0% found this document useful (0 votes)
21 views57 pages

Abstract

The document is an abstract of an estimate detailing various civil works for a construction project, including foundation, concrete, masonry, doors and windows, flooring, finishing, painting, and miscellaneous works. Each section lists specific tasks, materials, and units of measurement required for completion. The estimate also includes additional work for play fields, gates, fencing, toe walls, and road construction.

Uploaded by

musicraj1478
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views57 pages

Abstract

The document is an abstract of an estimate detailing various civil works for a construction project, including foundation, concrete, masonry, doors and windows, flooring, finishing, painting, and miscellaneous works. Each section lists specific tasks, materials, and units of measurement required for completion. The estimate also includes additional work for play fields, gates, fencing, toe walls, and road construction.

Uploaded by

musicraj1478
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 57

Abstract of Estimate

Project
Location
Date

Building Type :

S.No. Description Unit

A Civil Works
1 Foundation/Earth Work
1.1 Earthwork in excavation
Earth Work in excavation in foundation, etc. including dressing of sides
lift up and stacking of excavated materials beyond 1.00mtr. clear from
the edge of excavation within a lead of 80.00 mtr. and filling the
foundation trench (back filling below OGL) in layers of 15 cm. including
watering, ramming, consolidation and dressing, including sidewall
protection and dewatering work all complete.

a. Ordinary Soil cft

1.2 Filling Work


1.2.1 Earthwork in filling in foundation, under floors and other structures in
layers, not exceeding 20 cm, including watering, ramming and
consolidation (compaction more than 95% relative dry density) with the
earth obtained from the site or brought from outside all complete as per
drawings, specifications and instructions.

a) Earth to be supplied from site within 50m distance from the place of
filling. cft

b) Earth to be supplied from out of site carried by vehicle and


measured after compaction on the site. cft

1.2.2 Providing and Filling Sand in foundation, under floors and other
structures including watering, ramming all complete as per
specifications and instructions. cft

Sub - Total of 1

2 Concrete Work
2.1 P.C.C Work
Providing and laying machine mixed Plain Cement Concrete (PCC)
with 20mm down aggregate including the necessary side shuttering,
compaction, levelling, curing etc, all complete as per drawings,
specifications and instructions.
2.1.1 P.C.C - Nominal Mix (1:3:6) - M10 cft

2.2 R.C.C Work


Providing and laying machine mixed/machine vibrated Plain Cement
Concrete in columns, beams, shear walls, raft, slabs, lintels, sill, bed
blocks etc, including necessary ramming, leveling, curing etc,
excluding the cost of reinforcement and formwork as per drawings,
specifications and instructions. (cost of concrete pump and required
admixtures to be added in the rate)

2.2.1 M15 - Nominal Mix (1:2:4) - Lintel and Sill Bands cft

2.2 Providing and fixing in position Fe500 steel reinforcement in R.C.C.


works including straightening, cutting, bending, binding with 20 SWG
annealed wire for tying the reinforcement of all sizes of bars at each
junctions including all waste and cut pieces, placing in position with
cover block of cement mortar(1:1),fixing of chair, spacers to keep the
bars in intended position at all levels as per drawings, specification and
instruction (Lapping, Chairs & Spacers will be provided according to
joint measurement at site)
Kg

Page 1 of 57
Abstract of Estimate

Project
Location
Date

Building Type :

S.No. Description Unit

2.3 Providing, fabricating, erecting, centering and shuttering of water


resistance plywood formwork in slabs, beams, shear walls, stairs etc,
in perfect line and level including bracing, propping, de-shuttering at all
levels and heights all complete as per drawings, specifications and
instructions. sft

Sub - Total of 2

3 Masonry Work
3.1 Brick Masonry Work
Providing and laying 1st class brick masonry work in specified places
in all heights and level including the cost of scaffolding, RCC 3" thk.
band in 1:2:4 proportion at every 3'-0" high, curing, raking joints,
provision for recesses, openings, toothing etc. all complete as per
drawings, specifications and instructions.

3.1.1 Providing and laying chimney made first class brick work in 1:6
cement mortar in foundation. cft

3.1.2 Providing and laying chimney made first class brick work in 1:6
cement mortar in superstructure (9'' or more than 9''thk wall
excluding the cost of rcc band). cft

3.1.3 Providing and laying 4.5'' thk. chimney made local brick work in 1:4
cement sand mortar in superstructure internal partition wall with RCC
band (wall excluding the cost of rcc band). sft

3.1.4 Providing and laying chimney made first class dry flat brick soling
with sand filling in the gap sft

Sub - Total of 3

4 Doors and Windows


4.1 Wooden Windows
4.1.1 Wooden Frames in Windows
Providing and fixing of seasoned salwood timber frames in doors
made of specified size and section including the cost of protective paint
(i.e black Japan or equivalent) and 3 nos. of MS holdfast on each side
fixed in P.C.C.(1:2:4), making plaster groove all complete as per
drawings, specifications and instructions. cft

4.1.2 Glazed Window Shutter with Cross design


Providing and fixing in position glazed window shutter with cross
design on 80X32mm thick salwood timber shutter with 5mm thick clear
float glass along with brass hinges, aluminium handles, window
stopper (hook), tower bolts and all other necessary hardwares with one
coat primer and two coat enamel paint finish as per specification and
drawing.
sft

4.1.3 Providing and fabricating MS grill with 12X12 mm thick MS square rod
of approved pattern and manufacture finish with one coat of metal
primer paint with approved colour and two coat of mat Enamel paint as
per design, drawing and instruction all complete. sft

Page 2 of 57
Abstract of Estimate

Project
Location
Date

Building Type :

S.No. Description Unit

4.1.4 Existing Window with Shutter - installation


Fixing of existing Window with Shutter as per side condition in position
with hinges, handles, window stopper (hook), tower bolts and all other
necessary hardware's as per required at side with one coat primer and
two coat enamel paint finishas per design, drawing and instruction all
complete. no

4.1.5 Existing Door with Shutter - installation


Fixing of existing Door with Shutter as per side condition in position
with hinges, handles, window stopper (hook), tower bolts and all other
necessary hardware's as per required at side with one coat primer and
two coat enamel paint finishas per design, drawing and instruction all
complete. no

Sub - Total of 4

5 Flooring Work
(all flooring works Including surface preparation, chipping & cleaning of
surface cost before installation of flooring. The base rates of flooring
are excluding vat and approved equivalent flooring.)

5.1 Cement punning with screeding


Providing and laying cement concrete flooring of 40mm thickness in
volumetric proportion 1:2:4 (1cement : 2sand : 4coarse aggregate
12mm and down grade) in floor and finished with a floating coat of neat
cement including cement slurry, etc, all complete as per drawings,
specifications and instructions.
a) Flooring sft
b) Skirting rft

Sub - Total of 5

6 Finishing Work
6.1 Cement Plaster Work
Providing and applying cement plaster on walls and ceiling of 12-18
mm thick and in perfect line level and plumb and as per the drawings
and specifications, engineers instructions all complete.

6.1.1 Cement plastering on walls in 1:5 cement mortar (inside / Out side
wall) sft

6.1.1 Cement plastering on ceiling in 1:4 cement mortar (inside / Out side
ceiling) sft

Sub - Total of 6

7 Painting Work
Providing and Applying Primer coat and minimum two coats of the
approved quality paint including the cost of scaffolding as per the
specifications & architects' instructions all complete

7.1 Applying Water Based Acrylic Emulsion Paint on wall and ceiling
(Asian paint/ Nerolac paint or equivalent) sft

7.2 Applying One Coat of white cement primer and Two Coat of Clear seal
- XT Paint as Exterior Coating sft

Page 3 of 57
Abstract of Estimate

Project
Location
Date

Building Type :

S.No. Description Unit

7.3 Applying oil based Enamel Paint on Steel Surface


(Asian paint/ Nerolac paint or equivalent - rate only) sft

7.4 Applying oil based Enamel Paint on Wooden Surface


(Asian paint/ Nerolac paint or equivalent - rate only) sft

Sub - Total of 7

8 Miscellaneous Works
8.1 Dismantling of brick masonry made in cement and collect the usable
bricks from dismantling work for reuse, thereby disposing the debris
out of site via transportation medium. cft

8.2 Dismantling of R.C.C and R.B.C Structure and disposal of debris out of
site via transportation medium (5-7" thk.). sft

8.3 Epoxy Grout as per site condition no

8.4 Wall plaster with 12mm down aggregate and bounding adhesive in
1:2:4 cement sand & aggregate mortar. as per the specifications &
architects' instructions all complete sft

8.5 Existing Ms-gate installation


Providing , welding, and maintenance of Existing Ms-gate. applying
sandpaper and one coats of red oxide primer and two coat of enamel
paint as per drawing, instruction and specification all complete.
sft

8.6 Fence works


Providing , welding, fabricating metal fence of Rectangular Hollow
500x50x2 mm Section, 3mm sheet with ms frame including fixing in
position with necessary nut bolts, grinding and one coats of red oxide
primer and two coat of enamel paint as per drawing, instruction and
specification all complete. sft

Sub - Total of 8

Total Amount of Civil Work

Page 4 of 57
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

A Play Field
1.1 Cutting and loading of earth and transport it to the nearby
fill area within a distance of 1 KM. M3

1.2 Earth filling including compaction and leveling. M3

1.3 Natural wicket ( 6nos.)

1.3.1 Earth cutting,filling,levelling and compacting of earth. M2

1.3.2 Filling of Brickbats for wicket. M3

1.3.3 Filling of Clay for wicket. M3

1.3.4 Filling of sandy loam for wicket. M3

Total A

B Gate & Fencing work

1.0 Earth Work


1.1 Earth Work in excavation in foundation, etc. including
dressing of sides lift up to 2.00 mtr. stacking of excavated
materials beyond 2.00mtr. clear from the edge of
excavation within a lead of 50.00 mtr.
and filling the trench (back filling) in layers of 15 cm.
including watering ramming, consolidation and dressing,
including sidewall protection and dewatering work all
complete.

a.Ordinary Soil M3
2.0 Concrete Work
2.1 P.C.C Work
Providing and laying P.C.C with 20mm down aggregate
excluding the cost of formwork.
2.1.1 P.C.C - Nominal Mix (1:3:6) M3

2.2 R.C.C Work


Providing and laying P.C.C for R.C.C work excluding the
cost of Form Work and Reinforcement.

2.2.1 M15 - Nominal Mix (1:2 :4) M3

3.0 Masonry Work


3.1 Brick Work
Providing and laying Brick work including the cost of
scaffolding, curing, raking joint of one face and filling joint
of another face.

3.1.1 Providing and laying chimney made brick work in 1:6


cement mortar in Foundation M3
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

3.1.2 Providing and laying chimney made dry flat brick soling
with sand filling in the gap M2

4 Miscellaneous Works

4.1 Providing, fabricating and fixing theTubular M.S.


Pipe(Medium) frame & 2"x2"Chain link(10gauge) as
per the drawings, specifications and instructions of the
architect all complete

i) Main gate M2

4.2 Fencing works for boundary wall


a Providing and fixing tubular M.S pipe(Medium) of
specified sized. kg

b Providing and fixing RCC concrete Pole . No.

b Providing and fixing 2" x 2" chain link (10 gauge) and
fixing to support all complete M2

Total B

C Toe wall

1 Earth Work
1.1 Earth Work in excavation in foundation, etc. including
dressing of sides lift up to 2.00 mtr. stacking of excavated
materials beyond 2.00mtr. clear from the edge of
excavation within a lead of 50.00 mtr.
and filling the trench (back filling) in layers of 15 cm.
including watering ramming, consolidation and dressing,
including sidewall protection and dewatering work all
complete.
a.Ordinary Soil M3

2 Concrete Work
2.1 P.C.C Work
Providing and laying P.C.C with 20mm down aggregate
excluding the cost of formwork.

2.1.1 P.C.C - Nominal Mix (1:3:6) M3

3 Masonry Work
3.1 Stone Masonry Work
Providing and laying Stone work including the cost of
scaffolding, curing, raking joint of one face and filling joint
of another face.

3.1.1 Providing and laying Random Rubble stone Masonry


work in 1:6 cement mortar in Foundation M3

3.1.2 Providing and laying oneside fair face Random course


stone masonry work in 1:6 cement mortar in
superstructure with 1" racked joint built to 18" - 22"
course . M3
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

4 Miscellaneous Works
4.1 Providing and laying 110mm Dia. HDPE Pipe as wep
hole for Toe wall with required lenght and instruction all
complete M

Total C

D Construction of Road

1.0 Earth cutting ,filling and levelling with compaction in layer


by layer. M3

1.1 Construction of road all complete as per following M2

I) Preparation of sub grade with line, level as per design

including, watering, rollingand compaction all complete

ii) Providing 150mm thick gravel as sub base


course including rolling and levelling

iii) Providing 100mm thick crushed stone as


base course including rolling

iv) Surface preparation as cleaning & brushing by wire


brushes on WBM surface supply & spraying bituminus
tack coat 1 ltr per sq.m

v) Providing 50mm thiick premix carpet with sand seal


and tack coat on prepared surface of base course
including rolling and levelling all finish

vi) Providing 6mm chipseal as wearing course over finished


surface of Asphalt

Total D

E Pavillion

1 Earth Work
1.1 Earth Work in excavation in foundation, etc. including
dressing of sides lift up to 2.00 mtr. stacking of excavated
materials beyond 2.00mtr. clear from the edge of
excavation within a lead of 50.00 mtr.
and filling the trench (back filling) in layers of 15 cm.
including watering ramming, consolidation and dressing,
including sidewall protection and dewatering work all
complete.
a.Ordinary Soil M3

1.2 Filling Work


1.2.1 Earth Filling including watering, ramming all complete.
Earth to be supplied from site within 50m distance from
the place of filling M3

1.2.2 Providing and Filling Pit Sand including watering,


ramming all complete M3
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

2 Concrete Work
2.1 P.C.C Work
Providing and laying P.C.C with 20mm down aggregate
excluding the cost of formwork.
2.1.1 P.C.C - Nominal Mix (1:3:6) M3

3.0 R.C.C Work


Providing and laying P.C.C for R.C.C work excluding the
cost of Form Work and Reinforcement.

