Monthly HSE Activity Plan-Oct-2025

The document outlines the HSE (Health, Safety, and Environment) Activity Plan for Bharat Heavy Electricals Limited's 2 X800 MW Lara STPP project for October 2025. It details various inspections and activities scheduled throughout the month, including equipment inspections, safety checks, and training sessions. The plan emphasizes regular monitoring and compliance with safety standards to ensure a safe working environment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views4 pages

Monthly HSE Activity Plan-Oct-2025

The document outlines the HSE (Health, Safety, and Environment) Activity Plan for Bharat Heavy Electricals Limited's 2 X800 MW Lara STPP project for October 2025. It details various inspections and activities scheduled throughout the month, including equipment inspections, safety checks, and training sessions. The plan emphasizes regular monitoring and compliance with safety standards to ensure a safe working environment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

BHARAT HEAVY ELECTRICALS LIMITED

Project: 2 X800 MW LARA STPP, STAGE- II


HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3 4
i) Lifting tools & tackles (D-
i) Lifting tools & tackles (D-
shackles, slings, CPB etc.)
shackles, slings, CPB etc.)
Inspection and color coding
Inspection and color coding
Indwell- Harpreet
PEEPL- Harpreet
Akash Engg & RSA- Rahul
GEPL, Tribeni MPH- Chandan
PCTL- Vaishnav
HOLIDAY HOLIDAY Y Sahitya & AKS BP- Rahul
BTL & Hundal- Sonu
Tribeni BOP- Vaishnav
CISCONS & SEPL- Chandan
TKIL & SIPL- Sonu
Anand shree, Anandi & Shyam Engg-
verma
Alcohol testing
Speed limit inspection (Road 01 & 10 MASS HOUSEKEEPING
jn.)- 5-5.30 PM Alcohol testing
5 6 7 8 9 10 11

i) Farana inspection: i) Crane inspection:


PEEPL& Indwell -Chandan & BHEL Cranes inspection (400 T & 150 i) Gas cutting set & Welding
Harpreet, T) & ESP area , PEEPL Cranes machine inspection-
SEPL- Telesfor inspection- Chandan & Harpreet, PEEPL& Indwell- Chandan, SEPL&
Akash Engg. & BHEL 260 T crane inspection at CW GEPL- Telesfor,
Y sahitya- Rahul, area- Verma, AK Singhania, Ciscons, Tribeni MPH-
PCTL, RK Lala- Ganesh, BHEL Crane at MM yard, Y Sahitya & Verma,
i) Fire extinguisher inspection i) Construction machineries
Tribeni MPH, Ciscons, AKS (Boiler/ Akash Engg cranes- - Rahul Shyam industries, Anand Shree, Anandi
inspection (Boom placer, Electrical power tools (Grinding,
ESP)- Verma Hundal crane- Sonu Builders- Rohan
Respective zone officers to conduct dozer, roller, PQC machine) - Vibro hammer, Hill Tee, Rod
A K Singhania (Track hopper), ii) Store inspection: SIPL, BTL, TKIL, Hundal- Sonu Kumar,
theirzones Respective zone officers bending, Rod cutting m/c) inspection
SIPL, TKIL, BTL- Sonu PEEPL & SEPL- Telesfor Tribeni BOP- Ganesh
(Respective zone officers to conduct,
Shyam industries- Rohan Tribeni MPH & Ciscons- Pradeep
ii) RCCB & Earth Pit Inspection- if balance any)
WEEK OFF ii) Store inspection: Anandi Builders, Anand Shree- Rohan, ii) Man lifter inspection
PCTL - Rajesh Mondal
GEPL, Indwell- Pradeep PCTL- Ganesh PEEPL, SEPL- Rahul Mukherjee
BTL, TKIL, Hundal- Sonu Kumar SIPL- Sonu R K Lala- Verma
Tribeni BoP & R K Lala- Verma RSA- Rahul
iii) RCCB & Earth Pit Inspection-
iii) RCCB & Earth Pit Inspection- ii) RCCB & Earth Pit Inspection-
Anandi Builders- Rajesh Mondal
Tribeni BOP- Rajesh Mondal Anand shree- Rajesh Mondal

Illumination Level Monitoring Illumination Level Monitoring Illumination Level Monitoring Alcohol testing
MASS HOUSEKEEPING
Speed limit inspection (Road 02 & 10 Alcohol testing Speed limit inspection (Road 01 & Alcohol testing Speed limit inspection (Road 01 & 10
Illumination Level Monitoring
jn.)- 5-5.30 PM VIP road jn.)- 5-5.30 PM jn.)- 5-5.30 PM

12 13 14 15 16 17 18
BHARAT HEAVY ELECTRICALS LIMITED
Project: 2 X800 MW LARA STPP, STAGE- II
HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

i) Lifeline, RFA & Safety net


i) Earth moving equipment i) Earth moving equipment I) Scaffolding & ladder Inspection
inspection (Boiler 1) by Zone SO
inspection (Excavator/ Poclain, JCB/ inspection(Excavator/ Poclain, JCB/ 1. DG inspection including DG (Boiler-01) by Pradeep Saha
i) Labour Camp Inspection
Backhoe etc.) (AKS Boiler- ESP, SIPL, Backhoe etc.) (AKS Track hopper, operated lights of NTPC/ BHEL (Zone 1,
ii) Scaffolding & ladder (C P Verma)
Tribeni BOP, BTL, Tribeni MPH, Ciscons AKS reservoir, PCTL, Anand Shree, 2 & 5) II) Heavy vehicle inspection
Inspection (TG & MPH) by
Batching plant, Anandi Builders) RSA, Ciscons TG) by Rajesh Mondal (Zone 3, 4 & 6)- by Zone SO
Pradeep Saha ii) Heavy vehicle inspection
(Zone 1, 3 & 5) by respective zone
ii) RCCB & Earth Pit Inspection- ii) RCCB & Earth Pit Inspection- 2. First Aid box inspection by iii) RCCB & Earth Pit Inspection-
iii) DG inspection including DG safety officers
WEEK OFF respective zone officers
operated lights of NTPC/ BHEL
Indwell- Rajesh Mondal BTL & TKIL- Rajesh Mondal Ciscons- Rajesh Mondal
(Zone 3, 4 & 6)
by Rajesh Mondal

