
bolt broken plz c
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 27.03.2025 Basic Start Date: 27.03.2025

Release Time: 17:59:41 Basic End Date:


27. o2.?fly

I c

Maintenance De ent User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 27.03.2025
Notification No: 100318666 Order No: 20198973 Description: sanli 4mtr shear nitrogen
tilling plz ch
Functional P301- DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 27.03.2025 Basic Start Date: 26.03.2025

Release Time: 18:01 :55 Basic End Date:

Maintenance Depart nt User Department


Kirby Building Systems KSA
KirbMAINTENANCE ORDER JOB TICKET
Date : 27.03.2025
Notification No: 100318667 Order No: 20198972 Description: conrac 01 entry side
conveyor chain broc
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No Date/Time Date/Ti
0010 conrac 01 entry side conveyor chain broc
¶2Go3 96'03
Cl&to ?flvkd?

1,

Release Date: 27.03.2025 Basic Start Date: 26.03.2025

Release Time: 18:01:19 Basic End Date &o32n5


Employee Codes Employee Names Operation No Hrs -

cYjht'7 t
0 ___________

Maintenance Depa ent User Department


Kirby Building Systems KSA
a:u
MAINTENANCE ORDER JOB TICKET

Date : 03.04.2025
Notification No: 100318858 Order No: 20199123 Description: re forklift t502 starting
problem plc
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time DateiTimc. ______________________

0010 pre forklift t502 starting problem plz c


22 c
3

_ / ___________

__
/4 ____ _________

/ /'o d4-
Release Date: 03.04.2025 Basic Start Date: L- 9032025 U
//
Release Time: 14:50:38 /
Basic End Date:

Employee Codes Employee Nañies Operation No Hrs

fl7; _____________________

TSfl 2t¬dtt _______________

//

Maintenance Department User Department


a Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
3!
Date .-t¬04.2O25
Notification No: 100319790 Order No: 10134405 Description: HELl 6001 side loader
PM & Repair work
Functional P301- MTHDL Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLlFT-E7enEpet LC/-
Lf
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

(" .i
*010 HELl 6001 side loader PM & Repair work
b '.3o cJ ri'y

Release Date: 12.04.2025 Basic Start Date: 12.04.2025

Release Time: 15:57:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
KirbIJ MAINTENANCE ORDER JOB TICKET

Date: 03.04.2025
Notification No: 100319024 Order No: 20199122 Description: P1001 Tube need to be
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thoftupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 EPloolTubeneedtobechange
y :o'7Pt-eze iUie
_____________________________

a
____
Ck 9-

Release Date: 03.04.2025 Basic Start Date: 03.04.2025

Release Time: 14:49:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs

( !'? Cie-i

Maintenance Department User Department


v- Kirby Building Systems KSA
nWuy &iR MAINTENANCE ORDER JOB TICKET

Date : 03.04.2025
Notification No: 100318939 Order No: 20199120 Description: EP- 502 forklift Oil hose
leak problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Tims ______________________

0010 EP- 502 forklift Oil hose leak problem


kr s \ c c'ee-4 ?

Release Date: 03.04.2025 Basic Start Date: 03.04.2025

Release Time: 14:48:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

' 2-2 U2t!A/


T1
_______________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.04.2025
Notification No: 100318404 Order No: 20199128 Description: EP- 1002 forklift battery
change
Functional P301 -POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateiTimc. ______________________

0010 EP- 1 002 forklift battery change


f? / z. )3o ç. c)

Release Date: 03.04.2025 Basic Start Date: 22.03.2025

Release Time: 15:31 :16 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S1fl?- _________ _________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 03.04.2025
Notification No: 100319065 Order No: 10134164 Description: Hyundai Bus for camp
battery change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Stat4,. Compi Remarks


Datj2flnie DatelTime

9?
No __________________________________ _______ ____________________

0010 Hyundai Bus for camp battery change _______

,X, ktt2z1?_-
________________________
Ck&

Release Date: 03.04.2025 Basic Start Date: 03.04.2025

Release Time: 16:00:11 Basic End Date:

-Erii$pyee Codes Employee Names Operation No Hrs

___________________

Maintenance Department User Department


Kirby Building Systems KSA
WI h YI
H'U 4
MAINTENANCE ORDER JOB TICKET

Date: 06.04.2025
Notification No: 100319100 Order No: 20199202 Description: please check & repair
forklift breakdown
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time DatelTimc ______________________

0010 please check & repair forklift breakdown


( -'_

____________________________ _____ ______ _____

?ib
booIr

Release Date: 06.04.2025 Basic Start Date: 04.04.2025

Release Time: 09:38:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____________________ âkejAJ
_____________________ ___________

Maintenance Department User Department


Krrby Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 06.04.2025
Notification No: 100319169 Order No: 20199201 Description: FORKLIFT 7tons
Hangcha replace tire
Functional P301- SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DatelTimc. _____________________

C
0010 FORKLIFT 7tons Hangcha replace tire
fi 3c /- 3t

C--

Release Date: 06.04.2025 Basic Start Date: 05.04.2025

Release Time: 09:30:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

4L&A¬V ___________________

______ _

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 06.04.2025
Notification No: 100319251 Order No: 10134202 Description: T-302 forklift front tyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302 -

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description tatus Start Compi Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

010 T-302 forklift front lyre puncher yt


o io 7/)/t-'z>C I
.0 ___

7i'
4&0aifr r4

Release Date: 06.04.2025 Basic StadiDate: 06.04.2025

Release Time: 09:29:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____
AkW-P _______________

Maintenance Department User Department


Kirby Building Systems KSA
KwbJ MAINTENANCE ORDER JOB TICKET
at?.-
-

Date ett04.2025
Notification No: 100319392 Order No: 201 99290 Description: paint line fork lift tp502
breakdown
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc _____________________

0010 'paifntfork lift tp502 breakdown


C ?3 ,_9L-f'Ve_. tLJ*
jpJ ccçr e&Lkr ______________

__ _______________ ___ ___ ukv\

'rump.-
___________________
R?c tt
Release Date: 09.04.2025 Basic Start Date: 09.04.2025

Release Time: 06:28:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 09.04.2025
Notification No: 100319559 Order No: 20199291 Description: EP1001 lyre need to be
change
Functional P301- MTHDL- Description: FORKLIFIS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP lOION EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Ihottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tim¬. ______________________

0010 EP1 001 lyre need to be change


(
gt
/1: oc
7?t7_e e&f-._.4
_________________ _________ Tu¼
__________________ ___ _______
ge

Release Date: 09.04.2025 Basic Start Date: 09.04.2025

Release Time: 09:24:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

7f _____________________________

Maintenance Department User Department


Kirby Building System KSA
,MAINTENANCE ORDER JOBJICKET

Date: 09.04.2025
Notification No: 100319466 Order No: 20199266 Description: Primo Wire motor not
working
Functional P301- BUILT- Description: BEAM WELDING LINE-3
LocaUon: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Description Status Start Compl Remarks


Date/Time Date/Tim
0010 Primo Wire motor not wor ing
-

tt!otjia Ot/rI4!5

oL

Release Date: 09.04.2025 Basic Start Date: 08.04.2025

Release Time: 08:24:10 Basic End Date: fl v#-'Qqtç

Em lo ee Codes Em lo ee Names O ration No

ea 19

lit'-.

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.04.2025
Notification No: 100319558 Order No: 20199287 Description: manual blasting hopper

Functional P301-POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start compl Remarks


No Date/Time Date/Tim
0010 manual blasting hopper
"$!0423 ex'Jojfr
C,0,
(t, Lr4

Release Date: 09.04.2025 Basic Start Date: 09.04.2025

Release Time: 08:24:54 Basic End Date:

Em Ic ee Codes Em lo ee Names 0 oration No

fee h

-a,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.04.2025
Notification No: 100319553 Order No: 20199289 Description: scm lubrication pipe
broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Timc ___________________

0010 scm lubrication pipe broken

4'J g.c1, Run ___ ________ __________

_
/ft ___________

Release Date: 09.04.2025 Basic Start Date: 09.04.2025

Release Time: 08:26:02 Basic End Date: 07oj

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : ¬04.2025
Notification No: 100319769 Order No: 10134404 Description: EP- 502 forklift front
break right repai
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TF&i'&f#c 5TON 2--

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Datellime Date/Timc. ______________________

0010 EP- 502 forklift front break right repai


feAv%c ç.zJir.o 0 p_ fi(JL /
_____________________
)0 J3O __________

43t
__________________ ___ _____

47p Se- v/
___________________ ___ ____

V c
Release Date: #&04.2025 Basic Start Date: 12.04.2025

Release Time: 15:53:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 12.04.2025
Notification No: 100319467 Order No: 20199386 Description: EP1001 Tube need to be
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID: ,oTh

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Time___________________

0010 EPloolTubeneedtobechange
___ _____________________ ____

; ç, TJY.ske 0'i.
________________________ ________
/ibc' C&cv
h/t- Ca4-',,:
V

Release Date: 12.04.2025 Basic StartDate: 08.04.2025

Release Time: 09:14:08 Basic End Date:

Maintenance Department L'fl mn


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315907 Order No: 20197767 Description: conrac olconveyor
electrical proble
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description; COn-rcLc-- t.oc.t !*&9- ln)
Plant Section: Person Vifthal Narayan Main Work Electrical Maintenance
Responsible: Ambure Centre;
Tech ID:

Opr Description Status Start Compl Remarks


jNo DateiTime Dateilimc _____________________

010 conrac 01 conveyor electrical proble


5-.3Q L , (_Cfl..q MjyftYl

Release Date: 18.02.2025 Basic Start Date: 17.02.2025

Release Time: 17:42:55 Basic End Date:

(CnTeC f3Qr I k3&to cc'ilN-W Ijo f ft

Cl4 tkk ofry prr9Jt o cL -Vtv gfrr*tJ


tic

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315957 Order No: 20197763 Description: 20tt shear vecuum litter
not working pls
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID: KJSH-0601

I Opr Description Status Start Compl Remarks


DateiTime Date/Timc ____________________

__________________________________
010
_____

20tt shear vecuum lifter not working pls


_______

L-rnØcP '

- 5t '4-CX-CA_fl-) B
ott:-.

Release Date: 18.02.2025 Basic Start Date: 18.02.2025

Release Time: 17:38:09 Basic End Date:

t pCLP c- S/ vDv1C t-fl1EA, 1oecun prfl-cvt g&atrb

/ 1odh
L-°"

Maintenance Department User Department


1 Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315958 Order No: 20197761 Description: 20 ft shear back side
conveyor mator not
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID: KJSH-0601

Release Date: 18.02.2025 Basic Start Date: 18.02.2025

Release Time: 17:35:52 Basic End Date:

:
613'97-

ü- k ç- as-
k ¼Ac2( f?un o

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315961 Order No: 20197760 Description: new scm near gantry
crane not working p1
Functional P301- MTHDL- Description: GANTRY CRANES
Location: GTCRN
Equipment No: Description: C1a$at gcM.J,W

Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 18.02.2025

Release Time: 17:34:37 Basic End Date:

kPt& S C- t) C fltum.c- '#'t M2)7 Si,D)ft4,

49eP St+ cLta&racv

Maintenance Department User Department


h Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315998 Order No: 20197755 Description: Plant-2welding holder
need repair
Functional P301- BUILT Description: BUILT-UP SECTION
Location:
Equipment No: Description: -4h cit uD4 c 144 c-
Plant Section: Person Main Work Electrical Maintenance
Responsible: Centre:
Tech ID:

I Opr Description Status Start Compl Remarks


Date/Time Date/Timi.
__________________

________________________________
Plant-2we1ding holder need repair
_____ ______

JO10 pn4 0_c


1'--t° QL44_4iJ_1ltt%J

____ ____________________________ _____ _______

La-f d---' olt.9&-C-.

Release Date: 18.02.2025 Basic Start Date: 18.02.2025


Release Time: 17:27:44 Basic End Date:

't312-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315864 Order No: 201 97749 Description: Plant-Dwelding holder
need fix
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: i&

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 17.02.2025


Release Time: Basic End Date:

cfrcck A)Qjdk rnc

Maintenance Department User Department


Kirby Building Systems KSA
t. MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315868 Order No: 20197748 Description: Grinder machine not
working ag4
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 17.02.2025

Release Time: 17:17:05 Basic End Date:

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315884 Order No: 20197768 Description: Plant-2 Drill M/C need
repair
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: rs&[t
Plant Section: Person Vishnu Venugopalan Main Work Electrical Maintenance
Responsible: Nair Centre:
Tech ID:

Opr Description Status Start Compi Remarks


LNO Date/Time Date/Timc __________________

010 Plant-2 Drill M/C need repair

3o cc sUd3o-.r)
___ _________________ ___

_____________________ ___ ____


eotse" cølolt R
___ ______________________ ____
C

Release Date: 18.02.2025 Basic Start Date: 17.02.2025

Release Time: 17:44:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs


33fl- ___________ __________ ___________

430(A3t¼t (1i9\t ArQS3 JC-C) #0 coC. O'-'-2

CQ -s-aQ
tf- L'

Maintenance Department User Department0j,,


ir
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315736 Order No: 20197766 Description: plant 2,mig weding/m
problem t57
Functional P301-BUILT- Description: WELDING MACHINES
Location: FWELD
Equipment No: Description: N.j wvi 4 's-s La
Plant Section: Person Vitthal Narayan Main Work CONRAC -1
Responsible: Ambure Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 15.02.2025

Release Time: 17:42:13 Basic End Date:

p\1 n4c -fl-D\&t -,Q- -s, n4-


2 cxAJC- S4&&CtL
So 4v & Ce-kixv tc }-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315740 Order No: 20197764 Description: Plant-3 welding machine
not working
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:4n&
kJd
Plant Section: Person Sunil Kumar Main Work Electrical Maintenance
Responsible: Krishnankutty Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 15.02.2025

Release Time: 17:39:58 Basic End Date:

dd Mk fl4

USc- jsaJ-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315784 Order No: 20197765 Description: stn c welding rn/c not
working
Functional P301- BUILT- Description: WELDING MACHINES
Location: FWELD
Equipment No: Description: t49 aøflt%1(C
Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance
Responsible: Ambure Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 15.02.2025

Release Time: 17:41 :15 Basic End Date:

Employee Codes Employee Names I Operation No I I-ks

<10½ £ tA9iAt LAgt& Cc4-S -cc


to- £&t
p

Maintenance Department User Deartment,


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.02.2025
Notification No: 100316104 Order No: 20197872 Description: SPT Blsating machine
brakdown
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 20.02.2025

Release Time: 12:00:25 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cs1
__________
$,I-4A&A2 _______________ ________________

Maintenance Department User Department


"r Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100315973 Order No: 20197656 Description: angle machine blade
damage nd check
Functional P301-CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 18.02.2025

Release Time: 12:09:53 Basic End Date: / 02


Employee Codes Employee Names Operation No Hrs
__________
tlokr1 '3J!oi _______________
I
-'________ '2,R11J _____________ i,
________ ____________ ___________

ljj H'

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100315899 Order No: 20197885 Description: primo welding liner
problem pls check
Functional P301- BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 17.02.2025


Release Time: 12:09:11 Basic End Date: /7 o21k,
Employee Codes Employee Names Operation No Hrs

5'?66t ____________ ___________ ____________

-S_________ _________________ _______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100315935 Order No: 20197883 Description: onrac 01 tacking section
oile leack
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID;

Description

0010

C bd,

Release Date: 22.02.2025 Basic Start Date: 18.02.2025

Release Time: 12:08:09 Basic End Date:


fBo2'2ny,

Employee Codes Employee Names Operation No Hrs

________
/-1vh,naIS1ohk,L. @1) If/ri
:tS %'O.5 ______________

C) I W:-

Maintenance Department User Department


it Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.02.2025
Notification No: 100316202 Order No: 20197870 Description: spt machine not working
broken roto-2
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 21.02.2025

Release Time: 11:32:15 Basic End Date:


2/' v2 2Q1

Maintenance Department User Department


Kirby Building Systems KSA
h
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316235 Order No: 20197869 Description: sanli 4 mtr shear stoper
not working
Functional P301-DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work CONRAC -1


Responsible: Shaikh Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 22.02.2025

Release Time: 11:29:27 Basic End Date:


22 02 2 02t)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316234 Order No: 20197868 Description: plasma coolant pipe
leakage
Functional P301- DTAIL-PLASM Description: PLASMA CUTTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 22.02.2025

Release Time: 11:28:02 Basic End Date: 22.o2. 20.2.5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316183 Order No: 20197867 Description: conrac 1 hydraulic
problam
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 21.02.2025


Release Time: 11:26:14 Basic End Date:
2?' O2 2Øz.5
Employee Codes Employee Names Operation No Hrs

________ ____________ ___________


Ikb
- C)a74n&'h "N')'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.02.2025
Notification No: 100315996 Order No: 20197887 Description: plasma cutting head bolt
loose plz check
Functional P301- DTAIL-PLASM Description: PLASMA CUTTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Stan Date: 18.02.2025


Release Time: 12:10:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

p
13

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316114 Order No: 20197873 Description: krass machine die bolte
loose
Functional P301- OTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work CONRAC -1


Responsible: Shaikh Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 20.02.2025

Release Time: 12:01:00 Basic End Date: 2-ej D9 2ea

Employee Codes Employee Names Operation No Hrs

_________________________________

ill

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.02.2025
Notification No: 100315968 Order No: 20197688 Description: scm dia punch stuck
need to b check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 18.02.2025

Release Time: 12:11:09 Basic End Date: /'O 2

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316020 Order No: 20197878 Description: SPT Bisating machine
brakdown
Functional P301-FIN IS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: Basic Start Date: 18.02.2025

Release Time: 12:04:02 Basic End Date:


tgo2- z
Employee Codes Employee Names Operation No Hrs

_______ ___________ __________ 2ksti

Maintenance Department User Department


Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316063 Order No: 20197875 Description: conrac 01 head oil leake
please check
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 19.02.2025

Release Time: 12:02:23 Basic End Date:


(9' e2
Employee Codes Employee Names Operation No Hrs

-I

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100315890 Order No: 201978B0 Description: irone worker machine not
working pls che
Functional P301-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 17.02.2025

Release Time: 12:06:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________
"-I0h;d_,vff. ________________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100316021 Order No: 20197879 Description: [lant 2 Girt blasting
machine breakdown
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 18.02.2025

Release Time: 12:04:38 Basic End Date:


J 02?O)4

/ ))

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.02.2025
Notification No: 100315894 Order No: 20197881 Description: conrac 01 b side head
cylender oil leake
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 22.02.2025 Basic Start Date: 17.02.2025

Release Time: 12:07:09 Basic End Date: j' 7.

Employee Codes Employee Names Operation No Hrs

_______ _____________________
Hi
______ __________

p __________

Maintenance Department User Department


1 Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.02.2025
Notification No: 100315934 Order No: 20197862 Description: conrac 01. b side head
problem
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Mv
I

Release Date: "..-


22.02.2025 Basic Start Date: 16.02.2025

Release Time: 12:07:47 Basic End Date:

I 1fli

Maintenance Department User Department


Kirby Building Systems KSA
it'
MAINTENANCE ORDER JOB TICKET

Date : 25.02.2025
Notification No: 100316542 Order No: 10133164 Description: PM work for Erudite
purline machine new
Functional P301-CFORM- Description: PURLIN LIEN Z SECT
-

Location: PURLN-ZPSEC
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

. Description ifl1rP
it. 'riin 'tirw
0010 UE"1iti711TTIki.iuiili,rauiirn1iiriiiti','

Release Date: 25.02.2025 Basic Start Date: 25.02.2025

Release Time: 14:01:45 Basic End Date:

Codes

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.02.2025
Notification No: 100316473 Order No: 20197999 Description: 20ff shear full down
please check
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH-0601

ILQQJZ- qec
Release Date: 25.02.2'025 'Basic StadDate? ' jJ02'>j
Release Time: 13:34:42 Basic End Date:
t '022ma5

partment User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 25.02.2025
Notification No: 100316539 Order No: 10133182 Description: Conrac auto weld #1
hyd. pump repair
Functional P301- BUILT- Description: SEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Tim¬ ____________________

0010 Conrac auto weld #1 hyd. pump repair


___ ________________________ _____

25o2 2F 25t14 _____________

cf/i, #yrl 7nvi/)

tniortf7 / %' cTh _________________

0tnnt7 a4-ti/ cc,rh ____ ___________ ______________

g/_cA,ad0k ______________

Release Date: 25.02.2025 Basic Start Date: 25.02.2025

Release Time: 13:38:51 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
KwbSJ MAINTENANCE ORDER JOB TICKET

Date : 9&4.2025
Notification No: 100316578 Order No: 20199126 Description: Forklift tube puncture

Functional P301 -POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Sfrt Compi Remarks


No ____________________________________ _______
DatelTime DatelTimc. _____________________

\0010
p
Forklift tube puncture
(' _______
ct3p j2-3 n
"
_$__a
.jv'

___ ______________________ ____ _____ _____

/ohø (Lj

A&
_______________________ ____ _________

a-- (1
Release Date: 03.04.2025 Basic Start Date: 26.02.2025

Release Time: 15:04:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

' [i?,d1 ___________________

Maintenance Department User Department


Kirby Building Systems KSA
ir
It
MAINTENANCE ORDER JOB TICKET

Date: 02.03.2025
Notification No: 100316782 Order No: 20198112 Description: conrac 01 head playing
pls check now not
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

I.)fl!7iItrnI 'Yitftdffl!.
0010 "¬.],iE*ti1Ii?I3F1mT1L.,i.vyi.t.i

Release Date: 02.03.2025 Basic Start Date: 01.03.2025

Release Time: 08:29:32 Basic End Date: 0 o3 Qo


.

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date : 02.03.2025
Notification No: 100316839 Order No: 20198114 Description: conrac 01 head playing
pls check now not
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 02.03.2025 Basic Start Date: 02.03.2025

Release Time: 08:31:23 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
Krb'JI'
at MAINTENANCE ORDER JOB TICKET

Date : 02.03.2025
Notification No: 100316784 Order No: 20198113 Description: bandsaw hydraulic
supporting plate b pls
Functional P301- CFORM- Description: ROD LINE
Location: RODLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ DatelTime Date/Time ______________________

0010 bandsaw hydraulic supporting plate b pls

Release Date: 02.03.2025 Basic Start Date: 01.03.2025

Release Time: 08:30:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.03.2025
Notification No: 100316666 Order No: 20198116 Description: conrac 02web tacking
conveyor chain down
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Remarks

Release Date: 02.03.2025 Basic Start Date: 27.02.2025

Release Time: 08:43:59 Basic End Date: 27op 2..o

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date 02.03.2025
Notification No: 100316626 Order No: 20198118 Description: conrac 01 roller one side
up&down pls ch
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWl 4N-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

. Description L1fl'i-
I. tWainn 'Mt
0010 ".i.1ir.T4sIv1l1t.irL1rira1n1s1'!i1.mu

Release Date: 02.03.2025 Basic Start Date: 27.02.2025

Release Time: 08:46:41 Basic End Date:


2 7'02

Employee Codes Employee Names Operation No Hrs


________

A/sb rq,/4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.03.2025
Notification No: 100316613 Order No: 20198115 Description: SPT Blsating machine
brakdown
Functional P301- FIN IS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: Basic Start Date: 27.02.2025

Release Time: 08:42:48 Basic End Date: 27a2'2n.5

frJi

Maintenance Department User Department


WwhtiY Kirby Building Systems KSA
'U
MAINTENANCE ORDER JOB TICKET

Date : 04.03.2025
Notification No: 100316892 Order No: 20198211 Description: conrac 01 entry side
conveyor chain brea
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 01 entry side conveyor chain brea

Release Date: 04.03.2025 Basic Start Date: 03.03.2025

Release Time: 18:i4:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


" ..".L Kirby Building Systems KSA
KWUYk1. MAINTENANCE ORDER JOB TICKET

Date : 04.03.2025
Notification No: 100316866 Order No: 20198212 Description: conrac 02 press wheel
lock pin remmoce p
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Moharnmad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Tim¬ ____________________

0010 conrac 02 press wheel lock pin remmoce p

Release Date: 04.03.2025 Basic Start Date: 02.03.2025

Release Time: 18:14:38 Basic End Date:

Employee Codes Employee Names peration No Firs

Maintenance Department User Departmen)


Kirby Building Systems KSA
KirbJ MAINTENANCE ORDER JOB TICKET

Date : 04.03.2025
Notification No: 100316896 Order No: 201 98209 Description: conrac 01 conveyor roller
fell down
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tim¬ ______________________

0010 conrac 01 conveyor roller fell down

Release Date: 04.03.2025 Basic Start Date: 03.03.2025

Release Time: 18:12:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
%,
MAINTENANCE ORDER JOB TICKET

Date: 04.03.2025
Notification No: 100316893 Order No: 20198210 Description: dteaU scm holding jack
bolt loose
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 dteail scm holding jack bolt loose

Release Date: 04.03.2025 Basic Start Date: 03.03.2025

Release Time: 18:13:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirbilit flat
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 04.03.2025
Notification No: 100316897 Order No: 20198208 Description: 201t shear blade both
side touching
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID: KJSH- 0601

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 201t shear blade both side touching

Release Date: 04.03.2025 Basic Start Date: 03.03.2025

Release Time: 18:11:57 Basic End Date:

Employee Codes Employee Names Operation No Firs

Maintenance Department I User Department


Kirby Building Systems KSA
II4Tb MAINTENANCE ORDER JOB TICKET

Date: 07.03.2025
Notification No: 100317203 Order No: 10133435 Description: Station B Air compressor
PM & Air filter
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000303 Description: STATION B AIR COMPRESSOR L75 -2 -

Plant Section: Comprsr Room- i Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible; Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Station B Air compressor PM & Air filter

Release Date: 07.03.2025 Basic Start Date: 07.03.2025

Release Time: 09:01:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.03.2025
Notification No: 100317078 Order No: 20198331 Description: conrac 01 operator side
cylender not wor
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Timt. ______________________

0010 conrac 01 operator side cylender not wor

Release Date: 08.03.2025 Basic Start Date: 05.03.2025

Release Time: 11:28:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
II1Ti3:t1 MAINTENANCE ORDER JOB TICKET

Date : 08.03.2025
Notification No: 100317251 Order No: 20198325 Description: paint line compressor
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 paint line compressor problem

Release Date: 08.03.2025 Basic Start Date: 08.03.2025

Release Time: 11:25:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
IC whii*t
I %IJ
MAINTENANCE ORDER JOB TICKET

Date : 08.03.2025
Notification No: 100317137 Order No: 201 98330 Description: CNC Angle machine
hydralic oil
Functional P30l-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc. _____________________

0010 CNC Angle machine hydralic oil

Release Date: 08.03.2025 Basic Start Date: 06.03.2025

Release Time: 11:28:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Deprtment


'
Kirby Building Systems KSA
irb MAINTENANCE ORDER JOB TICKET
Date : 08.03.2025
Notification No: 100317237 Order No: 20198327 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 08.03.2025 Basic Start Date: 07.03.2025


Release Time: 11:26:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
rIru1
MAINTENANCE ORDER JOB TICKET

Date : 09.03.2025
Notification No: 100317086 Order No: 20198369 Description: new purlin rn/c uncoiler
not working
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Moharnrnad Sahbaz Main Work Electrical Maintenance


Responsible: Moharnrnad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ Date/Time Date/Time ______________________

0010 new purlin rn/c uncoiler not working

Release Date: 09.03.2025 Basic Start Date: 05.03.2025


Release Time: 11:11:51 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
'u ,.jvaa MAINTENANCE ORDER JOB TICKET

Date: 12.03.2025
Notification No: 100317618 Order No: 20198452 Description: conrac 01 operator side
nozzle burn pis
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 01 operator side nozzle burn pis

Release Date: 12.03.2025 Basic Start Date: 12.03.2025

Release Time: 09:04:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.03.2025
Notification No: 100317552 Order No: 20198453 Description: Sanli 4mtr stoper chain
removd pls check
Functional P301- DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: 15000267 Description: Sanli Shear 25 x 4000

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 12.03.2025 Basic Start Date: 11.03.2025

Release Time: 09:05:25 Basic End Date: If .

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.03.2025
Notification No: 100317619 Order No: 20198451 Description: 20tt shear full down pis
check
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 12.03.2025 Basic Start Date: 12.03.2025

Release Time: 09:03:53 Basic End Date:


?2'q3- 2oz

lhb

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.03.2025
Notification No: 100317537 Order No: 20198454 Description: old purlin rn/c D-coiler
need to repair
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 12.03.2025 Basic Start Date: 11.03.2025

Release Time: 09:05:53 Basic End Date: nç

Employee Codes Employee Names Operation No Hrs

5_t. ___________ ____________

Maintenance Department User Department


Kirby Building Systems KSA
Kirb% MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100317855 Order No: 20198626 Description: 20ft shear ramp not
working properly
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohid Mulla Main Work CONRAC


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc. _____________________

0010 20ff shear ramp not working properly

Release Date: 18.03.2025 Basic Start Date: 16.03.2025

Release Time: 08:45:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Dea,yhent


Kirby Building Systems KSA
I tJi
YI%t MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100317693 Order No: 201 98630 Description: sanli 4meter stopper
chain removedplschk
Functional P301- DTAIL-DTLN1 Description: DETAIL LINES (Kirby)
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 sanli 4meter stopper chain removedplschk

Release Date: 18.03.2025 Basic Start Date: 13.03.2025

Release Time: 08:52:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User


Dient
ttrrknPfl. Kirby Building Systems KSA
iUMV
"aS MAINTENANCE ORDER JOB TICKET

Date: 18.03.2025
Notification No: 100318054 Order No: 20198636 Description: spt shot leakage

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Muhammad Ant Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTime _____________________

0010 spt shot leakage

Release Date: 18.03.2025 Basic Start Date: 18.03.2025

Release Time: 12:52:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs -

Maintenance Department User Department

At-
' 'J
h Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315027 Order No: 20197398 Description: ysd shear crane not
working
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Timc ___________________

0010 ysd shear crane not working


r
L

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:19:49 Basic End Date:

User Department
'I
Kirby Building Systems KSA-

-
MAINTENANCE ORDER JOB TICKET

Date : 06.02.2025
Notification No: 100315180 Order No: 1013265 Description: EP:' 701, new battery to
be replaced
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
EquipmentNo: 13000658 Description: :FORKLIFT EP 7 TON EP7O1 -

Plant Section: Person Rajendran Main Work Mechanical Maintpnance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc _____________________

0010 EP -701, new battery to be replaced Ar


( __
fA/c5A/E CI".- ___ ____

tC)
frICtI'5
__

CooLt,,t CAa ______ ________

__ /1 it o _______________

__

pie- a -tt- cr ______________

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:05:07 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


tirhtfl Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315255 Order No: 20197446 Description: FORKLI FT
H704-Change oil,grease
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

9010 FORKLIFT H704-Change oil,grease


(. 44/'67, /f
'I

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:24:09 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance fe,7nt User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315219 Order No: 20197427 Description: conrac 02 pressing head
cylinder not wor
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Description

0010

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 08:38:44 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315246 Order No: 20197445 Description: STN D D-4 over head
crane not working
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

DatelTime Date/Time ______________________

0010 STN D D-4 over head crane not working


C

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:23:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Deparl User Department


Kirby Building Systems KSA
Kwb9f' MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315228 Order No: 20197439 Description: conrac 01 web tacking
magunet not workin
Functional P301 -BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Brijesh Kumar Main Work Electrical Maintenance


Responsible: Chauhan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTime _____________________

0010 conrac 01 web tacking magunet not workin


r

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

fleleaseTime: 15:18:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

User Department
ill Kirby Building Systems KSA
" MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315234 Order No: 20197441 Description: conrac 01 not working
pls check
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 conrac 01 not working pls check

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:19:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

C)

Maintenance User Department


Kirby Building Systems KSA
KirbII MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315237 Order No: 20197442 Description: plant-2 1OTON crane
dock clamp change
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Time. ____________________

0010 plant-2 1OTON crane dock clamp change


(1

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:20:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 09.02.2025
Notification No: 100315239 Order No 20197444 Description: sin c drilling rn/c not
working
Functional P301- DTAIL-DTLN4 Description: DETAIL LINES CNC DRILL
-

Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Timc. _____________________

0010 stn c drilling rn/c not working


C

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:22:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Departye User Department


/
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.02.2025
Notification No: 100315238 Order No: 20197443 Description: conrac 01 ground shoe
not working
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 01 ground shoe not working


C

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:21 :53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fl

Maintenance I User Department


/
t
Vrhtifl Kirby Building Systems KSA
a"
MAINTENANCE ORDER JOB TICKET

Date: 09.02.2025
Notification No: 100315233 Order No: 201 97440 Description: conrac 02 wire feeder
roller not working
Functional P301- BUILT- Description: BEAM WELDING LlNE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

(T1.
0010 conrac 02 wire feeder roller not working
I

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time: 15:19:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.02.2025
Notification No: 100315228 Order No: 20197424 Description: stn C angle line blade
damage nd change
Functional P301-CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 09.02.2025 Basic Start Date: 09.02.2025

Release Time:. 08:35:07


'4'
Basic End Date: OToz 202-5
Employee Codes Emplo cc Names Operation No Hrs

Maintenance User Department


Kirby Building Systems KSA
Ks bt MAINTENANCE ORDER JOB TICKET

Date: 10.02.2025
Notification No: 100315337 Order No: 20197486 Description: stn c angle line die auto
down nd check
Functional P301-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

Q010 stn c angle line die auto down nd check

Release Date: 10.02.2025 Basic Start Date: 10.02.2025

Release Time: 15:31:19 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100315369 Order No: 20197517 Description: spt machine bolt problem

Functional P301-FINIS-SHOT1 Description: SHOT BLASTING MACHINES


Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Description

0010

Release Date: 11 .02.2025 Basic Start Date: 11.02.2025

Release Time: 17:01:29 Basic End Date:

tJflflItfl[. ":

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100315437 Order No: 20197518 Description: 20ft shear blad clearince
cheack pls
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/TimE _____________________

0010 20ft shear blad clearince cheack pls

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:01:56 Basic End Date:

Hrs

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100315368 Order No: 20197516 Description: DISA manual blasting
machine conveyor da
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA-

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Date/Time DateiTimc ____________________

0010 DISA manual blasting machine conveyor da


Li

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:00:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs


5k'cxZ

Li

Maintenance Department User Department


j_71

Vrrhdii Kirby Building Systems KSA MLvnR\&a,30e0t1f

'° MAINTENANCE ORDER JOB TICKET

Date: 11 .02.2025
Notification No: 100315439 Order No: 10132736 Description: EP- lOOl forklift total
repair work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

)9010 EP- lOOl forklift total repair work


(

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 16:46:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________________ __________ \ \ou-z3'


C..

Maintenance Department User Department


Kirby Building Systems KSA
VirhtiWR
MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100312327
/ Order No: 10131893 Description: EP 1001 break oil leakge
nd check
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

EP 1001 break oil leak end check


C "0010
p 'oM?
L&IATE QkB\it
£ E'ze44 &w _______

S
H /'zQAL Aaver cL4
_
e/4 e- __ ______

Release Date: 15.01.2025 Basic Start Date: 04.01.2025

Release Time: 12:07:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs

CJ

7)UM& iL Ckr -

£'r sk) c- &s1


7 'r o}Ai + &d
&
0p,'d
(i) 7--3- 4&t- L faLAcQ'j+ ett-3QtCt
Maintenance Department User Department
Kirby Building Systems KSA
Krb MAINTENANCE ORDER JOB TICKET

Date: 11 .02.2025
Notification No: 100315393 Order No: 20197520 Description: conrac 01 a side head
not working pls ch
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ DateJTime DatelTim6 ______________________

0010 conrac 01 a side head not working pls oh


n Uoiiln 4 'iuz b-&c5k.

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:03:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs


ZW2 MokM (\1uUo

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100315385 Order No; 20197524 Description: purlin line roll forming
machine not wor
Functional P301-SHEET Description: SHEET SECTION
Location:
Equipment No: Description:

Plant Section:

Tech ID:
Person
Responsible: iiiIIIII/
Sibin John
Centre:
CONRAC -1

Opr Description Status Start Compl Remarks


No __________________________________ ______ Date/Time Date/Timc ___________________

0010 purlin line roll forming machine not wor


Th___ __________________________ _____ ______ ______ ______________

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:10:21 Basic End Date:

kW)

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.02.2025
Notification No: 100315367 Order No: 20197521 Description: scm sensor problum
please check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Remarks

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:03:36 Basic End Date: (,t.


02 2015
Employee Codes Employee Names Operation No Hrs

___________
"1/71d 'Vu//rn cu) / fit)'

_______ _____________

CT)

Maintenance Department User Department


t(srhtilt Kirby Building Systems KSA
%LJ
MAINTENANCE ORDER JOB TICKET

Date: 11 .02.2025
Notification No: 100315429 Order No: 20197515 Description: stn C angle line blade
damage nd change
Functional P301-CFORM- Description: ANGLE LINE CF
-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

Date/Time Date/Time _____________________

0010 stn C angle line blade damage nd change


CT kk&
QLO

5Qt ________ ____ __________

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 16:55:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________ tvl4thl MvRa

i3rnU

Maintenance Department User Department


Kwb $t Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 11 .02.2025
Notification No: 100315428 Order No: 20197519 Description: purlin roliform bearing
broken
Functional P301- CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

Date/Time Date/Timc. _____________________

0010 purlin rollform bearing broken

___ VLtfttflm Un2- I9c ')ino

Release Date: 11.02.2025 Basic Start Date: 11.02.2025

Release Time: 17:02:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs


tr rs6kn
Ankb

Maintenance Department User Department


It rfrn Kirby Building Systems KSA
IH
MAINTENANCE ORDER JOB TICKET

Date: 12.02.2025
Notification No: 100315540 Order No: 201 97576 Description: STN D Bend Saw Blade
need to change
Functional P301-HTRLD Description: HOT ROLLED SECTION
Location:
Equipment No: 15000268 Description: CFM BANDSAW

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Tim6 ______________________

0010 STN D Bend Saw Blade need to change

.c

Release Date: 12.02.2025 Basic Start Date: 12.02.2025

Release Time: 18:18:55 Basic End Date:

I_ Employee Codes Employee Names Operation No firs


72 a'mkm ('nuI(

_______

, ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.02.2025
Notification No: 100315489 Order No: 201 97569 Description: conrac 02 conveyor not
working
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
DatelTime DatelTimc. ______________________

0010 conrac 02 conveyor not working


C
Uoe- -2 &nV213oF A1XLf
'flhlco sP ____

Release Date: 12.02.2025 Basic Start Date: 12.02.2025

Release Time: 18:12:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________

wL41K 4 ka"
_______ r5oJ- /9Vt1L ___________ ____________

Vt _________ 4i±i y7ejt

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.02.2025
Notification No: 100315442 Order No: 20197577 Description: SPT machine motor
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 12.02.2025 Basic Start Date: 12.02.2025


Release Time: 18:19:53 Basic End Date: /2-02 2ot9

Employee Codes Employee Names Operation No Hrs

_________
QAhATý. (7) I iS',.'
______________ ______________________ ____________________ / Hi'
_________ ______________ _____________
t_&'

Maintenance Department User Department


1 Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.02.2025
Notification No: 100315461 Order No: 20197578 Description: dg not working spt

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 12.02.2025 Basic Start Date: 11.02.2025

Release Time: 18:20:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs


5W"- ,6k9bk- 4 k1tJ

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 12.02.2025
Notification No: 100315505 Order No: 20197568 Description: FORKLIFT H704- fix lilt
bearing
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

TO10 FORKLIFT H704- fix lift bearing

__ ____________________________ Ck9L

Release Date: 12.02.2025 Basic Start Date: 12.02.2025

Release Time: 18:12:01 Basic End Date:

Employee Codes Employee Names Operation No Hrs

PI¬A/ _________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 15.02.2025
Notification No: 100315705 Order No: 20197635 Description: SCM 2 Holding clamp
conectin weld break
Functional P301 -DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc ____________________

\0010 SCM 2 Holding clamp conectin weld break


(

Release Date: 15.02.2025 Basic Start Date: 15.02.2025

Release Time: 09:21:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 16.02.2025
Notification No: 100315808 Order No: 20197678 Description: Plant-2 Drill machine
N/W
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person 1 Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 16.02.2025 Basic Start Date: 16.02.2025

Release Time: 17:14:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

') tSS1)_ ____________ ___________ ____________

AO4fltP r\\ Vv\lC W& (?LC kcytSt O pft4t-L1

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.02.2025
Notification No: 100315829 Order No: 20197674 Description: 20 ft shaering jack holder
full down pis
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ______________________________________ Date/Time Date/Time ______________________

20 ft shaeririg jack holder full down pis


(

Release Date: 16.02.2025 Basic Start Date: 16.02.2025

Release Time: 17:00:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(4..