3.1 M15 - Nominal Mix (1:2 :4) M3

3.2 Supplying and fixing TMT Fe500 Steel Reinforcement in


R.C.C work including bending, binding with gi wire,
placing in position including the cost of binding wire all
complete kg

3.3 Shuttering of plywood formwork in slabs, walls, beams


etc. including centering of steel proping, strutting etc. and
removal of forms including the cost of plastic sheet & oil
to shuttering. M2
4 Masonry Work
4.1 Brick Work
Providing and laying Brick work including the cost of
scaffolding, curing, raking joint of one face and filling joint
of another face.

4.1.1 Providing and laying chimney made brick work in 1:6


cement mortar in Foundation M3

4.1.2 Providing and laying chimney made brick work in 1:6


cement mortar in superstructure M3

.53 Providing and laying chimney made dry flat brick soling
with sand filling in the gap M2
5 Flooring Work

5.1 Cement punning with screeding


Providing and laying 3mm neat cement punning with
screed of required thickness in 1:6 cement mortar
a) Flooring M2

5.2 Interlock tile - 75mm thick


Providing and laying 75mm thick interlock tile (M25) in 2"
thick stone dust including cost of roller and fine sand for
levelling. M2

5.3 Cement tile Flooring


Providing and laying Cement Tile in 1:3 cement mortar
including screed of required thickness in 1:6 cement
mortar. M2
a) Flooring

6 Finishing Work
6.1 Cement Plaster Work
Providing and applying cement plaster on walls and
ceiling of minimum 12 mm thick and in perfect line level
and plumb and as per the drawings and specifications,
architects' instructions all complete.
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

6.1.1 Cement plastering on walls in 1:4 cement mortar


(outside wall) M2

7 Painting Work
Providing and Applying Primer coat and minimum two
coats of the approved quality paint including the cost of
scffolding as per the specifications & architects'
instructions all complete
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

7.1 Applying One Coat of white cement primer and Two Coat
of Clearseal - XT Paint as Exterior Coating M2
8 Roofing Works
8.1 Providing and laying 24Gauge CGI Sheet on slope roof
with J hooks,bitumin washers,metal washers,bolts etc.

a) 24 Gauge CGI Sheet M2


9 Miscellaneous Works

9.1 Providing, Fabricating and Fixing Structural Tubular


Mild steel truss (medium) as per design and drawing
including enamel paint all complete kg

9.2 Ms-gate
Providing , welding, fabricating metal truss of
Rectangular Hollow Section and sheet metal including
fixing in position with necessary nut bolts, grinding &
applying sandpaper and two coats of red oxide primer as
per drawing, instruction and specification all complete.
sft

9.3 Fence works


Providing , welding, fabricating metal fence of
Rectangular Hollow Section and sheet metal
including fixing in position with necessary nut bolts,
grinding as per drawing, instruction and specification
all complete.
sft

9.4 Brick Masonary in 1:6 cement sand mortar (9"thick wall)


Manhole with plaster and cement punning and precast
concrete cover (size 2'x2'x2' internal finishing) all
complete. nos

9.5 Brick Masonary in 1:6 cement sand mortar (9"thick wall)


Manhole with plaster and cement punning and precast
concrete cover (size 2-6"'x2-6"'x2'-0" internal finishing) all
complete. nos

9.6 Brick Masonary in 1:6 cement sand mortar (9"thick wall)


Manhole with plaster and cement punning and precast
concrete cover (size 3'x3'x3' internal finishing) all
complete. nos

9.7 Brick Masonary in 1:6 cement sand mortar (9"thick wall)


Grease trap with plaster and cement punning and precast
concrete cover (size 6'x3'x3' internal finishing)
nos

9.8 Providing and Laying NP3 HUME pipe including earth


work and collar.
i) 450mmФ HUME PIPE Rm
ii) 600mmФ HUME PIPE Rm

9.9 Construction of Septic Tank with Soak Pit including all


civil works as per drawing.
ii) 100 user no
iii) 200 user no
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

9.10 RCC Water tank 200,000 liter as per drawing. no

Total E

F Maintenance Shed

1 Earth Work
1.1 Earth Work in excavation in foundation, etc. including
dressing of sides lift up to 2.00 mtr. stacking of excavated
materials beyond 2.00mtr. clear from the edge of
excavation within a lead of 50.00 mtr.
and filling the trench (back filling) in layers of 15 cm.
including watering ramming, consolidation and dressing,
including sidewall protection and dewatering work all
complete.
a.Ordinary Soil M3

1.2 Filling Work


1.3 Earth Filling including watering, ramming all complete.
Earth to be supplied from site within 50m distance from
the place of filling M3

1.4 Providing and Filling Pit Sand including watering,


ramming all complete M3
2 Concrete Work
2.1 P.C.C Work
Providing and laying P.C.C with 20mm down aggregate
excluding the cost of formwork.
2.1.1 P.C.C - Nominal Mix (1:3:6) M3

3.0 R.C.C Work


Providing and laying P.C.C for R.C.C work excluding the
cost of Form Work and Reinforcement.

3.1 M15 - Nominal Mix (1:2 :4) M3

3.2 Supplying and fixing TMT Fe500 Steel Reinforcement in


R.C.C work including bending, binding with gi wire,
placing in position including the cost of binding wire all
complete kg

3.3 Shuttering of plywood formwork in slabs, walls, beams


etc. including centering of steel proping, strutting etc. and
removal of forms including the cost of plastic sheet & oil
to shuttering. M2
4 Masonry Work
4.1 Brick Work
Providing and laying Brick work including the cost of
scaffolding, curing, raking joint of one face and filling joint
of another face.

4.1.1 Providing and laying chimney made brick work in 1:6


cement mortar in Foundation M3

4.1.2 Providing and laying chimney made brick work in 1:6


cement mortar in superstructure M3
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

4.1.3 Providing and Cladding of Clay tile in 1:4 cement mortar


including the cost of ties as specified and instructed

I) Cladding of Clay tile M2

4.1.4 Providing and laying chimney made dry flat brick soling
with sand filling in the gap M2
5 Doors and Windows
5.1 Wooden Frames in Doors and Windows
Provides and fixing salwood timber frames in doors and
windows made of specified size and section as per
drawing including the cast of protective paint(I,e, black
Japan or equivalent ) and holdfast all complete M3
5.2 Glazed Windows Shutter
Providing and fixing in position 38mm thick Glazed
windows shutter with all complete. M2
5.3 Wiremesh Windows Shutter
Providing and fixing wiremesh door shutter as per
specificatiion all complete M2

5.4 Fixing in position fixtures and Fastening in the Door,


Window, and ventilator Shutters as per Specification and
drawings.(Excluding the cost of fixture)
a Tower Bolt150mm-Brass No.
b Tower Bolt 100mm-Brass for windows shutter No.
c Eye hook - Brass (heavy) No.
d Hinge -150mm (Brass) No.
e Handle - 100mm-Brass No.
6 Flooring Work

6.1 Cement punning with screeding


Providing and laying 3mm neat cement punning with
screed of required thickness in 1:6 cement mortar
a) Flooring M2
b) Skirting M
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

7 Finishing Work
7.1 Cement Plaster Work
Providing and applying cement plaster on walls and
ceiling of minimum 12 mm thick and in perfect line level
and plumb and as per the drawings and specifications,
architects' instructions all complete.

7.1.1 Cement plastering on walls in 1:5 cement mortar (inside


wall) M2

7.1.2 Cement plastering on walls in 1:4 cement mortar


(outside wall) M

7.1.3 Plastering work in Sill & Lintel Band (single layer) in 1:3
cement mortar (outside) M

7.1.4 Plaster Band (double layer) in 1:3 cement mortar


(outside) M

8 Painting Work
Providing and Applying Primer coat and minimum two
coats of the approved quality paint including the cost of
scffolding as per the specifications & architects'
instructions all complete

8.1 Applying Water Based Plastic Emulsion Paint on wall and


ceiling
(Asian paint/ Jenson & Nicolson or equivalent) M2

8.2 Applying One Coat of white cement primer and Two Coat
of Clearseal - XT Paint as Exterior Coating M2
9 Roofing Works
9.1 Providing and laying 24Gauge CGI Sheet on slope roof
with J hooks,bitumin washers,metal washers,bolts etc.

a) 24 Gauge CGI Sheet M2


b) 24 Gauge GI Sheet for RIDGE M
10 Miscellaneous Works
10.1 Providing and laying 400 Micron Plastic Sheet as damp
proofing member with required lap as per drawing and
instruction all complete M2

10.2 Providing, Fabricating and Fixing Structural Tubular


Mild steel truss (medium) as per design and drawing
including enamel paint all complete kg

10.3 Providing, Fabricating and Fixing Mild Steel Rolling


Shutter as per design and drawing including enamel
paint all complete M2

Total F
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

G Guard House

1 Earth Work
1.1 Earth Work in excavation in foundation, etc. including
dressing of sides lift up to 2.00 mtr. stacking of excavated
materials beyond 2.00mtr. clear from the edge of
excavation within a lead of 50.00 mtr.
and filling the trench (back filling) in layers of 15 cm.
including watering ramming, consolidation and dressing,
including sidewall protection and dewatering work all
complete.
a.Ordinary Soil M3

1.2 Filling Work


1.2.1 Earth Filling including watering, ramming all complete.
Earth to be supplied from site within 50m distance from
the place of filling M3

1.2.2 Providing and Filling Pit Sand including watering,


ramming all complete M3
2 Concrete Work
2.1 P.C.C Work
Providing and laying P.C.C with 20mm down aggregate
excluding the cost of formwork.
2.1.1 P.C.C - Nominal Mix (1:3:6) M3

3.0 R.C.C Work


Providing and laying P.C.C for R.C.C work excluding the
cost of Form Work and Reinforcement.

3.1 M15 - Nominal Mix (1:2 :4) M3

3.2 Supplying and fixing TMT Fe500 Steel Reinforcement in


R.C.C work including bending, binding with gi wire,
placing in position including the cost of binding wire all
complete kg

3.3 Shuttering of plywood formwork in slabs, walls, beams


etc. including centering of steel proping, strutting etc. and
removal of forms including the cost of plastic sheet & oil
to shuttering. M2
4 Masonry Work
4.1 Brick Work
Providing and laying Brick work including the cost of
scaffolding, curing, raking joint of one face and filling joint
of another face.

4.1.1 Providing and laying chimney made brick work in 1:6


cement mortar in Foundation M3

4.1.2 Providing and laying chimney made brick work in 1:6


cement mortar in superstructure M3

4.1.3 Providing and Cladding of Clay tile in 1:4 cement mortar


including the cost of ties as specified and instructed

I) Cladding of Clay tile M2


Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

4.1.4 Providing and laying chimney made dry flat brick soling
with sand filling in the gap M2
5 Doors and Windows
5.1 Wooden Frames in Doors and Windows
Provides and fixing salwood timber frames in doors and
windows made of specified size and section as per
drawing including the cast of protective paint(I,e, black
Japan or equivalent ) and holdfast all complete M3
5.2 Glazed Windows Shutter
Providing and fixing in position 38mm thick Glazed
windows shutter with all complete. M2
5.3 Wiremesh Windows Shutter
Providing and fixing wiremesh door shutter as per
specificatiion all complete M2

5.4 Providing and fixing in position 38mm thick solidcore


flush door with bothside water proof ply. M2

5.5 Fixing in position fixtures and Fastening in the Door,


Window, and ventilator Shutters as per Specification and
drawings.(Excluding the cost of fixture)
a Tower Bolt150mm-Brass No.
b Tower Bolt 100mm-Brass for windows shutter No.
c Eye hook - Brass (heavy) No.
d Hinge -150mm (Brass) No.
e Handle - 100mm-Brass No.
6 Flooring Work

6.1 Cement punning with screeding


Providing and laying 3mm neat cement punning with
screed of required thickness in 1:6 cement mortar
a) Flooring M2
b) Skirting M

7 Finishing Work
7.1 Cement Plaster Work
Providing and applying cement plaster on walls and
ceiling of minimum 12 mm thick and in perfect line level
and plumb and as per the drawings and specifications,
architects' instructions all complete.

