100% found this document useful (1 vote)
2K views97 pages

Rab Type 45

1 m3 Rp 112,500.00 m3 batu belah 1.000 Rp 112,500.00 zak semen 1.200 Rp 55,100.00 zak kapur 1.000 Rp 7,000.00 m3 pasir pasang 0.450 Rp 49,500.00 Upah 0.400 Pekerja Rp 12,000.00 0.040 Tukang Rp 1,600.00 Rp

Uploaded by

Muhammad Marlan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views97 pages

Rab Type 45

1 m3 Rp 112,500.00 m3 batu belah 1.000 Rp 112,500.00 zak semen 1.200 Rp 55,100.00 zak kapur 1.000 Rp 7,000.00 m3 pasir pasang 0.450 Rp 49,500.00 Upah 0.400 Pekerja Rp 12,000.00 0.040 Tukang Rp 1,600.00 Rp

Uploaded by

Muhammad Marlan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 97

Kebutuhan Besi Tulangan Pokok

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Kebutuhan Besi

Jenis Pekerjaan
Foot Plat
Balok Sloof
Ring Balk LT 1
Ring Balk LT 2
Kolom Praktis LT 1
Kolom Praktis LT 2
Kolom Struktur
Balok Lantai Induk
Balok Lantai Anak
Plat Lantai
Balok Balkon
Plat Balkon
Kolom Teras
Balok Teras
Plat Kanopy LT 1
Plat Kanopy LT 2
Plat Talang Air
Total Kebutuhan Besi

8
10.560

11
21
7
9
17
13
13
12
4
22
3
6
3
3
3
3
2

20.167
6.233
8.983
16.834
10.127
12.210
11.642
3.762
21.218
2.963
5.585
2.310
2.640
3.912
2.145
1.568

8
6

Satuan

6
6.600

12.210
8.731
1.881
19.113

13
9
2
20

2.833
1.155
1.320
3.337
2.030
1.265

3
2
2
4
3
2

152.00
67.00

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg

DAFTAR HARGA SATUAN BAHAN BANGUNAN


NO

HARGA /SATUAN

BAHAN BANGUNA

SATUAN

Batu Pecah / Belah

Rp

450,000.00

Rit

Kerikil / Krokos

Rp

300,000.00

Rit

Pasir Pasang

Rp

110,000.00

Pasir Urug
Bata Merah
Genteng Morando

100,000.00
500.00
4,000.00
3,800.00
6,000.00
-

m
bji
bji

Genteng Kerpus
Buis Beton

Rp
Rp
Rp
Rp
Rp
Rp

Besi 6 mm
Besi 8 mm SNI
Besi 8 mm FULL
Besi 8 mm SKS
Besi 8 mm Kurus
Besi 10 mm
Begel 8 x 10 cm
Begel 8 x 12 cm
Kawat Bendrat

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,000.00
38,000.00
38,000.00
28,000.00
19,000.00
44,000.00
13,500.00
13,500.00
13,500.00

btg
btg
btg
btg
btg
btg
kg
kg
kg

Keramik 30 x 30 cm

Rp

40,000.00

duz/m

Keramik 20 x 25 cm

Rp

37,000.00

duz/m

Keramik 20 x 20 cm
Portland Cement :
PC. 40 kg
PC. 50 kg
Semen Warna
Kapur Pasang
Kapur Halus
Kusen Pintu
Kusen Jendela :
Type J1
Type J2
Type J3 / Sudut

Rp

37,000.00

duz/m

Rp
Rp
Rp
Rp
Rp
Rp

47,000.00
55,100.00
2,500.00
7,000.00
8,000.00
50,000.00

zak
zak
kg
zak
zak
m

Rp
Rp
Rp

50,000.00
50,000.00
50,000.00

m
m
m

Daun Pintu Panil ( Biasa )


Daun Pintu Panil ( Jati )
Pintu Fiber
Daun Jendela + Kaca
Kaca
Roster 15 x 20 cm

Rp
Rp
Rp
Rp

500,000.00
900,000.00
175,000.00
300,000.00

Rp
Rp

47,000.00
3,000.00

unit
unit
unit
unit
lbr
bh

3
3

bji
bji

2
2
2

Kunci Tanam + Handle


Grendel
Engsel Pintu
Engsel Jendela
Kait Angin

Rp
Rp
Rp
Rp
Rp

60,000.00
5,000.00
6,500.00
6,500.00
2,500.00

bh
bh
bh
bh
bh

Pipa PVC 4 "


