PROTOCOL OF TRACE AND REPLANTING

This document presents the protocol for the layout, levels, and layout of a project, including the identification of the project and work area, the tools and materials to be used, the control points to be verified, and the scheme or plan of the work. The supervisor will review that the established requirements are met and will provide comments on the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views2 pages

PROTOCOL OF TRACE AND REPLANTING

This document presents the protocol for the layout, levels, and layout of a project, including the identification of the project and work area, the tools and materials to be used, the control points to be verified, and the scheme or plan of the work. The supervisor will review that the established requirements are met and will provide comments on the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QUALITY MANAGEMENT SYSTEM

REV: 00

PROTOCOL - TRACE, LEVELS AND REPLANTING PAGE: 01

IDENTIFICATION
PROJECT:
CONTRACT: CONTRACTOR:
SAINT NICHOLAS SAINT JOHN MINE WORK ORDER NUMBER
AREA: DATE: PROTOCOL CODE:
GAME: Trace levels and layout N° DE PARTIDA:

Departure Information
TOOLS AND/OR EQUIPMENT TO BE USED
TOPOGRAPHIC EQUIPMENT: LEVEL theodolite TOTAL STATION OTHERS

MATERIALS TO USE:
CORD GYPSUM WOOD NAILS OTHERS

CHECKPOINTS
DESCRIPTION ACCEPTED REJECTED NOT APPLICABLECOMMENT

Dimensions in plan
Relative distances to constructions
Land quotas
B.M. reference quota
Distances between axes
Right angle between axes
Location and level of beacons
Dimension and alignment of foundations
Dimensions and location of footings
Alignment of plaster brands on the ground with
main and secondary axes

SCHEME - PLAN
Quality Management System
REV: 00

PROTOCOL – TRACE, LEVELS AND RE-PLANNING PAGE: 01

SUPERVISION COMMENTS

…………………………………………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………………………………………..
SIGNATURES

Site Manager D SUPERVISOR SHP D


NAME M NAME M

FIRM A SIGNATURE A