0% found this document useful (0 votes)
6 views4 pages

MEP Supervisor

Uploaded by

Imran Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views4 pages

MEP Supervisor

Uploaded by

Imran Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SHAHID IQBAL

MEP Supervisor (15 Years’ Experience)

Mobile: +966-536674611
Email: [email protected]
Iqama Status: Transferable
Location: NEOM, Saudi Arabia

Professional Summary
Dedicated and results-driven Electrical Site Engineer with hands-on experience in the
Construction and Maintenance of Electrical systems in the construction of Highrise
building, shopping malls, commercial building, housing projects, housing societies and
industrial projects and water transmission pipelines with a solid understanding of
electrical safety standards, troubleshooting, and system optimization, I have worked
across various sectors including industrial and commercial projects. I am eager to apply
my technical skills and problem-solving abilities in a dynamic environment, while
continuously adapting to new technologies and advancing my expertise in electrical
engineering

Core Competencies
 Material Take off, BOQ, Material consumption reports, MIR, WIR and PR
 Prepare redline and as built drawings.
 Preparing schedules for preventive maintenance, routine maintenance, emergency
maintenance and predictive maintenance.
 Maintenance, Installation, Testing & Commissioning of power distribution systems,
switchgears, transformers, generators, motors, RMUs, start delta control panels, street light
control panels, VFD, Fire Alarm control panels, and control panels
 Underground Infrastructure Electrification, MV/LV cables pulling, Power Grounding system,
lightening protection system, structure grounding and street light distribution system,
Glanding and termination of power cables, Electrical maintenance and troubleshooting in
industrial and commercial facilities.
 EMT, RGS and cable trays (GI, SS, Aluminum & PVC Coated installation)
 Installation of Area lighting system at pumping stations, Valve station and Scrapper launcher
and scrapper receiver stations.
 Installation of all electrical equipment’s in oil & gas facilities.
 Maintenance & Installation of security system, BMS system and public address system in
building.
 Maintenance & Installation of Conventional and package HVAC units, Ducted Units,
FCUs, AHUs units, FAUs, ducting, insulation, air balancing, VCDs, lours, Linear grills
and temperature controllers.
 Maintenance & Installation of water supply and sewerage system in buildings
 Loop testing of all loops and prepare tags and LOGs.
 MOVs, PTs, TTs, PITs, LS, LITs, FIT, Flow meters and Automated Pump & Water
analyzers units’ installation and termination.
 Installation & maintenance of RIO panels, RTU, PLC & SCADA Racks.
 Preparation daily, weekly and monthly reports.
SHAHID IQBAL
MEP Supervisor (15 Years’ Experience)

Carrier Details

Title: E&I Site Engineer (Dec-2024 to date)


Company: Al Rawaf Contracting Company
Project: Magna Brake water Pressure Tank and Water Transmission Line

 Supervising the installation of electrical equipment, instruments racks, Scada rack,


access control panels, MDB, SMDB, EMDB and control systems installation.
 Installation of EMT conduit, RGS pipe and cable tray in control room, valve chambers
and Battery building. Glanding and termination of MV, LV and ELV cables.
 Develop work schedule and allocate resources effectively to complete the projects in
given timeline by client.
 MV, LV, SMFOC, Digital, Analog, Profibus PA, Profinite, CAT6 and Power cables
pulling, dressing, termination and splicing.
 Installation of ground grids according to given plan for ELV, LV and MV system
respectively.
 Area lighting poles installation, testing and commissioning.
 Electrical wiring and control system for all building utilities.
 MOVs, PTs, TTs, PITs, LS, FIT, Flow meters and Automated Pump, Water analyzers
units
 Preparing the WIR, MIR and method of statements.
Title: MEP Section Head (Jan- 023 To Nov- 2024)
Company: The University of Lahore
Project: The University of Lahore Raiwind Road Campus Lahore.

 Overseas the team of multiple technicians in day-to-day activities involved in


completion of the maintenance tasks, preventive, predictive and emergency
maintenance schedules.
 Reviewing and interpreting construction & maintenance documents (Quotation’s
review. maintenance reports,)
 Conducting Preventive and schedule maintenance plans of MEP systems during
different stages of operation and verify compliance with HSE standards requirements
 Apply all Estimating / Cost saving techniques in accordance with the approved
Project Controls Execution and maintenance plan.
 Communicating and collaborating with contractors, architects, engineers and other
stakeholders to establish and maintain quality control measures of MEP system.
 Assistance during testing & commissioning of all MEP accessories after installation.
 Monitoring of the safety equipment’s installation, testing and commissioning
Title: MEP Engineer (Jun- 020 To Dec- 2022)
Company: BSM Developers, Lahore
Project: Gwadar Golf City Gwadar.