7.1.1 Cement plastering on walls in 1:5 cement mortar (inside


wall) M2

7.1.2 Cement plastering on walls in 1:4 cement mortar


(outside wall) M2

7.1.3 Plastering work in Sill & Lintel Band (single layer) in 1:3
cement mortar (outside) M

7.1.4 Plaster Band (double layer) in 1:3 cement mortar


(outside) M
Abstract of Estimate

Project :
Location :
Date :

S.No. Description Unit

8 Painting Work
Providing and Applying Primer coat and minimum two
coats of the approved quality paint including the cost of
scffolding as per the specifications & architects'
instructions all complete

8.1 Applying Water Based Plastic Emulsion Paint on wall and


ceiling
(Asian paint/ Jenson & Nicolson or equivalent) M2

8.2 Applying One Coat of white cement primer and Two Coat
of Clearseal - XT Paint as Exterior Coating M2
9 Roofing Works
9.1 Providing and laying 24Gauge CGI Sheet on slope roof
with J hooks,bitumin washers,metal washers,bolts etc.

a) 24 Gauge CGI Sheet M2


b) 24 Gauge GI Sheet for RIDGE M
10 Miscellaneous Works
10.1 Providing and laying 400 Micron Plastic Sheet as damp
proofing member with required lap as per drawing and
instruction all complete M2

10.2 Providing, Fabricating and Fixing Structural Tubular


Mild steel truss (medium) as per design and drawing
including enamel paint all complete kg

Total G

Total(A+B+C+D+E+F+G)
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

A Civil Works
1 Foundation/Earth Work
1.1 Site Clearance & layout
Clearing the site of all the vegetation, roots and other unuseful
materials including excavation of top soil to a depth of 15 cm, removing
bushes, trees and leveling the Site for stacking the useful items in
specified space and disposing other item before commencing the
construction work & Placing project description sign board as per
instruction of the site engineer all complete including layout of
buildings, roads and ancillary services.
LS

1.2 Earthwork in excavation


Earth Work in excavation in foundation, etc. including dressing of sides
lift up and stacking of excavated materials beyond 1.00mtr. clear from
the edge of excavation within a lead of 80.00 mtr. and filling the
foundation trench (back filling below OGL) in layers of 15 cm. including
watering, ramming, consolidation and dressing, including sidewall
protection and dewatering work all complete.

a. All type Soil (using 60% excavator and 40% manually) cft

1.3 Filling Work


1.3.1 Earthwork in filling in foundation, under floors and other structures in
layers, not exceeding 20 cm, including watering, ramming and
consolidation (compaction more than 95% relative dry density) with the
earth obtained from the site or brought from outside all complete as per
drawings, specificaitions and instructions.

a) Earth to be supplied from site within 50m distance from the place of
filling. cft

b) Earth to be supplied from out of site carried by vehicle and


measured after compaction on the site. cft

1.3.2 Providing and Filling Pit Sand in foundation, under floors and other
structures including watering, ramming all complete as per
specifications and instructions. cft

1.3.3 Providing and laying sand mix pebbles filling in foundation and under
floors with 60% pebbles (maximum stone size 50mm) & 40% sand
including watering, ramming & leveling all complete as per drawing and
instruction. cft

1.3.4 Providing and Filling with bolders in foundations, under floors and other
structures along with ramming all complete as per specification and
instruction. cft

1.4 Permanent earth protection work


Providing, boring and installation of 100mm dia MS pipe (M) at 2'-0" c/c
including fixing of 8mm thick MS sheet for side earth protection work as
a permanent measure including removal of the same after completion
of foundation work as per drawing and instruction all complete.
sft

1.5 Concrete Pile work


Boring and installation of 20" dia concrete pile of 16'-6" (5.5 m) depth
at the foundation including manual or machine boring, disposal of
earth, approved M15-concrete filling as per drawing and instruction all
complete. no

Page 17 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

1.6 Stone Pile work


Boring and Installation of 600mm dia stone pile of 11m depth at the
foundation including manual or machine boring, disposal of earth from
out of site, filling of stone 60% & sand 40% with all required materials
and protection works as per drawing and instruction all complete.
no

1.7 Disposal work


Disposal of Earth or Debris out of site including loading, transportation
and unloading all complete cft

1.8 Temporary earth protection works


supply, boring and installation of 100mm dia MS pipe @ 2' -0" c/c
including fixing 8mm thick MS sheet for side earth protection work as a
temporary measure including removal of the same after completion of
foundation work as per drawing and instruction all complete.
sft

Sub - Total of 1

2 Concrete Work
2.1 P.C.C Work
Providing and laying machine mixed Plain Cement Concrete (PCC)
with 20mm down aggregate including the necessary side shuttering,
compaction, levelling, curing etc, all complete as per drawings,
specifications and instructions.
2.1.1 P.C.C - Nominal Mix (1:2:4) - M15 cft

2.1.2 P.C.C - Nominal Mix (1:3:6) - M10 cft

2.2 R.C.C Work


Providing and laying machine mixed/machine vibrated Plain Cement
Concrete in columns, beams, shear walls, raft, slabs, lintels, sill, bed
blocks etc,including necessary ramming, leveling, curing etc, excluding
the cost of reinforcement and formwork as per drawings, specifications
and instructions. (cost of concrete pump and required admixtures to
be added in the rate)

2.2.1 M15 - Nominal Mix (1:2:4) - Lintel and Sill Bands cft

2.2.2 M20 - Nominal Mix (1:1 1/2 :3) cft

2.2.3 M25 - Nominal Mix (1:1:2) cft

2.2.4 M20 - Design Mix (cost of concrete pump and required admixtures to
be added in the rate) cft

2.2.5 M25- Design Mix with Plasticizer using pump/ RMC Concrete cft

2.2.6 M30 - Design Mix (cost of concrete pump and required admixtures to
be added in the rate) cft

2.3 Providing and fixing in position Fe500 steel reinforcement in R.C.C.


works including straightening, cutting, bending, binding with 20 SWG
annealed wire for tying the reinforcement of all sizes of bars at each
junctions including all waste and cut pieces, placing in position with
cover block of cement mortar(1:1),fixing of chair, spacers to keep the
bars in intended position at all levels as per drawings, specification and
instruction (Lapping, Chairs & Spacers will be provided according to
joint measurement at site)
Kg

Page 18 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

2.4 Providing, fabricating, erecting, centering and shuttering of water


resistance plywood formwork in slabs, beams, shear walls, stairs etc,
in perfect line and level including bracing, proping, de-shuttering at all
levels and heights all complete as per drawings, specifications and
instructions. sft

Sub - Total of 2

3 Masonry Work
3.1 Brick Masonry Work
Providing and laying 1st class brick masonry work in specified places
in all heights and level including the cost of scaffolding, RCC 3" thk.
band in 1:2:4 proportion at every 3'-0" high, curing, raking joints,
provision for recesses, openings, toothing etc. all complete as per
drawings, specifications and instructions.

3.1.1 Providing and laying chimney made first class brick work in 1:6
cement mortar in foundation. cft

3.1.2 Providing and laying chimney made first class brick work in 1:6
cement mortar in superstructure (9'' or more than 9''thk wall
excluding the cost of rcc band). cft

3.1.3 Providing and laying 4.5'' thk. chimney made local brick work in 1:4
cement sand mortar in superstructure internal partition wall with RCC
band (wall excluding the cost of rcc band). cft

3.1.4 Providing and laying chimney made first class brick work in 1:4
cement mortar with 2nos, 4.75mm dia rebars at every 5 layers of brick
course in superstructure.(4.5'' thk wall) cft

3.1.5 Providing and laying 9" Thick one side fair face Machine made brick
work in 1:4 cement mortar in superstructure. cft

3.1.6 Providing and laying 4.5" Thick one side fair face Machine made
brick work in 1:4 cement mortar in superstructure. sft

3.1.7 Providing and cladding 2" thick one side fair face Machine made brick
work (English Bond) in 1/2" thk. Balendura base at wall, column and
lintel external face in superstructure including selection of well faced
bricks and cleaning the fair face brick everyday before closing the work
all complete as per drawing, specification and instruction
sft

Providing and cladding 1.5" thick Natural Stone in 1:3 cement mortar
with tile adhesive 500g per bag of cement mortar on wall including
backing plaster at wall, column and lintel external face in
superstructure with 75x75x5mm angle fixed with 8mm dia bolt @ 1000
mm c/c as per drawing. Selection of well faced Stone and cleaning the
stone everyday before closing the work all complete as per drawing,
specification and instruction (Tile adhesive brand: Perma Pinnacle
Excel) (plinth area)
sft

3.1.8 Providing and laying Dachhi brick in 1:4 cement mortar including the
cost of ties as per specification and instructions. sft

3.1.9 Providing and laying Decorative traditional brick in 1:4 cement


mortar as per drawing all complete. rft

Page 19 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

3.1.10 Providing and laying chimney made dry flat brick soling with sand
filling in the gap sft

3.2 Light Weight Partition Wall


3.2.1 Providing and fixing 100 mm thick light weight partiton wall as per
design and drawing all complete. sft

3.2.2 Providing and fixing 100 mm thick Shera infill wall as per drawing
(10mm shera board one side & 8mm shera another side) light weight
partition wall as per design and drawing all complete.

3.3 Stone Masonry Work

Providing and laying stone masonry work in specified places in all


heights and level including the cost of single or multi stage scaffolding,
curing, raking joints, provision for recesses, openings, toothing etc. all
complete as per drawings, specifications and instructions.

3.3.1 Providing and laying Random rubble stone work in 1:6 cement mortar
in foundation . cft

3.3.2 Providing and laying one side fair face Random rubble stone work in
1:6 cement mortar in superstructure with 1" raked joint built to 18" - 22"
course. cft

3.3.3 Providing and laying One side chiseled stone work in 1:6 cement
mortar in superstructure, excluding the cost of chiseling. cft

3.3.4 Providing and laying stone soling in Foundation with sand filling in
the gap. cft

Sub - Total of 3

4 Doors and Windows


4.1 Wooden Doors and Windows
4.1.1 Wooden Frames in Doors and Windows
Providing and fixing of seasoned salwood timber frames in doors
made of specified size and section including the cost of protective paint
(i.e black Japan or equivalent) and 3 nos. of MS holdfast on each side
fixed in P.C.C.(1:2:4), making plaster groove all complete as per
drawings, specifications and instructions. cft

4.1.2 Panelled Door Shutter - ( Fully wooden)


Providing and fixing in position 40mm thick fully wooden panelled door
shutter; single or double leaf, made up of salwood timber including
mortice lock, tower bolts, door stopper, brass hinges and all other
necessary hardware as per specification and drawing. sft

4.1.3 Panelled Door Shutter - (Wooden + Glazed)


Providing and fixing in position 40 mm thick salwood timber door
shutter; single or double leaf, fixed with 5mm thick clear float glass
including mortice lock, tower bolts, door stopper, brass hinges and all
other necessary hardware as per specification and drawing. sft

4.1.4 Flush Door Shutter - (Solid Core )


Providing and fixing in position 40 mm thick solid core flush door
shutter with both side commercial ply and Wooden beading and
mortice lock, tower bolts, door stopper, brass hinges and all other
necessary hardware as per specification and drawing. sft

Page 20 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

4.1.5 Flush Door Shutter - (Hollow Core)


Providing and fixing in position 40 mm thick Hollow core flush
doorshutter with 4mm Commercial ply on both side including wooden
framework, mortice lock, tower bolts, door stopper, brass hinges and
all other necessary hardware as per specification and drawing.
sft

4.1.6 Glazed Door Shutter - (Fully Glazed)


Providing and fixing in position fully glazed door shutter with 5mm thick
clear float glass and 40mm thick salwood shutter including mortice
lock, tower bolts, door stopper, brass hinges and all other necessary
hardware as per specification and drawing. sft

4.1.7 Partly Glazed Door Shutter


Providing and fixing in position partly glazed door shutter with 5mm
thick clear float glass and 40mm thick salwood timber door shutter
including mortice lock, tower bolts, door stopper, brass hinges and all
other necessary hardware as per specification and drawing. sft

4.1.8 Wire Mesh Door Shutter


Providing and fixing in position wire mesh door shutter with 40mm thick
salwood timber door shutter and 24G wire mesh along with mortice
lock, tower bolts, door closure, brass hinges and all other necessary
hardware as per specification and as per drawing . sft

4.1.9 Glazed Window Shutter - (Fully Glazed)


Providing and fixing in position glazed window shutter with 5mm thick
clear float glass and 40mm thick salwood timber shutter along with
brass hinges, aluminium handle, tower bolts, window stopper (hook),
and all other necessary hardware as per specification and as per
drawing . sft

4.1.10 Glazed Window Shutter with Cross design


Providing and fixing in position glazed window shutter with cross
design on 40mm thick salwood timber shutter with 5mm thick clear
float glass along with brass hinges, aluminium handles, window
stopper (hook), tower bolts and all other necessary hardwares as per
specification and drawing. sft

4.1.11 Wire Mesh Window Shutter


Providing and fixing in position wiremesh window shutter with 24g wire
mesh and 40mm thick salwood timber shutter including brass hinges,
aluminium handles, window stopper (hook), tower bolts and all other
necessary hardwares as per specification and drawing.
sft

4.1.12 Fixed Glass


Providing and fixing in position 5 mm thick clear float glass in doors,
windows, ventilator shutter as shown in drawing with putty or putty and
timber bead. sft

4.1.13 Providing and fabricating MS grill with 12X12 mm thick MS square rod
of approved pattern and manufacture finish with one coat of metal
primer paint with approved colour and two coat of mat Enamel paint as
per design, drawing and instruction all complete. sft

4.2 Aluminium Doors and Windows

Page 21 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

4.2.1 Aluminium Doors; frame size 100 X 50 X 1.2 thk. Titanium anodised
with 1.3 -1.4 mm thk powder coated 30 micron with 12 mm thick clear
toughened glass with sand blast & high edge polish, U-Shape both
side plastic gasket, with 6mm float glass including the cost of
Japanese (Heavy Duty) door closer, S.S handle, hinges as per drawing
all complete.
sft

4.2.2 Aluminium Glass Sliding Doors; frame size 100 X 50 X 1.2 thk.
Titanium anodised with 1.3-1.4 mm thk powder coated 30 micron with
12 mm thick clear toughened glass with sand blast & high edge
polish, U-Shape both side plastic gasket, floor spring Japanese, S.S
handle and screw all Accessories as per drawing all complete.
sft

4.2.3 Providing and Fixing Structural Glazing Windows of Aluminium


Frame, 100 x 60 mm, Under ISO 9001:2000, iso 14001:2004, OHSHS
18001:1999 Standard,1.4-2.0 mm thk powder coated 30 micron with 5
mm thk Reflected glass, 9000 K.P. Silicon both side Glue Tape,
Stainless Steel heavy handle and all other accessories, as per drawing
all complete.
sft

4.2.4 Aluminium Windows and Ventilations; frame size 100 X 50 X 1.2


thk. Titanium anodised with 1.3-1.4 mm thk powder coated 30 micron
with 6 mm clear float glass including S.S mosquito wiremesh, U-Shape
both side plastic gasket, steel hook locks and screw all Accessories as
per drawing all complete. sft

4.2.5 Aluminium Doors; frame size 90 X 50 X 1.2 thk. Titanium anodised


1.3-1.4 mm thk powder coated with 8 mm PVC Board and 6mm float
glass with U-Shape both side plastic gasket and including the cost of
Japanese (Heavy Duty) door closer, S.S handle, hinges as per drawing
all complete. sft

4.2.6 Aluminium Doors; frame size 90 X 50 X 1.2 thk. Titanium anodised


1.3-1.4 mm thk powder coated with 38 mm thick solid core flush door
shutter with both side commercial ply with U-Shape both side plastic
gasket and including the cost of Japanese (Heavy Duty) door closer,
S.S handle, hinges as per drawing all complete. sft

4.2.7 Aluminium Windows ; frame size 90 X 50 X 1.2 thk. Titanium


anodised with 1.3-1.4 mm thk powder coated with 12 mm toughened
glass, with spider web fitting, steel hook locks and screw all
accessories as per drawing all complete. sft

4.2.8 Aluminium Windows and Ventilations; frame size 90 X 50 X 1.2 thk.


Titanium anodised with powder coated with 6 mm clear float glass
including 50% S.S mosquito wiremesh, U-Shape both side plastic
gasket, steel hook locks and screw all Accessories as per drawing all
complete. sft

4.2.9 Aluminium Doors; frame less 12mm thick clear toughened glass with
SS fittings including the cost of S.S handle 18", SS spring hinges, lock
etc as per drawing all complete.

