PROTOCOL OF TRACE AND REPLANTING
PROTOCOL OF TRACE AND REPLANTING
REV: 00
IDENTIFICATION
PROJECT:
CONTRACT: CONTRACTOR:
SAINT NICHOLAS SAINT JOHN MINE WORK ORDER NUMBER
AREA: DATE: PROTOCOL CODE:
GAME: Trace levels and layout N° DE PARTIDA:
Departure Information
TOOLS AND/OR EQUIPMENT TO BE USED
TOPOGRAPHIC EQUIPMENT: LEVEL theodolite TOTAL STATION OTHERS
MATERIALS TO USE:
CORD GYPSUM WOOD NAILS OTHERS
CHECKPOINTS
DESCRIPTION ACCEPTED REJECTED NOT APPLICABLECOMMENT
Dimensions in plan
Relative distances to constructions
Land quotas
B.M. reference quota
Distances between axes
Right angle between axes
Location and level of beacons
Dimension and alignment of foundations
Dimensions and location of footings
Alignment of plaster brands on the ground with
main and secondary axes
SCHEME - PLAN
Quality Management System
REV: 00
SUPERVISION COMMENTS
…………………………………………………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………………………………………………..
SIGNATURES
FIRM A SIGNATURE A