Pipa PVC 3.5 "
Pipa PVC 3/4 "
Pipa AW 5/8 " ( Listrik )

Rp
Rp
Rp
Rp

50,000.00
35,000.00
18,500.00
1,750.00

btg
btg
btg
btg

Buis Beton ( 0.08 x 1.00 m )


Buis Beton ( 0.07 x 1.00 m )

Rp
Rp

200,000.00
180,000.00

bh
bh

Gording 6/12 cm( Glugu )

Rp

20,000.00

Usuk 5/7 cm ( Glugu )


Usuk 5/7 cm ( Albasia )
Reng 2/3 cm ( Glugu )

Rp
Rp

8,000.00
4,000.00

Rp

1,000.00

m
m
m

Paku Idep
Amplas
Paku 2 Jangkar
Paku 3 Jangkar
Paku 4 Jangkar
Paku Usuk
Paku 7 cm
Paku KalsiBoard
Nusa Plank
Nusa Board
Compound
Eternit Kerang
Pleped/Lis Eternit
List Gypsum
Cat Vinilex
Cat Decholit
Cat Avvian
Minyak Cat
Roll Cat
Plamir
Lem Fox

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

16,000.00
1,500.00
9,833.33
9,250.00
9,250.00
11,000.00
12,000.00
20,000.00
45,000.00
42,000.00
57,500.00
80,000.00
2,000.00
5,000.00
90,000.00
70,000.00
20,000.00
18,500.00
11,000.00
5,000.00
5,500.00

kg
lbr
kg
kg
kg
kg
kg
kg
lbr
lbr
zak
peti
m
m
galon
galon
kg
lt
bh
bh
bungkus

Saklar Brocco Seri


Saklar Brocco Engkel
Kabel Eterna NYA
Kabel Eterna NYA Niko

Rp
Rp
Rp
Rp

13,000.00
11,000.00
170,000.00
42,000.00

bji
bji
rol
rol

Kabel Eterna Diamond


Fitting Segi Enam Plafond
Fitting Plafond Brocco
Fitting Plafond Miring
Stop Kontak
Klem
Lampu TL

Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
4,000.00
3,500.00
5,000.00
6,000.00
300.00
20,000.00

Klosed Jongkok " TOTO "


Wastafel Dapur
Floor Drain
Kran Dinding Biasa
Kran Leher Angsa
Stop Kran
Paving Block segi 6

Rp
Rp
Rp
Rp
Rp
Rp

95,000.00
150,000.00
2,500.00
12,000.00
35,000.00
12,000.00

Rp

50,000.00

m2

Batu Alur

Rp

90,000.00

rol

ATUAN BAHAN BANGUNAN

GA /SATUAN

KETERANGAN
SATUAN
3

Rp

112,500.00

Rp

75,000.00

Rp
Rp

btg
btg

Rp

500.00

bji

Rp

duz/m

Rp

duz/m

Rp

duz/m

Rp
Rp
Rp
Rp
Rp
Rp

1,000.00
1,142.86
-

2
2
2

zak
zak
kg
kg
unit

Rp
Rp
Rp

unit
unit
unit

Rp

unit

Rp
Rp

unit
unit

Rp

m1

t = 5 mm ( 66 x 6.5 cm )

Rp
Rp
Rp
Rp
Rp

bh
bh
bh
bh
bh

Rp

m1

Rp

bh

Rp

Rp

Rp

m3

Rp

duz

3
3

Rp
Rp
Rp
Rp
Rp
Rp

295,000.00
277,500.00
277,500.00
-

duz
duz
duz
duz
duz
duz

Rp
Rp

1,437.50
16,000.0000

kg
lbr

Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
14,000.00
-

kg
kg

(1 x 1 m) 1 peti = 5 m

1 gln = 5 kg
1 gln = 5 kg
1 kg / kleng

kg
Rp
Rp
Rp
Rp

1,700.00
840.00

m
m

1 = 100 m
1 = 50 m

Rp

700.00

1 = 50 m

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


PROYEK : PEMBANGUNAN RUMAH TINGGAL
LOKASI

TAHUN

:
URAIAN PEKERJAAN

No
I. 1a.