Page 22 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

4.2.10 Aluminium fixed windows; Providing and Fixing paneled glass window
of aluminum frame, 90 x 50 mm, Under ISO 9001:2000, iso
14001:2004, OHSHS 18001:1999 Standard, 2mm thk anodized 30
micron with12 mm thick clear toughened using spider fitting, U-Shape
both side rubber gasket, hinge/heavy roller, chrome handle, screw,
exterior grade silicon all complete as per drawings, specifications and
instructions.

4.2.11 Aluminium Partition Works


Providing and Fixing of Aluminium partition frame of size (90X50X2mm
thk.) with 50% 5mm clear float glass and remaining 10mm thick
compressed board with gaskets and all Accessories including door as
per drawing all complete (including Heavy duty Door closer).

4.3 Steel Windows


Providing and Fixing Steel Windows with 1.5" x 1.5" Hollow Steel frame
(16 G) and Window Shutter made with 1.5" x 1" Hollow Steel (16 G)
and 5mm thick clear float glass all complete as per specification and
drawing. sft

Sub - Total of 4

5 Flooring Work
(all flooring works Including surface preparation, chipping & cleaning of
surface cost before installation of flooring. The base rates of flooring
are excluding vat and approved equivalent flooring.)

5.1 Marble Flooring - Mirror polished


Providing and laying Marble flooring in 1:3 cement mortar with colour
pointing, mirror polish, edge molding as per design with screed of
required thickness in 1:3:6 cement mortar all complete.
(Rate of Italiyan marble = Rs. 450/sft)
a) Flooring (living room, lobby, puja room) sft
b) Skirting 4" high rft
c) Tread rft
d) Riser rft

5.2 Marble Flooring - Polished


Providing and laying Polished Marble flooring in 1:3 cement mortar
with colour pointing with screed of required thickness in 1:6 cement
mortar.
(Rate of marble = Rs. 450/sft)
a) Flooring sft
b) Skirting rft

5.3 Cement punning with screeding


Providing and laying cement concrete flooring of 40mm thickness in
volumetric proportion 1:2:4 (1cement : 2sand : 4coarse aggregate
12mm and down grade) in floor and finished with a floating coat of neat
cement including cement slurry,etc, all complete as per drawings,
specifications and instructions.
a) Flooring sft
b) Skirting rft

5.4 Granite Flooring - Polished


Providing and laying Polished Granite flooring in 1:3 cement mortar
with matching colour pointing in joints including base screed of
required thickness in 1:6 cement mortar.
(Rate of Granite = Rs. 450/sft)

Page 23 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

a) Flooring sft
b) Skirting rft

5.5 Ceramic tile on floor


Providing and laying Ceramic Tile in 1:3 cement mortar on floor
including base screed of required thickness in 1:6 cement mortar with
matching colour pointing on joints. ( Rate of tile = Rs. 250/sft) sft

5.6 Ceramic tile on wall


Providing and laying Ceramic tile in 1:3 cement mortar on wall
including backing plaster. ( Rate of tile = Rs. 250/sft) sft

5.7 Ceramic Border tile on wall


Providing and laying Ceramic tile border in 1:3 c.m in toilet on wall
excluding backing plaster. ( Rate of tile = Rs. 250/sft) rft

5.8 Flag stone flooring - Hammer Dressed


Providing and laying 1"-2" thick hammer dressed Flag stone in 1:4
cement mortar with screed of required thickness in 1:6 cement mortar
and groove pointing on joint all complete.
a) Flooring sft
b) Skirting rft

5.9 Flag stone flooring - Machine Dressed


Providing and laying 1.5" thick machine dressed flag stone in 1:4
cement mortar with screed of required thickness in 1:6 cement mortar
and groove pointing on joint all complete.
a) Flooring sft
b) Skirting rft

5.10 Interlock Concrete Block - 50mm thick


Providing and laying 50 mm thick Interlock Concrete Block (M25) in 4"
thick stone dust including fine sand for levelling. sft

5.11 Telia tile Flooring


Providing and laying Telia Tile in 1:3 cement mortar including screed of
required thickness in 1:6 cement mortar with surkhi painted recessed
joint and tarpin oil polish .
a) Flooring sft
b) Skirting rft

5.12 Wooden parquet flooring -


Providing, laying and fixing wooden Parquet flooring with chapra polish
including the cost of adhesive and other accessories all complete.

a) Flooring sft
b) Skirting rft

5.13 Wooden board floor (Sisum) -


Providing, laying and fixing wooden board floor of 2" x 2" size @ 2' c/c
wooden frame filled with stone dust
a) Flooring sft
b) Skirting rft
c) Chapra polish on wooden board sft

5.14 Kotah stone flooring


Providing,Cutting in required sizes and laying kotah stone in 1:4
cement mortar with required colour grouting in white cement,screed of
required thickness in 1:6 cement mortar and paste in neat cement
slurry.

Page 24 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

a) Flooring sft
b) Skirting rft

5.15 Laminated wooden flooring


Providing, laying and fixing laminated wooden flooring as per drawing
and instruction all complete
a) Flooring sft
b) Skirting rft

5.16 Mosaic flooring


Providing and laying Mosaic flooring in pattern as per drawing and
instruction with glass strip including screed of required thickness in 1:6
cement mortar all complete
a) Flooring sft
b) Skirting rft
c) Polishing sft

5.17 Vitrified Tile (Chinese) - 600 mm x 600 mm


Providing and laying Vitrified Tile (Chinese) in 1:3 cement mortar on
floor including screed of required thickness in 1:6 cement mortar

a) Flooring sft
b) Skirting rft

5.18 Laminated Board Flooring - Alsapan or equivalent


Providing, laying and fixing Laminated Board Flooring (1290 x 190 x
8mm) as per drawing all complete
a) Flooring sft
b) Skirting rft

5.19 PVC Tile Flooring


Providing and laying PVC tile on floor with approved adhesive in line,
level, colour and pattern . Tile joints shall be filled with grout.
a) Flooring sft
b) Skirting rft

5.20 Carpet Flooring


Providing and laying PVC tile on floor with approved adhesive in line,
level, colour and pattern . Tile joints shall be filled with grout.
a) Flooring sft
b) Skirting rft

5.20 Floor Tile for Swimming Pool - Bisazza Tile


Providing and laying Bisazza Tile on floor of swimming pool including
the cost of adhesive and joint filling with polymer grout all complete
sft

5.22 Wall Tile for Swimming Pool - Bisazza Tile


Providing and laying Bisazza Tile on wall of swimming pool including
the cost of adhesive and joint filling with polymer grout all complete sft

5.23 Floor Tile for Swimming Pool


Providing and laying ceramic tile on floor of swimming pool (Johnson or
equivalent) laid on base grout of approved make (i.e. Bal Endura or
equivalent) & joint to be finished with coloured epoxy grout.
sft

5.24 Wall Tile for Swimming Pool


Providing and laying ceramic tile on wall of swimming pool (Johnson or
equivalent) laid on base grout of approved make (i.e Bal Endura or
equivalent) & joint to be finished with coloured epoxy grout.
sft

Page 25 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

5.25 Epoxy Flooring for Hygenic Control


Providing and applying 5.5 mm thk Epoxy Flooring as per specification
(3.5 mm thk Base coat and 2mm thk Epoxy coat)
(Apurva or Equivalent) sft

5.26 Epoxy on wall and ceiling for Hygenic Control


Providing and applying two coat of High Glass protective coating
Polyurethane Paint with single coat of Epoxy primer on evenly
prepared surface by Acrylic based wall putty as levelling compound on
wall and ceiling all complete. sft

5.27 Epoxy Coving for Hygenic Control


Making Epoxy Coving (3") with epoxy screed materials as surface
preparation, one coat of Florseal - WBP primer and two coats of
Polyurethane - FC Finish ( Apurva or equivalent)
a) Epoxy coving wall to floor (75mm X 50mm) rft
b) Epoxy coving wall to wall (35mm X 35mm) rft
c) Epoxy coving wall to ceiling (25mm X 25mm) rft

5.28 Slate Cladding around Plinth


Providing and laying 1/2" thick slate on 1:6 cement mortar sft

5.29 Granite Cladding


Providing and laying Granite Cladding on external plastered wall, clad
on 1/2''th Balendura base, joint to be finished with coloured epoxy
grout including cost of scaffolding as per drawing and instruction all
complete.
(Granite will be supplied by the Client)
a) Wall area sft

Granite Cladding - exterior wall


Providing and laying Granite Cladding on external including backing
plaster at wall, column and lintel external face in superstructure with
75x75x5mm angle fixed with 8mm dia bolt @ 1000 mm c/c as per
drawing. joint to be finished with coloured epoxy grout including cost of
scaffolding, cleaning the grainite everyday before closing the work all
complete as per drawing, specification and instruction (Tile adhesive
brand: Perma Pinnacle Excel)

(Granitebase rate = 650/sft))


a) Wall area

Sub - Total of 5

6 Finishing Work
6.1 Cement Plaster Work
Providing and applying cement plaster on walls and ceiling of 12-18
mm thick and in perfect line level and plumb and as per the drawings
and specifications, engineers instructions all complete.

6.1.1 Cement plastering on walls in 1:5 cement mortar (inside wall) sft

6.1.1 Cement plastering on ceiling in 1:4 cement mortar (inside ceiling) sft

6.1.2 Cement plastering on walls in 1:5 cement mortar (outside wall) sft

6.1.3 Cement plastering on ceiling in 1:4 cement mortar (outside ceiling) sft

Page 26 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

6.2 J K White Putty


Providing and applying minimum 3mm thick JK White Putty on walls
and ceiling in perfect line level and plumb and as per drawings and
specifications, instructions all complete. sft

6.3 Surkhi pointing work on machine made brickwork on External brick wall
surface as per the instruction of the engineer and all complete
including cleaning with mild acid after the application of surkhi. sft

Sub - Total of 6

7 Painting Work
Providing and Applying Primer coat and minimum two coats of the
approved quality paint including the cost of scffolding as per the
specifications & architects' instructions all complete

7.1 Applying Water based cement paint with chalk powder filling on
plastered surface for smoothing the surface on wall and ceiling.
(Asian paint/ Nerolac paint or equivalent) sft

7.2 Applying Water Based Plastic Emulsion Paint on wall and ceiling
(Asian paint/ Nerolac paint or equivalent)
sft

7.3 Applying Water Based Acrylic Emulsion Paint on wall and ceiling
(Asian paint/ Nerolac paint or equivalent) sft

7.4 Applying Water Based semi solid washable Distemper Paint with
filler(Filler materials - primer mix with whitening powder of 101 no with
chalk powder) on wall and ceiling (Asian paint/ Nerolac paint or
equivalent)
sft

7.5 Applying One Coat of self primer (Clearseal) and Two Coat of
Clearseal Paint as Exterior Coating sft

7.6 Applying One Coat of white cement primer and Two Coat of Clearseal
- XT Paint as Exterior Coating sft

7.7 Applying oil based Enamel Paint on Steel Surface


(Asian paint/ Nerolac paint or equivalent) sft

7.8 Applying oil based Enamel Paint on Wooden Surface


(Asian paint/ Nerolac paint or equivalent) sft

7.9 Applying Chapra Polish on Wooden Surface


a) Applying Chapra Polish sft
b) Applying Touchwood or Melamine on polished surface sft

7.10 Applying Linsed oil paints on surface of marine ply eaves board sft

7.11 Interior Hygiene Wall Coating on plastered surface


a) Applying Two Coats of cement based Walkote Putty as surface
preparation. sft

b) Applying Two Coats of Florseal - WBP Epoxy Primer to strengthen


the surface of Putty sft

c) Applying Two coats of waterborne polyurethane based Walgard -


WB as hygenic waterborne interior wall finish

Page 27 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

(Apurva or Equivalent) sft

7.12 Interior Hygiene Wall Coating on plastered surface - For black area

a) Applying Two Coats of cement based Walkote Putty as surface sft


preparation.
b) Applying Three coats (1 Coat Primer & 2 Coat Finish) of waterborne
polyurethane based Walgard - WB as hygenic waterborne interior wall
finish
(Apurva or Equivalent) sft

7.13 Interior Hygiene Coating on False Ceiling


a) Applying Two Coats of Florseal - WBP Epoxy Primer sft

b) Applying Two coats of waterborne polyurethane based Walgard -


WB as hygenic waterborne interior wall finish
(Apurva or Equivalent) sft

Sub - Total of 7

8 Roofing Works
8.1 Providing, fabricating and fixing Structural M.S. Truss Work ( purlin,
rafter,struts,vertical posts,MS plates,etc.) including the cost of anchor
bolt, welding,fixing, granding and minimum two coats of approved
coloured enamel paint with its respective metal primer as per drawing,
instruction and specification all complete kg

8.2 Providing and fixing given size of salwood timber as framework for
roofing work with required required accessories and two coat of
enamel paint as per instructions and specifications all complete. cft.