Maintenance Department User Department


Kirby Building Systems KSA
it
MAINTENANCE ORDER JOB TICKET

Date: 16.02.2025
Notification No: 100315801 Order No: 20197679 Description: pint line air compressor
breakdown
Functional P301-FINIS- PAINT Description: PAINTING MACHINES
Location:
Equipment No: Description: Cc'npn-escn -po,J'fr L-c#-
Plant Section: Person Vitthal Narayan Main Work Mechanical Maintenance
Responsible: Ambure Centre:
Tech ID:

Release Date: 16.02.2025 Basic Start Date: 16.02.2025

Release Time: 17:15:54 Basic End Date:

,, aat- 0' fte2 'ft t9-C-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.02.2025
Notification No: 100315750 Order No: 20197680 Description: Grinder machine not
working ag4
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: .Lf ctch y.jAj

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
TechiD:

Opr Description Status Start Compl Remarks


Date/Time DateiTimc _____________________

O10
_____ ____________________________________
Grinder machine not working ag4 _______

tk l2_ Cc t_cn- (oor B I)-


(ç(

Cikaje.A ttc

Release Date: 16.02.2025 Basic Start Date: 15.02.2025

Release Time: 17:16:43 Basic End Date:

L c\d CO%AD&r) bryq4,


Qc. De,t-

Maintenance Department User Department


Kirby Building Systems KSA
' MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315860 Order No: 20197751 Description: paint line last crane up
down proble
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:
u-n--- rrzt'n
Plant Section: Person Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Datellimt _____________________

10 paint line last crane up down proble


'40 lo 3o ptØ,
a5-p'1ti GL1rt4
______________________ ____ ____ ____

Release Date: 18.02.2025 Basic Start Date: 17.02.2025


Release Time: 17:22:48 Basic End Date:

Employee Codes Employee Names Operation No Hrs

oR r fri Dct4tctc 0L-1,4cv


Ac0ç-LcN 9CA-t EwqAe /k1-F-tcI rfV - kt. -.

Maintenance Department User Department


r, v. vu Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315862 Order No: 20197750 Description: Plant-s Gas cutting
tourch need repair
Functional P301- GENRL Description: GENERAL EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


- Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________

Date/Time Date/TimE. _____________________

9010 Plant-S Gas cutting tourch need repair

Release Date: 18.02.2025 Basic Start Date: 17.02.2025

Release Time: 17:22:16 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
Kb1 MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315816 Order No: 201 97753 Description: htc f punching blade
clearnce check now
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________

Date/Time DatelTime _____________________

9010 htc f punching blade clearnce check now

Release Date: 18.02.2025 Basic Start Date: 16.02.2025

Release Time: 17:24:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
Ku"11' MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315908 Order No: 20197759 Description: 20ttsheaairpipe
brocken please check
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______

DatelTime Date/Time ______________________

010 20ft shea air pipe brocken please check

Release Date: 18.02.2025 Basic Start Date: 17.02.2025

Release Time: 17:31:10 Basic End Date:

Employee Codes Employee Names Operation No Firs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315997 Order No: 20197756 Description: welding mchine earth
cable in paint line
Functional P301 -UTLTY- Description: ELECTRICAL POWER SYSTEM
Location: ELECT
Equipment No: Description: i3..tS? a V\Att, krdc.
Plant Section: Person Vitthal Narayan Main Work Mechanical Maintenance
Responsible: Ambure Centre:
Tech ID:

Release Date: 18.02.2025 Basic Start Date: 18.02.2025


Release Time: 17:25:54 Basic End Date:

Employee Codes Employee Names Operation No Krs

-ça- -R ca-k2\t- V-c-- cH7


(
LeAfl1
(-'---y OL

Maintenance Department User Department


h Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.02.2025
Notification No: 100315959 Order No: 20197757 Description: primo hard punching
machine not working
Functional P301- BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description: rç Pv1M 't\' '1 Ic
Plant Section: Person Vitthal Narayan Main Work Mechanical Maintenance
Responsible: Ambure Centre:
Tech ID:

F Opr
_____
Description
__________________________________
Status
_______
Start
Date/Time
Compi
Date/Timc
Remarks
____________________

010 primo hard punching machine not working


vn2p14 o ri '2-o N%

y2t10cLn4 r-fl

Release Date: 18.02.2025 Basic Start Date: 16.02.2025

Release Time: 17:29:46 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_________ ______________ _____________

3e

p40 NV frto cccu%u/\.g dL ft cLtd

CcL&he (xuiok -CU4A-t.&L -&Q 9&L4 (.9 CCJIJQ4

cHAJ- L &C&,4.-Q .- _____

Maintenance Department User Department


Kirby Building Systems KSA
flkf MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100311476 Order No: 20197185 Description: conrac 01 pump not
working please check
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimt _____________________

0010 conrac 01 pump not working please check

o1L S -

__
60L ___________________

Release Date: 02.02.2025 Basic Start Date: 20.12.2024

Release Time: 13:03:05 Basic End Date:

Employee Codes Employee Names Operation No Hrs


kko'Z

MoW Mftr--

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100311260 Order No: 20197185 Description: forklift lyre puncher t3ol

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 forklift tyre puncher 1301


TYjzt__
____

JctRr
_____________________________ ______ _______ ______
CLttcpi
ci

Release Date: 02.02.2025 Basic Start Date: 17.12.2024

Release Time: 13:32:47 Basic End Date:

Employee Codes Employee Names Operation No Hrs

7J
C

Mainteyw User Department


Kirby Building Systems KSA
Kwbt' MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100310768 Order No: 20197191 Description: side bade tyre puncher
nd check
Functional P301- MTHDL Description: FORKLIFTS
Location: FRLFT 2
Equipment No: 13000659 Description: FORKLIFT
¬06
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTime ______________________

0010 side bade tyre puncher nd check


C ___________________ _______ ____

/vJoç
___

8bofc'/L_(g4j3) ________ ____ __________

AIp' cce9treCSJ1t

Release Date: 02.02.2025 Basic Start Date: 10.12.2024

Release Time: 13:38:09 Basic End Date:

Employee Codes Employee Names Operation No Hrs

User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100311263 Order No: 20197187 Description: t501 forklift tyre puncher

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime Date/Timc. _____________________

0010 t501 forklift tyre puncher


( '7iij,
___

(ce5 vi , ____ ________ ___________

Release Date: 02.02.2025 Basic Start Date: 17.12.2024

Release Time: 13:32:20 Basic End Date:

Employee Codes Employee Names. Operation No Hrs

Saul ___________________________________

User Department
&
S Kirby Building Systems KSA
%fl
MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100310467 Order No: 201 97196 Description: t301 forklift trye puncher

Functional P301- MTHDL- Description: FORKLI FTS


Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301
-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/TimE..______________________

0010 t301 forklift trye puncher 7yz To


C
O\Qktf

Release Date: 02.02.2025 Basic Start Date: 06.12.2024

Release Time: 13:43:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
2Ls _______________________

Maintenance User Department


Kirby Building Systems KSA
I %II
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310632 Order No: 20197193 Description: Forklift T-301 Aco pedal
broken
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______ Date/Time Date/Time ______________________

0010 Forklift T-301 Acc pedal broken


(
h4' (Ce&v7n*-"

Release Date: 02.02.2025 Basic Start Date: 08.12.2024

Release Time: 13:40:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fl3?J ___________________________________

User Department

cQ-w4(c oL'2-
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310497 Order No: 20197195 Description: Hangcha 7 tons forklift
flat tire
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTime _____________________

\0 Hangcha 7 tons forklift flat tire


( A cie7(
Tö'

Release Date: 02.02.2025 Basic Start Date: 07.12.2024

Release Time: 13:41:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_______ _
Th.pka __________

Maintenance Deartment\j-t User Department


Kirby Building Systems KSA
I U
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310403 Order No: 20197197 Description: forklift 302 oil hose
change
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Time ______________________

0010 forklift 302 oil hose change


c _______________ ______

WI- /flc

Release Date: 02.02.2025 Basic Start Date: 05.12.2024

Release Time: 13:49:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


I, Ia.WI Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310586 Order No: 20197192 Description: side loader tyre damage
need repair
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: &cr- -1A Lode5
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: ço,cfl Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time Date/Time ______________________

0010 side loader tyre damage need repair


7)Vjzz__njj(

bo4 lc&ka 72t CL&L4

Release Date: 02.02.2025 Basic Start Date: 10.12.2024

Release Time: 13:39:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
I 1l
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310167 Order No: 20197198 Description: Side loderdisel,Airfilter
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description: r
J/ (p

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/TimE. _____________________

0010 Side loder disel,Air filter change


C -.4
_____________ ___

62/
LL /Z'A tkQtJ

Release Date: 02.02.2025 Basic Start Date: 02.12.2024

Release Time: 13:59:12 Basic End Date:

EmployeeCodes EmployeeNames OperationNo Hrs

Maintenance Department Usermt


WushO?I Kirby Building Systems KSA
iJtt MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100310934 Order No: 20197190 Description: forklift ep302 tyre
puncture pls check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc. ______________________

0010 forklift ep302 tyre puncture p1s check


7)t
cc'eLvictCt JflQ

Release Date: 02.02.2025 Basic Start Date: 12.12.2024

Release Time: 13:35:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100309795 Order No: 20197201 Description: hancha tyre puncture

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT ? TON EP7O1 -

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

'010

Release Date: 02.02.2025 Basic Start Date: F**IWZ'YZI

Release Time: 14:02:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs

.cns' 23eLcpkq'-l ___________________

User Department
Kirby Building Systems KSA
sr MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100309486 Order No: 10132446 Description: side loader tyre puncher
need repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/TimE ____________________

0010 side loader tyre puncher need repair


73'.4.c &
__

fl ftb/ _____

7bQ tk

Release Date: 02.02.2025 Basic Start Date: 25.11 .2024

Release Time: 14:04:11 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs

&qTee1

User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100310024 Order No: 20197199 Description: EP1001 Tyre need to be
change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______ Date/Time Date/Time ______________________

010 EP1 001 Tyre need to be change

Jeviceij-,

Release Date: 02.02.2025 Basic Start Date: 30.11.2024

Release Time: 14:00:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs

/iOGJSTIc3 J4ARHoQsE
User Department -/j y 4
Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100309443 Order No: 20197205 Description: EP1001 back lyre tube
replacement
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ ______ DateiTime Datellim ____________________

.3010 EP1 001 back tyre tube replacement


7Yt¬_ &M_q
fJb
4o4' ct'z vi ceS ___ ________ _________

___ & ____ __________ ____________

Release Date: 02.02.2025 Basic Start Date: 23.11.2024

Release Time: 14:06:01 Basic End Date:

Employee Codes Employee Names Operation No Hrs

User Department
Kirby Building Systems KSA
Kvrb' MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100310904 Order No: 20197189 Description: side loader lyre tube
problem
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT S(dQ (S 4ij,
ýoa(
Equipment No: 13000672 Description: FORKLlFT9t*-56t1=et

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

9010 side loader lyre tube problem


c
_____________________ ___ ________
T/&t /

Release Date: 02.02.2025 Basic Start Date: 12.12.2024

Release Time: 13:34:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

User Department
Kirby Building Systems KSA
flU M'Va
MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100309629 Order No: 201 97202 Description: Side loader tyre puncture
paint line
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: (4
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tim& ______________________

Side loader tyre puncture paint line


1010
7-y&
___ __________________________ ____

Tube

Release Date: 02.02.2025 Basic Start Date: 25.11.2024

Release Time: 14:03:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs


çCcfl ____________________ __________

Maintenance Department User Department


Kirby Building Systems KSA
Krbfl MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100309968 Order No: 20197200 Description: forklift tire puncher

Functional P301 -MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: Description: .-t,P-'5t3 .s
Plant Section: Person Rajendran Main Work Mechanical Maintenance
Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTime ______________________

forklift tire puncher


>

Release Date: 02.02.2025 Basic Start Date: 29.11.2024

Release Time: 14:02:05 Basic End Date:

Employee Codes Employee Names Operation No Hrs

SY1) _____________________________

Maintenance Department User Department


Kirby Building Systems KSA
Kirb$J MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100314629 Order No: 20197165 Description: EP-501 Back lyre
puncher
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time. _____________________

0010 EP-501 Back lyre puncher


e/a.\

4c4" cce'Lv-, tQC ____ _____ ____

Release Date: 02.02.2025 Basic Start Date: 02.02.2025

Release Time: 08:44:28 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance User Department


vv,
" Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100314644 Order No: 20197169 Description: plant 2 tab skd 1 over
head not working
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: ¶ I avJ Person Vitthal Narayan Main Work Fabrication Table- i
Responsible: Ambure Centre:
Tech ID:

jt..

Release Date: 02.02.2025 Basic Start Date: 02.02.2025

Release Time: 09:43:06 Basic End Date: -C 7*la.)

Employee Codes Employee Names Operation No Hrs


Co2_o \!jjkcdr 4junk.& ___________
2-
f3cJ7 @7ijtfl). \f&Ca&
565/5 _____________ ___________ _____________

39Q. ______________ _____________ ______________

Fe (oi_frnJ Co 4 cr . t to Ct4 Kavc fr


I i)9 O cL1t R tnof c
rf ev r ( çj
t ,,t' k cfnc41 , 14-v Ltt,1a- 7na(1
Kirby Building Systems KSA
""
h
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100314640 Order No: 20197170 Description: plant-2 F- b welding wire
need to joint
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: P\ (V'-' .2- Person Sunil Kumar Main Work Fabrication Table- i
Responsible: Krishnankutty Centre:
Tech ID:

Description

El."

Release Date: 02.02.2025 Basic Start Date: 02.02.2025

Release Time: 09:44:21 Basic End Date:

t- dt'v tnnl'¬- c&.cot C..-ti- So


WntWi Kirby Building Systems KSA
i:u
MAINTENANCE ORDER JOB TICKET

Date : 03.02.2025
Notification No: 100314661 Order No: 20197236 Description: conraclTacking machine
hydraulic problam
Functional P301 -BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 conraciTacking machine hydraulic problam

ML
___

___

__ Jt

Release Date: 03.02.2025 Basic Start Date: 02.02.2025

Release Time: 11:00:01 Basic End Date:

Employee Codes Employee Names Operation No Hrs


±

Maintenance Department User Department


Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date: 03.02.2025
Notification No: 100314721 Order No: 20197231 Description: conrac 02 a side welding
problem p18 che
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Aic,.nje Qnyscxn chhA


Release Date: 03.02.2025 Basic Start Date: 03.02.2025

Release Time: 09:50:28 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.02.2025
Notification No: 100314662 Order No: 20197234 Description: KD M/C not shearing
properly
Functional P301 -SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 KD M/C not shearing properly

p e1

Release Date: 03.02.2025 Basic Start Date: 02.02.2025

Release Time: 10:59:32 Basic End Date:

Employee Codes Employee Names Operation No Hrs

MokcJ- riøtLo-_

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 03.02.2025
Notification No: 100314726 Order No: 20197232 Description: Plant-2 F-55 wire feeder
roller set chan
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Main Work Fabrication Table- i


Tech ID:
Responsible: \J AC.- ç Centre:

irØi

Release Date: 03.02.2025 Basic StartDate:- 03.02.2025

Release Time: 09:55:03 Basic End Date:

bTh\C.- c;t-1 to CJA42C& &-Atie


$4QJ
4 tnre
Pt ttj¬ 4iw

Maintenance Department User Department


Kirby Building Systems KSA

I MAINTENANCE ORDER JOB TICKET

Date: 03.02.2025
Notification No: 100314727 Order No: 20197237 Description: Plant-2 F-63 Wire feeder
gear roller
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:
c
Plant Section:
9 H

Person 6 Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Dateilime Date/Tim¬____________________

0010 Plant-2 F-63 Wire feeder gear roller


Dn- N1-e pC4I.si
___ ______________________ ____ _____ I-Sop _____________

_________

ct-c.

Release Date: 03.02.2025 Basic Start Date: 03.02.2025

Release Time: 11:01:14 Basic End Date:

2- '-Sac 42ccd- D4-

Maintenance Department User Department


It -.

tc
"
arntspI
Kirby Building Systems KSA
tLJ
MAINTENANCE ORDER JOB TICKET

Date : 03.02.2025
Notification No: 100314735 Order No: 10132471 Description: EP-503tyrepuncher
please repair
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

Date/Time DatelTimc. _____________________

EP-503 tyre puncher please repair


Tb be

Release Date 03 02 2025 Basic Start Date 03 02 2025

Release Time: 11:14:07 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______
2eok&c
_
_________ __________

Maintenance Department partment


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 05.02.2025
Notification No: 100314905 Order No: 20197296 Description: Iant-2 F56 Wire feeder &
Ground cable
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: M rwt C
Plant Section: Person
Responsible:
¶ us-t.( c4
Main Work Fabrication Table- i
Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/TimE _____________________

0010 Iant-2 F56 Wire feeder & Ground cable


__ ________________________

KJ .&cl-4-t,iu.\pt4
tA Ut) (.9

Lit tt

Release Date: 05.02.2025 Basic Start Date: 05.02.2025

Release Time: 14:16:16 Basic End Date:

-w4t-j itt'rfl O
t>

2) (,

Maintenance Department User Department


t,4t&
" Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date: 05.02.2025
Notification No: 100314833 Order No: 20197301 Description: Plant-2 drillig area desert
cooler N/W
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Vitthal Narayan Main Work Fabrication Table- i


Responsible: Ambure Centre:
Tech ID:

Release Date: 05.02.2025 Basic Start Date: 04.02.2025

Release Time: 18:52:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs


O2,6O - ___________

Pc-L_3_t,/ tajok' Vbrree*U 's'o v.cc It

cU+ei cUo-v1-

Maintenance Department User Department

____________
Iii n7A'I-/
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 05.02.2025
Notification No: 100314834 Order No: 20197300 Description: Plant-3 FAB & Weld
need tpo fix Cooler
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: .)fty te'wj..&'v
Plant Section: Person Vitthal Narayan Main Work Fabrication Table- i
Responsible: Ambure Centre:
Tech ID:

Release Date: 05.02.2025 Basic Start Date: 04.02.2025

Release Time: 18:48:46 Basic End Date:

JQt'O -M' (oti-t'v rPNc4 -4' rci


k)6A¬'v nat.b11 p 48taW oioJa- CC1nat-C4
am RFk4

Maintenance Department User Department


ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 05.02.2025
Notification No: 100314906 Order No: 20197295 Description: PIant-2 F62 liner need to
change
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: M . MAt

Plant Section: Person Vitthal Narayan ttain Work Fabrication Table- i


Responsible: Arnbure Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DateiTime Date/Timc _____________________

0010 Plant-2 F62 liner need to change


_________________________ ¶-3o t&o- $.7 vn-d tJV

Release Date: 05.02.2025 Basic Stan Date: 05.02.2025

Release Time: 14:15:40 Basic End Date:

t) kdd;' prrr NJef tL- nO CAtLL Thft-CI/)

ço CftJ
4-QTV Ii Ltv

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 05.02.2025
Notification No: 100314841 Order No: 20197263 Description: Angle punch mach dia up
/down not workng
Functional P301-OTAIL Description: DETAIL SECTION
Location:
Equipment No: Description: 8jsP, k.Dfil4, PA 11-t:
Plant Section: Person Main Work Electrical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/TimE ____________________

0010 Angle punch mach dia up /down not workng


ç- g7J f'v f

___________________- ____ ____


\teyc CLk,P-aUr

frtrr
____ ___________________________ _____ ______ ______
O(c_
Release Date: 04.02.2025 Basic Start Date: 04.02.2025

Release Time: 16:55:44 Basic End Date:

Employee Codes Employee Names 9peration No Hrs


________
rAj q,( _- ___________

0 swt4-

'f-cJ, 4U&Jr tj

tOA#LJPl

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
s
Date : 05.02.2025
Notification No: 100314738 Order No: 201 97284 Description: nfe punching machine
blade complaint
Functional P301-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Angle punching machine blade complaint


( ncItto M9L-
__
g,q%- ____________________

bl,4- tttta'icc_dziezc/-s ____ _____ _____ _____________

Release Date: 05.02.2025 Basic Start Date: 03.02.2025

Release Time: 08:40:28 Basic End Date:

Employee Codes Employee Names Operation No Hrs


Mehth. Mofte& _______________________

Maintenance Department User Department

S
Kirby Building Systems KSA
KirbI MAINTENANCE ORDER JOB TICKET

Date : 05.02.2025
Notification No: 100314799 Order No: 20197282 Description: forklift t302 back tyre
puncher
Functional P301- BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work CONRAC -1


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 forklift t302 back tyre puncher


-,T:Yjz_c._
_____________________
iio- GuN3

Release Date: 05.02.2025 Basic Start Date: 04.02.2025

Release Time: 08:39:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs

L12X91 ____________ ___________

/o 4t-42

Maintenance Department User Department


WwhtiWi Kirby Building Systems KSA
%fl
MAINTENANCE ORDER JOB TICKET

Date: 05.02.2025
Notification No: 100314743 Order No: 20197283 Description: EP502 forklift oil leakage

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 EP502 forklift oil leakage


(

Is1 ___ C

Release Date: 05.02.2025 Basic Start Date: 03.02.2025

Release Time: 08:39:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______________________ kcck1
(0

Maintenance Department User Department


J
I(rbdPi Kirby Building Systems KSA
flu MMs a
MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315063 Order No: 20197396 Description: Fork Lift T-301 Battarey
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person


Responsible:
k Main Work Fabrication Table- i
Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

C
0010 Fork Lift T-301 Battarey change
g

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:17:51 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(p

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315159 Order No: 20197390 Description: Plant-2 F-12 Mig Holder
switch N/W
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: frIJ
q' rvi
Plant Section: Person in Work Fabrication Table- i
Responsible: Centre:
Tech ID:

Remarks

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:12:38 Basic End Date:

Q &A c'flJCtV ThY (,tt vtofl CtA4o\'

ciJaAJc m' tb)- gF-t D- -A- So


iQatA6s-e) -A-- '-a- ( -¬J--e c to c tc.

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.02.2025
Notification No: 100315059 Order No: 20197387 Description: Paint tine 10 ton crane
not working
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Vitthal Narayan Main Work Electrical Maintenance


Responsible: Ambure Centre:
Tech ID:

Description Remarks

0010

00/0

ea'V)

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:11:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________
4&i._kamot _____________ ______________

-'___________ __________________ ________________ __________________

-, J
fl2. (Ifs hrwi ________________ _________________

__________ Agtrnm. _______________ ________________

* 5 C9Z?oe 61QCXCC/ jF 3 Jo S
-/oo
oonj?eq' ?4
Ciaa hoc 'C. te. tbmq9e4/ *ocx Oa/ Coooeolec/ toaj
Ood FlaW ts Chooge ite Cba2ec/ 'üht/e

Maintenance Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.02.2025
Notification No: 100315181 Order No: 10132654 Description: PLASMA PM WORK

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Vitthal Narayan Main Work Mechanical Maintenance


Responsible: Ambure Centre:
Tech ID:

Remarks

[II,",]
,

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:09:33 Basic End Date:

"A /

* plQiroa Mxbice Erit Cttb Gmxe Cbobe itze Cobk foci

Ckrop ;is ift

Maintenance Department User Department


Kirby Building Systems KSA
U
MAINTENANCE ORDER JOB TICKET

Date : 06.02.2025
Notification No: 100315064 Order No: 20197395 Description: Fork Lift T-301 Electrical
issues
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:
stlct \

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

90i0 Fork Lift T-301 Electrical issues


,fr14 ;'Al F -'°

(24' ifrcuv, _______________

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:1 7:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(. _____
-gJQ-i't _________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315037 Order No: 20197397 Description: conrac 02 flange tacking
conveyor chaine
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 conrac 02 flange tacking conveyor chaine

[I S_________ ____________________________________________________________________ _____________ ________________ _______________ _______________________________________

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:19:23 Basic End Date:

User Department
Kirby Building Systems KSA

t. MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315138 Order No: 20197391 Description: conrac 01 hydraulic
pump sound more pls
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Timt ____________________

0010 conrac 01 hydraulic pump sound more pls


[I

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:13:11 Basic End Date:

Hrs

Ma n n Department User Department


/
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.02.2025
Notification No: 100315065 Order No: 20197394 Description: conrac 02 pressing
wheelbroken pis check
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 02 pressing wheelbroken pls check

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:16:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

User Department

$1
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315133 Order No: 20197392 Description: sanli 6 mtr full down jack
not working
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Release Date: 08.02.2025 Basic Start Date: 08.02.2025

Release Time: 14:13:37 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________
çfrn ___________ _____________

/JYW ftP
S 7%
9 ___________ ___________

" I rim User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.02.2025
Notification No: 100315161 Order No: 20197389 Description: ysd shear marking visble
wire broken pls
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 ysd shear marking visble wire broken pls


r

Release Date: 08.02.2025 Basic Start Date: 06.02.2025

Release Time: 14:12:03 Basic End Date:

_______________
Employee Codes
_____________
_______________________
Employee
____________________
Operation No
_____________________
________________________ Hrs
____________________
__________________________

Maint: ni cc Department User Department

I _______
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100313938 Order No: 201 96901 Description: Forklift tube puncture

Functional P301 -POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description: e:r.- s' 2K
Plant Section: Person 'nisF-l1,..trII Main Work Mechanical Maintenance
Responsible: ZanoiabtmaiyaI Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

(
O010 Forklift tube puncture
19' -_______ ________ ________
'Tb b -It

Release Date: 25.01.2025 Basic Start Date: 24.01.2025

Release Time: 16:47:04 Basic End Date:

I_ Employee Codes Employee Names Operation No Hrs

flax ___________ __________


1'kbuJt-

Maintenance DePkrt4Ønt I User DeparØient


Wwfrnik7l Kirby Building Systems KSA
'tJJ
MAINTENANCE ORDER JOB TICKET

Date: 25.01.2025
Notification No: 100313917 Order No: 201 96898 Description: Fork Lift T-301 Fan belt
change
Functional P301- MTHDL Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

QOlO Fork Lift T-301 Fan belt change


__________________

frav QJf

Release Date: 25.01.2025 Basic Start Date: 23.01.2025

Release Time: 16:07:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Dep User Department


Kirby Building Systems KSA

Ut
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100314043 Order No: 20196904 Description: Plant-3 need lifting chain
and tackles
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Fabrication Table- i


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 Plant-3 need lifting chain and tackles


___ _______________________ ____
25oI"t 5vf'zT _____________

%, ,tjr Ciho iri'nq


t?4t ltpWe

Release Date: 25.01.2025 Basic Start Date: 25.01.2025

Release Time: 16:50:05 Basic End Date: '2-5 01

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100313914 Order No: 201 96905 Description: primo master link chaine
2mtr need new
Functional P301-BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Release Date: 25.01 .2025 Basic Start Date: 23.01.2025

Release Time: 16:50:44 Basic End Date: .Qfl)5

Maintenance Department User Department


r Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.01.2025
Notification No: 100314129 Order No: 20196957 Description: ysd shear chain
complaint
Functional P301-DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 27.01.2025 Basic Start Date: 26.01.2025

Release Time: 09:44:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
it'

MAINTENANCE ORDER JOB TICKET

Date : 27.01.2025
Notification No: 100314181 Order No: 20196961 Description: Conrac 1 B side cylinder
not working
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010 Conrad Bsidecylindernotworking


272, 2_7'oI'25

%P ___ _______ _________

Cf Tlbejcth,41/,flc/fl()
I

Release Date: 27.01.2025 Basic Start Date: 27.01.2025

Release Time: 09:50:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________ ___________________
() P lfn

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.01.2025
Notification No: 100314121 Order No: 20196959 Description: krass die need 1-25

Functional P301-CFORM- Description: ANGLE LINE CF


-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

9 Chntcdc'4
Release Date: 27.01.2025 Basic Start Date: 26.01.2025

Release Time: 09:46:40 Basic End Date: 2-tV ti '202_5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.01 .2025


Notification No: 100314132 Order No: 20196956 Description: sanli 4mtr jack holder iol
lek nd tochk
Functional P301 -DTAIL-DTLN1 Description: DETAIL LINES (Kirby)
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 27.01.2025 Basic Start Date: 26.01.2025

Release Time: 09:43:47 Basic End Date:


2o,s

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.01.2025
Notification No: 100314145 Order No: 20196960 Description: p forklift 302 tyre
puncture pis cheack
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Date/Time _____________________

QOiØ p forklift 302 tyre puncture pls cheack \r)/ _________

..7_ry)
/
CK

Release Date: 27.01 .2025 Basic Start Date: 26.01.2025

Release Time: 09:48:39 Basic End Sate: oi )


Employee Codes Employee Names Operation No Hrs

Maintenance D ailment User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314268 Order No: 10132278 Description: Toyota T-303 back side
tyre puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _________________________________________ ________
DatelTime Date/Timt _______________________

Q010 Toyota T-303 back side tyre puncher -

______

Qk

Release Date: 28.01.2025 Basic Start Date: 28.01.2025

'-tt rzT
Release Time: 09:57:54 Basic End Date: I) '

Employee Codes Employee Names Operation No Hrs

______
2-e&k4 ___________________

_______(fare _________________

Vlaintenance partment User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314249 Order No: 20197006 Description: P501 forklift tire puncher

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT 5TON t"-3"b)

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
DateiTime Date/Tim( ____________________

0010 EPSO1 forklift tire puncher


I-.
'al 'c ________

Release Date: 28.01.2025 Basic Start Date: 28.01.2025


Release Time: 09:18:10 Basic End Date: 281 ) rttó'
Employee Codes Employee Names Operation No Hrs
cn9 _____________________________

Maintenpartment User Department


KrbJ Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314266 Order No: 20197009 Description: EP&t forklift tire
puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Time _____________________

,rQ,010 EP.&1 forklifttire puncher


a1r'a ________
7Z5hc

Release Date: 28.01.2025 Basic Start Date: 28.01.2025

Release Time: 10:01:06 Basic End Date:


) '2t-ks-
Employee Codes Employee Names Operation No Hrs

______
oeok& ___________________

Maintenance D partment User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314267 Order No: 20197015 Description: Plant-3 need two set
dock clamp
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Fabrication Table- i


Responsible: Purification Centre:
Tech ID:

/
Opr Description Status Start Compi Remarks
No __________________________________ ______

DateiTime Date/Tim¬ ____________________

0010 Plant-3 need two set dock clamp


_ A __ _____________

___ O&oflp imkt9j ___.8+c p2.tA'-


tovr grn

Release Date: 28.01 .2025 Basic Start Date: 28.01.2025

Release Time: 10:10:37 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 28.01 .2025


Notification No: 100314269 Order No: 10132279 Description: SPT blasting new
machine repair work
Functional P301- FlNlS-SHOT1 Description: SNOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

DateiTime DateiTime ____________________

0010 SPT blasting new machine repair work


"1__ _______________________________

Release Date: 28.01.2025 Basic Stan Date: 28.01.2025

Release Time: 10:00:23 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________
/arrnQ _______________
(2- Rr
ia krc
__________ ________________ _______________ I

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314236 Order No: 20197014 Description: 20ft shear up&down
problem
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time____________________

0010 20ft shear up&down problem


_______________________ ____
-"t z 27.s V _____________

e&dtir j'uJ,, c/ ___ ____ ____ __________

___ L.Artrcih/ Ii, ________ _______________

q' ththivk ____ _____ _____ _____________

Release Date: 28.01.2025 Basic Start Date: 27.01.2025

Release Time: 10:06:17 Basic End Date:


t 2o-5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 28.01 .2025


Notification No: 100314285 Order No: 10132283 Description: Station B Air compressor
breakdown work
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -1
-

Plant Section: Comprsr Room- i Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 28.01.2025 Basic Start Date: a01.26.2025 &_,,!6/1o t5L

Release Time: 15:36:07 Basic End Date:


aq/i7 tn- q
Employee Codes Employee Names Operation No Hrs
________ _____________ ___________
61w'
ç ________________ 2-1/ ;sj fl-tj ______________

Main nance epartment User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.01.2025
Notification No: 100314265 Order No: 20197010 Description: 20tt shear up&down
problem
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH-0601

0010

Release Date: 28.01.2025 Basic Start Date: 28.01.2025

Release Time: 10:03:08 Basic End Date: P g'. ø, 102-5

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.01 .2025


Notification No: 100314250 Order No: 20197012 Description: ysd shear scrap stuck
inside blade
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Release Date: 28.01.2025 Basic Start Date: 28.01 .2025


Release Time: 10:04:43 Basic End Date: 2o 2

Employee Codes Employee Names Operation No Hrs


________ ______________

() P "to

________ ______________________________

Maintenance Department User Department


it' Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 28.01.2025
Notification No: 100314251 Order No: 20197013 Description: conrac 01 conveyor
chain break
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 28.01.2025 Basic Start Date: 28.01.2025

Release Time: 10:05:47 Basic End Date: 23


Emplbyee Codes Employee Names Operation No Hrs

______
2abhat p _________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.01.2025
Notification No: 100314364 Order No: 20197044 Description: conrac 02 web station
magunet not workin
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mphid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.01.2025 Basic Start Date: 29.01.2025

Release Time: 11:26:36 Basic End Date:

Maintenance Depa t User Deartmejit


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.01 .2025


Notification No: 100314358 Order No: 20197045 Description: conrac 02 auto welding
area hy hose brok
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.01.2025 Basic Start Date: 29.01.2025

Release Time: 11:32:37 Basic End Date:

Employee Codes Employee Names Operation No Hrs


______ ____________________/

Li I) _________________________ _______________________ _________________________


Kirby Building Systems KSA
"rh
MAINTENANCE ORDER JOB TICKET

Date : 29.01.2025
Notification No: 100314362 Order No: 20197047 Description: conrac 01 entry side
conveyor not workin
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.01.2025 Basic Start Date: 29.01.2025

Release Time: 11:39:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

C
Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date : 29.01.2025
Notification No: 100314340 Order No: 20197046 Description: 20ff shear up&down
blade touch
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 75020

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID: KJSH-0601

Release Date: 29.01 .2025 Basic Start Date: 29.01.2025

Release Time: 11:35:20 Basic End Date: a / "

LflSd /

a
Maintenance Department User Department -
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.01.2025
Notification No: 100314375 Order No: 20197043 Description: primo auto welding
machine convyour moto
Functional P301-BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work CONRAC -1


Responsible: Shaikh Centre:
Tech ID:

Release Date: 29.01.2025 Basic Start Date: 29.01.2025

Release Time: 11:21:30 Basic End Date:


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 30.01.2025
Notification No: 100314437 Order No: 201 97068 Description: scm punching problem
plz check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 scm punching problem plz check


(Th.
__ eo cck&t 4+ __________

Release Date: 30.01.2025 Basic Start Date: 30.01.2025

Release Time: 16:34:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs


lviokthn. tViu1&. I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.01.2025
Notification No: 100314416 Order No: 20197061 Description: sanli 6mtr shear scrap
stuck inside blad
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Release Date: 30.01.2025 Basic Start Date: 30.01.2025

Release Time: 09:05:12 Basic End Date: 3.of 2o5


Employee Codes Employee Names Operation No Hrs

iAi() / f'li,
______
MAd 0 ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.01.2025
Notification No: 100314457 Order No: 20197067 Description: 2Ott shear up&down
problem
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH-0601

Release Date: 30.01.2025 Basic Start Date: 30.01.2025

Release Time: 16:33:08 Basic End Date:


&

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.01.2025
Notification No: 100314436 Order No: 20197069 Description: conrac 02 head wire
support clampbolt br
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description

0010

Release Date: 30.01.2025 Basic Start Date: Cull W2l}!Z

Release Time: 16:35:56 Basic End Date:

Maintenance Department
"" h Kirby Building Systems KSA
J
MAINTENANCE ORDER JOB TICKET

Date: 01.02.2025
Notification No: 100314547 Order No: 20197102 Description: Plant-2 Magnetic drill
NM
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sin3ehn Main Work Fabrication Table- i


Responsible: jsJjj, Centre:
Tech ID:

Release Date: 01.02.2025 Basic Start Date: 01.02.2025

Release Time: 11:33:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________
"5on;I_/'C'in.ni' _______________ ________________

"'\ Ishnn. 1/ an' _____________ ______________

* Mncpe1ic Dil1 povue'v Cobe foote. C000ecfrs) obewed 000' C,oocC]eQ


zl QtaQJe t f' 7't £St/¬

3z4 jaccl4'o Lvt Oa,otajec/ aai ;'s ctoor/ pu .'veti our

Maintena c partment User Department


It Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.02.2025
Notification No: 100312195 Order No: 20197133 Description: sptnewblasting machine
breakdown
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

0010 spt new blasting machine breakdown

Release Date: 01.02.2025 Basic Start Date: 29.12.2024

Release Time: 16:18:14 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User


Kirby Building Systems KSA
Kwbsl' MAINTENANCE ORDER JOB TICKET

Date :01.02.2025
Notification No: 100311676 Order No: 20197135 Description: spt new blasting machine
breakdown
Functional P301 -FINIS- SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ Date/Time Date/Time. ______________________

0010 spt new blasting machine breakdown

Release Date: 01.02.2025 Basic Start Date: 23.12.2024

Release Time: 16:20:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User D3jt --


Kirby Building Systems KSA
Kwbj MAINTENANCE ORDER JOB TICKET

Date: 01 .02.2025
Notification No: 100314473 Order No: 20197145 Description: EP502 forklift tyre
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DateiTim¬ _____________________

Lp010 EP502 forklift tyre puncture


7_:e_¬__
TUbQ C4t
bcef9- ch4'ft I
Release Date: 01.02.2025 Basic Start Date: 31.01.2025

Release Time: 16:34:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

".

Cf
_______ _
$?A Lh- s _______________________

Maintenance Department User Department -


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.02.2025
Notification No: 100312570 Order No: 20197132 Description: spt machine motor sound
variation
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

kQ010 spt machine motor sound variation


(

Release Date: 01 .02.2025 Basic Start Date: 05.01.2025

Release Time: 16:17:09 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Dnt


Kirby Building Systems KSA
ur
MAINTENANCE ORDER JOB TICKET

Date : 01 .02.2025
Notification No: 100314561 Order No: 20197103 Description: ysd shear marking visbie
wire broken pis
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time Date/TGne.
_____________________

0010 ysd shear marking visble wire broken pls


-,___ ________________________
wm" ii:o-f j/LSD ______________

Release Date: 01.02.2025 Basic Start Date: 01.02.2025

Release Time: 11:37:05 Basic End Date:

Maintenance Depa M' User Department


lv'
-, /Y1jsrcç
&2t0 aM&.ZTos)e
t
Kirby Building Systems KSA -

MAINTENANCE ORDER JOB TICKET

Date :01.02.2025
Notification No. 100314563 Order No: 20197104 Description: plant-2 gantry crane4
dock clamp change
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No Date/Time Date/Ti
0010 plant-2 gantry crane4 dock clamp change
op 701
Dl'ot"L

Release Date: 01.02.2025 Basic Start Date: 01.02.2025

Release Time: 11:50:52 Basic End Date: 0;' O2tV25


Em lo ee Codes Em lo cc Names 0 eration No

ttJ
4!fl.