MASS HOUSEKEEPING Alcohol testing


Alcohol testing Speed limit inspection (Road 01 & VIP MASS HOUSEKEEPING
Alcohol testing Alcohol testing Illumination Level Monitoring
Speed limit inspection (Road 02 & road jn.)- 5-5.30 PM
VIP road jn.)- 3-3.30 PM Illumination Level Monitoring

19 20 21 22 23 24 25

i) Full Body Safety Harness


i) Lifeline, RFA & Safety net Inspection (Zone 2 & 4) by
i) Heavy vehicle inspection (Zone
inspection (Boiler 2) by Zone SO respective zone safety officers
2, 4 & 6) by respective zone safety i) RCCB & Earth Pit inspection
Drinking Water Facility
officersI) (SEPL & AKS) by Rajesh Mondal
ii) Lifeline, RFA & Safety net Inspection ii) Scaffolding & ladder Inspection
inspection (ESP 01) by Telesphore (Other than Boiler, TG & ESP area) by
ii) Scaffolding & ladder Inspection ii) Full Body Safety Harness
Respective zone officers to conduct Pradeep Saha
(ESP-01) by Pradeep Saha Inspection (Zone 4) by respective
iii) Batching plant inspection their agencies' Drinking water tank
WEEK OFF HOLIDAY zone safety officer
(PCTL, Anandi Builders, Tribeni iii) RCCB & Earth Pit Inspection-
iii) Diesel pump inspection of BHEL
MPH)
by Rajesh Mondal
Tribeni MPH- Rajesh Mondal

MASS HOUSEKEEPING
Speed limit inspection (Road 02 & Alcohol testing Illumination Level Monitoring Alcohol testing Speed limit inspection (Road 01 & 10
03 jn.)- 12-12.30 PM jn.)- 5-5.30 PM

26 27 28 29 30 31
BHARAT HEAVY ELECTRICALS LIMITED
Project: 2 X800 MW LARA STPP, STAGE- II
HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

i) RCCB & Earth Pit inspection i) Full Body Safety Harness


i) RCCB & Earth Pit inspection
(Batching Plant of AKS & RSA) by Inspection (Zone 1 & 5) by
(PEEPL) by Rajesh Mondal
Rajesh Mondal i) RCCB & Earth Pit inspection respective zone safety officers i) RCCB & Earth Pit inspection (if
(Batching plant of Ciscons & SIPL) any balance) by Rajesh Mondal
ii) Lifeline, RFA & Safety net
ii) Lifeline, RFA & Safety net by Rajesh Mondal ii) Scaffolding & ladder Inspection
inspection (Zone 3) by Nagraj
inspection (Zone 5) (Other than Boiler, TG & ESP area) ii) Full Body Safety Harness
ii) Lifeline, RFA & Safety net by Pradeep Saha Inspection (if balance any) by
iii) Full Body Safety Harness
iii) Heavy vehicle inspection inspection (Zone 4) respective zone safety officer
Inspection (Zone 3 & 5) by respective
WEEK OFF (Zone 2, 4 & 6) by respective zone iii) Batching plant inspection (AKS,
zone safety officers
safety officers RSA, SIPL, Ciscons)

Speed limit inspection (Road 02 & Speed limit inspection (Road 01 & 10
Illumination Level Monitoring Alcohol testing VIP road jn.)- 5-5.30 PM Alcohol testing jn.)- 5-5.30 PM
Illumination Level Monitoring Illumination Level Monitoring

Inspection Activities and Frequencies (Oct-2025)


Sl No Inspection Frequencies
BHARAT HEAVY ELECTRICALS LIMITED
Project: 2 X800 MW LARA STPP, STAGE- II
HSE Activity Plan For the Month of October-2025
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 Illumination Level Monitoring Weekly

2 Mass Housekeeping Weekly

3 Labour Camp Inspection Monthly

Weekly Training on High Risk Activities (Work at Height, Electrical Safety, Hot work Safety,
4 Weekly
Confined Space, Rigging / Materials Handling, Defensive Driving etc.)

5 Noise Level Monitoring Weekly

6 Electrical Installation Inspection (ELCB/RCCB, PDBs, Earth Pits Reg. etc.). Fortnight

7 Scaffolds/Ladder inspection and Tagging Fortnight & As per require

8 T&P Inspection and Colour Code (Winch M/C, Crane & Hydra, Vehicles etc.) Monthly

9 Fire Extinguisher Inspection Monthly

10 Portable / Power Tools Inspection (Welding Machines / Grinding Machines etc. Monthly

11 PPE'S / FBSH Inspection Monthly

12 Store Inspection Monthly

13 First Aid Box & first Aid Facility Inspection Monthly


14 Drinking Water Facility Inspection Monthly
15 Fall protection (life line & safety net) Monthly
16 Safety Awarness Programe Monthly