I. 1b.

I. 2a.

I. 2b.

HARGA SATUAN

JUMLAH HARGA

Pembersihan lapangan
Luas 1 m pembersihan lapangan diperlukan :
Upah :
0.052
Pekerja
0.003
mandor

Rp
Rp

30,000.00
50,000.00

Rp
Rp

1,560.00
150.00

Memasang Bouplank
Panjang 1 m memasang bouplank diperlukan :
bahan :
0.050
m kayu begesting / bambu
0.015
m kayu papan
0.050
kg paku 2 - 5 "

Rp
Rp
Rp

10,000.00
300,000.00
12,000.00

Rp
Rp
Rp

500.00
4,500.00
600.00

upah
0.010
0.010

Rp
Rp

30,000.00
40,000.00

Rp
Rp

300.00
400.00

Galian Tanah
Untuk 1 m galian diperlukan :
upah :
0.400
Pekerja
0.040
Tukang

Rp
Rp

30,000.00
40,000.00

Rp
Rp

12,000.00
1,600.00

Urugan Kembali
upah :
0.192
Pekerja
0.019
Tukang

Rp
Rp

30,000.00
40,000.00

Rp
Rp

5,760.00
760.00

Pekerja
Tukang

BAHAN

Rp

5,600.00

I. 3a.

I. 3b.

I. 3c.

Urugan Pasir
bahan :
3
m pasir urug
1.000
upah :
0.300
Pekerja
0.010
Tukang

Rp

100,000.00

135,000.00

Rp

135,000.00

112,500.00
66,120.00
49,500.00
7,000.00

Rp

235,120.00

Rp

100,000.00

Rp

100,000.00

Rp
Rp

30,000.00
40,000.00

Rp
Rp
Rp

9,000.00
400.00
9,400.00

Aastampang Batu Kali


bahan :
1.200
m batu belah

Rp

112,500.00

Rp

Pas. Fondasi Batu Kali


Untuk memasang 1 m batu kosong diperlukan :
bahan :
3
m batu belah
1.000
1.200
zak Portland Cement ( 50 kg )
3
m pasir pasang
0.450
1.000
zak Kapur

Rp
Rp
Rp
Rp

112,500.00
55,100.00
110,000.00
7,000.00

Rp
Rp
Rp
Rp

II.1a.

II.1b.

II.1c.

Beton Tanpa Tulangan


bahan :
4.360
(zak) semen
m3 pasir cor
0.500
3
m batu kricak 2/3
0.800
3.000
zak Kapur

Rp
Rp
Rp
Rp

55,100.00
110,000.00
75,000.00
7,000.00

Rp
Rp
Rp
Rp

240,236.00
55,000.00
60,000.00
21,000.00

Memotong dan Memasang Besi Beton


bahan :
# dia 8 mm
1.100
kg besi ( 10 % hilang )
1.100
kg bendrat

Rp
Rp

38,000.00
13,500.00

Rp

41,800.00

Membuat / memasang begesting


Cetakan beton tiap 1 m diperlukan
bahan :
3.000
m kayu / bambu
5.000
m usuk
1.000
lb Trilek 3 mm
1.000
kg paku

Rp
Rp
Rp
Rp

10,000.00
4,000.00
50,000.00
9,833.33

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00

1 m1
1 m1
1 m1
1 m1
1 m1
1 m1
1 m1

II. 2b

Pasang Bekisting untuk sloof


Pasang Bekisting untuk kolom praktis
Pasang Bekisting untuk kolom struktur
Pasang Bekisting untuk balok
Pasang Bekisting untuk plat lantai
Pasang Bekisting untuk plat kanopy
Pasang Bekisting untuk dinding