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.02.2025
Notification No: 100312542 Order No: 20197131 Description: spt blasting motor nut
damage nd check
Functional P301- FINIS-SHOT2 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

0010 spt blasting motor nut damage nd check


(
seT- btol3tb'1m
DT-V bo14- J-

Release Date: 01.02.2025 Basic Start Date: 05.01.2025

Release Time: 16:15:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________ ______________ ____________

4 km- 3

Maintenance Department User Department


Kirby Building Systems KSA
Kwb1' MAINTENANCE ORDER JOB TICKET

Date: 01 .02.2025
Notification No: 100314468 Order No: 20197146 Description: scm lubrication oil leak
need chk
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 scm lubrication oil leak need chk


(
3&1 (t-ne4tk &A

Release Date: 01.02.2025 Basic Stan Date: 31.01.2025

Release Time: 16:34:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ ca4f ___________________

Maintenance Department User Department


Kirby Building Systems KSA
it
MAINTENANCE ORDER JOB TICKET

Date : 01 .02.2025
Notification No: 100314462 Order No: 20197147 Description: scm punching machine
olle leack
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Description

0010

Release Date: 01.02.2025 Basic Start Date: 31.01.2025

Release Time: 16:35:21 Basic End Date: 2/ 0/ 2,

1)

I)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.02.2025
Notification No: 100310740 Order No: 20197184 Description: gecko shear press swi
not working pls
Functional P301- DTAIL-DTLN2 Description: DETAIL LINES GECKO
-

Location:
Equipment No: Description:

Plant Section: Person Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 02.02.2025 Basic Start Date: 10.12.2024

Release Time: 13:01:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ ______________

6)

Maintenance Department User Department


Kirby Building Systems KSA
tflrhtfl
%.j
MAINTENANCE ORDER JOB TICKET

Date : 02.02.2025
Notification No: 100313988 Order No: 20197186 Description: primo web tacking
welding machine not wo
Functional P301 -BUILT- Description: BEAM WELDING LINE-3
Location: AWLIN-BMWO3
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Tims ______________________

0010 primo web tacking welding machine not wo

o wb 4cU ,nn Sk ____________

atD

Release Date: 02.02.2025 Basic Start Date: 25.01 .2025

Release Time: 13:11:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs


9ktbcZ
AilorrL

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :12.01.2025
Notification No: 100313009 Order No: 20196408 Description: please check & repair
tyre puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP701
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Tim6 ______________________

0010 please check & repair tyre puncture


7j b

Release Date: 12.01.2025 Basic Start Date: 11.01.2025

Release Time: 08:36:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

çfl9c________________________
,RYeci
7) 3T- L _________________

Maintenance Department User Department


Kirby Building Systems KSA
I1:Thgj] MAINTENANCE ORDER JOB TICKET

Date: 12.01 .2025


Notification No: 100312938 Order No: 201 96410 Description: forklift t 501 tyre puncher

Functional P301- MTHDL Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501-

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 forklift t 501 tyre puncher


6

Release Date: 12.01.2025 Basic Start Date: 10.01.2025

Release Time: 08:39:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.01.2025
Notification No: 100312892 Order No: 20196486 Description: fabrication forklift tire
tube
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 fabrication forklift tire tube


LYk2Z(

Release Date: 14.01.2025 Basic Start Date: 09.01.2025

Release Time: 16:43:12 Basic End Date:

Employee Codes Employee Names Operation No Hrs

57Th _________ _________

Maintenance Department User Department


Kirby Building Systems KSA
Kwb9C MAINTENANCE ORDER JOB TICKET

Date: 14.01.2025
Notification No: 100312614 Order No: 20196487 Description: Forklift T-502 Radiator
pipe broken
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DatelTimc _____________________

0010 Forklift T-502 Radiator pipe broken


,

ckt
?ifQ

Release Date: 14.01.2025 Basic Start Date: 06.01.2025

Release Time: 16:44:02 Basic End Date:

Employee Codes Employee Names Operation No Firs

Maintenance Department User Department


Kwb
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 14.01 .2025


Notification No: 100312558 Order No: 201 96488 Description: T502 front tyre 8.25-15
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DatelTime DatelTimc. ____________________

0010 T502fronttyre 8.25-15 puncture

_________________________ 7be

Release Date: 14.01.2025 Basic Start Date: 05.01.2025

Release Time: 16:44:48 Basic End Date:

Employee Codes Employee Names Operation No Hrs


çfl; ___________________________

(1 ,IYaeJ _________ __________

Maintenance Department User Department


Kirby Building Systems KSA
Ki b $1' MAINTENANCE ORDER JOB TICKET

Date: 14.01.2025
Notification No: 100313199 Order No: 201 96478 Description: sideloader paintline
s16002 starting pro
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 sideloader paintline s16002 starting pro


i'?

AU-

Release Date: 14.01.2025 Basic Start Date: 14.01.2025

Release Time: 16:34:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs


______ _________

/koaA57
cca- 9- LT41 _______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.01 .2025


Notification No: 100313181 Order No: 20196479 Description: preparation forklift 1302
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON -1302

Plant Section: Person Zeeshan Ahmed Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateJTim ______________________

0010 preparation forklift 1302 puncture


____________________ ___ ________
73Yz-e 7' e

Release Date: 14.01 .2025 Basic Start Date: 14.01 .2025

Release Time: 16:34:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

KirbIJ MAINTENANCE ORDER JOB TICKET

Date : 14.01 .2025


Order No: 20196481 Description: FORKLIFT FLAT TIRE
Notification No: 100313061
H704
Functional PSO1-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 FORKLIFT FLAT TIRE H704


___________________________ ____
/_ >4k¬ aj

Release Date: 14.01.2025 Basic Start Date: 12.01.2025

Release Time: 16:38:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
.0
MAINTENANCE ORDER JOB TICKET

Date: 14.01.2025
Notification No: 100312850 Order No: 20196483 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Datellimc. ______________________

0010 FORKLIFT FLAT TIRE H704


7_c7_,&_¬_Aji.j/

__ ________________________ ____
(A

Release Date: 14.01.2025 Basic Start Date: 09.01.2025

Release Time: 16:39:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
Wsrhtfl
.H
MAINTENANCE ORDER JOB TICKET

Date: 14.01 .2025


Notification No: 100312917 Order No: 20196484 Description: Fork lift EP501 Back tyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time. ______________________

0010 Fork lift EPSOi Back tyre puncher


i
_________________________ Ct'o

Release Date: 14.01.2025 Basic Start Date: 10.01.2025

Release Time: 16:40:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______
2cR9kAk ___________________

Maintenance Department User Department


Kirby Building Systems KSA
KrbuJ MAINTENANCE ORDER JOB TICKET

Date : 14.01 .2025


Notification No: 100312902 Order No: 201 96485 Description: side loader puncher nd
repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person "Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTimc ______________________

0010 side loader puncher nd repair C75,%


a.c(

Release Date: 14.01.2025 Basic Start Date: 09.01.2025

Release Time: 16:41:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 15.01.2025
Notification No: 100313236 Order No: 20196512 Description: side loader lyre puncture
pis check
Functional P301- MTHDL- Description: FORKLIFTS
Location; FRLFT
Equipment No: Description: (/P

Plant Section: Person Main Work Mechanical Maintenance


Responsible: M18ir Centre:
TechlD: 2coko.

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc _____________________

0010 side loader lyre punclure pis check

Release Date: 15.01.2025 Basic Start Date: 14.01.2025

Release Time: 08:24:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ _____________________

, kbU9-u
/ .. ___

5T2* __________________________

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 15.01 .2025


Notification No: 100313312 Order No: 20196547 Description: conrac 01 overhead
crane not working
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Vitthal Narayan Main Work CONRAC -1


Responsible: Ambure Centre:
Tech ID:

IZ

k. et cl/u '2'

I-

Release Date: 15.01.2025 Basic Start Date: 15.01.2025

Release Time: 12:15:52 Basic End Date: /5 a I '2-O2._5


Employee Codes Employee Names Operation No Hrs

________
jr/ti ___________ ____________

Maintenance Department User Department


Kirby Building Systems KSA
Kwbyj MAINTENANCE ORDER JOB TICKET

Date: 15.01 .2025


Notification No: 100312966 Order No: 10131889 Description: side loader puncher nd
repair
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON - P49Q1 6OO>

Plant Section: Person Me1Rammad-Sahb¬z Main Work Mechanical Maintenance


Responsible: .Mohammad Jaha4t Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 side loader puncher nd repair


_________________________ ____

77'cQ

Release Date: 15.01.2025 Basic Start Date: 13.01.2025

Release Time: 08:27:09 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Sfl71 __________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.01 .2025


Notification No: 100313266 Order No: 20196511 Description: hydraulic pipe leake
forklift T302
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTimc. ______________________

0010 hydraulic pipe Ieake forklift T302


(1*4

Release Date: 15.01.2025 Basic Start Date: 15.01.2025

Release Time: 08:23:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

fl39/ __________________________

S5S'-P- gg _____________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :15.01.2025
Notification No: 100313270 Order No: 20196509 Description: H-704 tyre puncher
please repair
Functional P301 -SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ DatelTime DatelTimE. _____________________

0010 FORKLIFT FLAT TIRE H704

Release Date: 15.01.2025 Basic Start Date: 15.01.2025

Release Time: 08:22:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs


-

Maintenance Department User Department


WushP4t Kirby Building Systems KSA
i%IJ
MAINTENANCE ORDER JOB TICKET

Date : 22.01.2025
Notification No: 100313575 Order No: 20196774 Description: please check & change
tyre
Functional P301-MTHDL- Description: FORKLI FTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/TimE. _____________________

0010 please check & change tyre

___ ____________________ ____ ____ ____


/
___ ___________________________ ____

C Kg

Release Date: 22.01.2025 Basic Start Date: 19.01.2025

Release Time: 17:55:11 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S27 Pjei/ ___________________

Maintenance Department User Department


Ituttifl Kirby Building Systems KSA
t %:fl
MAINTENANCE ORDER JOB TICKET

Date: 22.01.2025
Notification No: 100313707 Order No: 20196768 Description: forklift t-302 back tyre
puncture
Functional P301- MTHDL.- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Zeeshan Ahmed Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timt ______________________

0010 forklift t-302 back tyre puncture

Release Date: 22.01.2025 Basic Start Date: 21.01.2025

Release Time: 17:48:48 Basic End Date:

Employee Codes Employee Names Operation No Firs

______ Q&jert _________


(!o

_______
2erQk4it __________ ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.01.2025
Notification No: 100313758 Order No: 201 96762 Description: T502 front tyre 6.26-15
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502 -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time flatelTimc. ______________________

0010 T502 front tyre 8.25-15 puncture


__ _________________________ _____ _____

/vh

Release Date: 22.01.2025 Basic Start Date: 21.01.2025

Release Time: 17:38:13 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cc- ,gJN ________ _________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.01.2025
Notification No: 100313840 Order No: 20196757 Description: Fork Lift EP-501 Tyre
puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 Fork Lift EP-501 Tyre puncher


___________________________ /7k
___ ____________________ ____ _____ ____

Release Date: 22.01.2025 Basic Start Date: 22.01.2025

Release Time: 17:32:05 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Ra.it"/ ____________________

_____
z.eeoLa ___________ ____________

Maintenance Department User Department


Kirby Building Systems KSA
44I
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100314075 Order No: 10132190 Description: fork lift EPW3 PM and
engine work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT T&øi4tL.- '
E!j' 42s'b
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
cm
Responsible: n r Centre:
Tech ID: 0 01

0010

Release Date: 25.01.2025 Basic Start Date: 25.01.2025

Release Time: 16:01:01 Basic End Date:

C
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100314075 Order No: 10132190 Description: fork lift EP-503PM and
engine work
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT fr S 3 S -Tot4
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance

Tech ID
Responsible: _ç g ' Centre:

Opr Description Status Start Compl Remtrki


No ______________________________________ _______ Date/Time Date/Time ______________________

r\10 fork lift EP-303 PM and engine work

P1
___
M1th)NE trek ____ ____ ____
Of'QN;

A/f ofIt'
pIc;J1 6 ____ _____________

Release Date: 25.01.2025 Basic Start Date: 25.01.2025

Release Time: 16:01 :01 Basic End Date:

Employee Codes Employee Names Operation No Hrs


/o/a3-
rcg-? fl?qflc' _______ UJO.

- Mcc'ktIizf P&ccA"f(?o& &


"T fA-M CPC
)- M-°° g it 6
cgp(j
-
Hr0°'t
4&r /4r &1LiE

Maintenance Department - User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.01.2025
Notification No: 100314075 Order No: 10132190 Description: fork lift EP-503PM and
engine work
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TJyif TJM

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:
_cg

Opr Description Status Start Compi Remarks


No ______________________________________ _______

Date/Time Date/Timc. ______________________

___
0010 fork lift EP-303 PM and engine work
MthjM¬ ore t Ctfcø &? jf '2., Nc
Ii
_________ ________

____ ____ ___________

1A/f ofrIt'
__

fr1,',¼pg flt&-
I
F"
_____________________________

Release Date: 25.01.2025 Basic Start Date: 25.01.2025

Release Time: ii.lfl mil Basic End Date:

Employee Codes Employee Names Operation No Hrs

/'3..

Co1c- - M#f6tI 7ec/ti'ft&-


)- st ?if*
6
H0Lt
p-
r 4&r
r /r ?LfEr

Maintenance Department User Department


Kirby Building Systems KSA
:JV
MAINTENANCE ORDER JOB TICKET

Date : 01 .10.2024
Notification No: 100305321 Order No: 20192839 Description: conrac 1 tack stroller
broken
Functional P301- BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 1 tack stroller broken


____ _____________________________ ______
OU&24 t(fo'4 _________________

___ '2n&ve4' rfl £f(n ç/


()/wtktl oL ____ _____ _____
tel -

Release Date: 01 .10.2024 Basic Start Date: 01 .10.2024

Release Time: 18:00:22 Basic End Date:


O (Jo zoi4
Employee Codes Employee Names Operation No Firs

___________ ___________________ _________________ tIP

Maintenance Department User Department


1 Kirby Building Systems KSA
I
MAINTENANCE ORDER JOB TICKET

Date : 01 .10.2024
Notification No: 100305326 Order No: 20192838 Description: T502 back tyre
replacement
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 01.10.2024 Basic Start Date: 01.10.2024

Release Time: 17:58:41 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 01.10.2024
Notification No: 100305327 Order No: 20192837 Description: EP1001 Gear oil pipe
changing
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 01.10.2024 Basic Start Date: 01.10.2024

Release Time: 17:58:12 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :02.10.2024
Notification No: 100305383 Order No: 20192901 Description: plant 2 dog clamp
replacement 31on.
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______

Date/Time Date/Tim( ___________________

0010 plant 2 dog clamp replacement 3ton.


lb .- /2.f- _______________________

Do c4t'
c_(Aithi 0k _____ ______ ______ ______________

Release Date: 02.10.2024 Basic Start Date: 02.10.2024


Release Time: 17:28:27 Basic End Date: O2, to 2u4
Employee Codes Employee Names Operation No Hrs

ft/n/Ia

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :02.10.2024
Notification No: 100305319 Order No: 20192900 Description: old blasting port problem

Functional P301- FlNIS-BLAST Description: GRIT BLASTING MACHINES


Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA
-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______

Date/Time Date/Time ___________________

0010 old blasting port problem


-'___ __________________________ _____ 02.(v2( Oa.io'zf. ______________

/adr. 1/Ic /&fpgj,crn, L/j ____ ____ _______________

____
flnn.çr n-ti n/il _____ _______ ______ ________________

____
p4 r/i(t_/ok__c/,pyli ______ _______ ______ _________________

____ c/. ,"Jj (IA/LIQ i pipe- A 1. ______ ______ _______________

Release Date: 02.10.2024 Basic Start Date: 02.10.2024


Release Time: 17:27:11 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 02.10.2024
Notification No: 100305399 Order No: 20192899 Description: krass press die replace
1-25 to G4
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 02.10.2024 Basic Start Date: 02.10.2024

Release Time: 17:25:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______________________
QD i

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :02.10.2024
Notification No: 100305410 Order No: 20192898 Description: forklift s16002 chalenger
pipe welding
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ Dateilime Date/Time_______________________

0010 forklift sI6002 chalenger pipe welding


: Z,o \t\3o

bc4 £e- a'w I


Release Date: 02.10.2024 Basic Start Date: 02.10.2024

Release Time: 17:24:48 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 02.10.2024
Notification No: 100305408 Order No: 20192897 Description: Hangcha 7 ton lyre
replacement
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 02.10.2024 Basic Start Date: 02.10.2024

Release Time: 17:24:19 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :03.10.2024
Notification No: 100305507 Order No: 10129064 Description: SCM machine PM &
repair work
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

#eu .
Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 17:42:26 Basic End Date:

-I

G& noQnj ci *1-.


-Y C,ko.aLc! cflt, r-fakcu
k

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.10.2024
Notification No: 100305508 Order No: 10129065 Description: Station B to C burn table
relocation wor
Functional P301-BUILT-OFLIN Description: BUILT-UP OFF LINE
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DateiTime Date/Time____________________

0010 Station B to C burn table relocation wor

___
hk ___ ________ __________

__ c94q c/7h ___ _______ _________

___
cYb /F/cl c -I "tt c/ RDC22_ ____ _____ _____ ____________

4/w4 r3j '-/r'h)t ________ __________

/ 0310202- (siedcle4' czk'tc 4-ce ')/


.ç.,h çy Basic '
Release Date: Start Date: d&10.2024

Release Time: 17:46:24 Basic End Date:

Vc4J Pn1jxn

Maintenance Department User Department


Kirb&J Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 03.10.2024
Notification No: 100305506 Order No: 10129063 Description: C & Z purlin line PM &
grising work
Functional P301- CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: 11000131 Description: CZ PURLIN LINE

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 C & Z purlin line PM & grising work


(
'i'( b%*3 t4 CW&1At _____ ______ ______ _______________

Ltn& nA ,Z" sia ____ _____ ____ ____________

___

r1L&xo,ut:t
rev' 2
%nn'r tsr to&e &.a ______ _______ _______ __________________

Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 17:40:50 Basic End Date:

Employee Codes Employee Names Operation No Hrs

c-71ct- c ______________________ ____________________

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 03.10.2024
Notification No: 100305505 Order No: 10129062 Description: KR/KW sheet line PM &
grising work
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: 11000130 Description: SHEETING LINE FOR KR & KW PROFILES

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 17:38:33 Basic End Date:

'4-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.10.2024
Notification No: 100305482 Order No: 20192939 Description: T502 Engine Oil change

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 17:33:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :03.10.2024
Notification No: 100305470 Order No: 10129053 Description: TOYOTA -501 PM
REPAIR WORK
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA STON T501
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 08:48:33 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 03.10.2024
Notification No: 100305502 Order No: 20192942 Description: blasting helmet air pipe
problam
Functional P301 -FINlS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

DateiTime Date/Time ______________________

0010 blasting helmet air pipe problam


___ _________________________ 02 fy24

?prutd c/hcl4nn,I ___ ____ ____ __________

___
c/_oAts kdot. ____ _________ ___________

Release Date: 03.10.2024 Basic Start Date: 03.10.2024

Release Time: 17:36:27 Basic End Date: 02 to Z24

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :03.10.2024
Notification No: 100305481 Order No: 20192940 Description: Unipunch machine dia
problam
Functional P301- HTRLD Description: HOT ROLLED SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 03.10.2024 Basic Start Date: 03.10.2024


Release Time: 17:34:06 Basic End Date: 03 2Qj-
Employee Codes Employee Names Operation No Firs

(3 i

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :03.10.2024
Notification No: 100305438 Order No: 20192925 Description: 10 Tons Forklift EP

Functional P301-SHIPG Description: SHIPPING


Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 03.10.2024 Basic Start Date: 03.10.2024


Release Time: 08:45:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305609 Order No: 20193084 Description: t301 forklift rear tyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: [i1W['JQitfI

Release Time: 17:49:20 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305675 Order No: 10129096 Description: T502 back tyre
replacement
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 06.10.2024

Release Time: 08:46:02 Basic End Date:

Maintenance Department User Department


irj Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :0?.10.2024
Notification No: 100305741 Order No: 20193120 Description: FORKLIFT EP1 001
FLAT TIRE
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person -uncL -.i Main Work Mechanical Maintenance


-

Responsible: 'Zfliulabthii,, Halyal Centre:


Tech ID:

Release Date: 07.10.2024 Basic Start Date: 07.10.2024

Release Time: 08:38:55 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_____________________

/ Z
j

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :06.10.2024
Notification No: 100305552 Order No: 20193081 Description: pedding hause punching
machine punch hr
Functional P301-DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS # 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 04.10.2024

Release Time: 17:47:15 Basic End Date:

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :06.10.2024
Notification No: 100305557 Order No: 20193082 Description: conrac 01 seam welding
support bearing b
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 05.10.2024

Release Time: 17:47:46 Basic End Date:


,

Employee Codes Employee Names Operation No Hrs


_______________________

() 19r,

j
a8flna. F) i vi

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305605 Order No: 20193083 Description: pending hause 1
punching holder notwork
Functional P301-OTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS # 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ________________________________ ______

Date/Time DatellimE __________________

0010 pending hause 1 punching holder notwork


___ __________________________ _____

O5 (o o5to a ______________

___

c:# ________ _______________

Release Date: 06.10.2024 Basic Start Date: 05.10.2024


Release Time: 17:48:50 Basic End Date: 5 fo 2tt
Employee Codes Employee Names Operation No Hrs

3 ___________
/ 'p"

C / 1-i"

Maintenance Department User Department


Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305612 Order No: 20193085 Description: Fig brace rn/c blade need
to tight
Functional P301-CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Tim¬ ____________________

0010 FIg brace rn/c blade need to tight


___ _____________________ ____

D5a4- cs1o21 ____________

LyE&) rt' b/oth cl _______ _____________

__ (o0bd _______________

Release Date: 06.10.2024 Basic Start Date: 05.10.2024

Release Time: 17:50:05 Basic End Date: VS (o" t024

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305509 Order No: 20193078 Description: OLd blasting deadmental
pipe damage
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 03.10.2024


Release Time: 16:50:25 Basic End Date: 03" QOý4

Employee Codes Employee Names Operation No Hrs


______ hbn (r) HI
(ft

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305663 Order No: 20193058 Description: hemming M/C roller
came out
Functional P301-SHEET- Description: SHEET TRIMS AND ACCESSORIES
Location: ACCSR
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 06.10.2024


Release Time: 08:47:20 Basic End Date: nj .

Employee Codes Employee Names Operation No Hrs

(!) II-fn

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305684 Order No: 20193088 Description: plasma air leakage prob

Functional P301 -UTLTY- Description: GAS CUTTING & HEATING SETS


Location: GASET
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 06.10.2024


Release Time: 17:53:54 Basic End Date: Iv.

Employee Codes Employee Names Operation No Hrs

_______ S?.hh p

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305693 Order No: 20193089 Description: 20 ft shear machine cony
chain breake
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID: KJSH-0601

Release Date: 06.10.2024 Basic Start Date: 06.10.2024

Release Time: 17:54:52 Basic End Date:


To

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 06.10.2024
Notification No: 100305708 Order No: 20193091 Description: sanli 4mtr back side
sloper chaine loose
Functional P301- DTAIL-DTLN1 Description: DETAIL LINES (Kirby)
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Mainlenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 06.10.2024

Release Time: 17:55:57 Basic End Date: 'ro

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :06.10.2024
Notification No: 100305628 Order No: 20193086 Description: sanli 4mtr back side
stoper chaine loose
Functional P301- DTAIL-DTLN2 Description: DETAIL LINES GECKO
-

Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 06.10.2024 Basic Start Date: 05.10.2024

Release Time: 17:50:39 Basic End Date:

I Employee Codes Employee Names

çpg
I Operation No I Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.10.2024
Notification No: 100305754 Order No: 20193119 Description: old blasting hose
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ ______

Date/Time Date/Timf ____________________

0010 old blasting hose problem


"____ ___________________________ _____ O'7"D24 07.ID"ij _______________

'1121 P1 ___ ____ __________

Release Date: 07.10.2024 Basic Start Date: 07.10.2024


Release Time: 08:37:04 Basic End Date: 07 to 'Qoz..g
Employee Codes Employee Names Operation No Hrs

___________ _________________ ________________


I f-jt,

___________

3
2MJ 1) fir.'

Maintenance Department User Department


Kirby Building Systems KSA
irb MAINTENANCE ORDER JOB TICKET

Date: 07.10.2024
Notification No: 100305742 Order No: 20193135 Description: sheeting uncoiler
up&down not working
Functional P301- SHEET Description: SHEET SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 07.10.2024 Basic Start Date: 07.10.2024

Release Time: 14:51:15 Basic End Date: 07 ra

Employee Codes Employee Names Operation No Hrs

UI)
-'
(1) / i'

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date: 07.10.2024
Notification No: 100305777 Order No: 20193137 Description: sheet mill coil lifter not
working
Functional P301-SHEET Description: SHEETING LINES
Location: RLFRM
Equipment No: 11000130 Description: SHEETING LINE FOR KR & KW PROFILES

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time
________ Date/Time
________ _____________________
______________________

0010 sheet mill coil lifter not working


. 07 _______________________

___ Cop? Jifia ,tIofl4oy,ncJ ____ _____ _____ ____________

sg
___ pci?) cn-i ____ _____ _____ _____________

___ flt) '9iosinw9- d Chuiudo ____ _____ _____ ____________

j
Release Date: 07.10.2024 Basic Start Date: 07.10.2024

Release Time: 15:02:53 Basic End Date: b7 lo

U)
7_.tJn

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :07.10.2024
Notification No: 100305778 Order No: 20193139 Description: sheet mill not cuffing
properly
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 07.10.2024 Basic Start Date: 07.10.2024


Release Time: 15:07:34 Basic End Date: 07/o 2t24
Employee Codes Employee Names Operation No Hrs

_________
(93s,tJ C) ' i-".'

I /11
D

Maintenance Department User Department


Kirby Building Systems KSA
ub MAINTENANCE ORDER JOB TICKET

Date : 07.10.2024
Notification No: 100305792 Order No: 20193140 Description: T-302 forklift back tyre
punctur
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 07.10.2024 Basic Start Date: 07.10.2024

Release Time: 15:09:01 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date :07.10.2024
Notification No: 100305805 Order No: 10129117 Description: paint line side loader
SL6001 oil leak
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLlFEP1g- E1 cc
2-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start compl Remarks


No __________________________________ _______

DateiTime Datellimc ____________________

0010
?c) c
paintlintside loadernotworkind
00 6 (ç

(rPç) ;)Pa CkA3

___
tAJi'v IpE 0 ____ _____ _____ ____________

__ ei Ua ___________ _________

Release Date: 07.10.2024 Basic Start Date: 07.10.2024

Release Time: 18:21 :14 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 08.10.2024
Notification No: 100305814 Order No: 20193165 Description: conrac 02 seam welding
please check
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

08.10.2024't An sL Chakt
Release Date: Basic tart Date: 07.10.2024

Release Time: 08:30:12 Basic End Date:


io

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :08.10.2024
Notification No: 100305860 Order No: 20193168 Description: t301 forklift need to oil
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ________________________________ ______

DateiTime Date/Time__________________

0010 t301 forklift need to oil change


D ________________ ___
Thic )v2s o4' CAq41-
54

Release Date: 08.10.2024 Basic Start Date: 08.10.2024

Release Time: 08:45:14 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.10.2024
Notification No: 100305900 Order No: 20193203 Description: scm plate hole out
problem
Functional P301 -DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 08.10.2024 Basic Start Date: 08.10.2024

ReleaseTime: 18:11:58 Basic End Date: cxz

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.10.2024
Notification No: 100305843 Order No: 20193167 Description: T-502 forklift Oil leakage
please check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 08.10.2024 Basic Start Date: 08.10.2024

Release Time: 08:38:07 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
iv'
MAINTENANCE ORDER JOB TICKET

Date: 08.10.2024
Notification No: 100305887 Order No: 20193202 Description: forklift ep502 engine oil
change
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 08.10.2024 Basic Start Date: 08.10.2024

Release Time: 18:11:20 Basic End Date:

cct,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.10.2024
Notification No: 100305732 Order No: 201 93206 Description: FORKLIFT CHANGE
TIRE H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person ouccIazQm Main Work Mechanical Maintenance


Responsible: ZainelabddiwHalyal- Centre:
Tech ID:

Release Date: 08.10.2024 Basic Start Date: 06.10.2024

Release Time: 18:14:12 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 09.10.2024
Notification No: 100305954 Order No: 20193234 Description: sheet mill coil lifter not
working
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
DateiTime Date/Timc ____________________

0010 sheet mill coil lifter not working


_____________________ ___

d1ft21 Ot!D24 __________

____ cA&d s'h' I up ci n(am


p; ___________ _____________

mo&d (2nn,otny do &1123&.


qc&atJ QkJ&1 ___ ________________

___ 4thc §jp) Q/ (',ddo4 ____ ___________________

Release Date: 09.10.2024 Basic Start Date: 09.10.2024

Release Time: 10:15:29 Basic End Date: t9 to

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.10.2024
Notification No: 100305935 Order No: 20193226 Description: conrac 01 pressing
wheel shaft down pls
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLlNeBMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Electrical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 09.10.2024 Basic Start Date: 09.10.2024

Release Time: 08:40:09 Basic End Date: oct10. 2024-


Employee Codes Employee Names Operation No Hrs

fl
______ ___________________

2jj

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.10.2024
Notification No: 100305798 Order No: 20193246 Description: Purlin M/C X axis punch
need to change
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 09.10.2024 Basic Start Date: 07.10.2024

Release Time: 11:01:50 Basic End Date: O7'tozø4

I fr/i)

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :09.10.2024
Notification No: 100305980 Order No: 20193256 Description: T-502 forklift oil leakage
prob
Functional P301-MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N 1502-

Plant Section: Person Rajendran Main Work CONRAC -1


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Time ____________________

0010 T-502fork1iftoi1 leakage prob


'o , 3o % ?-)
CfeAVI'LCUJ-
-

___ ____________________ ____ _________ ca/i Ig-gL


________________________

v4p '-

Release Date: 09.10.2024 Basic Stan Date: 09.10.2024

Release Time: 15:02:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 10.10.2024
Notification No: 100306023 Order No: 201 93301 Description: 1502 back tyre punture

Functional P301 -MTH DL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 T502 back tyre punture


__ __________________

£?Lo /J!&W7ZA-c t/

___ __________________ ________ ____

/o&

Release Date: 10.10.2024 Basic Start Date: 10.10.2024

Release Time: 09:21:14 Basic End Date:

Employee Codes Employee Names Operation No Hrs

sml ____________
LI

Maintenance Department User Department


Kirby Building Systems KSA
ib MAINTENANCE ORDER JOB TICKET

Date: 13.10.2024
Notification No: 100306164 Order No: 20193440 Description: EP502 BACK TYRE
PUNCTURE
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 13.10.2024 Basic Start Date: 12.10.2024

Release Time: 10:16:18 Basic End Date: /2At


Employee Codes Employee Names Operation No Hrs
sqas _____________ ____________ jljb

32

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.10.2024
Notification No: 100306364 Order No: 20193482 Description: FORKLIFT HY 701

Functional P301-SHIPG Description: SHIPPING


Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 14.10.2024 Basic Start Date: 14.10.2024

Release Time: 13:44:40 Basic End Date:

Maintenance Department User Department

___________

6çi27 53-y91
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.10.2024
Notification No: 100306474 Order No: 10129295 Description: T3olforklitt back tyre
puncher nd check
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

,0010 T3Olforklift back lyre puncher nd check


p

Release Date: 16.10.2024 Basic Start Date: 15.10.2024

Release Time: 08:19:55 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Wwhdfl Kirby Building Systems KSA
U
MAINTENANCE ORDER JOB TICKET

Date: 18.10.2024
Notification No: 100306618 Order No: 20193646 Description: FORKLIFT CHANGE
TIRE H704
Functional P301-SHIPO Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thou upurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 FORKLIFT CHANGE TIRE H704


77,czt avj/
__ ___________________ ___

/Ubc

Release Date: 18.10.2024 Basic Start Date: 17.10.2024

Release Time: 08:27:18 Basic End Date:

Employee Codes Employee Names Operation No Hrs

¶_WI____________
a_____
_____________________

Maintenance Department User Department


tkt
r t
Vntnt
:
Kirby Building Systems KSA
flu M
MAINTENANCE ORDER JOB TICKET

Date: 18.10.2024
Notification No: 100306572 Order No: 20193645 Description: pre 302 forklift back tyre
puncture pls
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 pre 302 forklift back tyre puncture p1s


___ _______________________ ____ _____ _____

/y/cc /'JbQ
cYtccur

Release Date: 18.10.2024 Basic Start Date: 16.10.2024

Release Time: 08:24:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
KrbIj MAINTENANCE ORDER JOB TICKET

Date : 20.10.2024
Notification No: 100306788 Order No: 201 93771 Description: SL-6002 side loader
cilencer welding dam
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ Date/Time DatefTimc. ______________________

0010 SL-6002 side loader cilencer welding dam


1fl w/t¬

,Fr1 -A £i#7L
ofeJt,,/ /C('
I
________ ____

Release Date: 20.10.2024 Basic Start Date: 19.10.2024

Release Time: 17:25:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


It tYfltI Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :20.10.2024
Notification No: 100306779 Order No: 20193768 Description: T301 back tyer puncher

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTAS TON T301- -

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ Date/Time DateITim6 ______________________

0010 T301 back tyer puncher ,.-.--.-

( -__ ___________________________ ____


/Y-tt

Release Date: 20.10.2024 Basic Start Date: 19.10.2024

Release Time: 17:14:28 Basic End Date:

Employee Codes Employee Names Operation No Hrs


___________________

/!?4

(
.cf% - ,t T/ _________________

Maintenance Department User Department


Vit+niWI Kirby Building Systems KSA
%U
MAINTENANCE ORDER JOB TICKET

Date :22.10.2024
Notification No: 100306987 Order No: 201 93841 Description: T502 back tyre punture

Functional P301- MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

DatelTime Date/Time ______________________

0010 T502 back tyre punture


c

Release Date: 22.10.2024 Basic Start Date: 22.10.2024

Release Time: 10:50:35 Basic End Date:

Employee Codes Employee Names Operation No Hrs

( sc Z _________________

Maintenance Department User Department


Kirby Building Systems KSA
Krrb MAINTENANCE ORDER JOB TICKET

Date: 26.10.2024
Notification No: 100307129 Order No: 201 94010 Description: 1502 forkllift hydraulic
pump cros clamp
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc. ____________________

0010 1502 forkllift hydraulic pump cros clamp


7fl cYh.a
K3-

Release Date: 26.10.2024 Basic Start Date: 23.10.2024

Release Time: 17:55:01 Basic End Date:

Employee Codes Employee Names Operation No I-Irs

Sn?! __________________________

Maintenance Department User Department


Kirby Building Systems KSA
K,rhmtt MAINTENANCE ORDER JOB TICKET

Date :02.11.2024
Notification No 100307729 Order No 10129724 q9i Description side loader back tyre
puncher nd check
Functional P301- MTHDL- Description: FORKLIFT*'
Location: FRLFT
4
Equipment No: 13000659 Description: FORKLIFT EF'lOTON EP1 001
-

Plant Section: Person -SLJITrrJcPfr Main Wbrk Mechanical Maintenance


Responsible: rJ...oØ/kfi4/1 Centre:
Tech ID:

Opr Description Status Start Compi Remarks


Date/Time Date/Timc.
r[4
No ____________________________________ _______ ____________________

0010 side loader back tyre puncher nd check

_________________ ___
H _______

Release Date: 02.11.2024 Basic Start Date: 01.11.2024

Release Time: 14:16:36 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cfl7/ _____________________________

cic-pn S ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 04.11.2024 '4


Notification No: 100307940 Order No: 20194288 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DateITim6 _____________________

0010 FORKLIFT FLAT TIRE H704


__ _________________ ___ ____ ____

/Y-'e eui&

Release Date: 04.11 .2024 Basic Start Date: 04.11.2024

Release Time: 09:38:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________________ _________
'

cgt-- jeA/ _______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 04.11.2024
Notification No: 100307915 Order No: 20194291 Description: hangcha 8.25-15 tyre
tube replaicement
Functional P301- MTHDL- Description: FORKLIFTS
Location: FIRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 hangcha8.25-l5tyretube replaicement


7iT/i,cz_¬
L

Tc'be Ck

Release Date: 04.11 .2024 Basic Start Date: 03.11.2024

Release Time: 09:40:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

5$8fl- gj,-/ _____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 04.11.2024
Notification No: 100307910 Order No: 201 94292 Description: please check & repair
tyre puncture
Functional P301- MTHDL- Description: FORKLI FTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thoftupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

please check & repair tyre puncture


T

Release Date: 04.11.2024 Basic Start Date: 03.11.2024

Release Time: 09:41:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cii __________________________

( cf -9- q Tt,j ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 04.11 .2024


Notification No: 100307805 Order No: 1019787 Description: side loader back tyre
puncher nd check
Functional P301- MTHDL- Description: FOKLlFTS
Location: FRLFT
Equipment No: 13000659 Description: FORK,jET EP 1OTON EP1 001-

VP

Plant Section: Person RaJerlran * Main Work Mechapical Maintenance


Responsible: Thottj.4purath Centre: 4

Tech ID:
r
Opr Description Status Start Compi Remarks
No ______________________________________ _______
Date/Time Date/Time ______________________

£plo side loader back tyre puncher nd check


"/

____________________ ___ ____bc

Release Date: 04.11 .2024 Basic Start Date: 03.11.2024

Release Time: 09:45:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

f9/ ___________________ __________

( irg-- gITe,J _______________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDERJOB TICKET

Date : 04.11 .2024


Notification No: 100307982 Order N9f4 20194299 Description: please check & repair
ft lyre puncture
Functional P301-MTHDL- Description: FORKLIETS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP,7 TON EP7O1
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DatelTimc _____________________

0010 please check & repair lyre puncture r7Tyfr/Z


O6q

Release Date: 04.11.2024 Basic Start Date: 04.11.2024

Release Time: 13:43:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ç9j ___________ _____________________

scS'-- qTeJ ________________

Maintenance Department User Department


" Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 04.11.2024
Notification No: 100307961 Order No: 20194298 Description: new blasting one port not
working
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ Date/Time Date/Time ___________________

0010 new blasting one port not working


-'__ ______________________ ____ O411zA a

B/CA! /n 4 hoed ,k/o I _____ ______ _____ ______________

I mnri1 ____ _____ _____ ____________

___
nli C/rM- e/ ____ _________ ___________

___
ç/ ahajad v4 ____ _____ _____ ____________

/
Release Date: 04.11.2024 Basic Start Date: 04.11.2024

Release Time: 11:06:54 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 07.11.2024
Notification No: 100308132 Order No: 20194419 Description: old blasting compresor
tripping
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA
-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Remarks

Release Date: 07.11.2024 Basic Start Date: 07.11.2024

Release Time: 16:19:51 Basic End Date: Vi h"?Øa4-


Employee Codes Employee Names Operation No Hrs

________ F6MJ_<j61 ____________ _____________

___________
./Nha! An)bw7e 13 _________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.11.2024
Notification No: 100308504 Order No: 20194558 Description: ysd shering cony moter
bolt loose
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID: KJSH-0601

Release Date: 11.11.2024 Basic Start Date: 10.11.2024

Release Time: 08:35:37 Basic End Date: Th- 2oi4


Employee Codes Employee Names Operation No Hrs

________
¶ornii ___________ _____________

_________
/12qw) _____________
IXftn

Maintenance Department User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date: 11.11.2024
Notification No: 100308511 Order No: 20194557 Description: dama conyr motor prob

Functional P301-POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Remarks

Release Date: 11.11.2024 Basic Start Date: 11.11.2024

Release Time: 08:34:57 BasicEndDate: 1/ /) 2o1-4-


Employee Codes Employee Names Operation No Hrs

_________
g,P3MJ. ______________
/ I(n
_________
Jr/h&A ,q,nhuic C) I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.11.2024
Notification No: 100308774 Order No: 20194733 Description: t301 forklift back puncher

Functional P301-MTHDL- Description: FORKLIFTS


Location: FRLFT
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 16.11.2024 Basic Start Date: IIcMWZiJeZ!