8.3 Providing and fixing CGI sheet as per drawing and specification all
complete
a) 24 gauge noncoloured CGI sheet including ridge and valley sheets.
sft
b) 24 gauge coloured CGI sheet including ridge and valley sheets. sft
c) 24 gauge coloured CGI rectangular corrugation sheet including ridge
and valley sheets. sft
d) 26 gauge noncoloured CGI sheet including ridge and valley sheets.
sft

8.4 Providing,cutting and laying 6mm.thick Polycarbonate Sheet/fiber


sheet/UPVC sheet as roofing member with required aluminium
strips,screws and seallant etc.as per drawing and instruction all
complete.
a) Roofing work sft
b) Gutter work of 24 guage metal sheet with 4" x 4" section rft

8.5 Providing and laying Indian roofing tile on slope in 1:4 cement mortar
with screed of required thickness in 1:6 cement mortar
a) Roofing tile of 4" x 8" size sft
b) Roofing tile of 9" x 15" size sft
c) Ridge tile rft
d) Decorative tile on edge no.

8.6 Providing and laying Nepali Jhingati tile in mud mortar on slope
a) Roofing tile of 4" x 8" size sft
b) Ridge tile rft
c) Decorative tile on edge no.

8.7 Decra Tiles Roofing

Page 28 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

Providing and laying of stone coated interlocking Decra traditional tile


roofing system of approved brand and size and colour with the
following items: sft
a) Ridge / Valleys / Hip cap as required
b) Zincalum steel battens for tile fixing
c) Glufoil heat reflective insulation foils
d) 50 mm glass wool with chicken wire mesh
e) Self driling screws, etc.
f) Any other accessories required for roffing system

8.9 Providing and laying stone coated interlocking Metro Bond roofing
tiles resting at rafter/purlin with 18mm thick marine ply, wooden battens
required including facia aluminiun reflecting insulation foil, 25mm thick
glasswool wall covering cap, black galvanised nail etc. and ridge/hip
cap standard clamp as per drawing, specification and instruction all
complete.
sft

8.10 Supplying and fixing of Bluescope Lysaght Crimp Curve/Bluescope


Lysaght Kliplock roofing with Lysaght purlin ZC10019 (high strength
Zink Aluminium with the following accessories as required,
sft
i) GI nut-bolt for purlin fitting
ii) Galvanised hexhead self drilling fastener
iii) Galvanised cliplock plate with screws
iv) Lysaght edge capping 600mm wide.

8.11 Cement punning over screeding at terrace:


Providing and laying cement concrete flooring of required thickness in
volumetric proportion 1:2:4 (12 mm down grade) in floor and finished
with neat cement slurry including 4mm glass or PVC strip at 1.5m
spacing with a floating coat of neat cement all complete.
a) Flooring sft
b) Skirting ft

8.12 Providing and fixing 1" x 9" marine ply eaves board with required
support to the truss as per drawing and instruction all complete. rft

8.13 Providing and fixing metal eaves board of 2mm thick and 6" wide
metal sheet with required support and welding with truss pipe including
one coat of metal primer and two coats of enamel paint as specified on
drawing all complete. rft

8.14 Providing and fixing Gutter of 26 gauge plain GI sheet with required
accessories as per drawing and specification all complete rft

8.15 Providing and fixing PVC Gutter with all required accessories as per
drawing and specification all complete rft

8.16 Providing and laying Helicopter Safety netting including M.S support as
per drawing and instruction all complete.

Sub - Total of 8

9 False Ceiling
9.1 Providing and fixing 12mm thick Gypsum Board false ceiling with
indoor unit trap door using GI section frame of size 48mm stud placed
on 610mm c/c in 50mm channel perpendicular to hangers and
exposed sides are fixed with 25mm screw . All joints in between two
boards shall be covered with gypsum compound and paper tape as per
drawing, specification and instruction all complete.
sft

Page 29 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

9.2 Providing and fixing 12mm thick Gypsum Board false ceiling with
indoor unit trap door using GI section frame of size 48mm stud placed
on 610mm c/c in 50mm channel perpendicular to hangers. all the
hanging arrangements, leveling etc and providing cutout for duct,
recess, electrical line etc and exposed sides are fixed with 25mm
screw . All joints in between two boards shall be covered with gypsum
compound and paper tape as per drawing, specification and instruction
all complete.

9.3 Providing and fixing 8 mm thick CEMENT BOARD false ceiling with
indoor unit trap door false ceiling using GI section and with exposed
side fixed with 25 mm screw of 48 mm stud placed on 610 mm c/c in
50 mm channel perpendicular to hangers. All joints in between two
boards shall be covered with gypsum compound and paper tape as per
drawing, specification and instruction all complete.
sft

9.4 Providing and laying 12mm thick Marine plywood false ceiling
including all the hanging arrangements, leveling etc and providing
cutout for duct, recess, electrical line etc whereever required including
chapra polishing/enamel paint all complete. sft

9.5 Providing, fitting and fixing in position suspended 9-12 mm thick


Metalised Polymer Laminated (MPL) gypsum board plain false
ceiling with indoor trap unit (One surface covered with Aluminium foil)
using GI section frame of size 48mm stud placed on 610mm c/c in
50mm channel perpendicular to hangers and exposed sides are fixed
with 25mm screw . All joints in between two board shall be covered
with gypsum compound and fiber tape as per drawing all complete.
sft

9.6 Providing and laying 8mm thick Calcium silicate board false ceiling
with indoor unit trap door including all the hanging arrangements,
leveling etc and providing cut out for duct, recess, electrical line etc
whereever required all complete. sft

9.7 Providing and laying Armstrong false ceiling (2' x 2') with all
necessary accessories and cutouts all complete. sft

9.8 Providing and fixing of false ceiling using wooden section and 6mm
thk commercial plyboard in exposed side with Painted finish, screwed
fixed with of stud placed on channel perpendicular to hangers and
antitermite painting on wooden surface as per drawing all complete.
sft

9.9 Padded Ceiling: Providing and fixing of false ceiling using wooden
section and 6mm thk commercial plyboard with high denstity form
wrapped in cotton cloth (base price of cloth = Rs. 150 per meter) in
exposed side with screwed fixed with of stud placed on channel
perpendicular to hangers and antitermite painting on wooden surface
as per drawing all complete.
sft

Sub - Total of 9

10 Miscellaneous Works
10.1 Providing and laying 500 Micron Plastic Sheet as damp proofing
member with required lap as per drawing and instruction all complete.
sft

Page 30 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

10.2 Applying crystallization chemical coating of approved brand as Water


proofing treatment on RCC Wall including minimum 12mm protective
plaster in 1:6 cement mortar as per engineer's instruction all complete.
sft

10.3 Applying polymer coat of approved brand as Water proofing treatment


with minimum 12mm protective plaster in 1:6 cement mortar and
including the cost of floor chipping, cleaning, lapping of membrane,
required chemicals etc all complete. sft

10.4 Providing and applying Water proofing treatment with readymade HY


Series or equivalent membrane on roof, terrace, garden etc, according
to the requirement as per manufacturer's application manual including
cost of floor chipping, cleaning, lapping of membrane, required
chemicals etc all complete. sft

10.5 Providing and applying Permise termiticide for Anti-termite Treatment


(pre-construction three stage treatment + periferal area.) at the
excavated soil base of fondation trenches, floors for all buildings
wherever necessary as per manufacturer's specification. (measurment
only plinth area for payment)
a) Plinth area sft
b) Periferal area rft

10.6 Providing, fabricating and fixing timber handrail, newel post, balusters
etc covering the metal frame including polishing as per drawing,
specifications and instructions all complete.
a) 3'-6" High rft

10.7 Providing, fabricating and fixing Stainless Steel railing of Grade 202
with polishing as per design and drawing all complete.
a) 6" High rft
b) 3'-6" High rft

10.8 Providing, fabricating and fixing M.S railing with two coats of enamel
paint as per design and drawing all complete.
a) 3'-6" High rft

10.9 Providing and laying R C C (1:2:4) parapet coping including form


works, nominal reinforcement as per drawing with plaster finishing all
side in 1:4 cement mortar all complete. rft

10.10 Providing and Fixing cornice made up of plaster of paris at corner of


wall and ceiling as per design and drawing all complete
a) Large cornice - 6" size rft
b) Small cornice - 4" size rft

Making and Fixing Decorative Sal wood wodden Strut of (750 * 230
Nos.
*230 mm )as per drawing and instruction all complete

10.11 Fencing works:


10.11.1 Providing and fixing angular & tubular M.S post of specified grade and
size as per design and drawing all complete. kg

10.11.2 Providing and fixing barbed wire on post as per instructions with all
fixing arrangements. rft

Page 31 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

10.11.3 Providing and fixing 2" x 2" chain link of GI wire (10 gauge) and fixing
to the post with required numbers of eye bolt, ring nuts, winding
brackets, cleat and strech bars as per desing and specifications all
complete. sft

10.11.4 Providing, fabricating and fixing theTubular M.S. Pipe(Medium) frame


& 2"x2"Chain link(10gauge) as per the drawings, specifications and
instructions of the architect all complete sft

10.11.5 Fencing works for boundary wall


a Providing and fixing tubular M.S pipe(Medium) of specified sized. kg

b Providing and fixing RCC concrete Pole . no

c Providing and fixing 2" x 2" chain link (10 gauge) and fixing to support
all complete sft

10.12 Expansion Joint Treatment:


Providing and fixing aluminium metallic plate of 16G and 150mm wide
at expansion joint, with back foam or Salitex Board or Bitumen Board
filling between the buildings gap and covering the gap as per drawing
and instruction all complete.
a) Horizontal Treatment rft
b) Vertical Treatment rft

10.13 Providing and applying Thermal Insulation on Roof of Sika including


following items: sft
a) Waterproofing coat with sika latex powder
b) Earthen pots in closed matrix
c) Gap filling with sika latex powder
d) Aluminium Panel
e) Screed with sika plastocrete super

10.14 Skylight:
Providing, fabricating and fixing 6mm thick Toughen glass on
Aluminium Frame as per design and drawing all complete. sft

10.20 Leveling PCC at terrace:


Providing and laying cement concrete flooring of required thickness
(upto 60 mm ) in volumetric proportion 1:2:4 (12mm down aggregate)
in floor and finished with a neat cement slurry. sft

10.21 PCC Flooring with silica Hardening (at basement parking)


Providing and laying 50 mm thick P.C.C (1:2:4) with 12mm down
aggregate with application of Silica compound and trowel finishing all
complete as per drawing and instruction. sft

10.22 Screeding with Colored Admixture


Providing and laying cement concrete flooring of 50mm thickness in
volumetric proportion 1:2:4 (1cement : 2sand : 4coarse aggregate
12mm and down grade) in road surface with a stone pattern grooving
etc, all complete as per drawings, specifications and instructions.

10.22 Garden Works :


Providing and laying average 6" thick boulder layer and 6" thick
approved garden soil over the boulder (overall 12" thick) including one
layer of approved type grass as per drawing and instruction all
complete. sft

10.23 Providing and making Design Feature as per drawing all complete.

Page 32 of 57
Abstract of Estimate
Project
Location
Date

Building Type :

S.No. Description Unit

(Length to be taken only once while computing quantity)

10.23.1 Design Feature at Eaves level


a) Form work for making eaves as per design . rft
b) Plaster in 1:4 c/m in eaves level rft

10.23.2 Providing and making Gutter on projection as per drawing and design
all complete
a) Formwork for making gutter rft
b) Cement punning and screeding on gutter rft

10.23.3 Design feature at lintel level


a) Formwork rft
b) Plaster in 1:4 c/m rft

10.23.4 Design feature at sill level


a) Plaster in 1:4 c/m rft

10.23.5 Making Decorative Pillar as per drawing. no

Sub - Total of 10

11 Dismantling Works
11.1 Dismantling of brick masonry made in cement and collect the usable
bricks from dismantling work for reuse, thereby disposing the debris
out of site via transportation medium. cft

11.2 Dismantling of R.C.C and R.B.C Structure and disposal of debris out of
site via transportation medium . cft

11.3 Dismantling of P.C.C and disposal of the debris out of site via
transportation medium. cft

11.4 Dismantling of existing flooring works and disposal of the debris out of
site via transportation medium. sft

Sub - Total of 11

Total Amount of Civil Work

Page 33 of 57
Dismantling works

Dismantling of existing building, properly stacking bricks,


rubble, etc. at required location, all complete as per
specifications and instructions.
General

Clearing and grubbing of site for construction including


uprooting of vegetation, grass, brush wood, trees and
saplings of girth up to 300 mm & removal up to a distance of
50 m as per drawings, specifications and instructions
Earthwork

Earthwork in excavation in trenches, pits and foundations in


soft soil including existing debris and brick bats of old
structure, if any, up to specified depth including shoring,
dressing of sides, mechanical ramming of bottom,
dewatering in foundation pits and trenches, if required, lifting
of soil for minimum 2.0 m and stacking soil to minimum
height of 1m and lead up to 30m, all complete as per
drawings, specifications and instructions

