KPMG – Six Sigma (Green Belt)
All Questions and Answer
date:- 11/10/2025
Q1. Force Field Analysis has [Select all that apply]
• Forces resisting change
• Forces for Growth
• Forces for change
• Forces against Growth
Answer: Forces resisting change, Forces for change
Q2. A sample that will lead to incorrect conclusions about the population and
which will not be representative of the population is:
• Biased
• Random
• Clustered
• Stratified Random
Answer: Biased
Q3. Solution Acceptance Strategy TCP Stands for
• Test, cultural, and process
• Technical, Cultural and Political
• Test, control and process
• Total Control Process
Answer: Technical, Cultural and Political
Q4. Process is a collection of activities that takes one or more inputs and
transforms them into outputs that are of value to the ____
• Management
• Investors
• Customers
• Employee’s
Answer: Customers
Q5. Which of the following is not in a hypothesis test?
• One-Sample t-test
• One-Way ANOVA
• One-Sample q-test
• Chi Square Test
Answer: One-Sample q-test
Q6. Which of the following are examples of continuous data? [Select all that apply]
• Average repair time of a machine
• Ph scale used in acidity test
• Thickness of a wire
• Length of a cable
Answer: All of the above
Q7. Significance of control phase in DMAIC?
• To hold team together
• To hold the gains
• To extend deadlines
• To hold the championship award
Answer: To hold the gains
Q8. Digital Twin is?
• A virtual representation of an object or system
• CCTV for an object or system
• Audio for object or system
• Gamified object or system
Answer: A virtual representation of an object or system
Q9. An economist … decided to use One-Proportion to test the data. Was the
choice of test correct?
• Yes
• No
Answer: No
Q10. A process is said to be capable when:
• It falls outside of specification limits
• It has minimum errors
• All Data Points are lying within control limits (±3SD) and specification limits
• It falls outside of control limits
Answer: All Data Points are lying within control limits (±3SD) and
specification limits
Q11. Change management is
• unstructured approach …
• semi-structured approach …
• structured approach …
• None of the above
Answer: structured approach …
Q12. In which of the following cases will you reject the null hypothesis, where α =
0.05?
• p = 0.35
• p = 0.037
• p = 0.08
• p = 0.23
Answer: p = 0.037
Q13. Cycle time is the time taken to complete a specific task from ____ to ____
• Customer to Business
• Customer to Customer
• Start to Finish
• Business to Business
Answer: Start to Finish
Q14. Why organizations need to change? [Select all that apply]
• New technology
• Performance gaps
• Crisis/Competition
• New opportunities
Answer: All of the above
Q15. Milestones (Project Plan) are…
• Detailed project plan to define a problem statement
• Detailed project plan with key steps and target completion dates
• Detailed project plan to eliminate priorities
• Incomplete project plan with key steps and target completion dates
Answer: Detailed project plan with key steps and target completion
dates
Q16. Special Cause Variation is:
• None of the above
• Present in stable process
• Random and routine
• Non random and sporadic
Answer: Non random and sporadic
Q17. Problem Statement is
• Description of the “efforts”
• Description of the “mapping”
• Description of the “targets”
• Description of the “pain”
Answer: Description of the “pain”
Q18. Which of the following is known as the Ishikawa or Cause and Effect diagram?
• Pareto Chart
• Fishbone Diagram
• Gantt Chart
• Control Chart
Answer: Fishbone Diagram
Q19. The causes that are beyond the control of the present process boundaries
• Special Cause
• Common Causes
• Improper Causes
• Likely and Controllable Causes
Answer: Common Causes
Q20. Specification limits are decided by
• VOP
• VOB
• CTQ
• VOC
Answer: VOC
Q21. Calculation for Risk Priority Number (RPN) in FMEA is done with [Select All
that apply]
• Detection
• Occurrence
• Severity
• Objective
Answer: Detection, Occurrence, Severity
Q22. DMAIC approach we Define:
• What are Black Belt’s expectations…
• What are Master Black Belt’s expectations…
• What are Green Belt’s expectations…
• What are customer/Process/Business expectations?
Answer: What are customer/Process/Business expectations?
Q23. “Sigma” (Standard deviation) is a measure of _____
• Mean
• Variation
• Mode
• Median
Answer: Variation
Q24. A team wants to see if there is a relationship between ambient temperature
and viscosity of a material. Tool?
• Chi Square
• Scatter Diagram
• Two-Sample t-Test
• One-Way ANOVA
Answer: Scatter Diagram
Q25. Which waste elimination technique focuses on preventing errors?
• TQM
• Poka-Yoke
• None of these
• 5S
Answer: Poka-Yoke
Q26. An automobile company wants RPN (Severity=7, Occurrence=8, Detection=9).