 Coordinated Interconnection MEP issues with other utilities.


 Manage Projects, Timelines Costs, Specifications and Documentation.
SHAHID IQBAL
MEP Supervisor (15 Years’ Experience)

 Assist Site Supervisors and provide technical supports to minimize production line
interruptions.
 Participated in testing activities such as Testing’s of Cables, Transformers, Motors,
Panel Boards and Fire Alarms.
 Maintain safety measures on site and ensure quality.
 Underground MV & LV cables laying, street lighting, Electrification in Parks, and
public places
 Installation of RMU, Transformers & LV panels
Title: QAQC Electrical Inspector (Dec- 018 To April- 020)
Company: Honeywell Turki Arabia CO. Ltd
Project: King Saud University & King Faisal Hospital

 Review project specifications, drawings, and method statements to ensure all


requirements are met.
 Implement Inspection & Test Plans (ITPs), Method Statements, and Quality
Procedures.
 Coordinate with the engineering and construction teams to ensure quality standards
are maintained throughout the project lifecycle.
 Monitor material submittals and ensure materials are approved before use.
 Perform inspections and testing on all electrical work (e.g., cable laying, termination,
panel installation, grounding, lighting, etc.).
 Verify proper installation and functioning of electrical systems such as transformers,
switchgear, generators, UPS, and other LV/MV equipment.
Title: E&I SUPERVISER (Dec- 016 To Nov- 018)
Company: ARK AD ENGINEERING & CONSTRUCTION CO.
Project: MASTER GAS SYSTEM EXPANSION PHASE II EWG-2 SECTION II PIPELINE 422
KM

 Supervising the installation of electrical equipment, instrumentation, and control


systems
 Proactive approach for preventive maintenance of all equipment to ensure smooth
operation.
 Managing and supervision of a team of electrical technicians.
 Develop work schedule and allocate resources effectively to complete the projects in
given timeline by client.
 To monitor the quality of work as per Aramco standards.
 Cable laying from power source to till load point as per Aramco standards.
 To supervise to connect all equipment’s with grounding with grid.
 Power distribution to camp offices.
 Area lighting poles installation, testing and commissioning.
 Overseeing routine and preventive maintenance of electrical and instrumentation
equipment, including motors, transformers, circuit breakers & control panels.

Title: Site Engineer Electrical (Sep-012 To Oct- 016)


SHAHID IQBAL
MEP Supervisor (15 Years’ Experience)

Company: Elite Engineering Pvt Ltd


Project: Construction of Sahiwal & Daulat Purr Bulk Oil Depot

 Supervise day-to-day electrical activities on-site related to cable laying, tray


installation, earthing, lighting, and power distribution.
 Ensure timely execution of electrical works as per project schedule.
 Review and interpret electrical drawings, SLDs, and installation details.
 Monitor subcontractor work to ensure compliance with approved drawings and
safety protocols.
 Provide technical support to foremen and technicians for site issues.
Title: Electrical Supervisor (April-012 To Aug- 016)
Company: Frontier Works Organization
Project: UNDERGROUND INFRASTRUCTURE DEVELOPMENT DHA LAHORE PHASE – 6

 To supervise he HV, LV cable laying as per provided drawings in block K, L, M, N and


P.
 Supervise the installation of transformers, poles, RMUs and DB, s.
 Prepare the weekly & monthly progress reports.
 Installation HV, LV termination kits and cable joints.
 Testing of HV & LV cables.
 To energize the system after confirmation.
 Generator’s installation and maintenance.
 To monitor construction and maintenance activities in staff residences & offices.
Education:

 Associate Engineer Electrical


(Punjab Board of Technical Education)
Computer Skills:
 AutoCAD
 MS Word
 MS Excel
Soft Skills:

 Communication
 Teamwork & Conflict Resolution
 Service -Focused
 Time management
 Leadership
Driving License:

 Under Process

You might also like