Providing and placing of random filling of excavated earth


stacked at site or brought from burrow pit in 150mm thick
layer in trenches, plinth or under floor, sides of foundation
and below beam at footing covered area etc. including
watering, mechanical ramming and compaction of each
layer, consolidation and dressing, all complete as per
Sand fillingspecifications
drawings, in plinth under floors,
and including watering,
instructions.
ramming, consolidating and dressing, all complete as per
Gravel
drawings,filling in foundation
specifications below
and PCC, including watering,
instructions.
ramming, consolidating and dressing, all complete as per
drawings, specifications and instructions.
Brick worksoling of local chimney bricks laid in line and level,
Flat brick
including packing joints with sand, complete as per
drawings,
First class specifications and instructions
brick work in cement and sand mortar of mix 1:4
with chimney-made bricks, in any size and shape of wall,
made to required line, level, shape and plumb including
setting out, soaking of bricks, curing of the works and
First class half brick masonry works made with chimney
made bricks in cement mortar 1:4 (1 cement: 4 coarse sand)
with reinforcement (2 number 8mm dia) as per detail in
every fifth course, embedded in cement mortar in wall of any
size and shape, made to required line, level, shape and
plumb including setting out, soaking of bricks, curing of the
Concrete Work
Plain cement concrete (PCC) of grade M10 (1:3:6 with 1
cement, 3 coarse sand and 6 aggregate of 19 mm and down
grade) in foundation base including mixing, laying,
compacting, finishing, curing, laid to exact line, level and
dimensions, inclusive of shuttering, complete as per
drawings, specifications and instructions

Structural concrete (PCC for RCC) of Grade M20 works with


approved quality of cement, sand and well graded aggregate
in any form, size, shape and level including batching and
mixing with machine, laying including compaction with
vibrating machine, curing, testing and finishing, all complete
as per drawings, specifications and instructions.
Placing ply board form work with steel props, shuttering,
centering in horizontal/Vertical surfaces like slab, beams,
column, wall, stair etc. for all RCC works of any shape, size
and at any level and removal after completion

Providing and placing steel reinforcement bar tested grade


Fe-500 equivalent NS, for RCC work including bending,
binding with anneal wire and placing in position, all complete
as per drawings, specifications and instruction
Finishing works

12.5 mm thick cement plastering with 1cement : 4 sand


mortar on any level size and shape of wall, column, ceiling,
band, blocks, etc. inclusive of dusting, throating, etc. as
required including racking, watering, cleaning of base,
plastering to plumb, line, level, smooth etc. and curing, all
complete as per drawings, specifications and instructions.
Two coat of plastic emulsion paint over two coat of primer,
finished including surface preparation all complete as per
drawings, specifications and instruction

Providing and laying glazed ceramic tile (A-grade Kajaria,


Orient or equivalent) in required pattern and colour on walls
with cement mortar of mix 1:4 backing and filling joints
(epoxy grout), including border tile, all complete as per
drawings, specifications and instructions.

Providing and laying stone finish ceramic tile in required


pattern and colour on exterior walls with cement mortar of
mix 1:4 backing and filling joints (epoxy grout), all complete
as per drawings, specifications and instructions.
Two coat of enamel paint in mat finishing over two coat of
primer, finished including surface preparation all complete as
per drawings, specifications and instruction

Two coat of weather coat (Apex or equivalent) over required


coat of primer, finished including surface preparation all
complete as per drawings, specifications and instruction

Applying 2 mm thick white putty punning (Birla or equivalent)


to walls and ceilings in smooth and even finish, all complete
as per drawings, specifications and instructions.
Flooring

Providing and placing 50 mm thick Plain cement concrete of


grade M15 (1:2:4 with 1 cement, 2 coarse sand and 4
aggregate of 19 mm and down grade) in the floor base
including water proofing compound, mixing, laying,
compacting, finishing, curing, laid to exact line level and
dimensions (floor concrete is laid in alternate panels of 1 m x
1 m) inclusive of shuttering complete as per drawings,
specifications and instructions

Providing and placing 100 mm thick Plain cementconcrete of


mix 1:2:4 in the floor base (with 1 cement, 2 coarse sand
and 4 aggregate) of 19 mm and down grade including
mixing, laying, compacting, finishing, curing, laid to exact
line level and dimensions below half brick wall at ground
floor inclusive of shuttering complete as per drawings,
specifications and instructions

Providing and placing 300mm wide and 50 mm thick Plain


cement concrete of grade M15 (1:2:4 with 1 cement, 2
coarse sand and 4 aggregate of 19 mm and down grade)
below stone dust for paving block (making average 2.5 m x
2.5m grid), including mixing, laying, compacting, finishing,
curing, laid to exact line level and dimensions inclusive of
shuttering complete as per drawings, specifications and
instructions

Providing and placing 38 mm thick Plain cement concrete of


grade M15 (1:2:4 with 1 cement, 2 coarse sand and 4
aggregate of 19 mm and down grade) in the floor base
including water proofing compound, mixing, laying,
compacting, finishing, curing, laid to exact line level and
dimensions (floor concrete is laid in alternate panels of 1 m x
1 m) inclusive of shuttering complete as per drawings,
specifications and instructions
Providing and laying vitrified, monolithic straight edge tile
(600mm X 600 mm) for floor over 30 to 40 mm thick cement
sand mortar of mix 1:6 backing and filling joints with epoxy
grout and pigment, all complete as per drawings,
specifications and instructions.

Providing and laying 3 mm cement punning in floor of 1:1


(cement : screened sand) over 12.5 mm thick cement
screeding of 1:3 ( cement : sand) laying in required pattern,
line and level including curing all complete as per drawings,
specifications and instruction

Providing and laying 3 mm cement punning in floor of 1:1


(cement : screened sand) laying in required pattern, line and
level including curing all complete as per drawings,
specifications and instruction.

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction
Providing and placing 75 mm high, 3 mm cement punning
skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction
Providing and placing 75 mm high, 3 mm cement punning
skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Providing and placing 75 mm high, 3 mm cement punning


skirting of 1:1 (cement : screened sand) over 12.5 mm thick
cement plaster of 1:2 ( cement : sand) laying in required
pattern, line and level including curing all complete as per
drawings, specifications and instruction

Exterior Land Development


Preparation of subgrade for interlocking paving blocks laying
by cutting and filling with compaction work up to 20cm high
in general soil in driveways areas, complete as per
specifications and drawings.

Supplying and laying of 60 mm thick heavy duty interlocking


paving blocks of approved colour and quality on the 50 mm
thick stone dust base in driveways and parking areas,
complete as per specifications and drawings.
Providing, Laying and construction of sand mixed gravel
sub-base course of thickness 15cm, loading and unloading
of materials, transportation and laying preparation, including
10m haulage distance
Mild Steel Works
Providing and fixing of grill window with two coats of anti-
corrosive base coat and two coats of enamel paint (4.5x20
mm MS plate and 12 mm square bar) in
position, all complete as per drawings, specifications and
instruction.

Providing and fixing of MS member (pipe, angle, plate, etc.)


for ladder, staircase step nosing, openable hatch and
support to brick wall at beam slab soffit etc. with two coats of
anti-corrosive base coat and two coats of enamel paint (if
required) in position, all complete as per drawings,
specifications and instruction.
False Ceiling
Providiing and fixing of 6mm thick Waterproof Cement Board
false ceiling, with necessary provixions for light fittings, light
boxes, where required, all complete as per drawings,
specifications and instructions.

Miscellaneous
Staircase and veranda railing with one 50 mm dia and two
25 mm dia medium MS pipe horizontal rails and 32 mm dia,
900 mm high medium MS pipe balusters spaced at 600 mm
c/c in the veranda and one on alternate tread of the
staircase, including 10X10mm MS Solid bar combination
and painting with two coats of anti corrosive metal primer
and two coats of enamel paint, all complete as per drawings,
specifications and instruction

Staircase railing on the wall for interior staircase area with


MS member framing and 50mm dia MS pipe hand rail, all
complete as per drawings, specifications and instruction

Front, side step and ramp railing with one 50 mm dia MS


pipe (wall thk=3.65mm) hand rail and two 25 mm dia MS
pipe (wall thk=3.25) horizontal rails and 38 mm dia MS pipe
(wall thk=3.25), 900 mm high medium MS pipe balusters
spaced at 900mm c/c (on average) on the ramp and one on
alternate tread of the staircase, including painting with two
coats of anti corrosive metal primer and two coats of enamel
paint, all complete as per drawings, specifications and
instruction.
Terrace railing with one 35 mm dia MS pipe (wall
thk=3.25mm) horizontal rail on 300mm high 35 mm dia MS
Pipe (wall thk =3.25 mm) balusters spaced at 520 mm c/c,
finished with enamel paint of approved colour, all complete
as per drawings, specifications and instruction
Providing and fixing in position 4 mm float glass mirror fixed
on 9 mm marine ply, all complete with wooden framing in
seasoned sisum wood with SS studs screw as per drawings,
specifications and instruction
Proving & fixing in place 1.5 mm thick slip membrane in
sliding joints, including smoothening of receivingsurface
through steel trowelling, all complete as perdrawings,
specifications and instruction.
Proving & fixing in place chicken wire mesh at column - brick
wall junction, all complete as per drawings, specifications
and instruction.
Supply and placing of 25 mm thick loose mortar of 1:10
cement sand mortar, in between masonry wall and column
joint gap, all complete as per drawing instruction and
specification.
Supply and mixing water proofing compound (Dr. Fixit
Pidiproof LW+ or equivalent) 200 ml in one bag of cement in
plinth beam and DPC concrete mix during casting, all
complete as per specification and instruction.
Supply, fabrication and installation of 50mm thick precast
RCC slab over plinth protection drain, all complete as per
drawing, specifications and instruction
Bill of Quantity
Building Type : Residential
S.No. Description Unit

A Main Panel/Distribution Boards:


1 Main Distribution Boards/Final DB'S make:
SIEMENS/ABB/HAVELS
Supply of following SMDB fabricated out of 2 mm thick CRCA sheet
wall mounted, dust and vermin proof 16/14 gauge CRCA sheet steel
shall be used for panels. Cable gland plates shall be provided on top of
the panels. Panels shall be treated with all anticorrosive process before
painting as per specifications with 2 coats of zinc chromate primer and
final approved shade of enamelled paint.1 No. earthing terminals shall
be provided for all distribution panels. Panels shall be suitable for 415V,
3-phase, 4-wire, 50Hz supply system .
Approval shall be taken for each panel before fabrication. Galvanized
hardwares with zinc passivation shall be used in fabrication of panels.

(Breakers: Schneider/L& T/ABB)


1. All MCB’s shall be of minimum 10 KA breaking capacity.
2. All MCCB rated 63A and above shall be provided with thermal load
adjustment elements. and Breaking capacity of the breakers shall be
minimum: 16kA up to 100A, 18kA up to 160A, 25kA up to 250A and
36kA above 250A).
1a. MAIN PANEL Nos.
Incoming :
63 A 3 pole MCB of 15 KA-3 Nos.
100 A 3 pole Changeover-1 nos
Indicator
100 A SPN Copper Busbar
Outgoings :
3 Nos.32A, DP MCB(10 KA)
2 Nos.25A, DP MCB(10 KA)
1 Nos.16A, DP MCB(10 KA)
1b. Solar Panel Set
Incomer:25 2 pole MCB of 10 kA
20 A 3 pole Changeover-1 nos
Outgoings:
3 Nos 16A 15 kA 2-P MCB
1c 8 WAYS TPN DB for Ground floor set
Normal
Incoming :
32 A 3 pole MCB of 10 KA-1 No.
Outgoings :
9 Nos.16 A, SP MCB (10KA)
Back-UP(Inverter)
Incoming :
16 A 2 pole MCB of 10 KA-1 No.
Outgoings :
9 Nos.6 A, SP MCB (10KA)
1d 8 WAYS TPN DB for First floor set
Normal
Incoming :
32 A 3 pole MCB of 10 KA-1 No.
Outgoings :
9 Nos.16 A, SP MCB (10KA)
Back-UP(Inverter)
Incoming :
16 A 2 pole MCB of 10 KA-1 No.
Outgoings :
5 Nos.6 A, SP MCB (10KA)
1e 6 WAYS TPN DB for second floor set
Normal
Incoming :
32 A 3 pole MCB of 10 KA-1 No.
Outgoings :
7 Nos.16 A, SP MCB (10KA)
Back-UP(Inverter)
Incoming :
16 A 2 pole MCB of 10 KA-1 No.
Outgoings :
5 Nos.6 A, SP MCB (10KA)

2 (3x10) sq. mm; COCOND single core multi flexible PVC wire drawn
inside 32 mm Ø HDP conduit r mt

3 (3x6) sq. mm; COCOND single core multi flexible PVC wire drawn
inside 32 mm Ø HDP conduit (from MDB to DB's) r mt

4 2x6 sq. mm; COCOND single core multi flexiable PVC wire drawn
inside 25 mm Ø HDP conduit (for Invertor, PV system) r mt

5 3x2.5 sq. mm; COCOND single core multi flexiable PVC wire drawn
inside 20 mm Ø HDP conduit (UG tank to OH for pump automation)
r mt

C Light and Power Point Wiring

1 All switches & sockets - Legrand (Arteor) /Schneider (Zencelo)

2 Wiring of light /exhaust points by means of (2x2.5+1x1.5) sq. mm;


COCOND Multi core PVC cable drawn inside 20 mm dia HDP conduit
including accessories, circular box, 16 SWG GI Metal Box, Modular
Type switch pts
3 Wiring of ceiling fan points by means of (2x2.5+1x1.5) sq. mm;
COCOND Multi core PVC cable drawn inside 20 mm dia HDP conduit
including accessories, circular box, 16 SWG GI Metal Box, dual model
Type fan regulator and switch. pts
3 Outdoor Light point with 3 core 2.5 Sq. mm Copper wire laid in
underground through 20 mm dia HDP Conduit and junction boxes pts

4 Outdoor power point with 3 core 2.5 Sq. mm Copper wire laid in
underground through 20 mm dia HDP Conduit and junction
boxes+socket-IP-65 pts
5 Wiring of 2 way light points by means of (4x2.5+1x1.0) sq. mm;
COCOND Multi core PVC cable drawn inside 20 mm dia HDP conduit
including accessories, circular box, 16 SWG GI Metal Box, Modular
Type switch pts

6 Wiring of 6/16 A switched socket with indicator points by means of


(2x4+1x2.5) sq. mm; COCOND Multi core PVC cable drawn inside 20
mm dia HDP conduit including accessories, circular box, 16 SWG GI
Metal Box, Modular Type switched socket outlet pts