• 504
• 405
• 105
• 305
Answer: 504
Q27. Waste type: Executive going to 1st floor for print repeatedly
• Waiting
• Transportation
• Underutilization
• Motion
Answer: Motion
Q28. How VSM supports Digital Transformation
• Identify Non-value-added, bottleneck, provide digital solution
• Identify unsatisfied Staff, managers and customers
• Identify unsatisfied Staff, managers and investors
• Identify Non-Performing Staff, machines and products
Answer: Identify Non-value-added, bottleneck, provide digital solution
Q29. Identify Discrete (Attribute) Data
• Number of students participating tournament
• Count of Feedback received
• Numbers of students who passed exams
• Count of Students passing exams
Answer: All of the above
Q30. Which element of project charter deals with improvement?
• Project Scope
• Goal Statement
• Business Case
• Problem Opportunity
Answer: Goal Statement
Q31. Most common measure of variability in data set
• Quartile Deviation
• Median
• Specification Limits
• Standard Deviation
Answer: Standard Deviation
Q32. Method for validating measurement system
• Attribute Agreement Analysis
• Project Charter
• Sub-process Mapping
• Sampling
Answer: Attribute Agreement Analysis
Q33. Sample size is dependent on all EXCEPT
• Precision
• Population
• Confidence Level
• Standard Deviation
Answer: Population
Q34. Relationship between 6 Sigma Levels and DPMO
• 3.6 DPMO
• 4 DPMO
• 3.4 DPMO
• 5.6 DPMO
Answer: 3.4 DPMO
Q35. Not included in a project charter
• Goal Statement
• Team Members
• Defect Summary
• Problem Statement
Answer: Defect Summary
Q36. Test for association between more than 2 discrete variables
• One-Sample t-Test
• One-Way ANOVA
• Chi Square Test
• Regression Analysis
Answer: Chi Square Test
Q37. Chart for variable data with subgroup = 10
• I-MR Chart
• np-Chart
• c-Chart
• X bar S-Chart
Answer: X bar S-Chart
Q38. Key difference Internal vs External Customer
• Internal customers always influence product design
• Internal introverts, external extroverts
• Internal core market, external not
• External customers best determine quality by experience
Answer: External customers best determine quality by experience
Q39. Responsibilities of a process owner [Select all]
• Owns end-to-end process
• Project review
• Helps resolve conflicts
• Sets goals for projects
Answer: Owns end-to-end process, Project review, Helps resolve
conflicts
Q40. Benefits of Lean Six Sigma for Digital Transformation [Select all]
• Accelerated Time-to-Market
• Streamlined Processes and Waste Reduction
• Limited or No Data-Driven Decisions
• Improved Customer Experience and Satisfaction
Answer: Accelerated Time-to-Market, Streamlined Processes and Waste
Reduction, Improved Customer Experience and Satisfaction
Q41. Statistical measure of strength of linear relationship
• Venn Diagram
• Bar Chart
• Correlation Coefficient
• Hypothesis
Answer: Correlation Coefficient
Q42. Who are not stakeholders in LSS Organization? [Select all]
• Process owner
• Blue Belt
• Black Belt
• External Auditors
Answer: Blue Belt, External Auditors
Q43. A Charter is: [Select all]
• Used to micromanage team members
• Keeps team aligned with organizational priorities
• Used by Apex Council to review progress
• Clarifies what is expected of the project
Answer: Keeps team aligned…, Used by Apex Council…, Clarifies
expectations
Q44. Key difference between Histogram and Boxplot
• Vertical vs Horizontal
• Histogram for Population, Boxplot for Sample
• Histogram shows distribution, Boxplot shows outliers
• Histogram for continuous, Boxplot for discrete
Answer: Histogram shows distribution, Boxplot shows outliers
Q45. Types of process maps [Select all]
• Swim Lane
• Top Down Flow Chart
• SIPOC
• Flow Chart
Answer: All of the above
Q46. VOC Step sequence mapping
1. Categorize → Step #3 → A
2. Prioritize → Step #4 → C
3. Identify Customer → Step #1 → B
4. Capture VOC → Step #2 → D
Answer: 1-A, 2-C, 3-B, 4-D
Q47. Diet program sample size (σ=9, E=2, 95% CL)
• 41 samples
• 87 samples
• 78 samples
• 44 samples
Answer: 78 samples
Q48. Alpha value for 95% confidence level
• 0.7
• 0.05
• 0.5
• 0.96
Answer: 0.05
Q49. Key considerations in collecting customer data [Select all]
• Time constraints
• Budget available
• Ensure expectations aligned
• Certainty needed to move forward
Answer: All of the above
Q50. Two-sample t-test conditions [Select all]
• Two random independent samples drawn
• Each population normal distribution
• One random sample drawn
• Equal std deviations assumed
Answer: Two random samples, Normal distribution, Equal std deviations
assumed