Release Time: 09:19:36 Basic End Date:


ia ii 2o24
Employee Codes Employee Names Operation No Hrs

Quucofe42qro

_______ _____________
1) 'k 11-'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.11.2024
Notification No: 100308988 Order No: 20194804 Description: primo flange splice chain
bk
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID;

0010

Release Date: 18.11.2024 Basic Start Date: 16.11.2024

Release Time: 15:49:32 Basic End Date:


/ )fQ
Employee Codes Employee Names Operation No Hrs

__________
8MJ !DHA! ______________
Ii 2024- ('i 1-f
-,________ L1c/hctf ftyohun (7 ( '-1'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 18.11.2024
Notification No: 100308964 Order No: 10130304 Description: forklift tyre puncher need
repair
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Remarks

Release Date: 18.11.2024 Basic Start Date: 17.11.2024

Release Time: 15:15:05 Basic End Date: /7 (I 2tP2J1r


Employee Codes Employee Names Operation No Hrs -

_________
Qoci,celozciro _____________
IF/n
-'_______ ____________
-__________ ____________

Maintenance Department User Department


Kirby Building Systems KSA
h
MAINTENANCE ORDER JOB TICKET

Date: 19.11.2024
Notification No: 100308790 Order No: 20194838 Description: cm bearing problem

Functional P301-DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Release Date: 19.11.2024 Basic Start Date: 13.11.2024

Release Time: 15:37:38 Basic End Date: IS 11'102-j-

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 19.11.2024
Notification No: 100308859 Order No: 20194842 Description: scm seq out cutting prob

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Suresh Chekala Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timc ___________________

0010 scm seq out cuffing prob


rc (/24 /5 //'2-j- ______________________

Aojtnhd c) C7.7jJ *t _____ ___________ _____________

j7 flit ,g01 ___ ____ ____ _________

piI c/ 9i6s FkIjvi1e'I


___
Cl (ktektdv ____ _____ _____ ____________

Release Date: 19.11 .2024 Basic Start Date: 15.11.2024

Release Time: 15:47:10 Basic End Date:


/5 /f 2o-f
Employee Codes Employee Names Operation No Hrs
__________

f::p,,/ 7nmJ

-'__________ u,ghal 11-.o&nt (V / th

Maintenance Department User Department


Kirby Building Systems KSA
K
aS MAINTENANCE ORDER JOB TICKET

Date:
Notification No: 100310538 Order No: 20197194 Description: Forklift tube air pressure
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description: ,EP (aol -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 Forklift tube air pressure problem


(

Release Date: [.T!a.J*Is Basic Start Date: 07.12.2024

Release Time: 13:40:42 Basic End Date:

Employee Codes Employee Names Operation No Its

2 -- __________________________

£ IA/ARE14003E

Maintenance Department User Department HIaOOE


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.09.2024
Notification No: 100303953 Order No: 20191932 Description: conrac 02 hydrolic pump
motor Sound
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 16.09.2024 Basic Start Date: 16.09.2024

Release Time: 09:28:54 Basic End Date:


(6 o. W2_

lull 11111 llllllllllllllllll 111111


SHVDPUMPSH1500453
PARKER HYD PUMP PVP3336R2UM21
FLOI

Maintenance Department User Department


Kirby Building Systems KSA
Iwl*ti MAINTENANCE ORDER JOB TICKET

Date: 16.09.2024
Notification No: 100303979 Order No: 20191953 Description: Iron worker machine
blade loose
Functional P301 -CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Iron worker machine blade loose


___ ___________________________ _____
focfj 1ec?q24 _______________

7y/ikr/ cfti

Release Date: 16.09.2024 Basic Start Date: 16.09.2024

Release Time: 15:11:41 Basic End Date:


(6'o 9'2o2_1
Employee Codes Employee Names Operation No Hrs

1AFt) ____________
k +"

Maintenance Department User Department


Kirby Building Systems KSA

KwbI1 MAINTENANCE ORDER JOB TICKET

Date: 16.09.2024
Notification No: 100303978 Order No: 20191954 Description: conrac 01 A side hydrolic
hose damage
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time DatelTimc ______________________

0010 conrac 01 A side hydrolic hose damage


ft oy.- It '09" z
9uI 40ktd I4ct
__
Hue c/ &1t221 C75 /r/Øjo ____ _____________

£/ ChatiLdcik _____________________

Release Date: 16.09.2024 Basic Start Date: 16.09.2024

Release Time: 15:14:13 Basic End Date:


(. oq. ggi
Employee Codes Employee Names Operation No Hrs

______
&IAJ _________
_
I

C
___________
fQh& - C9 ( ,rfjTh

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.09.2024
Notification No: 100304038 Order No: 20191998 Description: conrac 02 flange
pressing roller bearing
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Date/Timc _____________________

0010 conrac 02 flange pressing roller bearing


p fry' 17. -

t/on flreiHn9
___
1?U,. h2,'¬,1 0cano70
,pt/ec1 '/&, ____ _____ ____ ___________

QJ e- S v-theG'Icy ________ ____ __________

9 SncP '-7fl-
Release Date: 17.09.2024 Basic Start DAte: 17.09.2024
;iQV

Release Time: 10:54:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________________
(fl) ___________

( H ______________ ____________ ______________

c/Fi1d tf1e, /L(frj 7%L iiaf I p(alo CJ bean'n/'


Yvip] /'ceJ q fi&il/ C/II c,t, C1 etc

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.09.2024
Notification No: 100304072 Order No: 10128684 Description: EP-501 forklift tyre Reerr
tab & Welding
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501
-

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

0010

LI

Release Date: 17.09.2024 Basic Start Date: 17.09.2024

Release Time: 18:12:42 Basic End Date: -4 &95LO2--i

Employee Codes Employee Names Operation No Hrs

ct9c1C -is (n
ARONc 3

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.09.2024
Notification No: 100304050 Order No: 20191997 Description: Side loder Front tyre
need to change
Functional P301-MThDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description: c14 o% too)
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Release Date: 17.09.2024 Basic Start Date: 17.09.2024

Release Time: 10:53:57 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
%n MAINTENANCE ORDER JOB TICKET

Date: 17.09.2024
Notification No: 100303620 Order No: 20192040 Description: big shearing machine not
working pls che
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 big shearing machine not working pis che


___ ____________________________ _____
J'o9',4 !J'o72D- ________________

___
cAo4d c'/ tpct/rrl r/ ___________ __________

$//( '2,! @Akdtt' ____ _________ ___________

Release Date: 17.09.2024 Basic Start Date: 11.09.2024

Release Time: 18:43:16 Basic End Date:


t' o9.2oz,-
Employee Codes Employee Names Operation No Hrs

IAI(A'

Maintenance Department User Department


t(nøbtfl Kirby Building Systems KSA
tI:i
MAINTENANCE ORDER JOB TICKET

Date: 17.09.2024
Notification No: 100303257 Order No: 20192045 Description: Purlin decoiler brake
need to repair.
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: 11000131 Description: CZ PURLIN LINE

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Time _____________________

0010 Purlin decoiler brake need to repair.


tg.og...1 /.oqt2
___
c19ta- _____________________

47

Release Date: 17.09.2024 Basic Start Date: 09.09.2024

Release Time: 18:45:49 Basic End Date:


oq'zaa.g
Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________


/_'
/,rcJ 'Vu I/p () / Ni

Maintenance Department User Department


vutdwt Kirby Building Systems KSA
'tfl
MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304134 Order No: 20192104 Description: Hemming m/c chain
broken
Functional P301 -SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Ralan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 Hemming rn/c chain broken


(
,oiilrer/ cfiit ___ ___________________

Release Date: 18.09.2024 Basic Start Date: 18.09.2024

Release Time: 14:48:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________________ ___________t/-fr,
________
'%kd %ii, _____________

/_

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304139 Order No: 20192102 Description: EP5O1 FORKLIFT TYRE
TUBE PUNCTURE
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time DateiTim¬. ___________________

0010 EP5O1FORKLIFTTYRETUBE PUNCTURE /


__ __________________ ___ ____

12° 4L-t-
,t4' PuPi1 Pi4 __

iji
__
92-t 4U4r1
,Ceg± (I
____ _____ _____ _____________

Release Date: 18.09.2024 Basic Start Date: 18.09.2024

Release Time: 14:47:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
2eej7L _
__________ ___________

Maintenance Department User Department


Kirby Building Systems KSA
it'
MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304154 Order No: 20192103 Description: conrac 01 press wheel
not working
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 18.09.2024 Basic Start Date: 18.09.2024

Release Time: 14:48:01 Basic End Date: /2j.


oq'.
Employee Codes Employee Names Operation No Hrs
___________

3 i/n
_______
C'8w. ___________ _____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304106 Order No: 20192075 Description: ironworker notch blade
need to down
Functional P301-CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time Date/Timc. ______________________

0010 ironworker notch blade need to down


ogzd (V12'
pi?ed 14d ___________________

__

c/ c1kgatoi f ___

____ _____ _____ ____________

Release Date: 18.09.2024 Basic Start Date: 18.09.2024

Release Time: 09:15:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____________ ____________________ __________________

/_/t}3

Maintenance Department User Department


Kirby Building Systems KSA
KwbjtJ MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304100 Order No: 201 92076 Description: Conrac #1 flange cony.
roller damage
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
DatelTime Datellimc. ______________________

0010 Conrac#i flange cony, roller damage


_________________________ ____

& _____ _____________

olter' t0Cctrw7f vtfI ____ ____ ____ ___________

___ c)J(
f(&2 q (AkI ____ _____ _________________

___
Ok ________ _______________

Release Date: 1 8.09.2024 Basic Start Date: 18.09.2024

Release Time: 09:22:03 Basic End Date: /


Employee Codes Employee Names Operation No Firs

fl/Alt,' ________________
p fe/ti
ti/4it-d "(v//cf @2 " '9)'

Maintenance Department User Department


Kirby Building Systems KSA
Ihi1 MAINTENANCE ORDER JOB TICKET

Date: 18.09.2024
Notification No: 100304109 Order No: 20192074 Description: krass standard punching
not cut for m
Functional P301- DTAIL-PRESS Description: DETAIL PRESSES
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______

DatelTime Date/Time ______________________

0010 krass standard punching not cut form


&'09"2.t /S"Oitb,

Pc1Qt41 c7'fl die Cl, _____ ______ _____ ______________

___

CNe4Lf/pk ____ _____ ____ ___________

Release Date: 18.09.2024 Basic Start Date: 18.09.2024


Release Time: 09:10:37 Basic End Date: /8"oq,2g
Employee Codes Employee Names Operation No Hrs

$MJLl _
_____________

_______
ki ___________

ft-

Maintenance Department User Department


K1rb9jJ Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 19.09.2024
Notification No: 100304144 Order No: 20192179 Description: krass replace 106to 1-86

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Comp! Remarks


No ____________________________________ _______
Date,dTime DatelTim¬ _____________________

.Q010 krass replace 106to 1-86


____ __________________________ _____

/qog /q.oq.
& ,/td(nO, / c7Yy_ 47. ____ ___________

(?/ a4iraon _______ _____________

9/ Chnkdh ____________________

Release Date: 19.09.2024 Basic Start Date: 19.09.2024

Release Time: 09:07:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

E'/AIU _____________________

p
IJa,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 19.09.2024
Notification No: 100304207 Order No: 10128706 Description: Fig brace rn/c punch
need to remove
Functional P301-CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTim¬. ______________________

0010 Fig brace rn/c punch need to remove

fl'1t! D4'ncJ) '7)D&PJ * ____ _____ _____ _____________

__
(4nAdDL _____________

Release Date: 19.09.2024 Basic Start Date: 19.09.2024


Release Time; 09:06:51 Basic End Date:

Employee Codes Employee Names Operation No Hrs

L _________________
________ ____________________________

/_Fr'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 19.09.2024
Notification No: 100304143 Order No: 20192178 Description: paint line forklift ep502
lyre puncher
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 19.09.2024 Basic Start Date: 19.09.2024

Release Time: 09:06:17 Basic End Date:

7
a -

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :21.09.2024
Notification No: 100304380 Order No: 201 92279 Description: heavy sanli 4 mtr oil
Iaekage prob
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc. ______________________

0010 heavy sanli 4 mtr oil Iaekage prob


___ _____________________________ ______

Zf'c'24- 'v7t _________________

7?!' O(/ (Ct _______ ______________

Release Date: 21.09.2024 Basic Start Date: 21.09.2024

Release Time: 13:37:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

632 /
((

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.09.2024
Notification No: 100304333 ..-' Order No: 201 92261 Description: new blasting nosel and
light problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 new blasting nosel and light problem


2_I. -

(A#inm'c/ 4I'QIJ'/

Release Date: 21.09.2024 Basic Start Date: 21.09.2024

Release Time: 09:38:21 Basic End Date:


'1124
Employee Codes Employee Names Operation No Hrs

Si

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.09.2024
Notification No: 100304338 Order No: 20192281 Description: new blasting hose

problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 new blasting hose problem


__ _____________________ 2lti', _____ ____________

cf/u _________________

SF CAtkdpk
__

__________ _________

Release Date: 21 .09.2024 Basic Start Date: 21 .09.2024

Release Time: 14:09:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

@11) ( frn
__________________________________________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 21.09.2024
Notification No: 100304397 Order No: 20192286 Description: p1nt2, 2ton over head
cram not working
Functional P301- MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammed Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 p1nt2, 2ton over head cram not working


___________________________ 2_I °t24 2poqz
( ___ _____
_______________

___
-k &/L noVE/ _________ ___________

__
cti WAn) _______________

__ cftit $)
Release Date: 21.09.2024 Basic Start Date: 21.09.2024

Release Time: 14:46:31 Basic End Date: L!' O92o2.4

Employee Codes Employee Names Operation No Firs

_______ _______________________

I ii

Maintenance Department User Department


I? Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21 .09.2024
Notification No: 100304400 Order No: 10128792 Description: Conrac auto weld HYD.
CLY. repair work
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohid MuIla Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID: KJAWL-oi

Opr Description Status Start Compi Remarks


No ______________________________________ _______

Date/Time Date/Tim6 ______________________

0010 Conrac auto weld HYD. CLY. repair work


(
___

Cgbvic' cM, ____ _____ _____ ____________

p4oa' I / ____ _________ ___________

__

fl/ c1h fln ___________________

___
4-n fl//C_QI2eTh_cJL4 ____ _____ _____ ____________

Release Date: 21.09.2024 Basic Start Date: 21.09.2024

Release Time: 13:45:47 Basic End Date: 24 OC)7_13r


Employee Codes Employee Names Operation No Hrs

_________
y,'p r/. R- _____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA
LAP MAINTENANCE ORDER JOB TICKET

Date: 21.09.2024
Notification No: 100304352 Order No: 20192274 Description: conrac 01 press wheel
cylender oil leack
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc. _____________________

0010 conrac 01 press wheel cylender oil leack


___ _______________________ ____
24Ot3

Ctj (ICY/ti fern k c/ '1" ______________ ____________

Release Date: 21 .09.2024 Basic Start Date: 21 .09.2024

Release Time: 12:24:18 Basic End Date:


2?' V1c2Lv41
Employee Codes Employee Names Operation No Hrs
______

ci _________
4-Si- c)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 21.09.2024
Notification No: 100304305 Order No: 20192272 Description: Id blasting machine pipe
damege
Functional P301- FIN IS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Timc ______________________

0010 old blasting machine pipe damege


2o cq'.q- 2o eq.
I
cpe ,%,y,5e L,oc,e,J _____ ______ ______ _______________

y ,00eS- _____________

Release Date: 21.09.2024 Basic Start Date: 20.09.2024

Release Time: 12:22:30 Basic End Date: 2o o9'

Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________


, Hv

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 21 .09.2024
Notification No: 100304398 Order No: 10128791 Description: Conrac #1 PM &
Hyd.CIy. repair work
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Dateliime DatelTims _____________________

0010 Conrac # 1 PM & Hyd.Cly. repair work


2v vcj. .q- 2 txy -.

g0rnj ThiVcLe Ftix ___ ______ ________

(/Jo 4ni'eJ Q/ flnoy


oi;LIoc,/ Mn D1MP(I
__ ItS dopei )the ___ _________________

Release Date: 21.09.2024 Basic Start Date: 21.09.2024

Release Time: 13:43:49 Basic End Date:


Lo D9' 2024
Employee Codes Employee Names Operation No I-Irs

_________ _______________ (%) H?1

________
flt-170 ___________

_________ ______________ _____________

C
C/ti F+r'poil' (,)
h A 6
4*- !&ikodci

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.09.2024
Notification No: 100304415 Order No: 10128796 Description: Neon Project fabrication
& Repair work
Functional P301- UTLTY- Description: GAS CUTTING & HEATING SETS
Location: GASET
Equipment No: Description:

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 21 .09.2024 Basic Start Date: 21 .09.2024

Release Time: 17:14:25 Basic End Date: ot\%2b2j

Maintenance Department User Department


n
U %fl
rntnttW4Y
:
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.09.2024
Notification No: 100304470 Order No: 20192335 Description: krass press die loose

Functional P301- CFORM Description: COLD FORM SECTION


Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTimc. ______________________

0010 krass press die loose


Z2OT Q2e- #1t2 ______________________

___ 'rnpurt 1/i' the c/die


gearJn'i Pap; h07h)
__
o nnonJ ci
___
c/_; ___ __________________

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 15:03:05 Basic End Date:

Employee Codes Employee Names Operation No i-Irs

________________________
3pi
lj)

Maintenance Department User Department


Kirby Building
Kirb9jtj
Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 22.09.2024
Notification No: 100304473 Order No: 20192334 Description: krass M/C 0-cm bolt
broken
Functional P301- MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000661 Description: UNDERSLUNG CRANE 2TON A201 -

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 krass M/C 0-cm bolt broken


-\____ ________________________________ ______
22-'oz. a2.0q$ __________________

___ Lu ____ _____ ____ ___________

f
,40/ot&21 cy fly /1 ____ __________

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 15:02:34 Basic End Date:


..22 ZQ)-4
Employee Codes Employee Names Operation No Hrs

ífç

Maintenance Department User Department


V h dl Kirby Building Systems KSA

4 MAINTENANCE ORDER JOB TICKET

Date: 22.09.2024
Notification No: 100304486 Order No: 10128812 Description: G-bend alien bolt need to
change
Functional P301-CFORM- Description: PRESSES AND PRESS BRAKES CF -

Location: PRESS
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 G-bend alien bolt need to change


22'c%24 2a.eJ7'2
( ___ _________________________ _____
-

__
__________ _________

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 15:01:49 Basic End Date:


za eqt 20.24
Employee Codes Employee Names Operation No Hrs

gA/gO _____________________

Maintenance Department User Department


Li w&t Kirby Building Systems KSA
1 fl"
MAINTENANCE ORDER JOB TICKET

Date : 22.09.2024
Notification No: 100304498 Order No 20192333 Description: Conrac 2 weling UP &
Down problem
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Date/Time _____________________

0010 Conrac 2 weling up & Down problem


( 2.2."24 -2-o'/'2. H
___ 2 4un 44/fl ____ _____ _____ ____________

p't-oh)e. 9.1iS c&iL,j ____________________

___
Cl /7r0c,qk! Jo mh'avrn ________ __________

__

IroW
vTht ________________

I
tc1 '%'k gfr02fli' b
Release Date: 22.09.2024 (/ 2 '"'
Basic Start Date: 22

Release Time: 15:01:12 Basic End Date: Qoq.4

Employee Codes Employee Names Operation No Firs

if)
________
I,J7o ___________ ____________

(
________ c0Ah0 ___________ ____________

had- (JtttLdok

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.09.2024
Notification No: 100304497 Order No: 20192337 Description: PLANT 2 SIDE LOADER
HYDRAULIC PIPE LEAK
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKFT-TOYOWk5feW-eo2

Plant Section: Person Zeeshan Ahmed Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 17:38:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

SR39 2ee/21&t& ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.09.2024
Notification No: 100304458 Order No: 201 92332 Description: conrac 02 web
supporting bearing
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc. _____________________

\0010 conrac 02 web supporting bearing broken


-

___ bl1h Sc1p9nv'/y 1)%/9 Pasmn


___
heoiin; fly/ &5Ai ta" _____ _____ ____________

___

ir?aAi ognU' d47rvh I ___________ __________

__
cIFa4j*'I rft 1a24109 ___________ _________

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 14:58:08 Basic End Date: 22 eq 2o4


Employee Codes Employee Names Operation No Hrs

________ _____________ ____________


1,/i)
A__________
/t4J)/O ,'%)/4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.09.2024
Notification No: 100304501 Order No: 20192338 Description: 1502 TYRE
REPLAICEMENT
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.09.2024 Basic Start Date: 22.09.2024

Release Time: 17:38:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs


ci __________ ______

4,
3.

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET
)Jo7 /-
Date :..2e.09.2024
Notification No: 100304495 Order No: 10128810 Description: T-302 forklift lioght &
painting repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.09.2024 ¼ Basic Start Date: 22.09.2024

Release Time: 13:45:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

"cxY _____________________________

______
RaJet/ cp kWt4
________________

7wc dat
tsj

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.09.2024
Notification No: 100304631 Order No: 20192427 Description: krass press die replace
1-25 to 1-86
Functional P301- CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

.9010 krass press die replace 1-25 to 1-86


24-
4J0rt/ 7'ñi (k fl,1pj'/i
t° tip C (loriifl ($no?4 _____ ______ ______ _______________

Release Date: 24.09.2024 Basic Start Date: 24.09.2024

Release Time: 10:22:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
Ltu ____________
ltn-i
Q7

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 24.09.2024
Notification No: 100304602 Order No: 20192428 Description: old blasting port problem

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Timc. ______________________

0010 old blasting port problem


___ ________________________ ____
2&'o7M Q$'ou7 q
S/)a1fl41 ?0Yv1 c/ ________ _______________

Pan-qtcdr

Release Date: 24.09.2024 Basic Start Date: 24.09.2024

Release Time: 10:23:28 Basic End Date: .24-. o(f Qg4


Employee Codes Employee Names Operation No Hrs

,t/ah'h41/p __________________________

Maintenance Department User Department


It rK*WI Kirby Building Systems KSA
14 ass
MAINTENANCE ORDER JOB TICKET

Date : 24.09.2024
Notification No: 100304600 Order No: 20192423 Description: new blasting canwear &
holder problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 new blasting canwear & holder problem


Mt09t1 Q4'°9".y
cy%

As ,4i¬ ____ _____ _____ _____________

it/nc' i2IoYkiO ____ _____ _____ _____________

____ Prnncnpd. ('ont flPyvir


g,,ct_c/_rAuLd__c'6o/ ____ _________ ___________

Release Date: Basic Start Date: 24.09.2024

Release Time: [IJ;KsIWM Basic End Date:


4' o'7. 2o2-#
Employee Codes Employee Names Operation No Hrs
__________________ ___________5//n
?8v5___________ ___________________

qd c/ft (onvtqn r,ovtd cjjehJ cl. veü"


9ewnial4" Chbr C/&L&ktdck /¼e, /r/o'1
pea&y r/ u-0- Q/. fni,'ce 14/ Ao' v%- iw
bit /'T'1Y U /a Qa2rn £we W
Maintenance Department User Department
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 24.09.2024
Notification No: 100304617 Order No: 201 92422 Description: krass press die loose

Functional P301-CFORM Description: COLD FORM SECTION


Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 krass press die loose


21'c1.21 94.d1 -
tv1

C/ 427td h1 ___________________

__ WI 4hlc&o/
1CAuL/ Ok ___ _______ _________

Release Date: 24.09.2024 Basic Start Date: 24.09.2024

Release Time: 08:05:46 Basic End Date:


.24 , A
Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________


t_11-1)

Maintenance Department User Department


"'
h Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.09.2024
Notification No: 100304599 Order No: 20192424 Description: EP1001 NEW TYRE
REPLACEMENT
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 24.09.2024 Basic Start Date: 24.09.2024

Release Time: 08:07:03 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.09.2024
Notification No: 100304732 Order No: 20192519 Description: EP1001 TYRE
REPLACEMENT
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

I
Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:16:39 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
KarbJ MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304697 Order No: 20192515 Description: conrac 01 pressing
cylender bolt broken
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime Date/Timc _____________________

0010 conrac 01 pressing cylender bolt broken


(
bi OpatctIn5 cAe _____ ______ ______ _______________

%ua1-. eSL& tu- _____ ______ ______ _______________

___
Lcu- a4J _____ ______ _____ ______________

1t.__A hq-' _______ ______ ________________

Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:11:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

A? A" ________________
'2-

Maintenance Department User Department


Kirby Building Systems KSA
iS\Th;/At MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304681 Order No: 20192512 Description: conrac 01 welding wire
stuck in liner p1
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Tim6 ______________________

0010 conrac 01 welding wire stuck in liner p1


(
Cpo' 4"" ."-;- _____ _______ ______ ________________

Release Date: 25.09.2024 Basic Start Date: 24.09.2024

Release Time: 11:10:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

t7 t-t-C _________________ ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304670 Order No: 201 92511 Description: conrcac2 tacking
conveyor chain bk
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 corircac2 tacking conveyor chain bk


(. ______________________ ____
2-tzt 2+'v ___________

___

o&o ci ____ _____ _____ ____________

___ fi)1-rl Ack c/ Q'?nktic& ____ _____ _____ _____________

Release Date: 25.09.2024 Basic Start Date: 24.09.2024

Release Time: 11:09:54 Basic End Date:


ct '?o2j-
Employee Codes Employee Names Operation No Hrs

________________ _________
(fin
_______ c/8MJ __________ ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304746 Order No: 10128868 Description: Fig brace rn/c punch
need to fix
Functional P301- CFORM- Description: ANGLE LINE - CF
Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 FIg brace rn/c punch need to fix

purth tne. Lued _________________

97 fpl&& O(Jcfl/

Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:19:31 Basic End Date:


2024
Employee Codes Employee Names Operation No Hrs

_________
'Zh1tL. _____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA
Kwb MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304745 Order No: 20192520 Description: conrac 1 exit side
cylinder come out
Functional P301- BUILT Description: BUILT-UP SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Tim(. ____________________

0010 conrac 1 exit side cylinder come out


2seq24- 252
C
__ ___________________ ____
___________

_____ ___________ _____________

?,1r 5'! cha2J ___ _______ _________

Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:19:00 Basic End Date: it- 07.20.2.4

Employee Codes Employee Names Operation No Hrs

____________________ ___________
Ut'
__________
J01id S i f/I)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304724 Order No 201 92518 Description: dama hydro oil fill up

Functional PSO1-DTAIL-DTLN4 Description: DETAIL LINES CNC DRILL


-

Location:
Equipment No: 12000298 Description: CNC DRILLING MACHINE

Plant Section: Person Mohid MuIIa Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/TimE. ______________________

0010 dama hydro oil fill up


2e-vq2
(,. 9sj'21
_____________________ ___

oil IuA#cn. ____ _____ _________________

Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:16:06 Basic End Date: -o. QJJ)4

Employee Codes Employee Names Operation No Hrs

Y7

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.09.2024
Notification No: 100304717 Order No: 20192517 Description: 20f1strip lifter problem

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timt ______________________

0010 20 ft strip lifter problem


(
___
O,4pkd ci 4mireJ tk ____ _____ _________________

Poo7pCL1cd-

Release Date: 25.09.2024 Basic Start Date: 25.09.2024

Release Time: 11:13:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
Kirbjfj MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304854 Order No: 10128891 Description: urlin M/C X axis punch
need to change
Functional P301- CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 urlin M/C X axis punch need to change


____________________________ 2GQ'z.7- 2&ocf.
( ___ _____
________________

wrcI' cl _________ _______________

____
(Thnb c/cL _____ ___________ ______________

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:16:16 Basic End Date:


.

Employee Codes Employee Names Operation No Hrs

(
________ _____________ ____________

i (-f

Maintenance Department User Department


a Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304801 Order No: 20192582 Description: 201t shearing machine
top side blade bro
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH- 0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 20ff shearing machine top side blade bro


_______________________ ____

QE- cfl'21 -"°1 -

___
.ccr/o /pdo Ptobn ____ _____ _________________

___ B,ntciPd r4t h/at cf R0jiti ____ ______________

__ lfte h/a c./ ,'wW ch¬ _______ _____________

___ Ckarctn& t/ §(ttJvØL- ________ ______________

bold
Release Date: 26.09.2024 Basic Start Date: 25.09.2024

Release Time: 14:15:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________ ___________________ _________________ U

______
A-tr/o _________ __________

__________ _________________ _______________


1! ?q-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304855 Order No: 20192576 Description: PLANT 2 1 PC.DOG
CLAMP FOR
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time DatelTimE. ______________________

0010 PLANT 21 PC.DOG CLAMP FOR


REPLACEMENT 2Ldf24 ý4- t7.24
C ____ ______
_________________

___ 2 /n A7 Ctan/) *k12

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:07:31 Basic End Date: '>.

Employee Codes Employee Names Operation No Hrs

f Wv

Maintenance Department User Department


Kirby Building Systems KSA
%fl
MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304840 Order No: 20192580 Description: new blasting troly
problem
Functional P301 -POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 new blasting troly problem


______________________ ____
2"oq.&4 2&oT2k ___________

___
tJi 1M 7i//e eakv# ____ ___________________

Release Date: Basic Start Date: 26.09.2024

Release Time: 14:10:33 Basic End Date: 2tO?. °M


Employee Codes Employee Names Operation No Hrs

_______ ___________ __________


4- I-/ri

(.

Maintenance Department User Department -


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304826 Order No: 20192581 Description: sanli heavy sound prob

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ DatelTime DatelTimc ______________________

0010 sanli heavy sound prob


(
___ C&o& <'I. / /njü. ____ _____ _____ ____________

___ Apj4j' ol ____ _____ _____ ____________

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:15:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
Ii1Tt#;/t. MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304842 Order No: 201 92579 Description: Graco spray paint
machine not working
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Comp! Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Graco spray paint machine not working


24 --

___ Voini
,'mp A /of ____ _____ _________________

___
7>'r
JIck'. Q/ "Qiticj
tcio
9rnouel Clip

________
__________________

____ ___________

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:10:10 Basic End Date:


2 g .o7' 292-A
Employee Codes Employee Names Operation No Hrs

___________
3RM&2- ________________
P Wri
____________ _____________________ ___________________

/__'

Maintenance Department User Department


Kirby Building Systems KSA
Kirb! MAINTENANCE ORDER JOB TICKET

Date : 26.09.2024
Notification No: 100304864 Order No: 20192578 Description: PLANT 2 DOG CLAMP
REPLACEMENT 5TON.
Functional P301- GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Comp! Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 PLANT 2 DOG CLAMP REPLACEMENT 5TON.


____ _______________________________ ______

9609'M __________________

hiz Elor boy.

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:09:38 Basic End Date: c


C
Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


a Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 26.09.2024
Notification No: 100304856 Order No: 20192577 Description: PLANT 2 1 PC.DOG
CLAMP FOR
Functional P301- GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DatelTime Date/Time _____________________

0010 PLANT 2 1 PC.DOG CLAMP FOR


I. ____ REPLACEMENT ______
2bo,zk c26.o9.t ____________________

?p)ot1r-fi-t9 i-Ion 4 ____ ___________ ______________

(;Lp

Release Date: 26.09.2024 Basic Start Date: 26.09.2024

Release Time: 14:08:38 Basic End Date: 26 tOp


Employee Codes Employee Names Operation No Hrs

_________ ______________

() f 90

Maintenance Department User Department


Kirby Building Systems KSA
INTh4 MAINTENANCE ORDER JOB TICKET

Date: 28.09.2024
Notification No: 100305020 Order No: 20192658 Description: new blasting pipe
damage
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Daterrimc. ______________________

0010 new blasting pipe damage


( ______________________ ____
tb°nt Q4o744 ___________

r7%j /air
)/a//ty
____ ___________ ______________

W Ht& 4 MaId ___ __________________

Release Date: 28.09.2024 Basic Start Date: 28.09.2024

Release Time: 09:27:13 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________ __________________

09 __________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.09.2024
Notification No: 100305003 Order No: 20192656 Description: side loader s16002 back
tyre puncher
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT /
EquipmentNo: Description: (.P$'t'L -

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

4. "'1mu[.]. tjflT! 1
Il. "n 'fl

Release Date: 28.09.2024 Basic Start Date: 28.09.2024

Release Time: 08:42:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

sc-- ,Qfa4 ___________________

Maintenance Department User Department


Kirby Building Systems KSA
"
t
MAINTENANCE ORDER JOB TICKET

Date: 29.09.2024
Notification No: 100305111 Order No: 20192706 Description: stn d threading rn/c
motor prob
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ________________________________ ______
DateiTime Date1flmt __________________

0010 stn d threading rn/c motor prob

___ 4, '7odt C! ____ _____ _____ ____________

5/ZntO' Rm(exl ____ ___________ _____________

c/ (2,t,r &.h _________ ___________

__
ci :j çj
I
___ _______________

Release Date: 29.09.2024 Basic Start Date: 29.09.2024

Release Time: 10:14:39 Basic End Date: 2.q.c9


Employee Codes Employee Names Operation No Hrs

__________
SPJA.J ______________
I/it-/u

3 ____________ ____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 29.09.2024
Notification No: 100305102 Order No: 20192707 Description: BLASTING air pipe
leakage
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Release Date: xeP2izI Basic Start Date: 29.09.2024

Release Time: 10:18:40 Basic End Date: 2q o?zP2f

/ Wrj

Maintenance Department User Department


Kirby Building Systems KSA
urbMAINTENANCE ORDER JOB TICKET

Date : 29.09.2024
Notification No: 100305080 Order No: 20192705 Description: 1-301 fork lift starting
trable
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table-i


Responsible: Centre:
Tech ID:

Release Date: 29.09.2024 Basic Start Date: 28.09.2024

Release Time: 09:49:05 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date: 30.09.2024
Notification No: 100305056 Order No: 20192744 Description: krass press die replace
1-86to1-25
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

Release Date: 30.09.2024 Basic Start Date: 28.09.2024

Release Time: 10:28:04 Basic End Date:


°tt 7fl
Employee Codes Employee Names Operation No Hrs

_________ _______________ ______________ I I-ft2

__________
'7thor,,wer _______________
khn

Maintenance Department User Department


ir Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.09.2024
Notification No: 100305115 Order No: 20192743 Description: uni punch machine dia
setting problam
Functional P301-HTRLD Description: HOT ROLLED SECTION
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 30.09.2024 Basic Start Date: 29.09.2024


Release Time: 10:23:13 Basic End Date: cj. mz
Employee Codes Employee Names Operation No Hrs
_____________ ____________________ __________________

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.09.2024
Notification No: 100305120 Order No: 20192741 Description: krass press die hold
plate bolts loose
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 30.09.2024 Basic Start Date: 29.09.2024

Release Time: 10:20:57 Basic End Date: 29e9 2ct4

Employee Codes Employee Names Operation No Hrs


_________ _______________ ______________

I
________ ______________ _____________

I H'

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 30.09.2024
Notification No: 100305149 Order No: 20192740 Description: sheeting machine cuffing
problem pls c
Functional P301-SHEET Description: SHEET SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 30.09.2024 Basic Start Date: 30.09.2024

Release Time: 10:20:07 Basic End Date:

Employee Codes Employee$ames Operation No Hrs

______
PJU _________ __________

________ tlofllDt'luu.S _____________ If I

Maintenance Department User Department


Kirby Building Systems KSA
ir
U' MAINTENANCE ORDER JOB TICKET

Date: 30.09.2024
Notification No: 100305124 Order No: 20192739 Description: T301 forklift rear tyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 30.09.2024 Basic Start Date: 29.09.2024


Release Time: 09:54:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_______ _______________________

,t- bUJL

icc _____________________ ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 30.09.2024
Notification No: 100305185 Order No: 20192742 Description: RANGCHA 7 TON TYRE
REPLACEMENT
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 30.09.2024 Basic Start Date: 30.09.2024


Release Time: 10:21:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs

S11r _________ _________________

______
ei ___________________

Maintenance Department User Department


Kirby Building Systems KSA
V
MAINTENANCE ORDER JOB TICKET

Date : 01.10.2024
Notification No: 100305337 Order No: 20192836 Description: Old blasting machine
break down
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 01 .10.2024 Basic Start Date: 01.10.2024

Release Time: 17:57:21 Basic End Date: 01 fo' 2q-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 01 .10.2024
Notification No: 100304865 Order No: 20192823 Description: angle punchung rn/c
blade loose
Functional P301 -CEORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time DatelTimc ______________________

0010 angle punchung rn/c blade loose r


___ _______________________ ____
ZJyocy.24 2-b0724- _____________

_______ ______________
__

___ ___________________________ ____


-

Release Date: 01.10.2024 Basic Start Date: 26.09.2024

Release Time: 12:36:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

-J- ;d ,'-ft,if ________________ _________________

Maintenance Department User Department


Kirby Building Systems KSA
KirbW1 MAINTENANCE ORDER JOB TICKET

Date : 01.10.2024
Notification No: 100304944 Order No: 20192824 Description: Dog clamp with chain 1.5
mtr
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammed Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Dog clamp with chain 1.5 mtr


-__ ________________________ _____________

P r6rp ,"Ap,h i9Aaoy


Pu7 C/amp fit

Release Date: 01.10.2024 Basic Start Date: 27.09.2024

Release Time: 12:37:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

._________________ ________________ _________________

Maintenance Department User Department


Kirby Building Systems KSA

''
MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100304938 Order No: 20192822 Description: old blasting machine pipe
damege
Functional P301- FINIS- SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 old blasting machine pipe damege


r7'oq L7ccj9
__ ___________________ ____

rcL -

Release Date: 01.10.2024 Basic Start Date: 27.09.2024

Release Time: 12:34:57 Basic End Date: 27 .o 2V-24


Employee Codes Employee Names Operation No Hrs
____________________

(I) ____________

Maintenance Department User Department


Kirby Building Systems KSA
Krrb & MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305036 Order No: 20192821 Description: conrac 1 flange pressing
cylinder not wo
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWOi
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 1 flange pressing cylinder not wo


________________________ ____
QOPjM 2-4 ____________

___ Cki0d c/. C/1'& p/erLer/ t'


___
/ui A1o t4o;bh/
/1-r rJ7 V&An c _______________

__
Ike I _______ ____________

Release Date: 01.10.2024 Basic Start Date: 28.09.2024

Release Time: 12:34:21 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ _______________ ______________


4-ph)
H ______________________

1tu7

Maintenance Department User Department --


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305050 Order No: 20192819 Description: peddinghaus 1 had cup
broken
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS It 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTimc. ____________________

0010 peddinghaus 1 had cup broken


___ ______________________ ____
2zo? ____________

___ bvkn) nued cf ,a/reA ____ _____ _____ ____________

Cf tja& r)%j X/J ____________________

Ijaid-yp c/ o/aeod

Release Date: 01 .10.2024 Basic Start Date: 28.09.2024

Release Time: 12:33:03 Basic End Date: 0% '2c)2.1

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305027 Order No: 20192820 Description: conrac 02 conveyor roller
chan removed
Functional P301- BUILT Description: BUILT-UP SECTION
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 02 conveyor roller chan removed


( ____________________ ___ 2g'M24 2go.t __________

___
flS* ___ ____ ____ __________

49/otcf <7ht/,h4. ____ _____ _________________

Release Date: 01.10.2024 Basic Start Date: 28.09.2024

Release Time: 12:33:49 Basic End Date:


2S'cii
Employee Codes Employee Names Operation No Hrs

_______iAI _
_________________

________________ ____________________________ _________________________ ____________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 01 .10.2024
Notification No: 100305054 Order No: 20192818 Description: lion dogclamp 2pic
replace
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Elecirical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 lton dogclamp 2pic replace


2c,-0c12.4 2-'C)°('24 _______________________

___ 1 i't'n c5 Chmp %i&nA

Release Date: 01.10.2024 Basic Start Date: 28.09.2024

Release Time: 12:32:35 Basic End Date: 2i c%7. 2r-


Employee Codes Employee Names Operation No Hrs

_______________________ _
t)

Maintenance Department User Department


I tflV Kirby Building Systems KSA
a nrnin
_,_

%fl
MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305098 Order No: 20192817 Description: conrac 1 flange pressing
cylinder not wo
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -i


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
DatelTime Date/Timc. ______________________

0010 conrac 1 flange pressing cylinder not wo 9qocy.


__ _____________________ ____

Qoo7'2

P'a'y prP))t7 (k//heLl A/o,L _____ ______ _____ ______________

iy 591L Cv/,helei ___ ________

__

cY _________ ________

___ ø' eh1d ____ _____ _____ ____________

Release Date: 01 .10.2024 Basic Start Date: 29.09.2024

Release Time: 12:30:16 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
RAiL! _____________________

_______ _______________________
rn)
________
f&AJ. ____________
it??

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 01 .10.2024
Notification No: 100305200 Order No 201 92816 Description: new blasting roly
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 new blasting roly problem


C
__
&,I& I ftte _______ _____________

/ ____ _____ _____


4- npto4ctU.

Release Date: 01 .10.2024 Basic Start Date: 30.09.2024

Release Time: 12:29:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(Th) ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305223 Order No: 20192815 Description: conrac2 seam weld cony
motor prob
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTimc. ______________________

0010 conrac2 seam weld cony motor prob


__ ____________________ ____
Bo'c%z4. Ø4 ___________

cftw (iwy kf/01 _____ _____ _____________

T yt/nL (4rg __________

(Ø'npLfr I -

___ link c/ (A0&LvL ____ _____ _____ _____________

Release Date: 01.10.2024 Basic Start Date: 30.09.2024


Release Time: 12:28:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________ ____________ ___________
iffr'
_________ _______________ ______________
(if??'