Pasangan Bata 1/2 Batu 1 : 2


1 m pasang tembok 1 :2 diperlukan
bahan

30,000.00
20,000.00
50,000.00
9,833.33

Rp

376,236.00

Rp

14,850.00

Rp

109,833.33

Rp
Rp
Rp
Rp
Rp
Rp
Rp

451,236.00
451,236.00
451,236.00
451,236.00
451,236.00
451,236.00
451,236.00

70.000
0.500
0.040
0.500
upah
0.100
0.010
0.320
0.015
II. 2b

bata merah
semen (zak)
3
pasir pasang (m )
zak Kapur

Rp
Rp
Rp
Rp

500.00
55,100.00
100,000.00
7,000.00

Rp
Rp
Rp
Rp

35,000.00
27,550.00
4,000.00
3,500.00

tukang batu
kepala tukang batu
pekerja
mandor

Rp

40,000.00

Rp
Rp

30,000.00
50,000.00

Rp
Rp
Rp
Rp

4,000.00
9,600.00
750.00

Rp
Rp
Rp
Rp

500.00
55,100.00
110,000.00
7,000.00

Rp
Rp
Rp
Rp

35,000.00
16,530.00
5,500.00
1,050.00

Pasangan Bata 1/2 Batu


1 m pasang tembok
bahan
70.000
bata merah
0.300
semen (zak)
pasir pasang (m3)
0.050
0.150
zak Kapur

Rp

70,050.00

Rp

58,080.00

II. 3a.

Pengerjaan / pemasangan Kusen


1 m kayu kusen diperlukan
bahan
m1 kayu kusen
1.050
0.063
kg paku
0.050
Amplas

Rp
Rp
Rp

50,000.00
12,000.00
1,500.00

Rp
Rp
Rp

52,500.00
750.00
75.00

Rp

53,325.00

III. 1d.

Mengerjakan Rangka Atap (Gording 6/12)


Untuk mengerjakan 1 m2 rangka atap diperlukan
bahan :
0.0500
kg paku
1.000
m1 kayu glugu

Rp
Rp

12,000.00
20,000.00

Rp
Rp

600.00
20,000.00

Rp

20,600.00

Rp
Rp

11,000.00
4,000.00

Rp
Rp

550.00
4,000.00

Rp

4,550.00

Rp
Rp

11,000.00
1,000.00

Rp
Rp

550.00
1,000.00

Rp

1,550.00

Pekerjaan Lesplank Papan


1 m' lesplank papan diperlukan
bahan :
m1 Nusa Plank ( 20 x 400 cm )
1.000
0.050
kg paku

Rp
Rp

45,000.00
16,000.00

Rp
Rp

45,000.00
800.00

Rp

45,800.00

Memasang Genteng
Untuk menutup atap 1 m2 diperlukan
bahan :
20.000
bh Genteng Morando Glazur

Rp

3,800.00

Rp

76,000.00

Rp

76,000.00

Memasang Perabung / Kerpusan Gernteng


Untuk menutup bubungan 1 m' diperlukan
bahan :
3.000
bh Genteng Kerpus ( Morando Glazur )
0.020
(zak) semen
(m3) pasir pasang
0.010

Rp
Rp
Rp

6,000.00
55,100.00
100,000.00

Rp
Rp
Rp

18,000.00
1,102.00
1,000.00

Rp

20,102.00

Rangka Plafond
Untuk 1 m rangka plafond diperlukan
bahan :
1.100
m kayu balok
0.063
kg paku usuk

Rp
Rp

4,000.00
11,000.00

Rp
Rp

4,400.00
687.50

Rp

5,087.50

Mengerjakan Rangka Atap ( Usuk )


Untuk mengerjakan 1 m2 rangka atap diperlukan
bahan :
0.050
kg paku
1.000
m kayu albasia
.
Mengerjakan Rangka Atap ( Reng )
Untuk mengerjakan 1 m2 rangka atap diperlukan
bahan :
0.050
kg paku
1.000
m kayu albasia
III. 1e.

III. 2a.

III. 2b.

IV. 1a.

IV. 2a..

Memasang Plafond Gypsum


1 m plafond asbes 5 mm diperlukan
bahan :
0.600
lbr Gypsum
0.100
kg paku plafond
0.100
kg Compoun

Memasang PlafondEternit
1 m plafond asbes 5 mm diperlukan
bahan :
1.100
lbr Eternit
0.063
kg paku plafond

Rp
Rp
Rp
Perlengkapan

Rp
Rp

42,000.00
20,000.00
1,437.500

Rp
Rp
Rp

25,200.00
2,000.00
143.75

16,000.00
20,000.00

Rp
Rp

17,600.00
1,250.00

Perlengkapan
IV. 2b..

