Monthly HSE Activity Plan-Oct-2025
Monthly HSE Activity Plan-Oct-2025
1 2 3 4
i) Lifting tools & tackles (D-
i) Lifting tools & tackles (D-
shackles, slings, CPB etc.)
shackles, slings, CPB etc.)
Inspection and color coding
Inspection and color coding
Indwell- Harpreet
PEEPL- Harpreet
Akash Engg & RSA- Rahul
GEPL, Tribeni MPH- Chandan
PCTL- Vaishnav
HOLIDAY HOLIDAY Y Sahitya & AKS BP- Rahul
BTL & Hundal- Sonu
Tribeni BOP- Vaishnav
CISCONS & SEPL- Chandan
TKIL & SIPL- Sonu
Anand shree, Anandi & Shyam Engg-
verma
Alcohol testing
Speed limit inspection (Road 01 & 10 MASS HOUSEKEEPING
jn.)- 5-5.30 PM Alcohol testing
5 6 7 8 9 10 11
Illumination Level Monitoring Illumination Level Monitoring Illumination Level Monitoring Alcohol testing
MASS HOUSEKEEPING
Speed limit inspection (Road 02 & 10 Alcohol testing Speed limit inspection (Road 01 & Alcohol testing Speed limit inspection (Road 01 & 10
Illumination Level Monitoring
jn.)- 5-5.30 PM VIP road jn.)- 5-5.30 PM jn.)- 5-5.30 PM
12 13 14 15 16 17 18
BHARAT HEAVY ELECTRICALS LIMITED
Project: 2 X800 MW LARA STPP, STAGE- II
HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
19 20 21 22 23 24 25
MASS HOUSEKEEPING
Speed limit inspection (Road 02 & Alcohol testing Illumination Level Monitoring Alcohol testing Speed limit inspection (Road 01 & 10
03 jn.)- 12-12.30 PM jn.)- 5-5.30 PM
26 27 28 29 30 31
BHARAT HEAVY ELECTRICALS LIMITED
Project: 2 X800 MW LARA STPP, STAGE- II
HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Speed limit inspection (Road 02 & Speed limit inspection (Road 01 & 10
Illumination Level Monitoring Alcohol testing VIP road jn.)- 5-5.30 PM Alcohol testing jn.)- 5-5.30 PM
Illumination Level Monitoring Illumination Level Monitoring
Weekly Training on High Risk Activities (Work at Height, Electrical Safety, Hot work Safety,
4 Weekly
Confined Space, Rigging / Materials Handling, Defensive Driving etc.)
6 Electrical Installation Inspection (ELCB/RCCB, PDBs, Earth Pits Reg. etc.). Fortnight
8 T&P Inspection and Colour Code (Winch M/C, Crane & Hydra, Vehicles etc.) Monthly
10 Portable / Power Tools Inspection (Welding Machines / Grinding Machines etc. Monthly