Maintenance Department User Department


t(utifl
I%H
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date :01.10.2024
Notification No: 100305271 Order No: 20192813 Description: T302 forklift hydraulic
lifting up p plc
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302 -

Plant Section: Person Andrat Austin Paulu Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime
________
DateiTimc
________
______________________
____________________

0010 T302 forklift hydraulic lifting up p plc


o('/o'9.oil- Ot"fo24-
( -

___
)nth4 cf r)e,/deL ____ _____ _____ ____________

__ ________________ ___________
£ccL

Release Date: 01 .10.2024 Basic Start Date: 01 .10.2024

Release Time: 12:28:05 Basic End Date: cub .20iij


Employee Codes Employee Names Operation No Firs

(7) ___________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31 .08.2024
Notification No: 100302612 Order No: 10128356 Description: Sandblasring Air
Compressor PM work
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000300 Description: AIR COMPRESSOR L75 BLAST
- -

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

DatelTime DatelTimc. _____________________

0010 Sandblasring Air Compressor PM work


____

3o'°&M !!oata4
ry;C2CI__c%i__,6_f(ffcl ____ _____ _____ _____________

caty U4,C1 fit


4/ afld,Jfl _______ ______________

___ oil ffo. c11 7iLp

i__oil Iew4'. ____ _____ _____ _____________

Release Date: 31.08.2024 Basic Start Date: 31.08.2024


Release Time: 10:38:14 Basic End Date: 3oOt
Employee Codes Employee Names Operation No Hrs

r &-
_______________

let-)-)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31.08.2024 6nJ7


Notification No: 100302428 Order No: 20191206 Description: purlin ribbing part need
to check
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:
fk

ku-frcL
C0t. mdju ngjj
Release Date: 31.08.2024 Basic S)'c1p4,
Date: 29.08.2024 Start c-b 61?)
Release Time: 11:51:47 Basic End Date:
at' 2o2.4

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 02.09.2024
Notification No: 100302670 Order No: 20191317 Description: conrac 01 press weel
chain tell down
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


ResponibIe: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc______________________

0010 conrac 01 press weel chain fell down


r ____ ____________________________ _____
o/tq'* oI.0cf2.L
frwul *-ohm ppu1y
SI Ohnkt-d ok- ____ _____ _____ _____________

Release Date: 02.09.2024 Basic Start Date: 01.09.2024

Release Time: 18:34:19 Basic End Date: O/"oe/ .2_j


Employee Codes Employee Names Operation No Hrs -

tt4hcJ ______________ ________________

Maintenance Department User Department


Kirby Building Systems KSA
a
MAINTENANCE ORDER JOB TICKET

Date : 02.09.2024
Notification No: 100302731 Order No: 20191321 Description: conrac 01 entry side
roller problem
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time. ______________________

0010 conracOl entry side roller problem


O2- O99 O2'o9tf
(T ___ ________________________ _____

'po1lfiA 1- 3iin'c
____ C'hgpi.A p1 ______ _______ ______ ___________-_____

Release Date: 02.09.2024 Basic Start Date: 02.09.2024

Release Time: 18:39:29 Basic End Date:

Employee Codes Employee Names Operation No Firs


____________ ___________________

(19 ___________________

Maintenance Department - User Department


Kirby Building Systems KSA
flU! DJV*
MAINTENANCE ORDER JOB TICKET

Date : 02.09.2024
Notification No: 100302689 Order No: 20191319 Description: Stn- D bend saw need to
align rightangle
Functional P301-HTRLD Description: HOT ROLLED SECTION
Location:
Equipment No: 15000268 Description: CFM BANDSAW

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateITim ______________________

0010 Stn- D bend saw need to align rightangle


____ _______________________________ ______
GI24 Gb _________________

___
lierl 9i ,oh;o thd ____ ____ ____ ___________

orjle 1*#AIIE L. ____ _____ _________________

___
(4/Ott) vol ynuei 'ii ____ _____ _____ _____________

ç/._rhOEhdVk.
I
____ _____ ____ ___________

Release Date: 02.09.2024 Basic Start Date: 01 .09.2024

Release Time: 18:35:45 Basic End Date: qjj


224
Employee Codes Employee Names Operation No Hrs

( -

Maintenance Department User Department


Kirby Building Systems KSA
1H
"7MM MAINTENANCE ORDER JOB TICKET

Date: 02.09.2024
Notification No: 100302709 Order No: 20191320 Description: conrac 02 press wheel
chaine loose pis c
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc. ______________________

0010 conrac 02 press wheel chaine loose p1s c


( ____ _______________________________ ______

O1.c9'24 OI'*'-4.
yh4ed #b c/c;n c) _____ ______ _____ ______________

dlnkLdDk __ _____ ____________

Release Date: 02.09.2024 Basic Start Date: 01 .09.2024

Release Time: 18:38:51 Basic End Date: fi,' 09. ,

Employee Codes Employee Names Operation No Hrs

________ _____________ ____________


J_ffn.

Maintenance Department User Department


Kirby Building Systems KSA
fl:U
MAINTENANCE ORDER JOB TICKET

Date: 02.09.2024
Notification No: 100302688 Order No: 20191318 Description: scm rn/c bolt damage
need check
Functional P301- DTAIL-DTLN1 Description: DETAIL LINES (Kirby)
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______

Date/Time Date/Timc. ______________________

0010 scm m/c bolt damage need check


C ____ ___________________________ _____
oIO9t91 o)o994- _______________

Srj Pt!] ____ _________ ___________

tft Mn tifs c/ 7i3hlcd.


(%mp&.frcl-
___ 14mk*n 2wU Uh7nyc/.

Release Date: 02.09.2024 Basic Start Date: 01.09.2024

Release Time: 18:34:58 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________ __________________ ________________

C -N_______ &'AJu ___________


/ kib

Maintenance Department User Department


Kirby Building Systems KSA
itli M74j MAINTENANCE ORDER JOB TICKET

Date : 02.09.2024
Notification No: 100302738 Order No: 20191322 Description: conrac 01 pump too
much sound
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 conracOl pump too much sound


( _________________________

O2.t2t O3czj24

__ inf3PO _______ _____________

c&punp bocyfrI r/e9 _______ _____________

____ friz)cyjen. c/ 'D/tcad

,tvropc[ 'oil -/cmk all -r,p(Jp( _____ _____ _____________

Release Date: 02.09.2024?


c/cotW 7%brf q R- ffi eftj, ,kJt4) oil
Basic Start Date: 02.09.2024

Release Time: 18:40:03 Basic End Date:


oa. o9' 2g'.
Employee Codes Employee Names Operation No Hrs

4Hn
_____________ ____________

(
________________________________
4frjn

rjht 7P Cf &rnvtd-kan duki-d" &

Maintenance Department User Department


WirfrnWl
%U
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 02.09.2024
Notification No: 100302795 Order No: 20191323 Description: conrac 02 main machine
carrige no up
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 conrac 02 main machine carrige no up


( ____ ____________________________ _____
b2- o,4 O2o1. ________________

CtIYIP7 C1/9 4$ OCUn ,tit# ____ _____ _____ _____________

kJoikiy' Camaye up* ____ ____ ___________

U43ack. y?nnciS* _________________

Pwor &/pulcd pn'cn'2 - - __________________

-
CflQkj4 OIL
Release Date: 02.09.20 4 Basic Start Date: 02.09.2024

Release Time: 18:40:45 Basic End Date:


o q. 20Z4.
Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________

5kifr
-.________ __________________________
ffv
______
c91WA/ ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 03.09.2024
Notification No: 100302844 Order No: 20191347 Description: conrac 02 press wheel
not working p1s c
Functional P301- BUILT- Description: $EAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 02 press wheel not working pis c


°3°1-k- os.O1.21.
___ _____________________ ____

(o'cec- 9 pwcwkno1 /Dr)j cfr4-


S'h c/ b yh!
___

cIt rrxi)nknapca. 4?pbsd 'JuL ___________________

?Ppoirod cc,fn]a" afl,LOC/lO2

/7O(A! /flIEO I ohCrW-tkt c/


4r71L _____ ______ ______ _______________

Release Date: 03.09.2024 Basic Start Date: 03.09.2024

ReleaseTime: 11:52:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________ 1a
(
_______________

2!4

DIsft?aq4Ifr1 ct'& cdcnki c)s

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.09.2024
Notification No: 100302841 Order No: 20191344 Description: purlin rn/c roller position
need to set
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______
Date/Time Date/Timc. ______________________

0010 purlin rn/c roller position need to set


( __________________

OLt3t9fl &Ot9t

___
eimckul 'f/v ttk4
?ur/mo ft//c'.

// £t1 ç/ Mt/ ci fln,1,Wcct


___
eIe,o' c. r/1 AoØ Rita' _____ _____ _____________

c/_?tf,. ___ __________________

Release Date: 03.09.2024 Basic Start Date: 03.09.2024

Release Time: 11:50:00 Basic End Date: Q3. 09.


Employee Codes Employee Names Operation No Hrs

______________________________
/jftn
I _________
&Af,J cJ)

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 04.09.2024
Notification No: 100302982 Order No: 20191407 Description: EP1001 battry need to
be change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 04.09.2024 Basic Start Date: 04.09.2024

Release Time: 15:26:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________________

-_________ 1 k.u-t.

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 04.09.2024
Notification No: 100302951 Order No: 20191406 Description: Fork lift T-301 Cooling
fan And water pu
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:
fl3t)
3r1fr1
__

Release Date: 04.09.2024 Basic Start Date: 04.09.2024


Release Time: 15:26:16 Basic End Date:

Employee Codes Employee Names - Operation No Hrs

cfl:L; __________________________

Maintenance Department User Department


Kirby Building Systems KSA
[Ii MAINTENANCE ORDER JOB TICKET

Date: 08.09.2024
Notification No: 100303198 Order No: 20191538 Description: 20ff shearing machine
back side conveyor
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Release Date: 08.09.2024 Basic Start Date: 07.09.2024


Release Time: 17:36:48 Basic End Date:
07' oq.p
Employee Codes Employee Names Operation No Hrs
__________
"1Dh11 -1at(o' ______________
,' ftu

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 08.09.2024
Notification No: 100303277 Order No: 10128510 Description: EP-501 forklift tyre back
side puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 08.09.2024 Basic Start Date: 08.09.2024


Release Time: 17:04:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

çcM-

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 08.09.2024
Notification No: 100303279 Order No: 10128512 Description: Toyota -501 right side
tyre puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 08.09.2024 Basic Start Date: 08.09.2024

Release Time: 17:06:18 Basic End Date:

Employee Codes Employee Names Operation No Hrs


______ ___________________

j koç

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 08.09.2024
Notification No: 100303281 Order No: 10128514 Description: Toyota -303 front side
tyre change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 08.09.2024 Basic Start Date: 08.09.2024

Release Time: 17:08:20 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 08.09.2024
Notification No: 100303211 Order No: 20191541 Description: 4 mtr shearing machine
stoper chain brok
Functional P301- DTAIL-SSHER Description: DETAIL SMALL SHEARS
Location:
Equipment No: 15000267 Description: Sanli Shear 25 x 4000

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______

Date/Time Date/Timc ____________________

0010 4 mtr shearing machine stoper chain brok

___ c&n J1opM ches-, i(td ___ ________ __________

R' of ehtakt4& ____ _____ _____ ____________

Release Date: 06.09.2024 Basic Start Date: 07.09.2024

Release Time: 17:39:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_________ _______________ ______________
/ fIr,
-_____ '9 ________
/fln

Maintenance Department User Department


Kirby Building Systems KSA
KitbJ MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303412 Order No: 20191650 Description: conrac- 1 conveyor chain
broken
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac-i conveyor chain broken


( ___ ________________________ _____
/vo9'aj- Io'oy'2-
___
7% l'nUegos

Release Date: 10.09.2024 Basic Start Date: 10.09.2024

Release Time: 16:31:33 Basic End Date:


fQ. o9" 2-o.,L
Employee Codes Employee Names Operation No Hrs

i)

Maintenance Department User Department


a Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303391 Order No: 20191651 Description: scm die bufton bolt loos

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid MuIla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateITim6 ______________________

0010 scm die button bolt loos


e/)og,2q tý/ogi.
C
r/ybrJ c7?L &Hs _______ ____________

Release Date: 10.09.2024 Basic Start Date: 09.09.2024

Release Time: 16:32:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________________________________ _____________________________

Maintenance Department User Department


htP)t Kirby Building Systems KSA
K MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303440 Order No: 20191647 Description: conrac 01 press wheel
not working p1s c
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammed Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimE. ______________________

0010 conrac 01 press wheel not working pls c


___ _______________________ ____
(oc9'i trWz _____________

__
(?,a
flress'CA)hnJ MI ___ ____ ____ _________

(A1hi LuaU Q/
____
LQdP
/P .4J I
Cl (Al liLt! _____ _______ ______ ________________

___
(A/a )hing "/O7 _____ _____ _____________

J C/eoc/7fwChotcf 0*
Release Date: 10.09.2024 Basic Start Date: 10.09.2024

Release Time: 16:17:15 Basic End Date:


IO'o92fl4
Employee Codes Employee Names Operation No Hrs

________
2hh_ S
_______
&1o iJ)

1 )b p1ked L?yifn S?m' L' c1ijkgd c7fr &7,d


rcp -p
?1 niS
prnp;

jOf) 0/7W 7wy


F>cd ok

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303422 Order No: 20191648 Description: 5.6asa standard punching
die change plc
Functional P301-CFORM- Description: PRESSES AND PRESS BRAKES CF -

Location: PRESS
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Time _____________________

0010 56ass standard punching die change p1s


ft oq / & 'O9"2 _______________________

kG fiu PlfltiraflcC ____ _____ _____ _____________

Release Date: 10.09.2024 Basic Start Date: 10.09.2024

Release Time: 16:19:19 Basic End Date:


to 'oqoz.j..
Employee Codes Employee Names Operation No Hrs

________
kR/tit, ___________ _____________

(
I&/OkJ
'4/4 //

Maintenance Department User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303454 Order No: 20191643 Description: new blasting holder
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Taeaq-8FSdr Main Work Electrical Maintenance


Responsible: Shaiktr/3161. Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ ______

DatelTime DateiTimc. ___________________

0010 new blasting holder problem


__ _____________________ ____
(oocIji Ioi ____________

Release Date: 10.09.2024 Basic Start Date: 10.09.2024


Release Time: 16:03:45 Basic End Date: /C
Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________


t-h

Maintenance Department User Department


ir Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
°?'tYeiJi5 1tfeto- gMovt4. Tust z'"4
Date : 4-9O9.2024
Notification No: 100303476 Order No: 10128547 Description: EP-501 forklift Hyd.
Pump 7 Repair work
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON ?
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Release Time: 14:02:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

g%4
J

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKE
iwo- Mejuillk -eJ4oVL be4&ith Jbr AIJ
Wow
Date: 10.09.2024
Notification No: 100303475 Order No: 10128546 Description: Toyota -301 Eng. Repair
& painting work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON 1301
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

C) "-t"
Release Date: 10.09.2024 Basic Start Date: 10.09.2024
Release Time: 13:58:56 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.09.2024
Notification No: 100303424 Order No: 20191610 Description: 10 Tons Forklift EP Tyre

Functional P301-SHIPG Description: SHIPPING


Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 10.09.2024 Basic Start Date: 10.09.2024


Release Time: 08:46:06 Basic End Date:

Employee Codes Employee Names Operation No Firs


3a
£

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 10.092024
Notification No: 100303447 Order No: 20191646 Description: 2OFT shearing machine
jackholder oil le
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section; Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Datellime DatelTimc ______________________

0010 2OFT shearing machine jackholder oil le


__________________________
lo.oq%M !ooq.

Jl 4
___ _____

fpaJrto& s-fr
__ -m, bt?egJ _______________

Release Date: 10.09.2024 Basic Start Date: 10.09.2024

Release Time: 16:16:36 Basic End Date:


I
Employee Codes Employee Names Operation No Hrs

______ __________ _________

73 (J

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 12.09.2024
Notification No: 100303702 Order No: 20191811 Description: T502 lyre puncher need
check
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Mainlenance


Responsible: Thotlupuralh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time DateiTime___________________

0010 T502 tyre puncher need check


63t /223 /Yjtt 2ic&
w,T ___ ______ ________

____ To be ____ ___________


/ u)o e
5)
2?V('teiL- L4- ___________
b.dY V
Skv/p1
Release Date: 12.09.2024 Basic Start Date: 12.09.2024

Release Time: 18:12:21 Basic End Date:

Maintenance Department User Department


'4n too -'
Kirby Building Systems KSA HO -
ur MAINTENANCE ORDER JOB TICKET
10, -\

Date: 12.09.2024
Notification No: 100303669 Order No: 10128584 Description: Hyster -701 PM &
meantenance work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT a?
Equipment No: 13000657 Description: FOFRKLlFTHYCT-EM-7 TON - HY7O1

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start compl Remarks


No ____________________________________ -______ Date/Time Date/Time _____________________

0010 Hyster -701 PM & meantenance work


_________________ ___
'2 ____

________

___ P'4 uJ CkA9- -___ ____ ____

tcM'i,4
___________

_____________________
"'t - _________

__ cIa-' ci'C/ _______ _____________

F i'Pc SQtq1 _____________

Release Date: 12.09.2024 Basic Start Date: 12.09.2024

Release Time: 08:33:50 Basic End Date:

5!2ui
-

Maintenance Department I User Department


Kirby Building Systems KSA

KirbI! MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303822 Order No: 20191840 Description: New blasting port
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 New blasting port problem


/tToci,24 I4'b7P2
Ah St ___ ______ ________

rnp/uI
__
tsjl ci C,EMe _____________

V
vi >p7/a' tic / I
_________________

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 17:45:24 Basic End Date:


f4.
Employee Codes Employee Names Operation No Hrs

£490 !ttM
/ T _________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303823 Order No: 20191836 Description: old blasting deadmean
heridl problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc. ______________________

0010 old blasting deadmean hendl problem


t'0c, ''°T ______________________

7Paf)0J74 rfhi &od tnpn ____ _________ ___________

__ Pan 41(p. ___________________

___ jjo,e (eak $pciiu-/.

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 17:43:14 Basic End Date:


ctf2o2.
Employee Codes Employee Names Operation No Hrs

________
£8/k! ___________ /fcfi-2

Maintenance Department User Department -


Kirby Building Systems KSA
KwbIJ MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303836 Order No 20191837 Description: conrac 01 operator side
head oil leakage
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Tim6 ____________________

0010 conrac 01 operator side head oil leakage


/tdhJ2t!f0%Pt __________

Th, h'?d1 ____ _____ _________________

(uif,nrfni (&L
___

c/ c4n-,in ____ _____ _____ _____________

qi Qhoi&d ol

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 17:43:42 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ (%I,,4 r4ffg _________ _ I I.

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303839 Order No: 20191843 Description: 5m1r chain & hook 2nos
set Paint line
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Timc ____________________

0010 5mtr chain & hook 2nos set Paint line


-\__ ____ /fol'Qt
___
9aka' /t/&z) moJci diaiY) ____ ____ _______________

S' IlVok. 9AIw' _____ ______ ______ _______________

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 18:19:52 Basic End Date: 2024-


Employee Codes Employee Names Operation No Hrs

__________ Q,gmj _______________ ________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303821 Order No: 20191841 Description: old blasting port problem

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 17:45:54 Basic End Date: /'f ot 202.49-

Maintenance Department User Department


Kirby Building Systems KSA
trh
It
MAINTENANCE ORDER JOB TICKET

Date: 14.09.2024
Notification No: 100303834 Order No: 20191538 Description: krass replace G4 to 106

Functional P301-CFORM Description: COLD FORM SECTION


Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Description

Release Date: 14.09.2024 Basic Start Date: 14.09.2024

Release Time: 17:44:07 Basic End Date: / A. 29)4


Employee Codes Employee Names Operation No Hrs

C ____________

________ ______________ PS) (j fjr

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303916 Order No: 20191890 Description: Purlin M/C punch need to
change
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 15.09.2024 Basic Start Date: 15.09.2024

Release Time: 17:07:43 Basic End Date:


/6(29 202-4
Employee Codes Employee Names Operation No Hrs

#2akP ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303903 Order No: 20191891 Description: conrac 01 b side flux
valve not working
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime DateITim6 _____________________

0010 conrac 01 b side Ilux valve not working


fl___ _____
1Sog,- ts-o?21
___

-fl)(fl(/ V/It (A IL/P 61 ____ _____ _____ _____________

tpüireJ (4/&' cAmn t/


'ai4 viz' /at ____ ____ ___________

Release Date: 15.09.2024 Basic Start Date: 15.09.2024

Release Time: 17:08:27 Basic End Date:


/5
Employee Codes Employee Names Operation No Hrs
______ _________________

f/7tfl
___________________

() / gvi
_________ ______________ _____________

/ M

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303886 Order No: 20191892 Description: conrac 01 ma tube
problem for welding
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimt ______________________

0010 conrac 01 ma tube problem for welding


___ ____________________ ____
,yo9$ /5O'2.
t714P.

r/y 4h ___ ________ __________

9/ 4fk 'S1' $OJ ___ __________________

hnE _________________

Release Date: 15.09.2024 Basic Start Date: 15.09.2024

Release Time: 17:09:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_____
SZ4&2- _______________

-'_______ _______________________

I 4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303891 Order No: 20191896 Description: need to arrange 2set of
iTon dogclamp
Functional P3o1GENRL Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

a0010 need to arrange 2set of iTon dogclamp


___ _____________________ ____

1&1oct2) 5- c3't2$_.

.fr i'rcsehlerl. QJt/ 4 /oc ____ ____ ____ ___________

Release Date: 15.09.2024 Basic Start Date: 15.09.2024

Release Time: 17:12:11 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________________________ _ am,,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303890 Order No: 20191873 Description: Need to change lton
dogclamp Plant-2
Functional P301-GENAL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _____
Date/Time Date/Timc _____________________

0010 Need to change iton dogclamp Plant-2


___ _____________________________ ______
f5oC/.rm I6O-9 F
fp/DPcxI
71U ('/24)0 Cl. ____ _________ ___________

/45rrJci bA1/A/I

f'fly ½cirrmi /tt/s- /jscein.Jed


___ Ok ____ _____ _____ _____________

Release Date: 15.09.2024 Basic Start Date: 15.092024

Release Time: 09:48:15 Basic End Date: /5'oCf2oz


Employee Codes Employee Names Operation No Hrs

- ,

Maintenance Department User Department


irj Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 15.09.2024
Notification No: 100303895 Order No: 10128630 Description: Purlin Uncoiler coil
support ram bend
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: 11000131 Description: CZ PURLIN LINE

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 Purlin Uncoiler coil support ram bend


S\2l

Release Date: 15.09.2024 Basic Start Date: 15.09.2024

Release Time: 10:10:51 Basic End Date: ç-. 2s-

Employee Codes Employee Names Operation No Hrs

SI 2PIC £tsve&t, 2JwX4Js ____________


flC

Maintenance Department User Department


Kirby Building Systems KSA
Kir MAINTENANCE ORDER JOB TICKET
Date: 15.09.2024
Notification No: 100303842 Order No: 20191868 Description: t-502 forklift front tyre
puncture
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Main Work Mechanical Maintenance


Responsible: tainolabddin I latyal Centre:
Tech ID:

Description

0010 t-502 forklift front tir'éjiuncture

Release Date: 15.09.2024 Basic Start Date: 14.09.2024

Release Time: 08:22:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


ir Kirby Building Systems KSA
Ut
MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301671 Order No: 20190692 Description: conrad opt side weld
prob
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohid Mulla Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID: KJAWL-01

Release Date: 22.08.2024 Basic Start Date: 21.08.2024

Release Time: 08:44:29 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_____________ _____________________ ___________________
"_IIr
_______ ____________ ___________
1 ffn
) ___________ ______

Maintenance Department User Department


Kirby Building Systems KSA
u" "xii
ttuttflt

MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301707 Order No: 20190689 Description: New blasting dead meal
handal not woking
Functional P301- FINIS- SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc ______________________

0010 New blasting dead meal handal not woking


,IIr5J,Ls oifsf2Ls fleikrrum knijie
__________________________ _____ ______

2:J -t44,n1 '>..Att'up

Release Date: 22.08.2024 Basic Start Date: 21 .08.2024

Release Time: 08:39:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________ ___________________ _________________


v _i ,&..i

._________________

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301398 Order No: 201 90704 Description: New blasting port
problem
Functional P301- FIN IS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 New blasting port problem


( I?O CtZpc
n&ck' '?\P

\- foF "blue
____ _____________________________ ______ _______ ______

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:58:25 Basic End Date:

Employee Codes Employee Names Operation No Hrs

4lç&

Maintenance Department User Department


Kirby Building Systems KSA
Kwb9$' MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024

Notification No: 100301718 Order No: 20190688 Description: conrac 02 operating side
driverollerdown
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 02 operating side driverollerdown


_____ ttCO \btflO Enek r\\2.JY

5t-" '"vie

rrfl \,t.t.,thu

____________________________________________ _________ __________ __________


Lpoir Lox
Release Date: 22.08.2024 Basic Start Date: 21.08.2024

Release Time: 08:39:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
ib MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301684 Order No: 20190691 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 22.08.2024 Basic Start Date: 21.08.2024

Release Time: 08:41:47 Basic End Date:

-3

Maintenance Department j User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301791 Order No: 20190686 Description: conrac 02 operating side
driverollerdown
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time_____________________

0010 conrac 02 operating side driverollerdown


r ____ ___________________________ _____
22%08.2* Q-.a.oçi-
____
I-) 2 9,do Au _____ ______ ______ _______________

a9na nLo el' o

c1
____
_____ ______ _____ ______________

/ puth c/ Pr!112 ri ______ _____ ______________

flit teu/ y/ f, .xod Pack _____ ______ ______ ______________

Release Date: 22.08.2024 Basic Start Date: 22.08.2024

Release Time: 08:38:03 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :-2&.08.2024
Notification No: 100302080 Order No: 20190931 Description: Fork Lift T-301 Battery
need to change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Remarks

I'

Release Date: 26.08.2024 Basic Start Date: 25.08.2024

Release Time: 08:43:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs -________

sg 34, ___________

a)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 2&08.2024
Notification No: 100302077 Order No: 10128229 Description: T-30a forklift Oil, Battery
& Tyre repai
Functional P301-MTI-IDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000689 Description: FORKLIFT TOYOTA 3 TON T303
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 17:10:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :26.08.2024
Notification No: 100302078 Order No: 10128230 Description: I-IY-701 general
maintenance work
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000657 Description: FORKLIFT HYSTER 7 TON l-1Y701
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

ftc_I-
Release Date: 25.08.2024 Basic Start Date:

Release Time: 17:14:51 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
2flkkv- j!2 wvo'L
______________________
A- Lt
_______ __________

4(2 /Jte-t atn

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100301863 Order No: 20190897 Description: forklift ep502 hydraulic
pipe problem
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date: 24.08.2024

Release Time: 16:37:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ _______________________
11 4c-

Maintenance Department I User Department


Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date: 25.08.2024
Notification No: 100302049 Order No: 20190907 Description: 1502 blade get damage
need check
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 16:51 :45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

)c -op lb

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100301841 Order No: 20190895 Description: linelwebjt roller rod
down
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohid Mulla Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No ____________________________________ _______

Date/Time Date/Tims _____________________

0010 Iineiwebjt roller rod down


____
22ct4 9-2--c%2

RT)12J'OJ c7I P clvncie go's


mf('A c/ ChQb2Jk.. _____ ______ _____ ______________

Release Date: 25.08.2024 Basic Start Date: 22.08.2024

Release Time: 16:36:01 Basic End Date:


,
Employee Codes Employee Names Operation No Hrs

'+hrct "/u/fa. ( _____________

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No; 100301839 Order No: 20190894 Description: scm blade alien bolt
breaks
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/Timc ______________________

0010 scm blade allen bolt breaks


Th_________________________ ____

22'°M 92o- ____________

m6n nvJ rnpujfcI ___ ____ ____ ___________

____

AA1 1vfI _____ ______ _____ ______________

Release Date: 25.08.2024 Basic Start Date: 22.08.2024

ReleaseTime: 16:34:58 Basic End Date:


9_2-'oV2e.o_4
Employee Codes Employee Names Operation No Hrs

"/0W1 "/ulla ____________


ih

Maintenance Department j User Department


Kirby Building Systems KSA
I. MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100302075 Order No: 10128227 Description: EP-701 forklift fron
puncher pl.c
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date:

Release Time: 17:02:46 Basic End Date:

Employee Codes Employee Names Operation No Hrs

'a

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100302076 Order No: 10128228 Description: T-501 forklift Need Oil
change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 5TON T501-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DatelTimt ____________________

0010 T-501 forklift Need Oil change


___ ___________________ ____
43v S"3o tj Ctw41.

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 17:05:20 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
Kwbfl MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100301963 Order No: 20190900 Description: conrac 02 B side press
wheel chain loose
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DatelTime Date/Time _____________________

0010 conrac 02 B side press wheel chain loose


C
___
('onAn /Dro;' (UPLtJ (V7MTh
9'.ne4rc
,/
___ C/hv/r c'/ ft?,pwhJ c/ /ZQC ____ _____ _____ _____________

___ hC4_<'I_rA1Jo& ____ _____ _____ _____________

Release Date: 25.08.2024 Basic Start Date: 24.08.2024

Release Time: 16:44:02 Basic End Date: 24s a.


Employee Codes Employee Names Operation No Hrs
_____________
(111) __ ____________

___________________

-r ____________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.08.2024
Notification No: 100301928 Order No: 20190898 Description: forklift new engine oil
need to be ch
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON --PYt1

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thotlupurath Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date: 24.08.2024

Release Time: 16:37:52 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
flU
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100301901 Order No: 20190896 Description: purlin machine roller not
workng
Functional P301-CFORM- Description: PURLIN LIEN Z SECT-

Location: PURLN-ZPSEC
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 purlin machine roller not workng


r ___ _______________________ ____

52Lc3c.2, ¶L3c4

9ptd C11ALlttI' ______ ___ ________

Release Date: 25.08.2024 Basic Start Date: 23.08.2024

Release Time: 16:36:47 Basic End Date:


-& bV24
Employee Codes Employee Names Operation No Hrs

.___________________

Maintenance Department User Department


Kirby Building Systems KSA
Kirb MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100302044 Order No: 20190905 Description: angle punching rn/c stn C
blade loose
Functional P301- CFORM- Description: ANGLE LINE CF-

Location: ANGLN
Equipment No: Description:

Plant Section: Person Moharnrnad Sahbaz Main Work Mechanical Maintenance


Responsible: Moharnrnad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

0010 angle punching rn/c stn C blade loose


56

Anjle7xjncbs-J/c &9a0d Liode. _____ ______ _____ ______________

____ -/ch/t P.S 4hI J4 gbO

_____________ ___________

ht4 c'f a&tkc&L ____ _________ ___________

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 16:49:44 Basic End Date: 2-5ot 202.4

Employee Codes Employee Names Operation No Hrs


CJp1
"°1-"
(
_________

g(G/kl ______________

Maintenance Department User Department


Kirby Building Systems KSA
Krb(J MAINTENANCE ORDER JOB TICKET

Date: 25.08.2024
Notification No: 100302046 Order No: 20190906 Description: krass M/C 0-cm bolt
broken
Functional P301 -MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000661 Description: UNDERSLUNG CRANE 2TON A201 -

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 kmass M/C 0-cm bolt broken


___ _________________________
£St&L% 9fr*24 ____________

___

h1t0 ________ ____ __________

IôaicL

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 16:50:54 Basic End Date: .


20.2-j

Employee Codes Employee Names Operation No Hrs

________ _____________ ____________

kfraj

Maintenance Department User Department


Kirby Building Systems KSA
I lI
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100301958 Order No: 20190899 Description: 20ft shearing machine
blade broken pls
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH- 0601

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time DatelTimc ____________________

0010 201t shearing machine blade broken pls


( ____ ____________________________ _____
9-4-'ot'-5 2-S E%j

fl 5scnirtc
ct/It 47 inoued

____ bocib ,c;d, W,rk _____ _______ ______ ________________

Fcyjcf& RIdc C(,J1wtiA


___

rJjrL cTgo.anCt cf f1'yd rftt,L_ ____ _____ _____ _____________

/ C/&unt(. CJi&ct&sk
Release Date: 25.08.2024' Basic Start Date: 24.08.2024

Release Time: 16:40:27 Basic End Date: - 2o

Employee Codes Employee Names Operation No Hrs


__________________ __________

3Hi O2s4
,________ ______________ _____________ ?H'r, U.

(i) 3q
t-7othP ('fuu.M' ____________

3 Rn' 5a'2L)9

_________ ______________ _____________


2 fr/n 9o24

5t1o -

9 'd") (
A,qv
tt 4\
SiptAf.
- PD

Maintenance Department User Department


Wuttbfl Kirby Building Systems KSA
'J
MAINTENANCE ORDER JOB TICKET

Date : 25.08.2024
Notification No: 100302039 Order No 20190903 Description: conrac 02 drive roller
down pls check
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Flajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 02 drive roller down pis check


(

geil4
9', Pvrip&iL
T '
('1p/inj
c ?p1n' r& I 1h ____ _________ ___________

4iiwk1 C] ft/,1,kJ_c%y ____ _____ _____ ____________

/
Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 16:47:10 Basic End Date:

Employee Codes Employee Names Operation No I-Irs

c:!9 tkf/y)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 25.08.2024
Notification No: 100302015 Order No: 20190901 Description: SL6002 SIDELODER
TYRE PUNCTURE
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 25.08.2024 Basic Start Date: 25.08.2024

Release Time: 16:44:35 Basic End Date:

Employee Codes Employee Names Operation No Hrs

5P3 _____________ ___________ _____________

Maintenance Department I User Department


Kirby Building Systems KSA
Wi; MAINTENANCE ORDER JOB TICKET

Date: 26.08.2024
Notification No: 100302112 Order No: 20190930 Description: conrac 02 chaine broken
pis check
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 conrac 02 chaine broken pis check


C ___ _______________________
26c*M 2- Co
___ (%ntae- 2 (halo &VWF ____ _____ _____ ____________

___ Qi ynirren' cftu (oj1ypi,

___

CAD c'/ d2&&doE- ________ ____ ___________

Release Date: 26.08.2024 Basic Start Date: 26.08.2024

Release Time: 08:43:01 Basic End Date:


":-6o" ao9-
Employee Codes Employee Names Operation No Hrs

____________________________ _______________
(kfn
/r)
C I

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 26.08.2024
Notification No: 100302081 Order No: 20190932 Description: stn 3 blasting hose
damage nd check
Functional P301- FlNlS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA-

Plant Section: Person TawIeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 stn 3 blasting hose damage nd check

___
9ig2hoJ rj/jQ Noc _____ ______ _____ ______________

c'/ r&aao& _____ ______ ______ _______________

Release Date: 26.08.2024 Basic Start Date: 25.08.2024

Release Time: 08:45:31 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________ ________________ _______________


/_k

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 27.08.2024
Notification No: 100302237 Order No: 20191014 Description: conrac 02 drive roller
down pls check
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohamrnad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time Date/Timc _____________________

0010 conrac 02 drive roller down pis check


-3c,1 2-'ftçp

hiL#e 7f/eA L7t fl4wn' ____ _________ ___________

"P/a07t pie
,49u'ki c-ft ttin
g,t,1. Rrwet/ r1hJ9n
___
balk. A'J44d rfh
Li
[21/PA' _______________________

cfka M
Release Date: 27.08.2024 Basic Start Date: 27.08.2024

Release Time: 17:08:40 Basic End Date: ç..

Employee Codes Employee Names Operation No Hrs

QI) Ib

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.08.2024
Notification No: 100302196 Order No: 20191013 Description: old blasting valve
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 old blasting valve problem


(
____ Ho,4 hi7 fro4 do&p itL
ott] - _____ ______ _____ ______________

Va/uP_1btn&__Qrni (k ___ ________ __________

Pt f/a/Lie C'! ,ô&i/

___ 71k &Jv. Ch&nye% Z4c ____ ____ __________

"5&c/ ffrnd bat'c


Release Date: 27.08.2024 Basic Start Date: 27.08.2024

Release Time: 17:07:27 Basic End Date:


2jo 24ij-
Employee Codes Employee Names Operation No I-Irs

CicuA&wy _____________________

__________
(?t 81 At (!:: _________________

Maintenance Department I User Department


VntWöt Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.08.2024
Notification No: 100302134 Order No: 20191018 Description: old blasting dead mel
and hose problem
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 old blasting dead meal and hose problem


(
___
OL%& e.i S.h' p
7tJnhQr cks&&ce Ckai.je

Release Date: 27.08.2024 Basic Start Date: 26.08.2024

Release Time: 17:13:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
%U
MAINTENANCE ORDER JOB TICKET

Date: 27.08.2024
Notification No: 100302188 Order No: 20191017 Description: conrac 01 hydraulic
pump bracket breake
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time DatelTimc. ____________________

0010 conrac 01 hydraulic pump bracket breake


26ot' c,.

___
Mo'?- tAJLnWoj pta pt. / _____ _____ _____________

4t1'kd c*te prosrvro


c/ Cha&40pi I

Release Date: 27.08.2024 Basic Start Date: 26.08.2024

Release Time: 17:12:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

-1Z9

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.08.2024
Notification No: 100302121 Order No: 20191019 Description: pedding hause shaft
down pis check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS # 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ DatelTime DateITim6 ______________________

0010 pedding hause shaft down pls check


_________ _______________________

J-io'uyQ &Q ____ _____ _____ ____________

g7cja poh k-J


___

___ ____ ____ __________

(flO- t?nbf) ___ ____ ____ __________

___ /?o14 1o0j cl%L ki,' ____ _____ _____ _____________

/ cichs.4n
Release Date: 27.08.2024' Basic Start Date: 26.08.2024

Release Time: 17:14:12 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
Kwb MAINTENANCE ORDER JOB TICKET

Date : 27.08.2024
Notification No: 100302189 Order No: 20191016 Description: conrac 02 convey chaine
broken pis check
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime Date/TimE. ______________________

0010 conrac 02 convey chaine broken pls check


96tt2k- zccc2. _______________

j)flJ(Tf d tt-t' hnkO ____ _________ ___________

Release Date: 27.08.2024 Basic Start Date: 26.08.2024

Release Time: 17:12:13 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________
'10h,J 1%/In _______________

th /

Maintenance Department User Department


Vrrlsn
n.u
111 Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 27.08.2024
Notification No: 100302110 Order No: 20191020 Description: conrac 02 coveyor motor
not please check
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DatelTims _____________________

0010 conrac 02 coveyor motor not please check


2 2o

em-)utCfr "foj-m AJof


___ ______________________ ____

LAJoTAov ?rqntFPcj. k/ni- al (3rp&i-e.d -

taMU-yJ L1QI!td /d/ifl?4OcHJ


Ms,#ii tIXrI /ndç/ ____ _____ _____ _____________

Release Date: 27.08.2024 Basic Start Date: 26.08.2024

Release Time: 17:15:32 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________ _____________ ____________

"-in)

/ 0) / LV))

Maintenance Department User Department


Kirby Building Systems KSA
tiI M"'
MAINTENANCE ORDER JOB TICKET

Date: 28.08.2024
Notification No: 100302347 Order No: 20191054 Description: irone worker machine not
working plc c
Functional P301 -CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime Date/Timc. ____________________

\0010 irone worker machine not working plc c


C 2c1 Q. -

____ /Ro."-P rittoik.n A-to! (,Jôrbhj - _____ _______ ______ ________________

____ (ktekil cik Pii (Inkit Cf


ftj up/ed 'tho 7nttiV7e IA/A, ______ _______ _______ __________________

__ ut,7 /&otty uf't& _______________

Release Date: 28.08.2024 Basic Start Date: 28.08.2024

Release Time: 13:31:03 Basic End Date: ot 24 24


Employee Codes Employee Names Operation No Hrs

____________________________ _______________
I_k/ri

________________

(1,chnu ________________________

1 '9- "

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.08.2024
Notification No: 100301639 Order No: 20191086 Description: paint line forklift ep502
tyre puncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No Date/Time Date/Tim
0010 paint line forklift ep502 tyre puncher
.
/z-c- c149e..
"itcf (lit

Release Date: 28.08.2024 Basic Start Date: 21 .06.2024

Release Time: 17:55:49 Basic End Date:

Employee Codes Employee Names Operation No Hrs

SSy' Wpjt/ ________

3
flIs _________ __________

Maintenance Department User Department


Kirby Building Systems KSA
1
MAINTENANCE ORDER JOB TICKET

Date : 28.08.2024
Notification No: 100302345 Order No: 20191055 Description: T502 tyre puncher need
check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 28.08.2024 Basic Start Date: 28.08.2024

Release Time: 13:31:58 Basic End Date:

0 ration No
-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 28.08.2024
Notification No: 100302368 Order No: 20191059 Description: PIant2 need to arrange
one single chain
Functional P301-GENRL- Description: LIFTING TOOLS AND TACKLES
Location: LFTNT
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTimc. ______________________

0010 Plant2 need to arrange one single chain


2e.'v- 9Pjo%'j4 _______________________

5'.jôk; cbs', c/ Wcok 1McseJi ____ ___________ ______________

__
e&dok _________________

Release Date: 28.08.2024 Basic Start Date: 28.08.2024

Release Time: 14:04:37 Basic End Date: 29. °S


Employee Codes Employee Names Operation No Hrs
t7c1j
_________

(7) / 1/n

:
5S5GA
5ghh2.. _____________ H"

Maintenance Department User Department


Kirby Building Systems KSA
n rntfl
%:U
MAINTENANCE ORDER JOB TICKET

Date : 28.08.2024
Notification No: 100302374 Order No: 20191085 Description: scm conveyor bolts loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ DatelTime DatelTim¬ _____________________

0010 scm conveyor bolts loose


___ _________________________ _____
2cg. 2%o ______________

ChflUP pI4 tce_ ct/


rfpj b0ih ____ ___________________

Release Date: 28.08.2024 Basic Start Date: 28.08.2024

Release Time: 17:46:09 Basic End Date: 9_'


Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31.08.2024
Notification No: 100302619 Order No: 10128359 Description: L-75Station B Air
Compressor PM work
Functional P301 -UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -i -

Plant Section: Comprsr Room- i Person Sibin John Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______

Date/Time Date/Time ______________________

0010 L-75Station B Air Compressor PM work

CkaJc Djn4&Sca- carS 3o _____ ______ ______ ______________

___ Snircp t..taanaU ___ ____ ____ ___________

___

- ____ ___________________

Release Date: 31.08.2024 Basic Start Date: 31.08.2024

Release Time: 11:31:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

TC%104

Maintenance Department User Department


t.
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31 .08.2024
Notification No: 100302620 Order No: 10128360 Description: L-75Station BAir
Compressor PM work
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000303 Description: STATION B AIR COMPRESSOR L75 -2 -

Plant Section: Comprsr Room- i Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Timc, ______________________

0010 L-7551ation B Air Compressor PM work


( _____

;o!t vJt
____ 1 .-t !.cce _________________

___ p.&ri. _____ ______ _____ ______________

____ ______ _______ ______ _________________

Release Date: 31.08.2024 Basic Start Date: 31.08.2024

Release Time: 11:32:50 Basic End Date: 3o a


.