Les Pinggir Plafond Gypsum


bahan :
1.100
m' Gypsum List

Les Pinggir Plafond Eternit


bahan :
1.100
m' List Eternit
0.063
kg paku

Rp
Perlengkapan

Rp
Rp

5,000.00

2,000.00
16,000.00

Rp

Rp
Rp

Rp
Rp
Rp

27,343.75
2,734.38
30,078.13

Rp
Rp
Rp

18,850.00
3,770.00
22,620.00

Rp
Rp
Rp

1,100.00
5,500.00
6,600.00

Rp

3,200.00

5,500.00

2,200.00
1,000.00

V .1b.

Plesteran Dinding 1 :5
1 m plesteran dinding tebal 1 cm diperlukan
bahan :
0.140
zak semen
0.020
m pasir pasang progo
0.050
zak Kapur

Rp
Rp
Rp

55,100.00
110,000.00
7,000.00

Rp
Rp
Rp

7,714.00
2,200.00
350.00

Rp

10,264.00

Pengaccian
bahan :
0.085
0.045

Rp
Rp

55,100.00
8,000.00

Rp
Rp

4,683.50
360.00

Rp

5,043.50

Rp

7,264.00

zak semen
zak Kapur

Plesteran Kasar / Siar


bahan :
0.090

zak semen

Rp

55,100.00

Rp

4,959.00

0.020

m pasir pasang progo

Rp

110,000.00

Rp

2,200.00

0.015

zak Kapur

Rp

7,000.00

Rp

105.00

V. 2a

V. 2c.

Vi. 1a.

Memasang keramik 30 x 30 Polos


bahan :
1.000
m ubin keramik
0.040
zak semen portland
0.003
zak semen putih / warnah
0.030
zak kapur
0.010
pasir pasang

Rp
Rp
Rp
Rp
Rp

40,000.00
55,100.00
2,500.00
7,000.00
110,000.00

Rp
Rp
Rp
Rp
Rp

40,000.00
2,204.00
7.50
210.00
1,100.00

Rp

43,521.50

Memasang keramik 20 x 20 Motif


bahan :
1.000
m ubin keramik
0.040
zak semen portland
0.003
zak semen putih / warnah
0.030
zak kapur
0.010
pasir pasang

Rp
Rp
Rp
Rp
Rp

37,000.00
55,100.00
2,500.00
7,000.00
110,000.00

Rp
Rp
Rp
Rp
Rp

37,000.00
2,204.00
7.50
210.00
1,100.00

Rp

40,521.50

Memasang keramik 20 x 25 Motif


bahan :
1.000
m ubin keramik
0.040
zak semen portland
0.003
zak semen putih / warnah
0.030
zak kapur
0.010
pasir pasang

Rp
Rp
Rp
Rp
Rp

37,000.00
55,100.00
2,500.00
7,000.00
110,000.00

Rp
Rp
Rp
Rp
Rp

37,000.00
2,204.00
7.50
210.00
1,100.00

Rp

40,521.50

Urugan Pasir Bawah Lantai


1 m urugan pasir diperlukan
bahan :
1.000
m pasir urug

Rp

110,000.00

Rp

110,000.00

Rp

110,000.00

Mengerjakan / Memasang Pintu dan Jendela Kayu


1 m daun pintu dan jendela diperlukan
bahan :
1.000
Unit Pintu P1
1.000
Jedela
1.000
Pintu Fiber

Rp
Rp
Rp

500,000.00
300,000.00
175,000.00

Rp
Rp
Rp

2,500.00
1,500.00
875.00

Rp
Rp
Rp

502,500.00
301,500.00
175,875.00

VI. 1b.

VII. 3a.

VII. 3b.

Mengerjakan / Memasang Pintu dan Jendela Kaca


1 m memasang kaca tebal 5 mm diperlukan
bahan :
1.100
m kaca bening
0.030
kg paku

Rp
Rp

47,000.00
16,000.00

Rp
Rp

51,700.00
480.00

Rp

52,180.00

Mengecat Kusen
untuk mengecat kusen 10 m denga bahan plitur diperlukan
bahan :
0.300
Cat Kayu
0.060
Minyak Cat / Tiner
0.100
Lem Fox + Semen Putih
0.200
lbr kertas amplas

Rp
Rp
Rp
Rp

20,000.00
18,500.00
8,000.00
1,500.00

Rp
Rp
Rp
Rp

6,000.00
1,110.00
800.00
300.00

Rp

8,210.00

Mencat Dinding Dan Plafond


Mencat dinding baru tiap 1 m (3 x sapu) sudah termasuk pekerjaan mendempul
bahan :
0.400
Kg Cat Penutup Kualitas Baik
0.100
Semen Putih
0.060
bh Rol Cat
0.200
lbr Ampelas
0.100
Lem Fox