7 Wiring of Appliances (A/C, Cooking Range, Solar, Washing Machine,


Laundry, Dryer etc.) points without sharing the circuit by means of 3x4
sq. mm; COCOND Multi core PVC cable drawn inside 25 mm dia HDP
conduit including accessories, circular box, 16 SWG GI Metal Box,
Modular Type 20 Amp switched outlet pts

D Light and Fan Fixtures: (Installation charge only)


Supply, storing, assembling, installation, testing and .
commissioning of wall/ceiling, surface/recessed, suspended types LED
lighting fixtures including LED Driver all fixing and connecting
materials all complete. (Make - Legero.Wipro, Philips)
1 15 W LED 1'x1' surface panel Light having
CRI>85,Efficiency>85%, Temperature Range 5000-6500K and die-cast No
aluminium housing with white powder coated finish.
2 12 W LED surface dome Light having
CRI>85,Efficiency>85%, Temperature Range 5000-6500K and die-cast No
aluminium housing with white powder coated finish.
3 Cast Aluminium make Internal Bulkhead Wall light suitable
for 9 W LED bulb having CRI>80,Efficiency>85% and No
Temperature Range 3000-4000K.
4 Cast Aluminium make External Bulkhead Wall light suitable
for 9 W LED bulb IP-65 having CRI>80,Efficiency>85% and No
Temperature Range 3000-4000K.
5 538 mm logn 14 W LED mirror light with acrylic diffuser toilet
No
mirror light
6 4 feet 19 Watt LED Tube light complete set No
7 42" ceiling fan of usha or almonard make No
8 8" evhaust metal fan of crompton or almonard make No
9 Chandelier No
10 Dining table hanging light No

E TV/ Telephone System:

2 One gang, RJ 11 type telephone outlet socket including GI metal box,


Cat - 6 UTP cable drawn inside 20 mm dia HDP conduit with
accessories nos

3 One gang, RJ 45 outlet socket including GI metal box and all


connecting accessories nos

4 2xCAT -6 E UTP Cable within 20 mm dia HDP conduit (from Terrace to


Router point for Wi-Fi) r mt
5 One gang RG-6 outlet socket including GI metal box, 75 Ohms
Gellyfield Coaxial cable drawn inside 20 mm dia HDP conduit with
accessories nos

6 Telephone & Television FDF with 1 no of 10 Pairs CAT 5 E Crone Tag


including 1 numbers of 6 Way power pass splitter with required size
amplifier including power supply unit set

7 1xCAT -6 E UTP Cable with 2x75 Ohms Concentric Coaxial within 25


mm dia underground HDP conduit r mt
F Data Communication System
1 Computer Hub Switch
Supply, installation, inter-connection and putting into
operation of following computer Hub Switches enclosed in suitable U
Cabinet including patch panel fixing and connecting materials all
complete as per specification and
16 Ports No
2.00 Supply, interconnection and putting into operation of
data point wiring with 4 pair 0.5 mm dia copper telephone wire (cat-6)
concealed 20 mm dia PVC Conduit from nominated patch panel to
individual data points all complete as per drawing and specification. ( Pts
Note: Average length per point =
15 m )
3.00 DATA Socket Outlet No
Supply, installation, interconnection, testing and
commissioning of USB port type modular formation flush mounted
stand alone DATA socket including GI box to be installed in specified
location and height all complete. (North West/Philips or equvalent)

G Earthing and Lightening Protection:


Copper Plate earthling system - copper plate (600x600x3.14 mm), salt,
charcoal dust, 16 sq. mm bare copper conductor with solid CAD weld ,
Copper Nut Bolts with spring Washer & watering 25 mm dia PVC pipe set
& its installation in a whole of 90x90x250 cm as per dwg standard
a.
Lightening protection system with Lightening strike counter(Trishul) on
top to be fixed with stay wire and support on concrete mass on roof and
20 m long both Vertical and horizontal run of 25 x 3 mm copper strip Nos.
from mast to earth pit with all necessary equipment like earth test clamp
b. complete as package a.
Supply and installation of 120 watt PV Module Solar panel with Nos.
I
Charge controller, mounting frame as per detailed dwg.
Supply, installation , testing and commissioning of 2.5 KVA Invertor Nos.
J suitable for solar panel.
Supply, installation , testing and commissioning of 200 AH Tubular Nos.
battery sinewave of EXIDE make with all necessary material required
K for operation.
Total Amount of Electrical Works
Note: 13% VAT will be added extra on above cost
S.NO. Description Unit

1 Distribution Boards
Supply, installation and testing of Distribution Board (DB) wall mounting concealed
type, dust and vermin proof made of 16 SWG mild steel sheet cubical with
double cover covering the MCB with the locking arrangement as per drawing
and specification.

Main distribution board


60 A rated Single-phase Static electrononic kW-hr meter (L&T make) set
16 A Double pole MCB (10KA simens,MarlinGerlin,ABB,Legrand or ISI eqv.) nos
8 Way SPN DB Double Cover nos

Sub distribition board


8 Way SPN DB Double Cover set
4 Way SPN DB Double Cover (for solar DB) set
16 A, 10 A Double pole MCB (10KA simens,MarlinGerlin,ABB,Legrand or ISI eqv.) no.
6,10,16 amp single pole MCB (10KA simens,MarlinGerlin,ABB,Legrand or ISI eqv.) nos.

2 Earthing wire
Supply and installation of 8 SWG copper strip with 16 mm HDPE as earth conductor
from Earthing to SDB floor as per drawing and specification. rm

3 Power Cable from Mains to Floor DB :


Supply and laying of cable from Mains to SDB through HDPE Conduit
as per drawing and specification including cable shoes at both ends.
10 sq.mm multistrand flexible cu. wire through 25 mm mm internal dia HDPE rm
conduit concealed from DB to various points as per drawing and specification.
4 Light Point Wiring
Supply and installation of light point wiring from DB to various points with 2 nos
of 2.5 sq.mm multistrand flexible cu. wire through 20 mm
concealed via junction box and switch as per drawing and specification
including the cost of junction box and switch. Point

5 Power Socket Point Wiring


Supply and installation of 3 pin 6A/16A( socket point wiring with 2 nos of 4 sq. mm +

1no of 1.5 sq. mm multistrand flexiblecopper wires through 25 mm internal dia HDPE
conduit concealed from DB to various points as per drawing and specification. Point
6 Telephone system
Supply and installation of telephone point wiring from telephone junction box
to individual point with 2 pair drop wire (0.5mm copper wire) through 20 mm
internal dia HDPE conduit concealed as per drawing and specification. Point

7 Supply and installation of telephone junction box(TJB) made of 18 swg ms sheet


cubical, concealed type with enamel paint complete with 4 IDC connector
as per drawing and specification set

8 Supply and installation of Co-axial copper screened TV-cable through


16mm internal dia HDPE conduit concealed from TV-cable amplifier to various
point as per drawing and specification. mtr
9 Supply and installation of TV-Cable socket (3''x3'' plate type) with GI
metal box concealed as per drawing and specification.
(North -West, Siemens or equivalent) Set
10 Light Fixtures
Supply and installation of following light fixture complete with tube, choke,
starter, capacitor, bulb with complete accesories as per drawing and specification.

Supply and installation of LDC 1520Decorative Integrated 20 W LED batten light.


The housing consists of high quality extruded aluminium high efficiency PC cover,
pre-wired uptp terminal block and with electronic ballast, provoded with elegantly Set
designed end caps make of LEGERO

Supply and installation of 42" celing fan with complete set with dimmer and
all accessories (Almonard / Crompton) set

Supply and instalation of LRP 1212 galaxy square12 watt sleek square panel downlights

with integrated edge-lit LEDs installed with high efficient low glare sheet for optimum Set
light distribution make of LEGERO.

Supply and installation of Electric bell buzzer and bell push switch Set

Decorative wall mounted mirror luminary with best quality suitable for housing the one
number of CFL lamp of 7W / 9W / 11W / 13 W including CFL or LED (Philips, GE, Mayfair,
wipro, Decon) Set

Decorative wall mounted luminary with best quality suitable for housing the one

number of CFL lamp of 7W / 9W / 11W / 13 W including CFL or LED (Philips, GE, Mayfair, Set
wipro, Decon)
11 Power Socket
Supply and installation of 13/15 Amp Combined S/Socket Northwest,Seimens or eqvt Set
modular switch socket 3.5''x 3.5'' sq. plate type unbreakable white plate (Modular)
with GI box concealed as per rawing
12 Supply and installation of RJ 11 socket 3.5''x 3.5'' sq.
plate type unbreakable white plate (Modular) with GI box concealed as per
drawing and specification. (Siemen / North-West make or equivalent) Set

13 Supply and installation of solar bakup system with 400 Watt solar pannel,
with 2 X 200 AH Solar battery @ 10, including with 1500 VA pure sine wave
inverter (options for charging from NEA main supply) mounting with complete
framebattery. structure with including 2 x 10 sq. mm multistrend flexible cable from solar

pannel to Battery. Set

14 Earthing
Supply and installation of earthing electrode made of 20 mm dia copper coated
2m long GI rod eletrode burried vertically 1 m below the ground level and the rod
covered by soil resistivity reducing compound as per drawing and specification
and complete with connection to system with 25mmx3mm copper strip . Set
Item Description Unit
No.
A. SANITARY INSTALLATION
1.0 WC
Providing and fixing in position Vitreous China European
pattern floor mounted water closet, seat height lev. at 17"-
19" above finished floor "S" or "P" type white glazed with
dual flush cistern of 3/6 litre capacity with dual flush fitting,
Heavy SS 3" screw with grip, Antimicrobial Seat, 1nos. PVC
connecting pipe with angle valve with CP cap, 1nos. of long
neck CP Bib Cock etc. accessories connection to soil pipe
line and water line connections all complete as per
drawing, specification, direction of the Engineer and ready
for operation.
Nos.
4.0 WASH BASIN
Providing and fixing in position Vitreous China Wall Hung
Basin size of 550x 400 with MS brackets with 8mm dia.
screw holes and heavy SS screw with expansion grip with
32mm dia. waste coupling with 32mm dia. PVC bottle trap,
2nos. of Angular Stop Cock with CP cap, 1nos. of mixer
with PVC 1' Connecting pipe, connection to waste line and
water lines all complete as per drawing, specification,
direction of direction of the Engineer and ready for
operation.
Nos.
6.0 ACCESSORIES
Providing and fixing in position the following accessories
with SS screws or mortar of 1:1 etc. all complete as per
drawing, specification, direction of the Engineer and ready
for operation.
a) Mirror of float glass size of 600mm x450mm Nos.
b)Ceramic conceal Soap Holder 150mm x 150mm Nos.
c)Multi Floor Trap Nos.
d) Providing and fixing in position heavy quality Shower set
with shower head, mixer and faucet. Nos.
e) Providing and fixing in position heavy quality shower
curtain. Nos.
f) Providing and fixing in position heavy quality towel rod
1.5 x 60cm Nos.
g) Providing and fixing in position 160dia. Rain water floor
trap Nos.
h) Providing and fixing in position 5kg ABC type Fire
Extinguisher Nos.

TOTAL OF SANITARY INSTALLATION


B. SOIL, WASTE, VENT & RAIN WATER PIPES
1.0 Providing and fixing in position heavy quality 6kgf/cm.sq
PVC pipes and fittings for soil, waste, vent and rain water
lines as per need including cutting the pipes to required
length and fixing in position with PVC or MS clamps as
required keeping pipe barer min. 50mm apart from the wall
face, joining pipes and fittings with rubber rings and joining
solution etc. including nailing, clamping. Pipe line should
lay disregarding groove cutting, hole cutting in brick work
or RCC all complete as per drawing, specification, direction
of the Engineer and ready for operation.

a) 110 mm dia. 6kgf/cm.sq UPVC pipes single or double


socket as per need with disregarding groove cutting, hole
cutting in brickwork or RCC work all complete. Rm.
b) 75 mm dia. dia. 6kgf/cm.sq UPVC pipes single or double
socket as per need with disregarding groove cutting, hole
cutting in brickwork or RCC work all complete.
Rm.
c) 50 mm dia. 6kgf/cm.sq UPVC pipes single or double
socket as per need with disregarding groove cutting, hole
cutting in brickwork or RCC work all complete. Rm.
2.0 Providing and fixing in position heavy quality PVC fittings or
specials with or without door access as per need, joining
pipes and fittings with rubber rings and solution etc.
including nailing, clamping. Pipe line should lay
disregarding groove cutting, hole cutting in brick work or
RCC work and all complete as per drawing, specification,
direction of the Engineer and ready for operation. The clam
of MS clamps is separate.

a) 110mm dia. UPVC fittings even or uneven section such


as bend single or double junction. As per need and
direction of the Engineer. Nos.
b) 75mm dia. UPVC fittings even or uneven section such as
bend single or double junction. As per need and direction of
the Engineer. Nos.
c) 50mm dia. UPVC fittings even or uneven section such as
bend single or double junction. As per need and direction of
the Engineer. Nos.
3.0 MS STRUCTURAL FABRICATION
Providing and fixing M.S structural work (for mounting two
overhead water tank) fabricated from standard sections i.e.
rounds, solid angels, slotted angles, channels, cutting to
size, drilling, welding, fixing and welding to insert plates in
RCC structural members, hang, clamp it properly in
position with metal grip expansion bolt, including red oxide
and enamel painting for pipe hanger, supports, clamps all
complete as per drawing specification, direction of the
Engineer and ready for operation. (The fabrication shop
drawing shall be submitted by the contractor for
commencement of the job).

kg.