Employee Codes Employee Names Operation No Hrs

___________
,peeiQ ________________

__________
Sp&,r-J _______________

ky-s

Maintenance Department User Department


ttirtenPt Kirby Building Systems KSA
I%IJ :MV*a
ala MAINTENANCE ORDER JOB TICKET

Date : 31 .08.2024
Notification No: 100302628 Order No: 20191231 Description: conrac 01 optr side
welding problem
Functional P301- BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 01 optr side welding problem


31'*24
____ (pnArQ ol OpGtc4n RIde (k/C/dir ______ _______ ______ _________________

çmDPtro. 9l& çtFi'- _________________

,%w41 v'he ____________________

(?M/Th4__cAbt_c- ____ _____ _____ ____________

Release Date: 31.08.2024 Basic Start Date: 31.08.2024

Release Time: 15:41:38 Basic End Date: 341'


1*' 2_o24
Employee Codes Employee Names Operation No Hrs

_______
SID)O ___________ ____________

________ _____________ 16) ,j fh

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 31 .08.2024
Notification No: 100302615 Order No: 10128358 Description: Air Compressor PM work
L-45 Station B
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000304 Description: STATION B AIR COMPRESSOR L45 -

Plant Section: Comprsr Room- i Person Sibin John Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Tims ______________________

0010 Air Compressor PM work L-45 Station B

____ Ktnj;eJ clhc ,4t r;ljt-i _____

c'/ OndOnhr 4i,d Qrflflitilut


b9&Jsic up '1W-
_____ ,.,;! / _______ ________ ________ ____________________

Release Date: 31.08.2024 Basic Start Date: 31.08.2024

Release Time: 10:43:35 Basic End Date:


3!' oq 2..fl4
Employee Codes Employee Names Operation No Hrs

___________ _________________
(TO ( j4-r'
tR) / H,'

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31 .08.2024
Notification No: 100302614 Order No: 10128357 Description: Sandblasring Air
Compressor PM work
Functional P301 -UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000301 Description: AIR COMPRESSOR L45 BLAST-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ DatelTime DatelTime ______________________

0010 Sandblasring Air Compressor PM work L-45


_______________________ ____
2I'o-c _____________

___

kh4- . ____ _____ _____ _____________

Wiçt Seit,;rnc( 'tn- A;c'lft'


-41 Candenoi c.) enmpsiz"
___ ki._c11nte ikI kue-I. ____ _____ _____ ____________

Release Date: 31.08.2024 Basic Start Date: 31 .08.2024

Release Time: 10:41 :44 Basic End Date:


,,
Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
ill Till] MAINTENANCE ORDER JOB TICKET

Date : 31 .08.2024
Notification No: 100302611 Order No: 10128355 Description: Conrac Auto weld 2nos
main welding head
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTimc. _____________________

0010 Conrac Auto weld 2nos main welding head


-__ _______________________ ____ _____ _____ -

9 1\IcY) ofai-a/o( £' '-J&ad py) _____ _____ ____________

__
2/ O ___ _________________

__ AJcD/kktf tt,A/ok c4'd __________________

___
4oo' Quo dog' A/th- /1Je4)LM-iniioi _____ _____ _____________

?t4/t -

Release Date: 31.08.2024 Basic Start Date: 31.08.2024

Release Time: 10:28:43 Basic End Date:

Employee Codes Employee Names Operation No Firs

_________ ______________
29o&202-4- ______________

- __________
2c- Q4- __________

3oO- 2-

________
SHI-%&A2- ___________
/O i-fr'
________ ,Okt7V 3oo3a- )o tin'
JO!+NP So- o@ apt-

Ope'ioJo 9ip hQd 0g 2flg ) W /k4


/ Chnrr q Ckd Urn vLt'

Maintenance Department User Department


Kirby Building Systems KSA
F MAINTENANCE ORDER JOB TICKET

Date : 07.08.2024
Notification No: 100300495 Order No: 20189921 Description: conrac 02 ground cable
broken
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time DateIrirne _____________________

0010 conrac 02 ground cable broken


___ _______________________ ____

O7 Qfl4 c9j. cti -

(Lj PA0L Phi ____ _____ _____ _____________

___ P-elI c/]ncu/ntr Pq,h Laic. ____ ____ ___________

__ -rJwprf '4 4o/mndcj&AJO


___
kJ cJ t/7L
ci ___ ____ __________

Release Date: 07.08.2024 4' ca'h'tart Date: 07.08.2024

Release Time: 10:40:09 Basic End Date:


b7.03. zo
Employee Codes Employee Names Operation No Hrs

5go' _____________ _________________________

_________

P/A/u _____________ ______________

Maintenance Department User Department


a' Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 07.08.2024
Notification No: 100300492 Order No: 201 89916 Description: purlin M/C bolt broken
need to replace
Functional P301-CFORM- Description: PURLIN LINE
Location: PUFRLN
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ________________________________ ______

Date/Time Date/Time __________________

0010 purlin M/C bolt broken need to replace


r ___________________________ ____

07 o 70g"2 -

7Zi;o '//" All__Rjrvt,n ____ _____ _____ _____________

__ &nutc/ It (Yt g !Mt0 _______ ____________

___ Ri-/ 'p/ettn'


__
A/ &ih g Oha&dvk ____________________

Release Date: 07.08.2024 Basic Start Date: 07.08.2024


Release Time: 10:27:14 Basic End Date: 07 0¬ 2i4..
Employee Codes Employee Names Operation No Krs
_______ ____________
(7) ____________

Maintenance Department User Department


Kirby Building Systems KSA
.0
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300468 Order No: 20189919 Description: bandsawcuting machine
automacly down p1
Functional P301- CFORM- Description: SAW- SLITTERS-SHEARS CF -

Location: SHEAR
Equipment No: Description:

Plant Section: Person Mohid MulIa Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Descriptqn Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc ______________________

0010 bandsaw cuting machine automacly down p1

___ OA9Lc/__c7__oil__(/&/ve/ ____ _____ _________________

5p TiP? oi'/ &07pwe/

Release Date: 07.08.2024 Basic Start Date: 06.08.2024

Release Time: 10:29:29 Basic End Date: 06 202±


Employee Codes Employee Names Operation No Hrs

t-ljfp 0) ______________

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 08.08.2024
Notification No: 100300591 Order No: 20189989 Description: sheet mill 0-head cm
rope change
Functional P301-MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000670 Description: Overhead Crane 10 Ton-B1 002

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/TimE ____________________

0010 sheet mill 0-head cm rope change


2
________ _____________________

sh,0j rf/II &ht fan &ad (',ww _____ _______ ______ ________________

____ (c1w lhvnye c$ Aoooy. Oon$tc/.


___
r/hj s/L cj J1&IQ4!1t
____

f,' rn i.kto (jJire -

C? icMrrh*tt
Release Date: 08.08.2024 Basic Start Date: 08.08.2024

Release Time: 09:58:47 Basic End Date:


o5 o'.
Employee Codes Employee Names Operation No Hrs
_________

,_rJflJ4 ______________ _______________

5'31v4-' ___________ __________


+frm

Maintenance Department I User Department


4

r Kirby Building Systems KSA


L 1mw flf
Ifl MVn
MAINTENANCE ORDER JOB TICKET

Date: 09.08.2024
Notification No: 100300655 Order No: 10127869 Description: CompAir Compressor
L-75 PM Work
Functional P301 -UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000302 Description: STATION B AIR COMPRESSOR L75 -1 -

Plant Section: Comprsr Room- i Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc. ______________________

0010 CompAir Compressor L-75 PM Work


_____ ________________________________ ______

'Z4 09 'at' 2 -

_____
lrfj,'COd c/lw (2wnptQcvr
q. c,i ____ _____ _____ ____________

Release Date: 09.08.2024 Basic Start Date: 09.08.2024

Release Time: 08:07:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs

J)

Maintenance Department User Department


S
It rnt&I Kirby Building Systems KSA
t %.ti
MAINTENANCE ORDER JOB TICKET

Date : 09.08.2024
Notification No: 100300654 Order No: 10127868 Description: CompAir Compressor
L-75 PM Work
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000300 Description: AIR COMPRESSOR L75 BLAST
- -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 CompAir Compressor L-75 PM Work

____
£MIIIIV/ cft, ru !#ø! c(
g0p tip cf jen,"rcr/ c/hit cvsi _____ ______ ______ _______________

___
f)/h'r
c/I e0i¬ ___ ________ ___________

Release Date: 09.08.2024 Basic Start Date: 09.08.2024

Release Time: 08:05:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________________
(1) I kfr;

Maintenance Department User Department


Kirby Building Systems KSA
KwbJJ MAINTENANCE ORDER JOB TICKET

Date: 09.08.2024
Notification No: 100300653 Order No: 10127867 Description: CompAir Compressor
L-45 PM work
Functional P301- UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000304 Description: STATION B AIR COMPRESSOR L45 -

Plant Section: Comprsr Room- i Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr - Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimt ______________________

0010 CompAir Compressor L-45 PM work


C.. __________________________ &q.c O7og- 2
____ ir-. Qn-th'o I Rt _____ _______ ______ ________________

Er_/44k_ci__Phflub,l _____ ______ _____ ______________

cj oA1aG -c-Mt nil ftutf _____ ______ ______ _______________

Release Date: 09.08.2024 Basic Start Date: 09.08.2024

Release Time: 08:04:20 Basic End Date: QC1 oe


Employee Codes Employee Names Operation No I-Irs

________ _____________ ____________

i
__________ __________________ ________________ I

Maintenance Department User Department


Kirby Building Systems KSA
i%I'i:
MAINTENANCE ORDER JOB TICKET

Date: 09.08.2024
Notification No: 100300656 Order No: 10127870 Description: OompAir Compressor
L-75 PM Work
Functional P301 -UTLTY- Description: COMPRESSORS
Location: OOMPH
Equipment No: 12000303 Description: STATION B AIR COMPRESSOR L75 -2 -

Plant Section: Comprsr Room- i Person Tawfeeq Shakir Main Work Mechanical Maintenance
Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time Date/Time ______________________

0010 CompAir Compressor L-75 PM Work


(. ___ ____________________ ____
tcF2.j 9% ___________

?ji,iccd '1tt Corptassov Cf


____ Mh9thd cfk, nfl AN _____ ______ _____ ______________

___
;iIp pfgyntd Q( ChaLde4 ____ _____ _____ ____________

Release Date: 09.08.2024 Basic Start Date: 09.08.2024

Release Time: 08:08:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs

___________

c:d2&tj__ ________________ t ft

Maintenance Department User Department


Kirby Building Systems KSA
KwbIJ MAINTENANCE ORDER JOB TICKET

Date : 09.08.2024
Notification No: 100300657 Order No: 10127871 Description: Plant 2 Air Compressor
Denair PM Work2no
Functional P301- UTLTY Description: COMPRESSORS
Location: COMPR
Equipment No: 12000300 Description: AIR COMPRESSOR L75 BLAST
- -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 Plant 2 Air Compressor Denair PM Work2no


Qcy24
I ___ _______________________ ____

-.

Oorrprcco 2 rJ,flLLQ4' _____ ______ ______ _______________

___ P,IT;f4o Cle&nn/ Q/ (Shut) ___ ____ ____ __________

____ çth 0il _____ ___________ ______________

Release Date: 09.08.2024 Basic Start Date: 09.08.2024

Release Time: 08:12:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(I
5c1o1i
_______________________ _
t kfr,

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.08.2024
Notification No: 100300652 Order No: 10127866 Description: CompAir Compressor
L-45 PM work
Functional P301 -UTLTY- Description: COMPRESSORS
Location: COMPR
Equipment No: 12000301 Description: AIR COMPRESSOR L45 BLAST -

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre: -

Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc. _____________________

0010 CompAir Compressor L-45 PM work


dfQg24- b9cj
C
___ ________________________ ____

____ o;/ Itnt. ci _____ ______ ______ _______________

___ tk, 'k'° c) '°/


___ e/ed ci Seip,ccd ci ____ _____ _____ _____________

/rhIcniI ______ _______ ______ _________________

Release Date: 09.08.2024 Basic Start Dale: 09.08.2024

Release Time: 08:02:44 Basic End Date: Ocj'og.


Employee Codes Employee Names Operation No Hrs

____________________ () 1k/ri

___________

Maintenance Department User Department


it Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.08.2024
Notification No: 100300674 Order No: 20190068 Description: T302 forklift rear
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 10.08.2024 Basic Start Date: 09.08.2024

Release Time: 12:13:38 Basic End Date:

It

or.

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
tofr%
/ZP'
Date: $4.08.2024
Notification No: 100300778 Order No: 20190282 Description: Replace radiator
hose,fan belt,fanloTon
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Ie.i' "11(.], tlrl[- 1


Il. "n '7tifl
ii rim [SI
r*I1...rn
a
-
Release Date: 14.08.2024 Basic Start Date: 10.05.2024

Release Time: 17:53:21 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 10.06.2024
Notification No: 100300760 Order No: 20190070 Description: conrad press wheel
chain tell down
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -i


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DateiTims ____________________

0010 conrad press wheel chain fell down


____ _____________________________ ______ yo- og- 24 JO'c'24 _________________

___ C/wa OM OW TIn'? 7) iofrci 5/


__
C,_c&tdoi _________________

Release Date: 10.06.2024 Basic Start Date: 10.06.2024

Release Time: 12:15:09 Basic End Date:


1v O'3

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 10.08.2024
Notification No: 100300743 Order No: 20190069 Description: conrac 02 over head
crane rope tel down
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Tawteeq Shakir Main Work CONRAC -1


Responsible: Shaikh Centre:
Tech ID:

Release Date: 10.08.2024


nc1¬'me IAJI'n pc
Basic Start Date: 10.08.2024

Release Time: 12:14:26 Basic End Date:


!o. ce 2oi

4, find -/kt ,tttjh,


t fnltd -1k (oo,i f)mPfll5' c'j C/w&d 01¬

Maintenance Department I User Department


Kirby Building Systems KSA
I
MAINTENANCE ORDER JOB TICKET
ii-
Date :4408.2024
Notification No: 100300914 Order No: 20190294 Description: paint tine side loader
ep502 puncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

k ' 'fljjflItiii11d:4-
l.
" *uiIulrrr.ririrr]t*]4sI.iuur.iir1..__rR,r

_ --N--

Release Date: 14.08.2024


a
Basic Start Date: 12.08.2024

Release Time: 15:06:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ _ 2ae,2ttA __________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 44:08.2024
Notification No: 100300866 Order No: 20190285 Description: Flat tyre Slide Loader
5L6002
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 14.08.2024 Basic Start Date: 11.08.2024

Release Time: 17:56:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

2ee0k441 ___________ _____________

cga __________ __________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
ril°'I'"
Date :,.4.08.2024
Notification No: 100301072 Order No: 20190299 Description: Paint line side bade
puncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Release Date: 14.08.2024 Basic Start Date: 13.08.2024

Release Time: 18:10:44 Basic End Date:

'p

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300846 Order No: 20190284 Description: conrac 01 b side web
pressing jack botto
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 01 b side web pressing jack botto


____ _____________________________ ______
ft O'24 _________________

____ qk tU0t Worb'y


?T0pry

____ 4riwcktd__Q4L'rr/yi_(2/__[lost_(' _____ _______ ______ ________________

9 Adjuikr( rJj jJ ____ ____ _________

cf&a7i;pr/Q 4/ n/n&4oi _____ ______ ______ ______________

Release Date: 14.08.2024 Basic Start Date: 11.08.2024

ReleaseTime: 17:55:14 Basic End Date:

Employee Codes Employee Names Operation No Hrs

- 61o- ___________

Maintenance Department User Department


Kirby Building Systems KSA
KwbY<' MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300903 Order No: 20190289 Description: htc flange punching

Functional P301- DTAIL Description: DETAIL SECTION


plybord holder not w

Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 htc flange punching plybord holder not w


(.
__ ___________________

tkov.z+ fl'og4
f/cm; puirhinq hid01 MW _____ ______ ______ _______________

c4ob1 n'ied Q/ a/te4


cjiv &-kloL2, c/ C#Md& _________________

Release Date: 14.08.2024 Basic Start Date: 11 .08.2024

Release Time: 18:00:39 Basic End Date: t?

Employee Codes Employee Names Operation No Hrs

Ciau,Fea! ___________

13)

Maintenance Department I User Department


Kirby Building Systems KSA
tJ
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300874 Order No: 20190287 Description: conrac 01 b side torch
not working
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc. ______________________

0010 conrac 01 b side torch not working


(

g4, tioale Cf $id


c7' (?, ____ _____ _____
Cornp& Cc!

Release Date: 14.08.2024 Basic Start Date: 11.08.2024

Release Time: 17:59:29 Basic End Date:


fl g
Employee Codes Employee Names Operation No Hrs

_________ _______________ ______________


1 fl

Maintenance Department User Department


Kirby Building Systems KSA
JR
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300867 Order No: 20190286 Description: conrac2 oil topup

Functional P301- BUILT- Description: BEAM WELDING LINE-i


Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Main Work CONRAC -1


Responsible: Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compi Remarks


No __________________________________ ______
Date/Time Date/Timi ____________________

0010 conrac2 oil topup


_____________________ ___

1(°N lhofli __________

C7ciprfticA len'! __ _____________

(td -

Release Date: 14.08.2024 Basic Start Date: 11.08.2024

Release Time: 17:58:24 Basic End Date: ft og"


Employee Codes Employee Names Operation No Hrs

a- _______________________

Maintenance Department I User Department


Kirby Building Systems KSA
a I1
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300890 Order No: 20190288 Description: co2 pipe air leackage

Functional P301- BUILT- Description: WELDING MACHINES


Location: FWELD
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc. _____________________

0010 co2 pipe air leackage


( ___________________ ___

II2+ I('ct2f _________

pofl *a £% A1aAnL _____________ ___________

_____
R/! ______ _______ _______

flomn(p'td.

Release Date: 14.08.2024 Basic Start Date: 11.08.2024

Release Time: 18:00:06 Basic End Date: 1/. ot'


Employee Codes Employee Names Operation No Hrs

________ _____________ ____________


4/f

Maintenance Department I User Department


a Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300948 Order No: 20190293 Description: htc clamping problem

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 htc clamping problem


____ ____________________________ _____
/zog4 12c'i1a#,- ________________

('/pjfjj r//jp eLd0 _____ ______ _____ ______________

'2?pcu'?eo U,/1'n' AnJc8(' ç1 (k3rn led -

Release Date: 14.08.2024 Basic Start Date: 12.08.2024

Release Time: 18:05:33 Basic End Date:


/2 og z-.-

Employee Codes Employee Names Operation No Hrs

_________ ____________________________
1 I/u
5) / fr/ri

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300913 Order No: 20190292 Description: new blasting hose cut
problem
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time Date/Timt ___________________

0010 new blasting hose cut problem


___ _________________________ _____ !2O%2.j-

___ 1t4zo 8/a i/roy f/ore Rnkzo) ____ _____ _____ _____________

°nGinJ ¶74 F/ore c/ (bnp(.Mf -

___ C1?hI_ok ________ ____ ___________

Release Date: 14.08.2024 Basic Start Date: 12.08.2024


Release Time: 18:04:02 Basic End Date: /2o3 2024-
Employee Codes Employee Names Operation No Hrs
_________ _______________ ______________

I_Hr

-. !5G- j Hr

Maintenance Department User Department


Kirby Building Systems KSA
tIrMfl
be

MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300991 Order No: 20190297 Description: conrac2 tacking
conveyor chain breake
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc ______________________

0010 conrac2 tacking conveyor chain breake


____ ___________________________ _____

I2o'g2 )2o2+ _______________

&niMqrn (bIk) VdJ

j& ________ ______________

Release Date: 14.08.2024 Basic Start Date: 12.06.2024

Release Time: 18:09:10 Basic End Date: / 2 o'g.


Employee Codes Employee Names Operation No Hrs

_________ ______________ _____________

/_rn
_________ ________________ (1) / /-f))

Maintenance Department I User Department


Kirby Building Systems KSA
KwbjJ MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100301087 Order No: 20190301 Description: conrac 02 web lifting
cylender not worki
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
DatelTime Date/Timc ______________________

0010 conrac 02 web lifting cylender not worki


____ ___________________________ _____

)3'O'?r2-f )3-cfiz4 _______________

___ C&iatl 1/w r/io4x Cf FWjvrkc


___
-t& oron Opialc
____

"-114Q ('7/;op/ ¼/puenzc1 tic _____ ______ ______ _______________

Release Date: 14.08.2024 Basic Start Date: 13.08.2024

Release Time: 18:12:05 Basic End Date:


13
Employee Codes Employee Names Operation No Hrs

03 , H

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300988 Order No 20190298 Description: old blasting port problem

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______
Date/Time DatelTimE. ______________________

0010 old blasting port problem


___ _____________________ ____

Ib24 13'ci ____________

____
nid N37i 2J0 hov Ahi _____ ______ ______ _______________

t4Iothy hi#, 'J;ek -/ Poa-p(acd


___ L,W/c. *10;oet C) /Deacl ____ _____ _____ ____________

___
hr Aoncs4'e )pw'nd -J _______________________

C/zakta USc
Release Date: 14.08.2024 Basic Start Date: 13.08.2024

Release Time: 18:09:50 Basic End Date:


t3
Employee Codes Employee Names Operation No Hrs

5cros. ____________

S 22h

Maintenance Department User Department


wirhtMavl Kirby Building Systems KSA
'J:J
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100301074 Order No: 20190300 Description: scm conveyor base bolt
loos
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 scm conveyor base bolt Ioos


___ _____________________ ____
3oq J39j ____________

____

t7wkd rfho at! Rii _____ ______ _____ ______________

___ Rosm&4 fl/a*


___ A /di &. (ms ___________________

__ '*e t&tefcLo' &/Jc, L4)elthi1 ___ _____________

-J
rflu Plan to
Release Date: 14.08.2024 Basic Start Date: 13.08.2024

ReleaseTirne: 18:11:22 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______________ _____________
j/ f/aj

Maintenance Department User Department


Itwht1WI Kirby Building Systems KSA
t

MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300972 Order No: 20190295 Description: conrac2 hydopump
presure prob
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compi Remarks


No ______________________________________ _______

Date/Time Date/Time ______________________

0010 conrac2 hydopurnp presure prob


____________________ ___

120Wi- /Z.oSz __________

(\)
(214O&bd 4)& ?/Thr&/ 11ia ____ _____ _____ ____________

Urn,P fn-tPCurP - ____ _____ _____

Porpco*cL -

Release Date: 14.08.2024 Basic Start Date: 12.08.2024

Release Time: 18:07:43 Basic End Date:


/ 2 Os- 2O4
Employee Codes Employee Names _ peration No
jO Hrs

_________ ______________ _____________

/_F/H
_______ ____________ ___________

/_U

Maintenance Department
I User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100300931 Order No: 20190291 Description: scm machine puncher
broken please check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

Date/Time Date/Timc. _____________________

0010 scm machine puncher broken please check


!2'O%'tk
___ _________________________ _____

______________

Qt0Md q)(d çf ft/ti ____ _____ _____ _____________

41'td &oA c!/ 'tk hd nk Cmn-poicd.

Release Date: 14.08.2024 Basic Start Date: 12.08.2024

Release Time: 18:03:19 Basic End Date:


;. oc. 212k
Employee Codes Employee Names Operation No Hrs

- I if))

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100301046 Order No: 20190304 Description: paint line forklift tp502
tyre puncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

'010 :p'int line forklift tp502 tyre puncher

Release Date: 14.08.2024 Basic Start Date: 14.08.2024

Release Time: 18:13:47 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cV29i ___________ __________ ___________

)Stfl _____________ ___________ _____________

Maintenance Department I User Department


Kirby Building Systems KSA
Kwb9jlj MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100301121 Order No: 20190303 Description: Fig brace rn/c not
working properly
Functional P301-CFORM- Description: ANGLE LINE CF -

Location: ANGLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No _______________________________________ _______
Date/Time Date/Time ______________________

0010 FIg brace rn/c not working properly


m____________________ /+02f ItOv __________

P/r)c,jPd m2 /)Y, 'q;,


cj dátdok ___ ________ __________

Release Date: 14.08.2024 Basic Start Date: 14.08.2024

ReleaseTime: 18:13:12 Basic End Date: / waý


Employee Codes Employee Names Operation No Hrs

'4 /JU
________ _____________ ____________

"N

Maintenance Department User Department


Kirby Building Systems KSA
I %"I"1
MAINTENANCE ORDER JOB TICKET

Date: 14.08.2024
Notification No: 100301120 Order No: 201 90302 Description: nigara stopper plate
need to fix
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 nigara stopper plate need to fix


/4o M-.
Qvpev p)Je daioc/ ft/aK
___ ml tn-p ,P/oJt CDmL
PtOktfl) kp'atccl-
___
(IUi-A)fl FiyvJ ±h
1DJa/e pwp '9 ____ ___________

r/ D'ii/o, p,ImLe JIo_Xe_c _______ ________ ________ ____________________

/ 1 p/atoJ r/htWokto &I/c V AJc-rls'


Release Date: 14.08.2024 Basic Start Date: 14.08.2024

Release Time: 18:12:36 Basic End Date: F4-' O


-

Employee Codes Employee Names Operation No Hrs

S5ot fl/Mci (1) 2H


' - _______________

_______ ____________ ___________

2-

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
"
Date : .*.08.2024
Notification No: 100301224 Order No: 20190393 Description: FORKLIFT CHANGE
TIRE EP1001
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech !Di1

Release Date: 17.08.2024 Basic Start Date: 15.08.2024


Release Time: 11:27:48 Basic End Date:

Employee Codes Employee Names Operation No Hrs

&fl9' _______________ ________

Maintenance Department User Department


Kirby Building Systems KSA
.rb
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301225 Order No: 20190399 Description: con 2 conveyor chane
broken
Functional P301-BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 17.08.2024 Basic Start Date: 15.08.2024

Release Time: 11:31:13 Basic End Date: 2o2t


Employee Codes Employee Names Operation No Hrs

__________
MAin. _______________
f t;i

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301150 Order No: 20190402 Description: line 1 tacking conveyor
not working
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohammad Sahbaz Main Work CONRAC -1
Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-01

Release Date: 17.08.2024 Basic Start Date: 14.08.2024

Release Time: 11:33:42 Basic End Date: 1't'ot 292*.


Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301308 Order No: 20190394 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 17.08.2024 Basic Start Date: 17.08.2024

Release Time: 11:28:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

SV3gJ __________ ___________________

acfl? g9 Teji ___________________

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301309 Order No: 20190397 Description: purlin Uncoiler not
working
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ DatelTime DatelTime ____________________

0010 purlin Uncoiler not working


______________________ ____

!7'Or&24 ISO24- _____________

fk1 nf.A2rQ/
gnho 5)1Ffloka-ý '/bti/ h1
(A/ty /9a#rnyo

___

.1
hJ ____ _____ _________________

Release Date: 1tKsI:WeZó!Z! Basic Start Date: 17.08.2024

Release Time: 11:29:55 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_____________
/9 O"6'9-fr- 2- Un
_______ ____________
(i9 /to' LH
__________

(ti:;) f"7.tt2-4-' 4- Wa
_______ ____________

Aosa4 __________

________________

a&'n*o/Ifrn g001 q &&


fo4roo
A1 WI. 9
- Lrh
AO1Q A,o

$on cf aM 41dd 'c(


h0b. 'Vs/or fixnd b&ck C17Lth2oL

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301227 Order No: 20190398 Description: conrac 02 hydraulic
motor not working p1
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time. ______________________

0010 conrac 02 hydraulic motor not working p1


iGO21 !6o'
____ (2.nn-occ .QQ. 1n,r4uu4tr t/)j- h1

%uc91cA c/Ito ?rPIJCWC


C!, cMtda _________________

Release Date: 17.08.2024 Basic Start Date: 16.08.2024

Release Time: 11:30:40 Basic End Date:


(6 oy. 2-02.4
Employee Codes Employee Names Operation No Hrs

__________________ ________________________________ _____________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301228 Order No: 20190395 Description: 20ft shearing motor not
working pls chec
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Electrical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Descrit,tion Status Start Compl Remarks


No __________________________________ _______
Date/Time DateiTimc ____________________

0010 20ft shearing motor not working.pls chec


lb + I

Vft11 (4J.flt/A ;fl49)j


____

1/4 .1X,tfld PP" ?1"P


/ frjn4n htoayh4 rhnygA,/m,K( ______ ________

"lolor Aimt, p _____ ______ _____ ______________

J ' ¶ 15Se'nblej.
Release 17.08.2024 Basic Start Date: 16.08.2024

Release Time: 11:28:56 Basic End Date: It OZo24-

Oseration No.' Hrs

0/)

(H
At,) QCO

ftxtd hctzbc/. &tt' "lob' tA*d1n1 17U)hftt/. aywo frnovrn' £ /


41v1d 'o1v fixd c( duad ok

Maintenance Department User Department


Kirby Building Systems KSA
Kwbg'J MAINTENANCE ORDER JOB TICKET

Date: 17.06.2024
Notification No: 100301229 Order No: 20190396 Description: scm air leak

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 scm air leak


___________________________ _____
6"oc- I&c¬',- _______________

TTh P/v/Pal ____ _____ _____ ____________

apaicd -

Release Date: 17.08.2024 Basic Start Date: 16.08.2024

Release Time: 11:29:25 Basic End Date: f6 -

Employee Codes Employee Names Operation No Hrs

- ____________
(fl) ki/r-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301205 Order No: 20190400 Description: old blasting pipe hose
problem
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Release Date: 17.08.2024 Basic Start Date: 15.08.2024

Release Time: 11:31:49 Basic End Date: / 45 rOC. 2O2-1.

Maintenance Department I User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date: 17.08.2024
Notification No: 100301192 Order No: 20190377 Description: FORKLIFT CHANGE
TIRE H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person iRajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 17.08.2024 Basic Start Date: 15.08.2024

Release Time: 09:41:07 Basic End Date:

(a4LITL4I lii 14- 1:1

lb

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301436 Order No: 20190456 Description: conrac 01 press wheel
lock remove pls ch
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timt____________________

0010 conrac 01 press wheel lock remove pls ch


.

____
(one ptpn ciSc! thk C)
Sn&/ (nii nad (%nlp(Lfrc]
___ '1/it
4i pv.prr/y 9'
___ fs-0d cj P&kdok ____ _____ _____ ____________

Release Date: 18.08.2024 Basic Start Date: 15.08.2024

Release Time: 08:41:35 Basic End Date: 16' o g -202-c

5tç-

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301367 Order No: 20190453 Description: 201t shearing motor not
working pis chec
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Sibin John Main Work ElectricalMaintenance


Responsible: Centre;
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Timc _____________________

0010 20ft shearing motor not working pis chec


-_____________________ ___ F7og'%a f7o?24 ___________

(1ý 1o1, W;nc4b kiii/4 nnUft4


pomp '2) bnuyb/
____
rh 4vono
___ AMfc. Enm0 ,a- ee tj ____ _____ _____ _____________

-J
Release Date: 18.08.2024 Basic Start Date: 17.08.2024

Release Time: [.1;ictt4.1 Basic End Date:

Employee Codes Employee Names Operation No Hrs


_______ ____________

t7aw,c
09 L,frW'
1
2J',&
)
_________

_________ ____________________________
,

_______ ___________

4 tf"
/tZ4dcQJ 11w
W 7?ocTh s'* &ftt/C'j /61d i'-lo)oi
ctIomn9.cJ
.waxlrn ChQJkLJ
kP;0 ct'oj Cnn,n&}, pi./z4tj q "lolvv F1d 1k
A,cigh?zt thLd rftl, f/qa¼) ô'- 4°4, çynJ bý'1'- pwrf
Md (ocnte Jibi) Ci (huktI fv,cit'bt) Olc
ç
/
55M- ''Ptsbnu
t024e wcfk1,
-a; I-i
2oi4
r
- ¶-t4ir.

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301347 Order No: 20190452 Description: conrac 01 top sidehead
bearing loose pls
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 conrac 01 top sidehead bearing loose pis


?7'o%t4-
LI ____ ____________________________ _____

!7O2t

___
iQnttp -rz,c,g4 cfl ____ _____ _____ _____________

70 T)nk)cLw - _______ ______________

non? dl& (if Q) bri91


__
___
F,cJ /)ailk Qi e&hio& ____ _____ _________________

Release Date: 18.08.2024 Basic Start Date: 17.08.2024

Release Time: 08:37:19 Basic End Date: /7


Employee Codes Employee Names Operation No Hrs

___________________ __________
PH"
9T¬o5' _____________ ____________ _____________

Maintenance Department I User Department


WrfrniYR Kirby Building Systems KSA
I %iI7t4]R
MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301382 Order No: 20190454 Description: KD75 strickerAir pipe
leakage
Functional P301- CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time. ______________________

0010 KD75 strickerAir pipe leakage


7.©ç24 )7.c9 ______________________

____
'-flia pi'e /pk _____ ______ _____ ______________

c'/ CAWJJO ok ___ ______________

Release Date: 18.08.2024 Basic Start Date: 17.08.2024

Release Time: 08:39:36 Basic End Date: 7' O72ø2J1


Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301450 Order No: 20190487 Description: fork lift tyre puncture
please check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000673 Description: FORKLIFT TOYOTA 510N T501
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 18.08.2024 Basic Start Date: 18.08.2024

Release Time: 18:31:37 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301429 Order No: 20190455 Description: conrac 02 maine
machine shoe pin
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

3010 conrac 02 maine machine shoe pin bended


,
Qteanri c& po &vbn ____ _____ _____ _____________

___ Rk1 kod 1ie (2enoaied.


7)?npPcAy ci)! Thwy41
___
tAttiClkiq_ri/cc!_/Jr//J ___ ____ ____ __________

J)() PwPnt9 j LWdtt


Release Date: 18.08.2024 ' ' Bsic Stan Date: 18.08.2024

Release Time: 08:40:58 Basic End Date: I '- o% 2o


Hrs

'5,
4

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.08.2024
Notification No: 100301445 Order No: 20190488 Description: pre forklift 502 hydraulic
oil lubricati
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 18.08.2024 Basic Start Date: 18.08.2024

Release Time: 18:32:12 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Jft9J

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date v.08.2024
Notification No: 100301835 Order No: 20190734 Description: T502 strater prob
check
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

ri

Release Date: 22.08.2024 Basic Start Date: 22.08.2024

Release Time: 17:55:40 Basic End Date:

cc?

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: .08.2024
Notification No: 100301817 Order No: 20190722 Description: Side loder lyre puncher
SL-6001
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Tholtupurath Centre:
Tech ID:

Release Date: 22.08.2024 Basic Start Date: 22.08.2024

Release Time: 11:49:32 Basic End Date:

Employee Codes Employee Names Operation No Hrs


5139/ ___________ __________ ___________

______
gcre, _________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 208.2024
Notification No: 100301626 Order No: 20190698 Description: 201t shear vaccum hose
loose
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Tawteeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Timc ____________________

0010 20ft shear vaccum hose loose


( t.3fk/2t1 yi'pt
1j.tr flsvnoJp

____ __________________________ _____ mo 4oo ______________

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:50:17 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________ _________________ _______________


flnuSc3

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
'Li so7 2OÂ
Date : ae.08.2024
Notification No: 100301737 Order No: 20190687 Description: CCCD6O SIDE LODEIR
TYRE REPLAICEMENT
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 22.08.2024 Basic Start Date: 21.08.2024


Release Time: 08:38:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ci í _______________ ______________
I 2-

Maintenance Department j User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 21.08.2024
Notification No: 100301715 Order No: 20190652 Description: Side loder battery need
to change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 Side loder battery need to change


I! 00 fwo g4-t&,-5 '-I

_________________________________ ____

tL&

Release Date: 21.08.2024 Basic Start Date: 21 .08.2024

Release Time: 16:18:25 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Sn,! ___________________ __________

Maintenance Department I User Department


Kirby Building Systems KSA
Krb MAINTENANCE ORDER JOB TICKET

Date : 22.06.2024
Notification No: 100301654 Order No: 20190694 Description: conrac 01 drive roller not
working pls c
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac 01 drive roller not working pls c

3poeierl fht Dirgt ____ _____ _____ ____________

C,/ (i k4ok ____ _____ _____ _____________

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:47:06 Basic End Date: 2-t24

Employee Codes Employee Names Operation No Hrs

___________________ ____________lIfi

Maintenance Department User Department


gr
ret rn ,M
"" m Kirby Building Systems KSA
'tO:
7111 MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301652 Order No: 20190695 Description: Hemming machine roller
damage
Functional P301-CFORM- Description: SAW- SLITTERS-SHEARS CF -

Location: SHEAR
Equipment No: 12000295 Description: HEMMING MACHINE

Plant Section: Person Mohid MulIa Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 Hemming machine roller damage


_____________________________ ______

2-o'cc).A 2-o"oz, _________________

thetiaje /20A
9

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:47:39 Basic End Date: 2-o


Employee Codes Employee Names Operation No Hrs

__________ "1oinid 'jc,tf ______________


/115)

Maintenance Department User Department


Kirby Building Systems KSA
KrbII MAINTENANCE ORDER JOB TICKET

Date : 22.06.2024
Notification No: 100301464 Order No: 20190711 Description: old blasting crane not
working nd check
Functional P301-MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000653 Description: Overhead Crane 10 Ton- B1003

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 old blasting crane not working nd check


" _________________________________________ ________ __________ _________ _______________________

____
girl h/a,] 12rant AJ0, _____ ______ ______ _______________

'pcu'ttd prb-J 4Uth. aflT (ff4-eL

Release Date: 22.08.2024 Basic Start Date: 18.08.2024

Release Time: 09:08:42 Basic End Date: ' . O'- LO24-


Employee Codes Employee Names Operation No Hrs

5S392 ______________ ____________ ______________

p2-AG ______________ _____________ i tr

Maintenance Department User Department


It Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301580 Order No: 20190705 Description: 201t shear balde updown
prob
Functional P301- SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJSH- 0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time DatelTimc. ______________________

0010 2011 shear balde updown prob


9 ctz ______________________

Upd (Inwo AJt'icl tAlCum ô&& ____ _____ _____ ____________

Daw.
C$ pw4 c/ Tdst7h4 cjo m4n _____ ______ ______ _______________

___

"
f?oha,oc/ ord c0Jh £toibi _____ _____ _____________

Release Date: 22.08.2024


-
N2/ 4//%bItStart
cfl4vis/ &tok
Date: 20.08.2024
q( ChccbAo

Release Time: 08:59:21 Basic End Date: 2v -cç '2a


Employee Codes Employee Names Operation No Hrs

_____________________
(TI) ' ftfp
C
________ _____________ ___________
2kb-i
@9 3 (cfr

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301527 Order No: 10128128 Description: slitting M/C cooler water
supply needed
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

7-

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:04:35 Basic End Date: __________

Maintenance Department User Department


ii' Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.05.2024
Notification No: 100301526 Order No: 10125129 Description: sheet mill D-cooler water
supply needed
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 22.08.2024 Basic Stan Date: 19.08.2024


Release Time: 09:05:01 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301694 Order No: 20190690 Description: nigara jack not working

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 nigara jack not working a


I
________________________ _____ ______

2.1 o 24.. ______________

___
AAr 9CIF'.

c) cA,dJ A/c/r/ p0
___
('cme tU' c/ u,t(Qcf rAt ____ _____ _____ ____________

ri?)
I
pnpc' c11 R/v/x P/We
. V
____ _____ _____ ____________

Release Date: 22.08.2024 Basic Start Date: 21.08.2024

Release Time: 08:40:25 Basic End Date:


ot .io 24-
Employee Codes Employee Names Operation No Hrs

5qgos ____________ ___________ ____________

- ____________ ___________ ____________

%?,flttf) ci (AJL!CIC.1 c/Itt. Slo/pOr p/a/c . Chu&Iot

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301647 Order No: 20190696 Description: conrac 01 nozzle edapter
tred damage pls
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 22.08.2024 Basic Stan Date: 20.08.2024

Release Time: 08:48:23 Basic End Date: 10

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301629 Order No: 20190697 Description: conrac 01 carruge not up
please check
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:49:00 Basic End Date: Zo2.4

2enticS J
PF
4-%cethkJ £jcCA1t41<
Lkloi p1qrr' Q!-,tl,ThJ
/ab4o iQorc

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301656 Order No: 20190693 Description: EP502 FORKLIFT TYRE
PUNCTURE
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 22.06.2024 Basic Start Date: 20.08.2024


Release Time: 08:46:24 Basic End Date:

Employee Codes Employee Names Operation No Hrs

3e

Maintenance Department User Department


ir Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301579 Order No: 20190706 Description: conrad hydropump
sound prob
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohammad Sahbaz Main Work Mechanical Maintenance
Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No __________________________________ ______ DateiTime DatelTimc.
___________________

0010 conrad hydropump sound prob

3
___
Mcm' 9n,) 9',nnrp tt ____ ________ ___________

rfkpwp poJrTh ptiwp 1o4 _____ _____ ____________

9' 4nn,cPon ___ ____ ____ ___________

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 09:00:23 Basic End Date: 2-c C3

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301624 Order No: 20190699 Description: conrac 01 auto welding
nozzel holding c
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Remarks

Release Date: 22.08.2024 Basic Start Date: 20.08.2024

Release Time: 08:50:51 Basic End Date: O"O

Employee Codes Employee Names Operation No Hrs

55oi ________________ ______________ _______________

Maintenance Department I User Department


Kirby Building Systems KSA
KwbjJ MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301525 Order No: 10128130 Description: purlin M/C D-cooler water
supply needed
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 purlin M/C D-cooler water supply needed


__________________________ _____
tqcj- !%o24h _______________

___ Wak'r
'M'1t 4oW
cf &tRflkd -fiT f/peel

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:05:36 Basic End Date: I q. u-f


.