Rp
Rp
Rp
Rp
Rp

18,000.00
2,500.00
11,000.00
1,500.00
5,500.00

Rp
Rp
Rp
Rp
Rp

7,200.00
250.00
660.00
300.00
550.00

Rp

8,960.00

VIII

Memasang Kloset
bahan :
1.000
buah kloset jongkok
0.008
zak semen
0.005
pasir pasang progo
Instalasi Air Bersih
bahan :
1.000
PVC 3/4"

Rp
Rp
Rp

95,000.00
55,100.00
110,000.00

Rp
Rp
Rp

95,000.00
440.80
550.00

Rp

95,990.80

Rp

18,500.00

Rp
Rp

18,500.00
1,850.00

Rp

20,350.00

Rp
Rp

50,000.00
5,000.00

Rp

55,000.00

Rp
Rp

35,000.00
3,500.00

Rp

38,500.00

10 % Perlengkapan
Instalasi Air Kotor
bahan :
1.000
batang pipa PVC dia 4"
10 % Perlengkapan

Instalasi Air Kotor / Cuci


bahan :
1.000
batang pipa PVC dia 3.5"
10 % Perlengkapan

Rp

Rp
Rp

50,000.00

35,000.00
1,750.00

Pasang Kran Air


1.000
Kran Air Biasa
10 % Perlengkapan

Rp
Rp

12,000.00
600.00

Rp
Rp

12,000.00
1,200.00

Rp

13,200.00

Kran Air Leher Angsa


10 % Perlengkapan

Rp
Rp

35,000.00
1,750.00

Rp
Rp

35,000.00
3,500.00

Rp

38,500.00

Memasang Wastafel + Perlengkapan


bahan :
1.000
washtafel
10 % Perlengkapan

Rp
Rp

150,000.00
7,500.00

Rp
Rp

150,000.00
15,000.00

Rp

165,000.00

Rp
Rp

2,500.00
125.00

Rp
Rp

2,500.00
250.00

Rp

2,750.00

Memasang Sumur Air ( Buis Beton ) + Penutup


bahan :
4.000
bh Buis Beton
1.000
bh Penutup Beton Cor

Rp
Rp

200,000.00
38,550.00

Rp
Rp

800,000.00
38,550.00

Rp

838,550.00

Memasang SEPTICTANK ( Buis Beton ) + Penutup


bahan :
2.000
Buis Beton
1.000
bh Penutup Beton Cor

Rp
Rp

200,000.00
38,550.00

Rp
Rp

400,000.00
38,550.00

Rp

438,550.00

Memasang Sumur Resapan ( Buis Beton + Penutup )


bahan :
1.000
Buis Beton
1.000
bh Penutup Beton Cor

Rp
Rp

180,000.00
38,550.00

Rp
Rp

180,000.00
38,550.00

Rp

218,550.00

1.000

Memasang Floor Drain


bahan :
1.000
Floor Drain
10 % Perlengkapan

IX. 1a.

Pemasang an instalasi Listrik 900 watt


Biaya satu titik api ditaksir
catatan :
a. Pemasangan instalasi listrik berdasarkan jumlah titik
api dan dikerjakan oleh instalator yang telah mendapat

persetujuan dari PLN, dan terdaftar dalam daftar rekanan.


b. Biaya titik api tersebut telah termasuk pemasangan kabel
pengantar untuk seluruh titik api.
c. Sesuai denga uraian pekerjaan, yang seharusnya termasuk
pada harga satuan titik api, seperti stop kontak, saklar seri,
sakelar engkel dipisahkan dan dihitung masing - masing
harga satuannya.
1.00
IX. 1b.

titik

Pemasangan 1 Titik Penerangan dan Stop Kontak


bahan :
1.000
bh Fiting Tempel
0.100
rol Kabel NYM 3 x 2.5 mm
10%
Perlengkapan
1.000
0.100
10%

bh saklar seri
rol Kabel NYM 3 x 2.5 mm

1.000
0.100
10%

bh saklar engkel
rol Kabel NYM 3 x 2.5 mm

1.000
0.100
10%

bh stop kontak
rol Kabel NYM 3 x 2.5 mm

PemasanganCarport
0.500
(zak) semen
m3 pasir cor
0.050
m3 batu kricak 2/3
0.050
0.250
zak Kapur