TOTAL OF SOIL, WASTE, VENT & RAIN WATER PIPES


C. COLD and HOT WATER SUPPLY
1.0 COLD WATER LINES
1.1 Providing and fixing in position Chlorinated Poly Vinyl
Chloride (CPVC) with necessary CPVC fittings such as
elbow, tee, union, nipple, brass elbow and brass tee etc
making joint with applying solvent yellow, including nailing,
clamping. Pipe line should lay disregarding groove cutting
and hole cutting all complete as per drawing specification,
direction of the Engineer and ready for operation. Note: at
the outlet fittings should be of brass elbow or brass tee and
check valve as required.

a) 40mm dia. SDR 11CPVC pipe with fittings Rm.


b) 32mm dia. SDR 11 CPVC pipe with fittings Rm.
c) 25mm dia. SDR 11 CPVC pipe with fittings Rm.
d) 20mm dia. SDR 11CPVC pipe with fittings Rm.
e) 15mm dia. SDR 11 CPVC pipe with fittings Rm.
1.2 Providing and fixing in position CPVC valve
as per drawing specification, direction of
the Engineer and ready for operation.
a) CPVC CTS 40mm dia. Ball Valve Nos.
b) CPVC CTS 32mm dia. Ball Valve Nos.
c) CPVC CTS 25mm dia. Ball Valve Nos.
d) CPVC CTS 20mm dia. Ball Valve Nos.
2.0 HOT WATER LINES
2.1 Providing and fixing in position Chlorinated Poly Vinyl
Chloride (CPVC) with necessary CPVC fittings such as
elbow, tee, union, nipple, brass elbow and brass tee etc
making joint with applying solvent yellow, including nailing,
clamping. Pipe line should lay disregarding groove cutting
and hole cutting all complete as per drawing specification,
direction of the Engineer and ready for operation. Note: at
the outlet fittings should be of brass elbow or brass tee and
check valve as required.

a) 25mm dia. SDR 11 CPVC pipe with fittings Rm.


b) 20mm dia. SDR 11CPVC pipe with fittings Rm.
c) 15mm dia. SDR 11 CPVC pipe with fittings Rm.
2.2 Providing and fixing in position CPVC valve
as per drawing specification, direction of
the Engineer and ready for operation.
a) CPVC CTS 40mm dia. Ball Valve Nos.
b) CPVC CTS 32mm dia. Ball Valve Nos.
c) CPVC CTS 25mm dia. Ball Valve Nos.
c) CPVC CTS 20mm dia. Ball Valve Nos.
2.3 INSULATION TUBE
Providing and inserting in position 10mm wall thickness
Aeroflex or equivalent insulation tube applying talcum
powder and cut edges and joints should be sealed with
Aeroseal Adhesive all complete as per drawing,
specification and instruction of the Consultant and ready
for operation.

a) 27mm dia. 10mm thik. Rm.


b) 22mm dia. 10mm thik. Rm.
c) 16mm dia. 10mm thik. Rm.
3.0 PVC WATER TANK
Providing and fixing in position PVC water tank, provision of
drain and manhole with lock and connections all complete
as per drawing, specification, direction of the Consultant
and ready for operation.
a) 2000lit. PVC water tank Nos.
4.0 WATER TRANSFER PUMP
Providing and fixing in position 1 HP water transfer pump
with MS base as well as testing commissioning the same
all complete as per drawing, specification, direction of the
Engineer and ready for operation. Nos.
5.0 SOLAR WATER HEATER
Providing and fixing in position 250 lits. Solar water
heater as well as testing commissioning the same all
complete as per drawing, specification, direction of
the Site Engineer and ready for operation.

Nos.
TOTAL OF WATER SUPPLY
D. EXTERNAL WORKS
1.0 Providing and fixing in position heavy quality 6kgf/cm.sq
PVC pipes and fittings for soil, waste, vent and rain water
lines as per need including cutting the pipes to required
length and fixing in position and fittings with rubber rings
and joining solution etc. including excavation and back
filling all complete as per drawing, specification, direction
of the Engineer and ready for operation.

a) 110 mm dia. 6kgf/cm.sq UPVC pipes single or double


socket as per need with disregarding groove cutting, hole
cutting in brickwork or RCC work all complete. Rm.
b) 75 mm dia. 6kgf/cm.sq UPVC pipes single or double
socket as per need with disregarding groove cutting, hole
cutting in brickwork or RCC work all complete. Rm.
2.0 MANHOLE and GULLY TRAP
Construction of a catch basin size of 600x600 and max.
depth of 1.25m as per site condition including earth
excavation, brick soling, brick work 9" thick in cement
mortar (1:4) 110mm base concrete (1:2:4), internal and
outer surface cement plaster (1:4) & internal 5mm cement
punning and fixing 600x600 light CI cover with frame fixed
over 110mm thick RCC coping in 1:1.5:3. cement concrete
providing 10mm rods 110 c/c x 2nos.10mm rods with
screeding and punning on the floor with slope all complete
as per drawing, specification, direction of the Engineer and
ready for operation.

Nos.
TOTAL OF EXTERNAL WORKS
TOTAL OF SANITARY WORKS
S.No. Descriptions of Work Unit

A. Water tank, Pump,Fire Extinguisher:

1 Supply and installation of Water Pumping Set (to Pump Water


from Ground Water Tanks to the Over Head Tank):
a. Clear Water Transfer Pumping Set - Type: 'WP-1' consisting of set
Electrical Stainless Steel Open Well Multi Stage Centrifugal Pump
of 1.5 kW having capacity to discharge 100 lpm of clear water at
25 metre head (including Delivery + Friction Loss of the Pipe) with
NB 32 mm (1¼") delivery pipe size, including Electronic Level
Control Switch to control the water level of Over Head Tank &
Ground Tank, Electrical Control Panel of Pump, etc

2 Over Head Water Storage Tank:


a. Molded High Density Polyethylene (Heavy Duty) Water Storage set
Tank having Lockable Cover and necessary connection for Inlets,
Out lets, Inter Connection Pipe Line & Drain Pipe line of 'Hilltake'
or 'Nepatop' of 1'000 lts Capacity

3 set
ISI marked (IS:2878) portable CO2 type fire extinguisher type.
Including valve, discharge hose of not less than 10 mm dia & 1 M
long complete in all respects including initial filled with CO 2 gas
confirming to IS:307-1966 & filled to a filling rate of not more than
0.667 and wall suspension bracket.4.5 Kg capacity.

4 set
Fully charged ABC (Powder Type) Fire Extinguisher. In HP Mild
Steel Cylinders ISI marked/ TAC approved fitted with pressure
indicating gauge, internal tube, squeeze lever type valve fully
charged with ABC powder (Mono Ammonium Phosphate)
pressured by Nitrogen complete in all respects including wall
suspension bracket and confoming to IS:1349-1993.5 Kg capacity

5 Solar Water Heating System Set: By Client Supply


a. Solar water Heating System Set - consisting of Insulated Hot
Water Storage Tank (Horizontal Type) of 600 litres capacity with
Solar Collectors of 8.80 m² area including Auto Air Release Valve
of ½" size and Electrical Back-up having 3 sets of 2.0 kW heating
element and Thermostat . set

Sub - Total of A

Supply and Installation of the following Sanitary Apparatus


B.
and Fixtures as per drawings and instruction all complete:
1 Water Closet Set: (Installation charge only)
a. Water Closet consisting of White Glazed Vitreous China Porcelain set
Closed Coupled Floor Mounted WC 'S' trap Bowl with Duel Mode
(2/4 lts) Flushing Cistern, Soft Closing Seat & Cover, Toilet Paper
Holder, Angle Valves, Connector Tube, Health Faucet, Brackets,
etc. as per following schedule
- White Glazed Vitreous China Porcelain Floor Mounted 'S' trap
Water Closet Basin as one piece complete set including CP
anchorage Bolts, Nuts and Washers
- White Glazed slow closing Seat and Cover, Hinges, etc attached
with WC
- Toilet paper holder
- Universal Valve for Water Feed Pipe Lines
- Health faucet 450 mm long

2 Wash Basin Set: (Installation charge only)


a. Wash Basin Set consisting of White Glazed Vitreous China set
Porcelain Semi Recess Counter Type Lavatory Basin, CP Basin
Mixer, Waste, Bottle Trap, Angle Valves, Towel Rod (Short), Soap
Dish, etc.as per following schedule
- White Glazed Vitreous China Porcelain Counter top wash Basin
including fixing Bolts, 545x 400
- Milano Basin Mixer with pop up drain
- CP Regulating Valve for Water Feed Pipe Lines
- Flexible Braided Connector Tube with Nut & Washer 450 mm long

- White Glazed ABS Bottle Trap


- CP Towel Rod / Rail
- Soap Dish

3 Floor Drain Set:


a. Floor Drain Set consisting of uPVC Nahni Trap (110 mm x 75 mm set
size) with Stainless Steel Anti Cockroach Floor Grating, etc.as per
following schedule
- uPVC Nahni Trap 110 mm x 75 mm for Floor Drain
- Stainless Steel Anti Cockroach Floor Grating (Square or Round)

4 Shower Unit Set: (Installation charge only)


a. Shower Unit set consisting of CP Shower Mixer with Diverter for
Head Shower & Spout including Head Shower with Arm, Spout,
Soap Dish, CP Towel Rod, etc. set

Supply, Installation and fixing in position of single bowl large set


Stainless Steel Kitchen Sink without drain board of size
600x450x250 mm with 15 mm PVC connector -1nos. with both
5 ends couplings, 15mm CP sink cock , 40mm PVC bottle trap,
40mm CP Waste Coupling with Plug, stay and chain with testing
and ready for operation

Supply, Installation and fixing in position of Looking mirror Modi set


6
Guard 600x450 mm

Sub - Total of B
C. Cold and Hot Water Supply Pipe Line:

1 Cold Water Supply from Over Head Tank to the fixtures


(including duct pipe line):
a. C-PVC Pipe Line:
Cold Water Supply Pipe Line in the Ducts and from Duct to the
Toilets of the following sizes in Chlorinated Poly Vinyl Chloride (C-
PVC) Pipes of SDR-11 in Copper Tube Size (CTS) as per ASTM -
D 2846 of 'ASTRAL' India with necessary C-PVC Pipe Fittings (in
Socket joints) of SDR-11 in CTS as per ASTM - D 2846 of
'ASTRAL', India in C-PVC Solvent Cement (as per ASTM: 493)
joints including necessary Pipe Sleeves in the walls, Brackets,
Clamps, Hangers etc. of approved type also making holes,
pockets, etc. in walls or floors and making good the same to the
original condition, testing the pipe line with hydraulic pressure of
10 kg/sq cm, rectifying the leakage, if any, all complete as per
drawings, specifications and instructions.

- C-PVC Pipe of CTS 1¼" size rm


- C-PVC Pipe of CTS 1" size rm
- C-PVC Pipe of CTS ¾" size rm

2 Insulating the Hot Water Supply Pipe Line and Hot Water Return
Pipe Line of the following sizes with 9 mm thick 48 kg/cu m
density having 0.016 Kcal/hr m ºC thermal conductivity (as per BS
4370: part 2) pre molded Pipe Section for insulation of
"AEROFLEX" all complete, as per the specification and
instruction

- for C-PVC Pipe of CTS 1¼" size rm


- for C-PVC Pipe of CTS ¾" size rm
- for C-PVC Pipe of CTS 1" size rm

3 Valves:
a. Ball Valve for Insulating the C-PVC Pipe Line of ASTRAL, India of
the following pipe size:
- for C-PVC Pipe of CTS 11/4" size no
- for C-PVC Pipe of CTS 1" size no
- for C-PVC Pipe of CTS ¾" size no

4 Soil, Waste and Rain Water Drainage Pipe Line (from Toilets
to the ducts then to the nearest Manholes):
a. Soil & Waste Water Pipe Line (inside toilet from toilets to the
ducts only) having Unplastisied Poly Vinyl Chloride (uPVC-
Aquasafe and/or Ultradrain) Pipes conforming to Indian
Standard (ISI) of "ASTRAL" of India and all necessary Poly
Vinyl Chloride (uPVC-Aquasafe and/or Ultradrain) Pipe Fittings
conforming to Indian Standard (ISI) of "ASTRAL" of India of the
following sizes in uPVC Adhesive Cement Solvent and / or 'O'
Ring Socket Joints with necessary uPVC Pipe Fittings with or
without Clean Outs as per the condition, cutting the Pipes to the
required lengths and fixing pipe sleeves in the wall, clamps,
hangers, brackets, etc. of approved type including making
holes/pockets in walls or floor and making good the same to the
original condition, testing the pipe line by Smoke Test, rectifying
the leakage, if any, all complete as per the specification and
instruction.

- OD 50 mm (6.0 kgf/sq cm) rm


- OD 75 mm (4..0 kgf/sq cm) rm
- OD 110 mm (4.0 kgf/sq cm) rm
5 Sewer Pipe Line (Out side the Building including Rain Water):

a. Sewer Pipe Line having High Density Poly Ethylene (HDPE) Pipes
of "PANCHKANYA" conforming to Nepal Standard (NS:40) -
Working Pressure: 4 kgf per cm² of the following sizes in Butt
Welded Joints, cutting the Pipes to the required lengths, testing
the pipe line by Smoke Test, rectifying the leakage, if any, all
complete as per the specification and instruction

- OD 160 mm (6.0 kgf/sq cm) rm

Sub - Total of C

D. Civil Work

1 Construction of brick masonry Soil water chamber of internal size no


450x450mm with 250mm thick brickwork in 1:4 cement mortar,
450x450mm CI manhole cover with frame (medium duty), cement
plaster inside, height varies from 300 to 600mm

2 Construction of brick masonry waste water chamber of internal no


size 450x450mm with 250mm thick brickwork in 1:4 cement
mortar, 450x450mm CI manhole cover with frame (medium duty),
cement plaster inside, height varies from 300 to 600mm.The
manhole must be antisyphone type.

3 Sallow Tube well


Supply and installation of 50 m depth 150 mm dia.Sallow Tube
well all complete as per drawings, specification and instructions. NO.

Sub - Total of D

Total Amount of Sanitary Works(A+B+C+D)