Employee Codes Employee Names Operation No Urs

________
IR/J ________________________

S564

Maintenance Department User Department


Kirby Building Systems KSA
II
MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301528 Order No: 10128127 Description: nigara D-cooler water
supply needed
Functional P301- UTLTY Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Time _____________________

0010 nigara D-cooler water supply needed


tq o'24- i'1otM _______________________

(xhika'
(t6/cJ rfh _____ ______ _____ ______________

£pp!y '*'k cJI ____ ____ ____ ___________

F/cbj tniitit.. ______ _______ ______ _________________

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:03:33 Basic End Date:

Employee Codes Employee Names Operation No Firs

________

fm/A) (ks)
p

Maintenance Department -
User Department
11*t
t tw. Kirby Building Systems KSA
%I1
MAINTENANCE ORDER JOB TICKET

Date: 22.08.2024
Notification No: 100301529 Order No: 10128126 Description: Deck Panel D- cooler
water supply needed
Functional P301- UTLTY- Description: DESERT COOLERS
Location: DCOOL
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime DatelTimc. _____________________

0010 Deck Panel D-cooler water supply needed

_____
0- coufe iJcjr 2pi e/
____ tktoiac/ rfhe IA /&ki Vt / /'e _____ _______ ______ ________________

C/ -Ji ffo(

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:03:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
§ahh2. @9

Maintenance Department User Department


Kirby Building Systems KSA
niruy,
it Isa
MAINTENANCE ORDER JOB TICKET

Date : 22.082024
Notification No: 100301477 Order No 20190710 Description: onracl updown rollernt
workng
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 onracl updown roller nt workng


(
g;i1 Ofl)tp do,-) ____ ___________ _____________

rrtio43chn fl2aJ
___ dhi /)npn/y /jw
filfLir Y ________ ___________

__

fl Thlet ci CALctdeL ___ _______ _________

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:07:48 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cIII)

Maintenance Department User Department


Kirby Building Systems KSA
KrbJ MAINTENANCE ORDER JOB TICKET

Date : 22.08.2024
Notification No: 100301516 Order No: 20190709 Description: purlin Uncoiler not
working
Functional P301-CEORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DateiTime DatelTimc. ______________________

0010 purlin Uncoiler not working


___ _________________________ _____
rqa.21- Iqct2
CflIYnQ (fry'4'i ill.i
c aL. A/ti 1Thoprvly
!)ip)w f)omoje

Release Date: 22.08.2024 Basic Start Date: 19.08.2024

Release Time: 09:06:17 Basic End Date:

Employee Codes _Employee Names Operation No Hrs

T8fo. gW1f2L ______________ ________________

W"

Maintenance Department User Department


Kirby Building Systems KSA
1
I
MAINTENANCE ORDER JOB TICKET

Date: 01.08.2024
Notification No: 100299967 Order No: 20189699 Description: old blasting dead meal
and port problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 old blasting dead meal and port problem


____ _____________________________ ______
0; o" O'ot- _________________

Pm,t DkrJ)c'g tiA1 Donna ______ _______ ______ _________________

'c!n,'i gJ" 4nnc) c,I 11osmnn1wo)


____

n.. rj fpieico
____
lPak__'øAro,_d_c/_tnrain.d_ct _____ ______ ______ _______________

I /
'
fflQt) ,I,,t1/t 1 C4ü,Jok
Release Date: 01.08.2024 Basic Start Date: 01.08.2024

Release Time: 08:59:40 Basic End Date: D/

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date : 01.08.2024
Notification No: 100300055 Order No: 20189694 Description: T502 forklift battry need
to change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

0010 T502 forklift battry need to change

Release Date: 01.08.2024 Basic Start Date: 01.08.2024

Release Time: 08:53:06 Basic End Date:

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.08.2024
Notification No: 100300029 Order No: 20189700 Description: conrac 01 b side press
weelnot working p
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 01.08.2024 Basic Start Date: 01.08.2024

Release Time: 09:00:22 Basic End Date: Of Q og

Maintenance Department User Department


Kirby Building Systems KSA
LII MAINTENANCE ORDER JOB TICKET

Date: 01.08.2024
Notification No: 100300053 Order No: 20189698 Description: sanli 6mtr chain loose

Functional P301-SHEAR Description: SHEARING SECTION


Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

0010 sanli 6mtr chain loose

Release Date: 01.08.2024 Basic Start Date: 01 .08.2024

Release Time: 08:57:06 Basic End Date: 01 og

Maintenance Department I User Department


Kirby Building Systems KSA
""
h
MAINTENANCE ORDER JOB TICKET

Date: 03.08.2024
Notification No: 100300152 Order No: 20189748 Description: scm lubrication pipe
brocken pls check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 03.08.2024 Basic Start Date: 03.08.2024

Release Time: 10:13:27 Basic End Date: 03 0%

(dilJ

Maintenance Department User Department


ir Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 03.08.2024
Notification No: 100300187 Order No: 20189758 Description: conrac2 pump problem

Functional P301-BUILT- Description: BEAM WELDING LINE-2


Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compi Remarks


No ______________________________________ _______
DateiTime Date/Time ______________________

0010 conrac2 pump problem


o% 24-
/JkJr2 &z yp c/ 1?Md c7
___

/"r i ,q01 _____ ______ _____ ______________

(rn/nj /uit '+4'? 4A'Jpi:ki 10 ____ _____ _____ _____________

___
icc,,, / 4rrk ________ ____ ___________

Release Date: 03.08.2024 Basic Start Date: 03.08.2024


Release Time: 14:15:29 Basic End Date: 03 c%

Employee Codes Employee Names Operation No Hrs

___________
1,41,3 1) __________________

-64' 1hL 'bit

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.08.2024 T-S'2-


Notification No: 100300174 Order No: 20189747 Description: forklift 502 puncher

Functional P301-GENRL Description: GENERAL EQUIPMENTS


Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 03.08.2024 Basic Start Date: 03.08.2024

Release Time: 10:12:55 Basic End Date:

Maintenance Department j User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 03.06.2024
Notification No: 100300209 Order No: 20169766 Description: side loader 90016 back
tyre puncher
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 03.08.2024 Basic Start Date: 03.08.2024

Release Time: 16:47:13 Basic End Date:

Maintenance Department j User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.08.2024
Notification No: 100300196 Order No: 20189759 Description: 37 tool grinding

Functional P301 -DTAIL Description: DETAIL SECTION


Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 03.08.2024 Basic Start Date: 03.08.2024

Release Time: 14:16:05 Basic End Date: t3 a4

Maintenance Department User Department


"h Kirby Building Systems KSA
p-
"

MAINTENANCE ORDER JOB TICKET

Date : 03.08.2024
Notification No: 100300183 Order No: 20189746 Description: web splice 1ine2 chain bk

Functional P301-BUILT- Description: BEAM WELDING LINE-2


Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 03.08.2024 Basic Start Date: 03.08.2024

Release Time: 10:12:04 Basic End Date: t3 Dc

Maintenance Department I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 04.08.2024
Notification No: 100300258 Order No: 20189785 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SI-f IPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ Date/Time Date/Time
g10
_______

____________________

0010 FORKLIFT FLAT TIRE H704


to,c 7i?tc_? kc

Release Date: 04.08.2024 Basic Start Date: 04.08.2024


Release Time: 09:01:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ _________
I').

Maintenance Department User Department


Kirby Building Systems KSA
irb MAINTENANCE ORDER JOB TICKET

Date: 04.08.2024
Notification No: 100300223 Order No: 20189786 Description: conrac 02 drive side
roller not working
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid MuIla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 04.08.2024 Basic Start Date: 03.08.2024

Release Time: 09:19:47 Basic End Date: D3 o -

I t'

I f+t'

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 04.08.2024
Notification No: 100300226 Order No: 20189787 Description: htc flange punching back
side conveyor
Functional P301- DTAIL-FLOO1 Description: FLANGE LINE 1
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 04.08.2024 Basic Start Date: 03.08.2024

Release Time: 09:20:21 Basic End Date: 03 cg 2


Employee Codes Employee Names Operation No Hrs

MM'DjI/g _____________ / tfv

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 04.08.2024
Notification No: 100300250 Order No: 20189788 Description: Id blasting pot pipe
broken
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 Id blasting pot pipe broken


I

___
'7Q,yttq tre o4,n. ____ _____ _____ ____________

Release Date: 04.08.2024 Basic Start Date: 04.08.2024

Release Time: 09:20:47 Basic End Date: t9-


Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 04.08.2024
Notification No: 100300275 Order No: 20189769 Description: conrad press wheel lock
breake
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Sibin John Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No __________________________________ ______
Date/Time DateiTimE ___________________

0010 cdnracl press wheel lock breake


___________________ ___

btotzi _________

___
Wtiwi C&n Prthfl ____ _____ _____ ____________

___ Rnioc'erf f U/into c/


____ fl'ad SioIoJ ,Ptt&y g/
l/7.J-)2'ed of (&,p rho' th _____ ______ _____ ______________

I.,

Release Date: 04.08.2024 Basic Start Date: 04.08.2024

Release Time: 13:40:21 Basic End Date: r A


LI
T % 2024
Employee Codes I Employee Names Operation No Hrs

ISa,

Maintenance Department I User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date: 05.08.2024
Notification No: 100300313 Order No: 20189822 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 05.08.2024 Basic Start Date: 05.08.2024

Release Time: 08:56:01 Basic End Date:

Maintenance Department I User Department


W
Kirby Building Systems KSA
%11 Ic.? -

MAINTENANCE ORDER JOB TICKET

Date: 05.08.2024
Notification No: 100300284 Order No: 201 89824 Description: 201t shearing
machinevaccumlifterprob
Functional P301- SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

0010 20ft shearing machinevaccumlifterproblem

tI
____ nvA po%i _____ ______ _____ ______________

JS)V (*0 JYIA iv\ ptik ____ _____ _____ _____________

___ CAsp5 J- 114teU- tô'H. ____ _____ _____ _____________

Release Date: 05.08.2024 Basic Start Date: 04.08.2024

Release Time: 08:57:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

crknk _______________ ______________ _______________

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 05.08.2024
Notification No: 100300298 Order No: 20189823 Description: scm lubrication pipe
brocken pls check
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 scm lubrication pipe brocken pis check

C
___

y;p,' pilted ____ _____ _____ ____________

___ _____________________ ____ _____ _____

OQ$ -

Release Date: 05.08.2024 Basic Start Date: 04.08.2024

Release Time: 08:57:20 Basic End Date:


01 - zoa_t
Employee Codes Employee Names Operation No Hrs

A/OEW9 /LJLLM (7Z) 41 rn

Maintenance Department User Department


Kirby Building Systems KSA
KrbJ MAINTENANCE ORDER JOB TICKET

Date: 06.08.2024
Notification No: 100300362 Order No: 201 89872 Description: conrac 01 head cylender
clamp come out p
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrac 01 head cylender clamp come out p

Qf cLkl q fpn;iedok

Release Date: 06.08.2024 Basic Start Date: 05.08.2024

Release Time: 10:56:01 Basic End Date: Qc.0rr2..j


Employee Codes Employee Names Operation No Firs

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date : 06.08.2024
Notification No: 100300356 Order No:
.9
20189871 Description: T302 back tyre puncher
plaese check
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 06.08.2024 Basic Start Date: 05.08.2024

Release Time: 10:46:52 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 06.08.2024
Notification No: 100300354 Order No: 20189873 Description: conrac 02 drive side
roller not working
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 conrac 02 drive side roller not working


____ __________________________ _____ 2 O5'' 2 _______________

C /
AU ('Jmhsn l!°'
LA(nkn this?) q MjiiikA

cjMrfrrc/ flud ppeiy


_____
I (Aze&d' ok ______ _______ _______ __________________

Release Date: 06.08.2024 Basic Start Date: 05.08.2024

Release Time: 10:58:39 Basic End Date: O o 2in4.

I Employee Codes I Employee Names Operation No Hrs

I SiB1AJ ()

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300446 Order No: 20189913 Description: side loader back tyre
need change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Compl Remarks
Date/Ti

Release Date: 07.08.2024 Basic Start Date: 06.08.2024

Release Time: 10:22:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department I User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 07.08.2024
Notification No: 100300451 Order No: 20189922 Description: plant 2 new blasting
prolem
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 plant 2 new blasting prolem


OvOt2- t' ct2-4 -

CT Ctlcn14nj
1? tktblkjnj AM
ropet ou,d tp
____
POt/pr rf qwnpL,.Oi 1/fl t4n4ç-!

___
N,kthL m2 sbs poet ____ _____ _____ _____________

Release Date:
Cl Cka4tcLvl-
07.08.2024 Basic Start Date: 06.08.2024

Release Time: 10:40:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs

5IQ#_________________________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300493 Order No: 20189917 Description: FORKLIFT H704
REPLACE NEW TIRE
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 07.08.2024 Basic Start Date: 07.08.2024

Release Time: 10:27:51 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
flu
MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300454 Order No: 201 89920 Description: conrad press wheel b
side problem
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -i


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 conrad press wheel b side problem p

r. __ ____________________ bbtfSf c&ofll-

T)v1AJ ('ACJJ iokiO ____ _____ _____ _____________

c4to _& _____ ______ _____ ______________

____
(' 1thp(4 ty '/ C/-LOMD & _____ ______ ______ _______________

Release Date: 07.08.2024 Basic Start Date: 06.08.2024

Release Time: 10:30:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ _______________ ______________


4r.

Maintenance Department User Department I


Kirby Building Systems KSA
iv
t MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300524 Order No: 20189949 Description: station c angel
punchm/cblade
Functional P301-CFORM Description: COLD FORM SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

c4ec&J otc
Release Date: 07.08.2024 Basic Start Date: 07.08.2024

Release Time: 17:22:12 Basic End Date: 0 '1 0

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 07.08.2024
Notification No: 100300494 Order No: 20189918 Description: pedding hosepunch
holder problem
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS # 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 pedding hosepunch holder problem


1"
(
Pu0tknj tjfr. bi eke
/)Ll7Cb _____ ______ ______ _______________

____ ctlc to#/oii k16/41 I&t' (offpct4d


cJd'# &ifoo ____ _____ ____ ___________

___ 0vicrl_ci__FI.&w/__(1cp_.6rnp ____ _____ _____ _____________

f-/tie/ar Alicrnid Wit Ceof,c.. C/CtutkLdz/n


Release Date: 07.08.2024 Baic Start Date: 07.08.2024

Release Time: 10:28:53 Basic End Date: b7Q 2024

Employee Codes Employee Names Operation No Hrs


I
________
&tJtI ____________ _____________

I ________________

g)

Maintenance Department User Department


Wwhit Kirby Building Systems KSA
%IJ
MAINTENANCE ORDER JOB TICKET

Date: 12.06.2024
Notification No: 100296267 Order No 20187757 Description: conrac 01 a side
hydraulic cylender not
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ DatelTime DatelTimc _____________________

0010 conrac 01 a side hydraulic cylender not

b4r ____ ____ ____ ___________

C
______
s'-' _______ _________ ________ ______________________

Release Date: 12.06.2024 Basic Start Date: 12.06.2024

Release Time: 14:02:37 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________
A2-jrfV\ ______________ _______________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 13.06.2024
Notification No: 100296345 Order No: 201 87789 Description: Old Shot blasting hose
damage nd check
Functional P301- FlNlS-SHOT2 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc ____________________

0010 Old Shot blasting hose damage nd check

____
Ifl4iA tpe

Release Date: 13.06.2024 Basic Start Date: 13.06.2024

Release Time: 10:49:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________ __________________________

2k

Maintenance Department User Department


Kirby Building Systems KSA
Krrb MAINTENANCE ORDER JOB TICKET

Date : 29.06.2024
Notification No: 100296979 Order No: 20188303 Description: conrac 01 front side
coveyor chaine brok
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DatelTimc ______________________

0010 conrac 01 front side coveyor chaine brok

jc tzn Ju lv - _____ ______ _____ ______________

Release Date: 29.06.2024 Basic Start Date: 23.06.2024

Release Time: 11:18:56 Basic End Date:

Employee Codes Employee Names Operation No Hrs

zcn rvt1-a

-Th

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 01.07.2024
Notification No: 100297529 Order No: 20188371 Description: Fprk Lilt T-302 King pin
Repair
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON 1302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 01.07.2024 Basic Start Date: 01.07.2024

Release Time: 10:56:29 Basic End Date:

Employee Codes Employee Names I Operation No J Hrs

Maintenance Department User Department


Kirby Building Systems KSA
t MAINTENANCE ORDER JOB TICKET

Date: 03.07.2024
Notification No: 100297707 Order No: 10126980 Description: forklift 3ton T-302 back
tyre change
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000687 Description: FORKLIFT TOYOTA 3 TON T301
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 03.07.2024 Basic Start Date: 03.07.2024

Release Time: 17:46:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 03.07.2024
Notification No: 100297662 Order No 20188490 Description: conrac 01 auto welding a
side proble pls
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Dateilime DatelTimc ______________________

0010 conrac 01 auto welding a side proble pls


3Jo? o;jvi

°?'' S?cU ked Eoat ____ ___________ ______________

(o.-. oui-s,'cio ______ _______ _______ __________________

_____

own _____ _______ ______ ________________

____

Release Date: 03.07.2024 Basic Start Date: 02.07.2024

Release Time: 17:52:04 Basic End Date:

Employee Codes Employee Names Operation No Hrs

__________ ________________ cRc) 2-,o rntvø&-t

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 05.07.2024
Notification No: 100297865 Order No: 10127020 Description: New Tractor Trolley
Fabrication Work
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______
Date/Time Date/Tim( ____________________

0010 New Tractor Trolley Fabrication Work


___________________________ _____
"I Jô$-'i o\2M _______________

Release Date: 05.07.2024 Basic Start Date: 05.07.2024

Release Time: 10:13:12 Basic End Date:


I 01- 12_.Lj

&- Sc

r&ee

Q,Ljt&2\
£C%9lQ1LJ

cta1 cLio
L40
5 d[n/i
/Lwwk/

St S M Ø"
5 fl l%,w,
Maintenance Department User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 05.07.2024
Notification No: 100297863 Order No: 10127018 Description: Conrac 1 Oil Filtter
installation & Fab,
Functional P301- BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohid Mulla Main Work Mechanical Maintenance
ResponsibIe:' Centre:
Tech ID: KJAWL-01 N

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Conrac 1 Oil Filtter installation & Fab,


07'24 °s°'tM
TI- _____
______________

lAo till IC) 40bk.


?vrmupit _____ ______ ______ _______________

___ c/ enfl. tv Pt/c ____ _____ _____


Os c!-e.L -

Thh1;nid 'if _____ ______ ______ ______________

£f Th0k 7np p4in &t/4d _____ _______ ______ ________________

Qj ["xa 'Jet 14')ki' t.cjeid'


Release Date: 05.07.2024 Basic Start Date: 05.07.2024

Release Time: 09:52:44 Basic End Date:


Q- °71b-.j-
Employee Codes Employee Names Operation No Hrs

__________ A-tv IIFO "ILIuM (fl)


________
PAI7D _____________ tWri
_________ _______________
(7) St-lb

flt4ci R Pit;oj 1kp 07/ q, Ckg&d. +chi .41/ /totkoo


Ok-

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date : 05.07.2024
Notification No: 100297785 Order No: 20188538 Description: EP502 Battry damage
need change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

0010

'I

Release Date: 05.07.2024 Basic Start Date: 04.07.2024

Release Time: 09:42:02 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 05.07.2024
Notification No: 100297789 Order No: 20188539 Description: EP502 Battry damage
need change
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 EP502 Battry damage need change

Release Date: 05.07.2024 Basic Start Date: 04.07.2024

Release Time: 09:42:32 Basic End Date:

Employee Codes Employee Names Operation No Hrs

(.

Maintenance Department User Department


Kirby Building Systems KSA
Lø&twI

MAINTENANCE ORDER JOB TICKET

Date: 07.07.2024
Notification No: 100298014 Order No 10127050 Description: Pedding house plate
holder fabrication
Functional P301- UTLTY-MAINT Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 Pedding house plate holder fabrication

Q,tQ
- 4f&i &oIo ____ _____ _____ _____________

__
Ho(&t C! pwh biik -______ _____________

drillic; 4U0d 'PP/UI -____ _______ ______ _________________

'I
Release Date: 07.07.2024 Basic Start Date: 07.07.2024

Release Time: 18:22:39 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 07.07.2024
Notification No: 100298009 Order No: 20188601 Description: EP502 back tyre puncher
nd repair
Functional P301 -MTH DL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre;
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Time ____________________

0010 EP502 back tyre puncher nd repair


________________

ØO 7ff flQ CAl

Release Date: 07.07.2024 Basic Start Date: 07.07.2024

Release Time: 17:51:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________
3
)CCft) fgjP

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 07.07.2024
Notification No: 100298016 Order No: 10127052 Description: HANGCHA 31on forklift
new instalation
Functional P301- UTLTY-MAINT Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person Hajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: IYtO't1fleZl Basic Start Date: 07.07.2024

Release Time: 18:26:45 Basic End Date:

Employee Codes Employee Names Operation No Hrs

.-Sc8 k47eiJ

Maintenance Department User Department


'J -

ir KirbyBuilding Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 08.07.2024
Notification No: 100298056 Order No: 10127064 Description: PIant2 ram forklift & trolly
fabrication
Functional P301- UTLTY-MAINT Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Cent re:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time DateMme ____________________

0010 PIant2 ram forklift & trolly fabrication


9//e'zi Z3/'/t zv

Release Date: 08.07.2024 Basic Start Date: 08.07.2024

Release Time: 11:20:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________
$URE,y ___________

csmna __

.___

IS

________
SUgEç4q
ceno __ - -.

Rewr4L ASOULAHAØ

Maintenance Department - User Department


PLAW75.: R.Afr\

9lvlPtoya, coO,
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.07.2024
Notification No: 100298150 Order No: 20188688 Description: new blasting rn/c port not
working.
Functional P301- FINlS-SHOT2 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 09.07.2024 Basic Start Date: 09.07.2024

Release Time: 10:01 :37 Basic End Date: Qa, 07'

cj pad c/ frd bw-sc

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 09.07.2024
Notification No: 100298086 Order No: 20188689 Description: forklift 302 tyre puncture
front side
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

0010

Release Date: 09.07.2024 Basic Start Date: 08.07.2024

Release Time: 10:02:34 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.07.2024
Notification No: 100298063 Order No: 20188687 Description: old blasting port problem

Functional P301- POWER- Description: POWER TOOLS ELECTRICAL


Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 old blasting port problem

lns1- yor# ciIu flr,- ____ _____ _____ _____________

Vj'stnç -nohklj (I&c11A9e

t.o.fl

Release Date: 09.07.2024 Basic Start Date: 08.07.2024

Release Time: 09:55:38 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ _______________ ______________


\vt

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.07.2024
Notification No: 100298145 Order No: 20188686 Description: old blasting port not
working nd repair
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 old blasting port not working nd repair


__ ________________________
O'7o7.t4 O"cq- ___________

BIo)ip3.
1trJ A/aihnnr t,11h1 _______ ________ ________ ____________________

____ 77ed hpmaj,o rrt,tin/ ef


p/NJ 72L t/oJ,rnQn1 tIc4 I/IS _____ ___________ ______________

____ 9/ ehntdik Qf qod sn. J die ______ ______ _______________

How- bcin,aqe flpcthed iie (lost


Release Date: 09.07.2024 J Basic Start Date: 09.07.2024

Release Time: 09:54:41 Basic End Date: O9. °7'2n4


Employee Codes Employee Names Operation No Hrs

____________ ___________________ _________________


2
____________ ___________________
(1)
(

User Department
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 09.07.2024
Notification No: 100298186 Order No: 20188702 Description: sl 60002 gear not
working nd check
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000656 Description: FORKLIFT HYSTER 7 TON HY702
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 09.07.2024 Basic Start Date: 09.07.2024

Release Time: 15:33:54 Basic End Date:

p
S
V

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.07.2024
Notification No: 100298250 Order No: 20188781 Description: FORKLIFT FLAT TIRE
H704
Functional P301-SHIPG Description: SNIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 11 07.2024 H Basic Start Date: 10.07.2024

Release Time: 11:30:54 - Basic End Date:

Employee Codes Employee Names . Operation No - Hrs

/3.
______
H _________________

Maintenance Department User Department


Kirby Building Systems KSA
IEhvt:i MAINTENANCE ORDER JOB TICKET

Date: 11.07.2024
Notification No: 100298362 Order No: 20188778 Description: old blasting hose clamp
need to fix
Functional P301-FINlS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No _______________________________________ _______
Date/Time Date/Timc. ______________________

0010 old blasting hose clamp need to fix


f! v. 2 ______________________

_____
dod t1,I-) fib/P P ______ _______ _______ __________________

rht__W__c_(hizabdok ____ _____ _____ ____________

Release Date: 11.07.2024 Basic Start Date: 11.07.2024

Release Time: 11:18:26 Basic End Date:


-j. jg4
Employee Codes Employee Names Operation No Hrs

_________
'Scihbaz. _____________
I 1fv3
C, __________ ________________ _______________
Nt,

Maintenance Department User Department


Kirby
Krby MAINTENANCE ORDER
Building Systems KSA

JOB TICKET

Date: 11.07.2024
Notification No: 100298322 Order No 201 88784 Description: conra 01 vacuim air pipi
leakage pls che
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
DatelTime Date/Tim6 _____________________

0010 conra 01 vacuim air pipi leakage pis che


_____ ________________________________ ______
!v- crl.2M 1D-07.2.4 __________________

4aa4 lfi' t/atwrr l/oy ____ _____ _____ _____________

tèks)ay 4ii91a i% line. ________ _______________

___
I /ht Rn-njr ____ _____ _____ _____________

Release Date: 11.07.2024 Basic Start Date: 10.07.2024

Release Time: 11:32:47 Basic End Date:


(0' 07"2.oa4
Employee Codes Employee Names Operation No Hrs

___________
Sab&u _______________ 7 Hr'

Maintenance Department User Department


Kirbfl Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 11.07.2024
Notification No: 100298276 Order No: 20188782 Description: primowelding machine
hydraulic precing n
Functional P301- BUILT Description: WELDING MACHINES
Location: FWELD
Equipment No: Description:

Plant Section: Person Sibin John Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 primowelding machine hydraulic precing n


C ____ _______________________________ ______

°°"+ /v.01.M. __________________

n(f2)(AWJkv1 'J/c 34a*,s 74112 _____ ______ ______ _______________

!4eIdhy LMve cj (h01w _____ _______ ______ ________________

Ok

Release Date: 11.07.2024 Basic Start Date: 10.07.2024

Release Time: 11:31:39 Basic End Date: ft- D7"


Employee Codes Employee Names Operation No Hrs

59%o
_____________ ____________ _____________

Maintenance Department User Department


flS 4 SW
%:fl ml
I#
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 11.07.2024
Notification No: 100298299 Order No: 20188783 Description: old blasting dead mill
handle nd repair
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 old blasting dead mill handle nd repair


___ ________________________________ ______
1p.trf2- liJ- V124- __________________

___ Aandh 1njt7t


____
ci /7DcQ La/ed. 4nr& _____ _______ ______ ________________

___ 7o F/ose ci b4t,olip c'i dkt4 ____ _____ _____ ____________

____ Ok _____ ______ _____ ______________

Release Date: 11.07.2024 Basic Start Date: 10.07.2024

Releaselime: 11:32:19 Basic End Date:

Employee Codes Employee Names Operation No Hrs

59sc5 __________________ (1) _________________

_________ ________________ ______________


r_f/i;'

Maintenance Department User Department


Kirby Building Systems KSA
F4Th MAINTENANCE ORDER JOB TICKET

Date: 11.072024
Notification No: 100298273 Order No 20188779 Description: conrac 02 beam welding
roller up&down no
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc ______________________

0010 conrac 02 beam welding roller up&down no


___ ____________________________ _____
1Dcf$24 lO'o724 ________________

_____ Connie 'o') ptnsic

(Jpcij
dnzen b# t&IhIwnj 2JY1DUQ

____ +t- RHe, 'up cf d0 ci.o _____ ______ ______ _______________

Rkt-_cj 'a.pea10A__AP44_f'xcA. _____ ______ ______ _______________

bt4 kbi
u301kTh9.
Release Date: 11.07.2024 'Dasic Start Date: 10.07.2024

Release Time: 11:19:41 Basic End Date: (0 Z024

Employee Codes Employee Names Operation No Hrs

ThoU _____________________________

_________

- rntL frtitWD'4pL& )
_______
4t±- /94/if @1) _nc Lj6'#)

SOM) k4 ehcLd 9etet2 (


2cvto tn fiwl ekau ok (r7iLL AI(I A/tt
L'/i(/I)
f

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 11.07.2024
Notification No: 100298262 Order No: 20188780 Description: new blasting one port
problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/Time. ______________________

0010 new blasting one port problem

ppi,.. LV0 _____ ___________ _____________

____ 1, Ocle 'YuL.,, flty'.np _____ _______ ______ ________________

Release Date: 11.07.2024 Basic Start Date: 10.07.2024

Release Time: 11:27:03 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________ ______________

c4ô_AA.tAtAFt

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298510 Order No: 20188855 Description: old blasting dead mill
handle nd check
Functional P301-FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person / Main Work Mechanical Maintenance


Responsible: 'L. Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 old blasting dead mill handle nd check


.
O7'2s ______________________

(LW Nw,
___

cHit ________ ______________

__ c/ eAM gkg
___ #v M'e ________ ______________

Release Date: 13.07.2024 Basic Start Date: 13.07.2024


Release Time: 09:57:33 Basic End Date: 3'o7.
Employee Codes Employee Names Operation No Hrs

@2 /tlr)
C _______ ___________ (1i) ___________

Maintenance Department A I User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298551 Order No: 20188893 Description: KD rn/c 0-head crane
bolt broken
Functional P301-MTHDL- Description: OVERHEAD CRANES
Location: OHCRN
Equipment No: 13000661 Description: UNDERSLUNG CRANE 2TON A201 -

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time DatelTim¬ ____________________

9010 KD rn/c 0- head crane bolt broken


___ _______________________ ____
!3-c-24 A3-o7 -

____
JAn /hLto A/i _____ ______ ______ _______________

___
t ilL ____ _____ _________________

Release Date: 13.07.2024 Basic Start Date: 13.07.2024

Release Time: 16:44:20 Basic End Date: 13 rp7.gg


Employee Codes Employee Names Operation No Hrs

________
mhjd ,/u/fci (j) I ,7tfl

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298515 Order No: 20188852 Description: conrac 02 pressing roller
not up pls che
Functional P301 -BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Q,
Description Status Start Compi Remarks
No ______________________________________ _______
Date/Time DatelTimc. ______________________

010 conrac 02 pressing roller not up pls che


f.O7. 24 ______________________

___

.
p, i
____
(-lc,),) A/n-I fAlv}W7 pnpri/

__
CAs2d#z, MI(IAIofr q _____ __________

___

'19ub o* 47en h s?mtuitl ____ _____ _____ ____________

s.1nt& "191 1 FflW'


Release Date: 13.07.2024 Basic Start Date: 13.07.2024
O(1//tY tkWt

Release Time: 09:52:07 Basic End Date:


T &O1- °az4
Employee Codes Employee Names Operation No Hrs

&A)U _____________ ______________

( ________ _____________

(1) SItu

bud I4 Ok avecL nJ cj r/cahioy 541


Qyoin

q pi. ) AL! i i¼/&i cpT/u&d t$f o9


k.

Maintenance Department User Department


Kwbu1.
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298511 Order No: 20188853 Description: scm cnc machine
conveyor base moving
Functional P301 -DTAIL Description: DETAIL SECTION
Location;
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section; Person Mohid Mulia Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

Thoio scm cnc machine conveyor base moving pls


____ _____________________________ ______

1301.Z1- I&oj_ _________________

P/ern2p 93mntp/ ______ _______ _______ __________________

7'I cAmp PwuyhJ h mci '15 /eot _____ ______ _____ -

___

Ru 0/amp o) P1/er ____ _____ _____ _____________

___
r,&'td 4d O&thd t4(hi9 ____ ______________

Release Date: 13.07.2024 Basic Start Date: 13.07.2024

Release Time: 09:52:49 Basic End Date: (3o7. 2at


Employee Codes Employee Names Operation No Hrs

_______
tYonw"tzf _____________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298514 Order No: 20188851 Description: EP502 back lyre puncher
nd repair
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Mainlenance


Responsible: Tholtupurath Centre:
Tech ID:

010 EP502 back lyre puncher nd repair

Release Date: 13.07.2024 Basic Start Date: 13.07.2024


Release Time: 09:50:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298545 Order No: 20188894 Description: forklift 501 hydraulic pipe
broken pls c
Functional P301-MTRDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 510N 1502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 13.07.2024 Basic Start Date: 13.07.2024

Release Time: 16:44:53 Basic End Date:

Employee Codes Employee Names Operation No Hrs

cCp- p _________________

Maintenance Department User Department


'
h Kirby Building Systems KSA

t
MAINTENANCE ORDER JOB TICKET

Date: 13.07.2024
Notification No: 100298264 Order No: 20188856 Description: cccd60 side loder front
tyre pucncher
Functional P301-POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Gouselazam Main Work Mechanical Maintenance


Responsible: Zainolabddin Halyal Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/TimE ____________________

0010 cccd60 side loder front tyre pucncher

Release Date: 13.07.2024 Basic Start Date: 11.07.2024

Release Time: 09:58:41 Basic End Date: I) '2- 9-


Employee Codes Employee Names Operation No Hrs

.eq ?yi-rt p.- k rctct.irc -

Maintenance Department User Department


Kirby Building Systems KSA
ii: MAINTENANCE ORDER JOB TICKET

Date: 14.07.2024
Notification No: 100298599 Order No: 20188919 Description: old blasting macroom
wall nd check
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
DatelTime DatelTims ______________________

0010 old blasting macroom wall nd check


____ ____________________________ _____

I4t1'2-4 !40'1.21-
'4c,hroo'n UaVo'h, _____ ______ ______ _______________

c/__J,/e4ecJ__1/ti ____ _____ _____ _____________

____ !4/w. c( (ty7 bairn ye


____ _____ _____ ____________

'3
Release Date: 14.07.2024 Basic Start Date: 14.07.2024

Release Time: 08:38:15 Basic End Date: ;4 "o7


Employee Codes Employee Names Operation No Hrs

77j)
________
S%fIi9a ___________
2ftn.

Maintenance Department User Department


Kirby Building Systems KSA
Krb1J MAINTENANCE ORDER JOB TICKET

Date: 15.07.2024
Notification No: 100298612 Order No: 20188965 Description: new blasting rn/c dust not
coming
Functional P301- FINIS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

pio new blasting rn/c dust not coming


____ __________________________ _____ /--oj. I1- .d7.z4 _______________

___
C/tnbrlt /ktilrnq '/r 'f ____ _____ _________________

__ Cli,,j,j_r',i_£hj%,r_ci ___ ____ ____ __________

__ Cleaned QJ ile4J _________ _________

___
f,//c' ci f,velc( £Vah d54 ____ _____ _____ ____________

Release Date: 15.07.2024 Basic Start Date: 14.07.2024

Release Time: 10:53:36 Basic End Date:


'o7" 20 -4
Employee Codes Employee Names Operation No Hrs

_______

Al C® 2-1,)
r

Maintenance Department User Department


Kirby Building Systems KSA
ulbAit... MAINTENANCE ORDER JOB TICKET

Date: 15.07.2024
Notification No: 100298614 Order No: 20188964 Description: 20f1 shearing machine
back side conveyor
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH- 0601

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

( Thoio 201t shearing machine back side conveyor


____ ________________________ _____

/.47.24 /4"bl"4
(.11)fl)1 Ch1Jc 9tok4g. _____ ___________ ______________

___
z M1io. ____________ __________

Release Date: 15.07.2024 Basic Start Date: 14.07.2024

Release Time: 10:53:02 Basic End Date:

Employee Codes Employee Names Operation No Hrs


________

'Vv,911 /Lun- / ",'


f. _____
INk1! _________
itt"

Maintenance Department User Department


Kirby Building Systems KSA
KrbjJ MAINTENANCE ORDER JOB TICKET

Date: 15.07.2024
Notification No: 100298673 Order No: 20188962 Description: old blasting dead mill
handle nd check
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA-

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time DateliimL ______________________

'QOlO old blasting dead mill handle nd check


I5-072t I&tTh-Vf
% ,/, t1/C /)C&4 i1On AboRt _____ ______ ______ _______________

_____ AJJ (RIDYL'nJ Ao ri/i, .) ________ _______


&oTplttcd -

____
']it, fr/o0dI Rjriho ' 14° _____ _______ ______ ________________

___ Uak _____ ______ _____ ______________

Release Date: 15.07.2024 Basic Start Date: 15.07.2024

Release Time: 10:49:57 Basic End Date: (5o7. 2i4


Employee Codes Employee Names Operation No Hrs

_________ ________________ ______________


firs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 15.07.2024
Notification No: 100298682 Order No: 20188961 Description: conrac 02 flange tacking
magunet not wor
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Electrical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timt ______________________

010 conrac 02 flange tacking magunet not wor


_____ _______________________________ ______

f&'t7.2 (5-O7"21 __________________

Nayro/fl4;!] .ckbe/ docun9&


___
Arn' Chain /nt tto&o c-/
____
f/mi 1h fl'W9/)vvfln196/ &9I _____ ______ ______ _______________

____ (9dl IAh'P Pope aJ12;n,hJ


-
_____ ______ ______ _______________

(hnkd t/c
Release Date: 15.07.2024 Basic Start Date: 15.07.2024

Release Time: 10:48:57 Basic End Date:


/5. O72o4
Employee Codes Employee Names Operation No Hrs

T !Tc7$t5' ______________ _____________ ______________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 15.07.2024
Notification No: 100298650 Order No: 20188963 Description: cccd6O side loder front
tyre pucncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ Date/Time DateiTimt___________________

cccd60 side loder front tyre pucncher


jOlO
lb 1/5 c k4A -a

Release Date: 15.07.2024 Basic Start Date: 15.07.2024

Release Time: 10:52:25 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.07.2024
Notification No: 100298755 Order No: 20189033 Description: EP502 back tyre puncher
nd repair
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

F Opr Description Status Start Compl Remarks


INo ____________________________________ _______
Date/Time Date/Time
5ooio
_____________________

EP502 back tyre puncher nd repair


3 g'0 / b

Release Date: 16.07.2024 Basic Start Date: 16.07.2024

Release Time: 12:08:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs

SX2c9 ¶ ___________________ __________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 16.07.2024
Notification No: 100298720 Order No: 20189034 Description: Fork Lift T302 Alternator
jam
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Fabrication Table- i


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______
Date/Time Date/Tim¬
0010 Fork Lift 1302 Alternator jam
__ ________________ ___

j!3 4?3 Ck&--

Release Date: 16.07.2024 Basic Start Date: 15.07.2024

Release Time: 12:10:12 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs

Maintenance Department User Department


Vwhi?k'I Kirby Building Systems KSA
I %fl.
MAINTENANCE ORDER JOB TICKET

Date: 16.07.2024
Notification No: 100298708 Order No: 201 89035 Description: purlin rn/c not working
properly
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Electrical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

010 purlin rn/c not working properly


L5.o12t I 5'1 24-

___ PMakd at fLpMl c' 4? uJ ____ _____ _____ _____________

+ i4de S?/7h4wa Lpoilinc' (emp&kci


'&p(nDcr! of C&c&jAok / ___- ______ _____ ______________

Release Date: 16.07.2024 Basic Start Date: 15.07.2024

Release Time: 12:10:47 Basic End Date:


1&o1 ao .-4-
.