Rp

666,666.67

Rp

666,666.67

Rp

666,666.67

Rp
Rp

4,000.00
170,000.00

Rp
Rp
Rp

4,000.00
17,000.00
1,700.00

Rp

22,700.00

Rp
Rp
Rp

13,000.00
17,000.00
1,700.00

Rp

31,700.00

Rp
Rp
Rp

11,000.00
17,000.00
1,700.00

Rp

29,700.00

Rp
Rp
Rp

6,000.00
17,000.00
1,700.00

Rp

24,700.00

Rp
Rp

Rp
Rp

Rp
Rp

13,000.00
170,000.00

11,000.00
170,000.00

6,000.00
170,000.00

Rp
Rp
Rp
Rp

55,100.00
110,000.00
75,000.00
7,000.00

Rp
Rp
Rp
Rp

27,550.00
5,500.00
3,750.00
1,750.00

Rp

38,550.00

Rp
Rp

50,000.00
110,000.00

Rp
Rp

51,250.00
2,750.00

Rp

54,000.00

Rp
Rp

55,100.00
110,000.00

Rp
Rp

7,714.00
2,200.00

Pemasangan Paving
1.025
0.025

1 m2 - Paving block t = 6 cm
m2 Paving block t = 6 cm K. 250
m3 Pasir pasang

Finishing Batu Alur


1 m plesteran dinding tebal 1 cm diperlukan
bahan :
0.140
zak semen
0.020
m pasir pasang progo

0.050
1.000

zak Kapur
2
m Batu Tempel/ Alur

Rp
Rp

7,000.00
90,000.00

Rp
Rp

350.00
90,000.00

Rp

100,264.00

KEBUTUHAN BESI TOTAL UNTUK KV. NO 6


BESI
JENIS PEKERJAAN
7/6
8

SLOOF
RING BALK
KOLOM PRAKTIS ATAS
KOLOM PRAKTIS BAWAH
KOLOM TERAS
PLAT TERAS
BALOK TERAS + LATEY
PLAT KANOPI + LATEY
BALOK TRUSS
BALOK DAN PLAT TALANG
BALOK DAN DAK BELAKANG

13.20
82.53
14.08
53.14

290.10
256.56
140.72
366.00
26.40
55.08
28.16
76.10

27.00

137.45
62.33

BGL

286.10
303.20
138.40
403.75
36.00
38.33
38.20

57.00
59.33
40.00

7/6

10%

JML

13.20
82.53
14.08
53.14

1.32
8.25
1.41
5.31

14.52
90.78
15.49
58.46

27.00

2.70
JUMLAH

29.70

BESI DLM BTG

JENIS PEKERJAAN

7/6
SLOOF
RING BALK
KOLOM PRAKTIS ATAS
KOLOM PRAKTIS BAWAH
KOLOM TERAS
PLAT TERAS
BALOK TERAS + LATEY
PLAT KANOPI + LATEY
BALOK TRUSS
BALOK DAN PLAT TALANG
BALOK DAN DAK BELAKANG

10

1.210
7.565
1.291
4.871

8
26.593
23.518
12.899
33.550
2.420
5.049
2.581
6.975

2.475

12.600
5.714

10

38.333
3.502

Harga BESI
7/6
8
10
BGL

Rp
Rp
Rp
Rp

HARGA BESI / BTG

BGL
286.100
303.200
138.400
403.750
36.000

24,000.00
38,000.00
44,000.00
500.00

57.000
59.333
40.000
BTG
BTG
BTG
BJ

7/6

Rp
Rp
Rp
Rp

29,040.00
181,566.00
30,976.00
116,911.67

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8
1,010,515.00
893,684.00
490,174.67
1,274,900.00
91,960.00
191,876.51
98,090.67
265,064.25