Employee Codes Employee Names Operation No Hrs

________
iL II) _____________

( ___________
'Yv$iO__1tzafij- _________________ ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : O7.2024
Notification No: 100298957 Order No: 20189118 Description: Fork lift T501 readiator
replacing
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:53:40 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 17.07.2024
Notification No: 100298845 Order No: 201 89084 Description: Sheet mill D-coiler oil
leak
Functional P301 -SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: 11000130 Description: SHEETING LINE FOR KR & KW PROFILES

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 Sheet mill D-coiler oil leak


17.07.
C
. _______________________

___ JJ p4/1 Wafer %ok pa,rtd


____ '7'1t L't/0)e.__IPak ______ _______ ______ _________________

Release Date: 17.07.2024 Basic Start Date: 17.07.2024

Release Time: 09:22:24 Basic End Date:


/7 V7" 2024-
Employee Codes Employee Names Operation No Hrs
___________

/t/oH/D t1UU-ft ri;) / Ho


(

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: . .4
Notification No: 100298918 OrderNo: 20189114 Description: FORKLIFTCHANGE
TIRE EP1 001
Functional P301 -MTH DL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000659 Description: FORKLIFT EP 1OTON EP1 001
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:41:54 Basic End Date:

Employee Codes Employee Names Operation No Hrs

____________________ ___________
/3.

LI

ntenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 18.07.2024
Notification No: 100298934 Order No 20189115 Description: new blasting rn/c gate
lock nt wrkng
Functional P301- FINIS-SHOT2 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Dateffimc _____________________

0010 new blasting rn/c gate lock nt wrkng


____ _____________________________ _____
to7. lg.0-l'.24
r _________________

____ tbn lock. C/wed tdoj mipek,


q ovr c/ôcer A/Ul4& ___ ____ ____ __________

pnrJ 9 ___ ______ _________

____ eA,,._ n _____ ______ _____ ______________

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:42:46 Basic End Date:


1& 07.202+
Employee Codes Employee Names Operation No Hrs

5tflo5 flj) IFfY)

Maintenance Department User Department


Kirby Building Systems KSA
Kirb1' MAINTENANCE ORDER JOB TICKET

Date: 18.07.2024
Notification No: 100298967 Order No: 20189123 Description: plant-2 tab stn oxyacc
hose leake
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Fabrication Table- i


Responsible: Mohammed Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timt _____________________

0010 plant-2 tab stn oxyacc hose leake

C
!' O'"ipo /%tre ____ _____ ____ ___________

et]
£pah& e !)cnrijoiI

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 14:10:07 Basic End Date: I 07- tQlf


Employee Codes Employee Names Operation No Its

________ ______________ ____________

T Hdj

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.07.2024
Notification No: 100298858 Order No: 20189124 Description: Station B New FAB stn
OxyAcc set connect
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammed Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

0010 Station B New FAB stn OxyAcc set connect


/7'v7.2f /7V724 ______________

___ kie'o oen 41c/ciloi5/ //olcO


%i c-/. (/aih AMJi) ____ _____ _________________

Release Date: 18.07.2024 Basic Start Date: 17.07.2024

Release Time: 14:10:48 Basic End Date:


/7o7 2c241
Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date: 18.07.2024
Notification No: 100298956 Order No: 20189117 Description: Side loder body bolt
changing
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i


Responsible: Centre:
Tech ID:

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:53:07 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 18.07.2024
Notification No: 100298959 Order No: 20189120 Description: side Loder back left tyre
puncher
Functional P301- MTI-IDL- Description: FOIRKLIFTS
Location: FRLFT SI
Equipment No: 13000658 Description: PGRKIiFLFP TON i&P7O4
'a /
Plant Section: Person Zeeshan Ahmed Main Work Fabrication Table- i
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______

Date/Time Date/Time ____________________

0010 side Loder back left lyre puncher


C, __________________ 91c /7-'z-cj,
______________________ ____ ________
CLt

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:57:08 Basic End Date:

Employee Codes Employee Names Operation No Hrs

A5 _______________

c-Y39/

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 18.07.2024
Notification No: 100298950 Order No: 20189116 Description: Gbending machine slow
down pls
Functional P301- CFORM- Description: PRESSES AND PRESS BRAKES CF -

Location: PRESS
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Time ______________________

M010 Gbending machine slow down pls


_____________________ ___
/cc07.24 ktr7.24 __________

___
N)t! iJv upc3 dvao. ____ _____ _____ _____________

___ Chnbj -ftQ k4i4 Jaiin c) ____ _____ _____ ____________

____ O; e!t!. 'htt-hd-W


_____
e.eJ Citrcij&fboc) Cio'ng
I
______ ________ _______ __________________

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:52:25 Basic End Date: " LØI_4.

Employee Codes Employee Names Operation No Hrs

_________ 4naoL (10 4-.111) *0724-


1< f&i) '

_________ ______________ _____________


__(rfi)
flnan a' _______________
L f/i) rj7.

____________________
(5';) 2 IIYJ 2V7.?4

4a1 4ud4.1 QJ 17r0ujb) Ow ri-v koanct Q

cjtt tvtc çA boil j thtt4ok.

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET
4
Date: tO.07.2024
Notification No: 100298958 Order No: 20189119 Description: side Loder back tyre
changing
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EEJ TON EEDA. S i4
-
£eh4
goof
Plant Section: Person Rajendran Main Work Fabrication Table- i
Responsible: Thottupurath Centre:
Tech ID:

Release Date: 18.07.2024 Basic Start Date: 18.07.2024

Release Time: 11:56:06 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 8-.O7.2o24
Notification No: 100299315 Order No: 10127537 Description: EP-701 FORKLIFT
TYRE PUNCHER
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TON EP7O1
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Release Time: 12:29:30 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :
Notification No: 100299332 Order No: 20189308 Description: side loader oil & greece
nd to change
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT £'dc toc%,a éoo/
Equipment No: 13000656 Description: FORKLIFT hfm-Ij--H

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Release Time: 17:55:18 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 22.07.2024
Notification No: 100299229 Order No: 20189266 Description: nigara stopper not
working properly
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time DateITim _____________________

0010 nigara stopper not working properly


___________________________ 2.D7.1- 1241-
C ____ _____

_____
,4, Aloi (Alhtkicø _______ ________ ________ _____________________

'C 'Th nnt'C1'/ (ompw-u4..

e/. c( /Ptitt /h, _____ ______ ______ ______________

___ &m cW ci /?iii O'rn,tnl _____ _____ _____________

Release Date: 22.07.2024 Basic Start Date: 22.07.2024

Release Time: 16:08:47 Basic End Date: 22'o7. ojyA


Employee Codes Employee Names Operation No Hrs

______________
4th -/i(r//), ____________________
-
U"

<7

Maintenance Department User Department


Kirby Building Systems KSA
flu
MAINTENANCE ORDER JOB TICKET

Date : 22.07.2024
Notification No: 100298978 Order No: 20189259 Description: linel tacking
infeedconyevor not
Functional P301-BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work C071RAC -1


Responsible: Rajan Centre:
Tech ID:
1

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Time ______________________

0010 mel tacking infeedconyevor not working


C
gvi2 QI -.

____ (3,lpti.urn chin rpktr) .mua


___

11w eL) ci rfh tn ,rj/ _____ _____


flxkii-
fink,
I'
___

____ ____ ___________

Release Date: 22.07.2024 Basic Start Date: 18.07.2024

Release Time: 16:00:14 Basic End Date: ig .u .9g24


Employee Codes Employee Names Operation No Hrs

_______
$4)JtJ __________

(thi
________ __________________________

!fr,l
(

Maintenance Department User Department


Kirby Building Systems KSA
Kb4' MAINTENANCE ORDER JOB TICKET

Date : 22.07.2024
Notification No: 100299216 Order No: 20189265 Description: conrad entry side roller
not working
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Sibin John Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID: KJAWL-oi

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrad entry side roller not working


____ _____________________________ _____

22.o1.1. Q.'tc7.a4- _________________

r
£n4y p!/,x (ThoJo (tnt flu] _____ ______ _____ ______________

-)nlflPfl iAi C1tdnc( zhe'J


____ c'c ci bs _____ ______ ______ _______________

___ c/ cA&0' t/c ____ _____ _____ _____________

Release Date: 22.07.2024 Basic Start Date: 22.07.2024

Release Time: 16:07:50 Basic End Date: 2 2.


Employee Codes Employee Names Operation No Hrs

__________ ________________ _______________


r_4'

Maintenance Department User Department


Kirby Building Systems KSA
t%:Ii
MAINTENANCE ORDER JOB TICKET

Date: 22.07.2024
Notification No: 100299151 Order No: 20189263 Description: scm system problem

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 scm system problem


2,.o7"2- Q- I'o7.2-
r
________________
____ ____________________________ _____

__ ,P ;cf. ___ _______ _________

/ek

Release Date: 22.07.2024 Basic Start Date: 21.07.2024

Release Time: 16:05:34 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________
Hthd Hu// _____________
Ji it''

Maintenance Department User Department


Kirby Building Systems KSA
Kwb ; MAINTENANCE ORDER JOB TICKET

Date : 22.07.2024
Notification No: 100299068 Order No: 20189262 Description: band saw bladedown
problem
Functional P301-CFORM- Description: SAW-SLITTERS-SHEARS CF -

Location: SHEAR
Equipment No: Description:

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/TimE. ______________________

0010 band saw bladedown problem

____ (Aak4 Cf tiitd ti _____ _______ ______ _________________

Release Date: 22.07.2024 Basic Start Date: 20.07.2024

Release Time: 16:03:33 Basic End Date: 20


Employee Codes Employee Names Operation No Hrs

5tvC)

C.

Maintenance Department User Department


Kirby Building Systems KSA

Kirbjj MAINTENANCE ORDER JOB TICKET

Date : 22.07.2024
Notification No: 100299055 Order No: 20189261 Description: onrac2 outfeed roller
down problem
Functional P301- BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CON RAC -1
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time Date/Timc _____________________

0010 conrac2 outfeed roller down problem


C ________ ______________________

Chakul e/ Rp4. f
?JMDUer1 rlht huh e4
__
hv'&c/ i,trJt4tit ___ _______________

____
Jtijgf &4h 9W .c' I ftôo _____ ______ ______ _______________

[7aèkC/C/iUk.tOt
Release Date: 22.07.2024 Basic Start Date: 20.07.2024

Release Time: 16:01 :57 Basic End Date; ')Do1. ao4


Employee Codes Employee Names Operation No Hrs

__________________
(fl) ___________

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 22.07.2024
Notification No: 100298839 Order No: 20189260 Description: sheet mill uncoiler not
working
Functional P301-SHEET- Description: SHEETING LINES
Location: RLFRM
Equipment No: 11000130 Description: SHEETING LINE FOR KR & KW PROFILES

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______ Date/Time Date/Time. ____________________

0010 sheet mill uncoiler not working


__________________ ___

7 O3- cz __________

çJt,.j,'/) tincv;/ti ____ _____ _________________

&'haF OUI ,nyyQd


ge
_____ ______ ______ _______________
____

c-fM Mx c( h.t7ni
____
* maA,kn*n& ci bnmon4;n. I I
_____ ______ _____ ______________

Release Date: 22.07.2024 Basic Start Date: 19.07.2024

Release Time: 16:01:06 Basic End Date: O3' cc

Employee Codes Employee Names Operation No Hrs

________ ____________
Q5) I ppr' /t67'a024
r
"1_________
L 2I8/AI S OOZQ24

_________ ______________
(1) O3ot2oq_
_________

'1wkc4 () 2W

'®'St & 7ay/°td 4¬SIhDY sI/ bu+AM-fflblL


#0
c/ tptha Gm#- &wL flsiemth r/zt bz
fl1i cjcliain flixd hcuL (91! &,1/esl,
Qe
i\-Lok ms-' bqci fjo(td

Maintenance Department User Department


Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date : 23.07.2024
Notification No: 100299312 Order No: 20189293 Description: EP502 back tyre punchet
nd repair
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON 1502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Release Time: 11:42:33 Basic End Date:

1 3o
I

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 23.07.2024
Notification No: 100299293 Order No: 20189294 Description: FORKLIFT H704 FOR
GREASING
Functional P301 -MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000658 Description: FORKLIFT EP 7 TO
fl 3.-ta Lt.
Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance
Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ ______

Date/Time Date/Time ____________________

0010 FORKLIFT H704 FOR GREASING


_____________________ ___ ____

9/co __________

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Release Time: 11:44:10 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______
N _________
la-U

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 23.07.2024
Notification No: 100299316 Order No: 10127538 Description: CONRAC AUTO WELD
GROUND SHOE
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bays Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compi Remarks


No ____________________________________ _______ Date/Time Date/Time _____________________

0010 CONRAC AUTO WELD GROUND SHOE


_____ FABRICATION _______ ________ ________ ____________________

0d 9/we outJ Qt ___________________

fipJoJ. _______ ______________

__
S'& 2Kfo Aiokt9
/
Q1 ___________________

___
!fla_ Oruad 2hoQ 4iV°' ____ ____ ____ ___________

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Ref ease Time: 12:31:27 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Aftwibt/uf!g.
1'

q jakt d fttn 9' f/ chi'fc

Maintenance Department User Department


Kiruy,
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 23.07.2024
Notification No: 100299314 Order No: 20189304 Description: conrac2 infeed conveyor
problem
Functional P301 -BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: 16000959 Description: CONRAC AUTO BEAM WELDER LINE

Plant Section: Bldg A Bay 3 Person Mohammad Sahbaz Main Work CONRAC -i
Responsible: Mohammad Jahagir Centre:
Tech ID: KJAWL-01

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 conrac2 inteed conveyor problem

C
___ (Mean flIaO muQc/ rIño ____ _____ _____ ____________

__ c&*cf (Mnnp&d
___

c2Pi, kid ott ____ ________ ___________

Release Date: 23.07.2024 Basic Start Date: 23.07.2024

Release Time: 17:03:00 Basic End Date: -3 b''


20)-I-

Employee Codes Employee Names Operation No His

______ JA/ ___________________

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 26.07.2024
Notification No: 100299501 Order No: 20189429 Description: prepartion forklift
puncher
Functional P301- MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA STON T502
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description

0010

Release Date: 26.07.2024 Basic Start Date: 25.07.2024

Release Time: 10:11:05 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
Kirb''
Ytti MAINTENANCE ORDER JOB TICKET

Date : 24.07.2024
Notification No: 100299383 Order No: 201 89360 Description: old blasting dead mill
handle & port nd
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ______________________________________ _______ Date/Time DatelTimc. ______________________

0010 old blasting dead mill handle & port nd


________ ______________________

(1ad Don _____ ______ _____ ______________

fjtç/
7e,kdey ipaioth41'n4c
___ I4vw__ci_&lalli,g__Hoyqi ____ _____ _____ _____________

Release Date: 24.07.2024


J
c/ tatw p(a&-'
Basic Start Date:
-

24.07.2024

Release Time: 14:32:41 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_______ ____________
(ID ____________

5Wo5 ______________ _____________


f,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 24.07.2024
Notification No: 100299395 Order No: 20189338 Description: onrac2 flange roller not
working
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Binu Valayil Veedu Main Work CON RAG -1
Responsible: Rajan Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Timc. _____________________

0010 onrac2 flange roller not working


24v1'2 V° "

C
___ _______________________ ____

F/cnje )'QffL W dowo ____ _____ _____ _____________

___
A/pd- LA./ovkhj H(Ib (7W ____ _____ _________________

__
Cf &vtØ V
___________________

Release Date: 24.07.2024 Basic Start Date: 24.07.2024

Release Time: 14:31:59 Basic End Date:

Employee Codes Employee Names Operation No Hrs

________ _____________
() _____________

_________ ______________ _____________


2 i-rn -

rid N1Ce 6w fr00J.


Nrnor17 q-tu h hr-. Cf 1$Ju
q i

Maintenance Department User Department


Kirby Building Systems KSA

KwbIJ MAINTENANCE ORDER JOB TICKET

Date : 24.07.2024
Notification No: 100299412 Order No: 20169361 Description: sanli 6 mtr hold down
problem
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______ DatelTime DateITim6 _____________________

0010 sanli 6 mtr hold down problem


cm ____ _____________________________ ______
t4.o79zv. _________________

?!) J&f)CU741. NVTO' Co 7ctt /1y,


k1ik c,/ 7 kd ______________________

24; (Mid O ______________________

Release Date: 24.07.2024 Basic Start Date: 24.07.2024

Release Time: 14:36:00 Basic End Date:

Employee Codes Employee Names Operation No Hrs

- I) 1 P

(!i)

Maintenance Department User Department


N
- Kirby Building Systems KSA
%iJ
MAINTENANCE ORDER JOB TICKET

Date : 26.07.2024
Notification No: 100299433 Order No 20189430 Description: sanli 4 meter back side
sloper bolt brok
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment Nq: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Tawfeeq Shakir Main Work Mechanical Maintenance


Responsible: Shaikh Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______ Date/Time Date/Timc ______________________

9010 sanli 4 meter back side sloper bolt brok


___ ___________________________ _____ 'pt %2pC tZc '4AiLt°

flvthkt
____ _____________________________ ______ _______ ______

Release Date: 26.07.2024 Basic Start Date: 24.07.2024

Release Time: 10:12:12 Basic End Date:

Employee Codes Employee Names Operation No Hrs

_________

c1gu _______________ ________________

Maintenance Department User Department -


Wirfrnfl Kirby BuUdki Systams KSA
'fl
MAINTENANCE ORDER JOB TICKET

Date: 26.07.2024
Notification No: 100299433 Order No: 20189430 Description: sanli 4 meter back side
stoper bolt brok
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000270 Description: SANLI SHEAR 6 x 6000

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 sanli 4 meter back side stoper bolt brok


____ __________________________ ____

..2.o7.24. 24.cl.2t-
1
PVZL9 p4i9nI74tO

- _...t_ - ____________ ____________________ ___________________ _____________________________________

Release Date: 26.07.2024 Basic Start Date: 24.07.2024

ReleRse rime: 10:12:12 Basic End Date: .2..


Employee Codes Employee Names Operation No Hrs .

_____________

flAI *11-IA! __________________

/ .4ty
/

Maintenance Departjnen User Department


WirhWl
%.rt
Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 27.07.2024
Notification No: 100299622 Order No: 10127607 Description: 55 work for near plant #
2 cleaning work
Functional P301- BLDGS- Description: 55 METHODOLOGY ACTIVITIES
Location: SSMET
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 5S work for near plant #2 cleaning work


C,. _____ ______________

*i Qnap '144&aJ ____ _____ _________________

4/ r9at/vny .*i1c. tJ9l 4ht _____ ___________ ______________

___
£ 4h 4 orci ____ _____ _____ ____________

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: ti:46:10 Basic End Date: o7.


Employee Codes Employee Names Operation No Hrs

,5AJt/ __________
Cwn
1ninD ________________ __________________

Maintenance Department User Department


jr __ Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 27.07.2024
Notification No: 100299604 Order No: 20189464 Description: 208 shear hold down
prob
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: 15000265 Description: BIG SHEAR PACIFIC 750R 20

Plant Section: Person Mohid MuIIa Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID: KJSH-0601

Opr Description Status Start Compi Remarks


No ______________________________________ _______
Date/Time Date/TimE. ______________________

0010 201t shear hold down prob


1
___ ______________________ ____

21.i7 9-141-21 _____________

l4ilti 00 ____ _____ _____ ____________

___ 6;! 194k ; 2p/ane/ r/hi phtJ (?anpo*A -

jock, &inktr)vk ___________________

Release Date: 27.07.2024 Basic Start Date: 27.07.2024


Release Time: 08:53:31 Basic End Date: 2. 151 202_4
Employee Codes Employee Names Operation No Hrs

_______

&IAi cii __________ (frh

Maintenance Department User Department


Kirby Building Systems KSA
srbMAINTENANCE ORDER JOB TICKET
Date : 27.07.2024
Notification No: 100299631 Order No: 20189488 Description: EP1001- REPLACE
NEW TIRE
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 27.07.2024 Basic Start Date: 27.07.2024


Release Time: 15:39:26 Basic End Date:

Employee Codes Employee Names Operation No Hrs

çç __________ _________ __________

Li ______________

Maintenance Department User Department


Kirby Building Systems KSA
.JI
MAINTENANCE ORDER JOB TICKET

Date: 27.07.2024
Notification No: 100299630 Order No: 20189483 Description: Forklift EP1 001 change
stud
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 Forklift EP1001 change stud

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 15:34:52 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


,gr
ma Kirby Building Systems KSA
ru ".uva
MAINTENANCE ORDER JOB TICKET

Date : 27.07.2024
Notification No: 100299645 Order No: 201 89487 Description: old blasting air coming
out nd check
Functional P301- FINIS- BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA -

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
Date/Time Date/Time _____________________

0010 old blasting air coming out nd check


____________________________ 9-j. o72 c2- .157.rýi
(
________________

w
___ _____

tit
jjpJ*ic C., J,tnød r!ht 'igiu, Qo¬npk44.

_____ 41 ______ _______ _______ _________________

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 15:44:39 Basic End Date: O7" 2oj_.

Employee Codes Employee Names Operation No Hrs

_________
_____________________________

Maintenance Department User Department


C)

Kirby Building Systems KSA

U MAINTENANCE ORDER JOB TICKET

Date : 27.07.2024
Notification No: 100299621 Order No: 10127606 Description: New wall Gate no#2
fabrication work
Functionafr P301- UTLTY-MAIN2r Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person Suresh Chekala Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Timc ____________________

0010 New wall Gate no#2 fabrication work

___________ *

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 10:43:26 Basic End Date:


(3 e& '2-'i
m!L4aIq1
[4Lthe'L4I F;1 I tPflfl

efl'I Si

Iflhi

see ¬0
.5 .t Lou

HO Ii
r,O
) LD- t&
Maintenance Department User Department
-
,
rn4t7'

-
4 CJIJ

4n1V
-II i-'
r Cfl' '-C

(I

/ -

h'4
17- Ok- ALl
(I r
,,

2Ln1L1

it
H
(2-6&- 4d°
0 -
1/
,4id'o
/(,L2fl1& I' I,
Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.07.2024
Notification No: 100299603 Order No: 20189462 Description: scm pipe brkdw

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/TimE. ______________________

0010 scm pipe brkdw


2-1D7.z
C -

L14bnmfrvo rprpo I _____ ___________ _____________

r$
'lxpe p/eeed
____
R10e1 ,'pe _____ ______ _____ ______________

'"I

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 08:51 :25 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 27.07.2024
Notification No: 100299620 Order No: 10127605 Description: Plant 2 root sheet
installation work
Functional P301- UTLTY-MAINT Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section: Person GuI Mohammed Main Work Mechanical Maintenance


Responsible: Khan Centre:
Tech ID:

Description Remarks

0010

Ivy

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 10:41:26 Basic End Date:

'5 oo

'&Nrg /-

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: 27.07.2024
Notification No: 100299619 Order No: 10127604 Description: Plant2 lOTon Crane
Installation work
Functional P301- UTLTV-MAINT Description: MAINTENANCE EQUIPMENTS
Location:
Equipment No: Description:

Plant Section; Person GuI Mohammed Main Work Mechanical Maintenance


Responsible: Khan Centre:
Tech ID:

Release Date: 27.07.2024 Basic Start Date: 27.07.2024

Release Time: 10:36:22 Basic End Date:

Employee Codes Employee Names I Operation No I Hrs


Si.2cs. £UREcN U/7/2e2.9 H
G2LJNA
SHigA3q14L.
2eN/i. flDaL GRAD 8/2
RE4vffl 13ko141
_______
steitq __________

/?PNT1 ASDUL
________ 86'oLAEEiIIIIfl ___

Maintenance Department User Department


" Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date: .07.2024
Notification No: 100299741 Order No: 20189563 Description: t302 forklift rear lyre
puncher
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000688 Description: FORKLIFT TOYOTA 3 TON T302
-

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Remarks

0010

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:05:09 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :&Q.07.2024
Notification No: 100299803 Order No: 20189567 Description: EP1001- REPLACE
NEW TIRE
Functional P301-SHIPG Description: SHIPPING
Location:
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Description
")1!iiri 'taI.
0010

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:11:50 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______
2tpf)kt, _________ __________

Maintenance Department User Department


Kirby Building Systems KSA
I MAINTENANCE ORDER JOB TICKET

Date : eo.07.2024
Notification No: 100299746 Order No: 10127659 Description: EP502 back tyre punchei
nd repair
Functional P301-MIHOL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502
-

Plant Section: Person Zeeshan Ahmed Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

0010

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:07:52 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
ur MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299759 Order No: 20189566 Description: scm lub pipe breake

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:10:44 Basic End Date: ZB O12o4


Hrs

II)

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299744 Order No: 20189564 Description: korpleg rn/c stopper nut
loose nd check
Functional P301- OTAIL Description: DETAIL SECTION
Location:
Equipment No: 12000292 Description: Korpleg Punching Machine -1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Ok

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:07:24 Basic End Date: 28 o7 2oi.

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299753 Order No: 20189565 Description: conrac2 head problem

Functional P301- BUILT- Description: BEAM WELDING LINE-2


Location: AWLIN-BMWO2
Equipment No: 16000960 Description: PHI AUTO BEAM WELDER LINE

Plant Section: Person Sibin John Main Work CONRAC -1


Responsible: Centre:
Tech ID: KJAWL-02

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time ____________________

0010 conrac2 head problem


___ ________________________ _____
2st51.2sl 29u012j ______________

____
(pp F/gad try] Rv/I Ioo9°
o _____ _______ ______ ________________

c/ P1h 1)n-rye [/fld Amou 1 ______ _____ ______________

S' Ryi -Ia mQlqka,peg _______ ______________

___ 'firn0io(1flt
,q1,br- & &ijc ____ _____ ____ ___________

Release Date:
(?xu. bzk
29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:08:51 Basic End Date: O1


Employee Codes Employee Names Operation No Hrs
5cfo5 A& 12Th 5 ç H))
_________ ______________ (Th) ______________

__________ ________________ _______________


IIV
_________
fl-nm _____________ ______________

'-/akt J1L4 AJtO 8uhu f,xcci hack- "j)a. ed chsk4 )tu

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299769 Order No: 20189569 Description: conrac 01 flang lifting
upnot working
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:14:01 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299829 Order No: 20189580 Description: T502 hydrulic pump nd
change
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: 13000672 Description: FORKLIFT TOYOTA 5TON T502 -

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time. ____________________

0010 T502 hydrulic pump nd change


____________________

r:oz, lYd.ttjJ(
6?eSa-t ('A.a3

__________________________

po2e. c

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:26:14 Basic End Date:

a
4,

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299766 Order No: 20189568 Description: 7 ton forklift tyre
replaicement
Functional P301-MTHDL- Description: FORKLIFTS
Location: FRLFT
Equipment No: Description: 19 7b tj
Plant Section: Person Rajendran Main Work iviechanical Maintenance
Responsible: Thottupurath Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 28.07.2024

Release Time: 16:12:44 Basic End Date:

Employee Codes Employee Names Operation No Hrs

ý2391 __________ ___________________

S3 ?i ___________________

Maintenance Department User Department


"h Kirby Building Systems KSA
"
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299771 Order No: 20189570 Description: conrac 02 conveyor
chain broken pls chec
Functional P301- BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Description Remarks

0010

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:14:33 Basic End Date:

Employee Codes Employee Names Operation No Hrs

Maintenance Department User Department


Kirby Building Systems KSA
ir MAINTENANCE ORDER JOB TICKET

Date: 29.07.2024
Notification No: 100299786 Order No: 20189572 Description: conrac 01 b side press
wheel not work
Functional P301- BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Electrical Maintenance


Responsible: Centre:
Tech ID:

0010

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:19:29 Basic End Date: o7 2024

Employee Codes Employee Names Operation No Hrs

C) _____________

Maintenance Department User Department


Kirby Building Systems KSA
& MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299789 Order No: 20189573 Description: old blasting dead mill
handle & port nd
Functional P301- FlNlS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA
-

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Remarks

0010

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:20:04 Basic End Date: 2'/ o7 2aa


Employee Codes Employee Names Operation No Hrs

__________ ________________
1) frn
iJ) / H''

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299793 Order No: 20189574 Description: conrad entry side
ground shoe problem
Functional P301-BUILT-AWLIN Description: AUTOWELDING LINES
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:20:36 Basic End Date: 2'y 6/ 2024

Employee Codes Employee Names Operation No Hrs

_______________ _______________________

C) /J4))
________ ____________

(7 / >LH

Maintenance Department User Department


Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299795 Order No: 20189575 Description: conrac 02 vacum motor
not working
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work CONRAC -1


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No __________________________________ _______

Date/Time Date/Timc ____________________

0010 conrac 02 vacum motor not working


_________________________ _____

290124 QcJ.0f24. _______________

jacwn AJ4 (4hrL' (J'4/


____ 'Rnud 1 kJcwruvn icit,k ltlki _____ _______ ______ ________________

QJ_C_PonI__cJ_ov4u1-tht_°-tt _____ ______ ______ _______________

_____ !-kce_ ______ ________ _______ __________________

Release Date: 29.07.2024 Basic Start Date: 29.07.2024


Release Time: 16:21:06 Basic End Date: 2 o-j. 2o)4
Employee Codes Employee Names Operation No Hrs
_________
S7i8,,j__TJw,) _____________ ______________

________________

.? frffl
3

VJtcUtT) -fcink C- 1PQAtd cj $mDuec) -1hz Pü c

Maintenance Department User Department


w Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299805 Order No: 20189577 Description: nigara stopper plate
need to fix
Functional P301-SHEAR Description: SHEARING SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 29.07.2024


Release Time: 16:21:33 Basic End Date: 2c cyj 2W4
.

Employee Codes Employee Names Operation No Hrs


________

Bu CD _____________

Maintenance Department User Department


Kirby Building Systems KSA
' MAINTENANCE ORDER JOB TICKET

Date: 29.07.2024
Notification No: 100299806 Order No: 20189578 Description: purlin D-coiler brake not
working
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:23:15 Basic End Date:

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299817 Order No: 10127661 Description: purlin D-coiler fiber roller
need to cha
Functional P301-CFORM- Description: PURLIN LINE
Location: PURLN
Equipment No: Description:

Plant Section: Person Anto Victor Main Work Mechanical Maintenance


Responsible: Purification Centre:
Tech ID:

Release Date: 29.07.2024 Basic Start Date: 29.07.2024

Release Time: 16:24:14 Basic End Date: 2fl 07


Employee Codes Employee Names Operation No Hrs

_____________ ________
(F/si

Maintenance Department User Department


Kirby Building Systems KSA
"

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299614 Order No: 201 89583 Description: angle punch mc balde
problem
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______
Date/Time Date/Time____________________

0010 angIe punch mc balde problem


21oT242i07M _____________

p)

;2i14) pn5lp TL02a -i E/ _________ _______________

__ '&r)oupJ iha t?ctth 1?bXLK


___ Jo mnin)eflent, c?/
flu pacbng ?J?,ckI. jt, 4 ________ ____ ___________

J 8QQL ('hnkzd tic


Release Date: 29.07.2024 Basic Start Date: 27.07.2024

Release Time: 16:27:47 Basic End Date:


21 o7. 2024

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 29.07.2024
Notification No: 100299628 Order No: 20189582 Description: punching machine bolt
loose
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work CONRAC -1


Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start compl Remarks


No __________________________________ _______

DateiTime Date/Time ____________________

0010 punching machine bolt loose


2o7.z.q Q-'l-ol 2J _____________________

PoP Cf 77hkcL
-

____
JhD ,9-( PD!;! c[. eainp&i d
____
Pcich. 4?r4 Qaurcl 211 IDace _____ ______ ______ ______________

cI,p)etmrf liv 8b/4 ___ ____ ____ __________

Release Date: 29.07.2024 Basic Start Date: 27.07.2024


Release Time: 16:27:13 Basic End Date:

LTh'L4as!w Em " lo cc Names

Maintenance Department User Department


Kirby Building Systems KSA
U MAINTENANCE ORDER JOB TICKET

Date 29.07.2024
Notification No: 100299822 Order No: 20189579 Description: htc die change bolt loose

Functional P301- DTAIL Description: DETAIL SECTION


Location:
Equipment No: 12000296 Description: USI MECHANICAL PRESS MACHINE

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Ajak4c1 f,ad. ('I


14/e/' /['li 'kt-
Release Date: 29.07.2024 Basic Start Date: 29.07.2024
D/e
Release Time: 16:25:34 Basic End Date: 2q oi

ChQvb- d 0k

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 30.07.2024
Notification No: 100299896 Order No: 20189621 Description: old blasting report
cuppling & ball dama
Functional P301- FINIS-BLAST Description: GRIT BLASTING MACHINES
Location:
Equipment No: 12000299 Description: GRIT BLAST MACHINE DISA
-

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Release Date: 30.07.2024 Basic Start Date: 30.07.2024

Release Time: 13:37:30 Basic End Date:


Z.02-4-

Maintenance Department User Department


Kirby Building Systems KSA
Kwb MAINTENANCE ORDER JOB TICKET

Date : 30.07.2024
Notification No: 100299882 Order No: 20189606 Description: pedding hosepunch
holder problem
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000036 Description: PEDDINGHAUS PUNCH PRESS # 1

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______
DatelTime Date/Timc. ____________________

0010 pedding hosepunch holder problem


____________________ ___

3°51t goo7rz __________

(
___

i' ThicLr / ___ ____ ____ ___________

Ftp/ond th /r4/c/si _________________

9/C&dLdck

Release Date: 30.07.2024 Basic Start Date: 30.07.2024

Release Time: 09:00:38 Basic End Date:


3v 07' 2i2-t9--
Employee Codes Employee Names Operation No Hrs

___________
(Ti9 2M-
___________ __________________ _________________
2 i-in

Maintenance Department User Department


Kirby Building Systems KSA
I %tt
MAINTENANCE ORDER JOB TICKET

Date: 30.07.2024
Notification No: 100299859 Order No: 20189607 Description: conrac 01 press
weelmotor chain broken
Functional P301-BUILT- Description: BEAM WELDING LINE- i
Location: AWLIN-BMWO1
Equipment No: Description:

Plant Section: Person Mohid Mulla Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ______________________________________ _______
Date/Time Date/Timc. ______________________

0010 conrac 01 press weelmotor chain broken


3vt'H 't74
Jri &thr, I
CSh r' 970& ____ _____ _________________

__
'moQeCT Cf f,iJ /y ___________________

Release Date: 30.07.2024 Basic Start Date: 30.07.2024

Release Time: 09:01:15 Basic End Date:

Employee Codes Employee Names Operation No Hrs

'lam o "/L/LL4 ______________


/ It"

Maintenance Department User Department


Kirby Building
KtrbIJ
Systems KSA

MAINTENANCE ORDER JOB TICKET

Date: 30.07.2024
Notification No: 100299842 Order No: 20189608 Description: new blasting hose
damage nd check
Functional P301- FlNlS-SHOT2 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No ____________________________________ _______ Date/Time DateITim6 ____________________

0010 new blasting hose damage nd check


__ ____________________ ____ 2io724 2a°T'4 ____________

bvrn Hoc,° 0?p/and cf


__
dAi&d_Ok. ___________ _________

Release Date: 30.07.2024 Basic Start Date: 29.07.2024

Release Time: 09:01:47 Basic End Date:


07. (n
Employee Codes Employee Names Operation No Hrs

97%o5_______________________________
I 72-

Maintenance Department User Department


Kirby Building Systems KSA
irk
MAINTENANCE ORDER JOB TICKET

Date : 31.07.2024
Notification No: 100300013 Order No: 20189672 Description: conrac 01 B side press
weel not working
Functional P301-BUILT- Description: BEAM WELDING LINE-i
Location: AWLIN-BMW01
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

0010

Release bate: 31.07.2024 Basic Start Date: 31.07.2024

Release Time: 16:19:06 --


Basic End Date: 3 072t2f

Iflu
/frjn

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31.07.2024
Notification No: 100299986 Order No: 20189656 Description: conrac 02 conveyor
chain broken pls chec
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Sibin John Main Work Mechanical Maintenance


Responsible: Centre:
Tech ID:

Release Date: 31 .07.2024 Basic Start Date: 31.07.2024

Release Time: 09:41 :33 Basic End Date:


31 07 Zc1)4

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date :31.07.2024
Notification No: 100299960 Order No: 20189657 Description: old blasting dead meal
hose problem
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

ReleaseDate: 31.07.2024 Basic Start Date: 31.07.2024

ReleaseTime: 09:42:13 Basic End Date:


3 f7 aoal-
Employee Codes Employee Names Operation No Hrs

__________ KZhhai_ 1) _________________

________ __________________________
21/i)
1)
/ 1'/l
___________

Maintenance Department User Department


Kirby Building Systems KSA
ir
MAINTENANCE ORDER JOB TICKET

Date : 31.07.2024
Notification No: 100299987 Order No: 20189660 Description: scm shearing write angle
problem
Functional P301- DTAIL Description: DETAIL SECTION
Location:
Equipment No: 14000039 Description: AUTO LINE OF FLAT BAR/PLATE PUNCH& SHEAR

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Release Date: 31.07.2024 Basic Start Date: 31.07.2024

ReleaseTime: 09:50:21 Basic End Date: t%7 .O'7

- Zt/o

Maintenance Department User Department


Kirby Building Systems KSA
MAINTENANCE ORDER JOB TICKET

Date : 31.07.2024
Notification No: 100299965 Order No: 20189671 Description: Side loader s16002 back
tyre puncher
Functional P301- POWER- Description: POWER TOOLS ELECTRICAL
Location: ELECT
Equipment No: Description:

Plant Section: Person Rajendran Main Work Mechanical Maintenance


Responsible: Thottupurath Centre:
Tech ID:

Release Date: 31.07.2024 Basic Start Date: 31.07.2024

Release Time: 16:17:57 Basic End Date:

Employee Codes Employee Names Operation No Hrs

______ ___________________
is

Maintenance Department User Department


Kirby Building Systems KSA
'to ij
31St MAINTENANCE ORDER JOB TICKET

Date :31.07.2024
Notification No: 100299947 Order No: 20189659 Description: conrac 02 drive side
roller not working
Functional P301-BUILT- Description: BEAM WELDING LINE-2
Location: AWLIN-BMWO2
Equipment No: Description:

Plant Section: Person Binu Valayil Veedu Main Work Mechanical Maintenance
Responsible: Rajan Centre:
Tech ID:

Opr Description Status Start Compi Remarks


No ____________________________________ _______

Date/Time Date/Time _____________________

0010 conrac 02 drive side roller not working


_____

!.cJt2k cSl'01'2f ______________

bej.

Release Date: 31.07.2024 Basic Start Date: 31 .07.2024

Release Time: 09:43:19 Basic End Date:


3/'o7 292±
Employee Codes Employee Names Operation No Hrs

_________________ _________
7Th
_________ ______________ _____________

/_/fr1

Maintenance Department User Department


Kirby Building Systems KSA

MAINTENANCE ORDER JOB TICKET

Date : 31.07.2024
Notification No: 100299961 Order No: 20189658 Description: new blasting one port
problem
Functional P301- FlNlS-SHOT1 Description: SHOT BLASTING MACHINES
Location:
Equipment No: Description:

Plant Section: Person Mohammad Sahbaz Main Work Mechanical Maintenance


Responsible: Mohammad Jahagir Centre:
Tech ID:

Opr Description Status Start Compl Remarks


No __________________________________ _______ Date/Time Date/Timc ____________________

0010 new blasting one port problem


___ __________________________ _____ 310124- 8167 2.j- ______________

___ AJauBfh IVP flo)) chu ____ _____ _____ _____________

___ M/& fl ppedy c/ ____ _____ _____ ____________

____

EIuJ fit Aiii1 tili ci _____ ___________ _____________

____ ____ ____ ___________

___

C/ c/ewS C'! /Vk' T'xai / chud e&


Release Date: 31.07.2024 Basic Start Date: 31.07.2024

Release Time: 09:42:49 Basic End Date: 3 7 2.Q24


Hrs

el

I 'It

Maintenance Department User Department

You might also like