59,400.00

Rp
Rp

478,784.17
217,127.78

10

Rp
Rp

154,073.33

5.000
0.540
0.820
4.000

12

10%

JML

12

1.21
7.57
1.29
4.87

290.10
256.56
140.72
366.00
26.40
55.08
28.16
76.10

29.01
25.66
14.07
36.60
2.64
5.51
2.82
7.61

319.11
282.22
154.79
402.60
29.04
60.59
30.98
83.70

26.59
23.52
12.90
33.55
2.42
5.05
2.58
6.98

137.45
62.33

13.75
6.23
JUMLAH

151.20
68.57

12.60
5.71
131.90

2.48
17.41

RGA BESI / BTG

Rp
Rp
Rp
Rp
Rp

BGL
143,050.00
151,600.00
69,200.00
201,875.00
18,000.00

Rp

19,166.67

Rp
Rp
Rp

28,500.00
29,666.67
20,000.00

HARGA BESI MASING - MASING PEKERJAAN


ITEM
D7 + 8 + 10 +BGL
SLOOF
Rp
1,153,565.00
RING BALK
Rp
1,045,284.00
KOLOM PRAKTIS ATAS
Rp
559,374.67
KOLOM PRAKTIS BAWAH
Rp
1,476,775.00
KOLOM TERAS
Rp
139,000.00
PLAT TERAS
Rp
373,442.51
BALOK TERAS + LATEY
Rp
148,233.33
PLAT KANOPI + LATEY
Rp
381,975.92
BALOK TRUSS
Rp
182,573.33
BALOK DAN PLAT TALANG
Rp
508,450.83
BALOK DAN DAK BELAKANG
Rp
296,527.78
Jumlah =
Rp
6,265,202.38

Pekerjaan
a. Sloof

Vol/m3
1.387

10

10%

JML

12

38.20

3.82

42.02

3.50

JUMLAH

3.50

HARGA BETON + BEKESTING


BETON
BEKESTING

Rp

VOL
1.3842
1.0915
1.4535
0.4982
0.2430
0.6148
0.5263
0.3763
0.2052
0.4239
0.4920

451,236.00

Jumlah =

Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HSP
624,600.87
492,533.12
655,871.53
224,823.82
109,650.35
277,419.89
237,494.53
169,812.74
92,593.63
191,280.75
222,008.11
3,298,089.34

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,778,165.87
1,537,817.12
1,215,246.19
1,701,598.82
248,650.35
650,862.41
385,727.86
551,788.66
275,166.96
699,731.58
518,535.89
9,563,291.71

b. Ring balk
c. Plat Kanopi
d. Kolom Praktis Atas
Kolom Praktis Bawah
e. Gunung - Gunung/ Truss
f. Balok Teras
Plat Teras
g. Plat dan Balok Dak Belakang
h. Kolom Teras
i. Talang Air
Jumlah Volume =

PC
PSR
KRL
KPR

###

KOEF
42.245
4.562
6.928
33.796

1.364
0.376
1.817
0.623
0.257
0.750
0.615
0.540
0.243
0.477
8.449

BAHAN
zak
m3
m3
zak

Rp
Rp
Rp
Rp

VOL PEK
55,100.00
110,000.00
75,000.00
7,000.00

Rp
Rp
Rp
Rp

KBTHAN
2,327,673.88
501,865.08
519,607.78
236,569.40

HRG SAT

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,778,165.87
1,537,817.12
1,215,246.19
1,701,598.82
248,650.35
650,862.41
385,727.86
551,788.66
275,166.96
699,731.58
518,535.89
9,563,291.71

NO.
I

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Pemebesiahan Lapangan
Luas Area =

88

m2

2 Pemasangan Bouwplank
Panjang Bouwplank :
13.00
13.00
Bwplank
10.00
10.00
Jumlah =
46.00
II

PEKERJAAN PONDASI
1 Pengukuran Pondasi
a Pondasi induk =

Jumlah =
b Pondasi Teras ( Depan + Belakang ) =
Jumlah =
c Pondasi Pagar =

Panjang Total Pondasi =

m
m
m
m
m

V
6.25
6.25
2.25
3.00
3.00
3.00

H
4.50
1.50
3.50
3.00
3.00
3.00

23.75
42.25

18.50

8.95
Blkang
2.30
Jumlah =
74.25

m
S. Kiri
4.75
m

2 Penggalian Pondasi
Penampang Pondasi :
Tinggi/ Kedalaman =
Lebar =

0.50
0.60

m
m

Luas =
Panjag Pondasi =

0.30
74.25

m2
m

22.28

m3

42.25

0.25
0.45
0.40

m
m
m

0.14
5.92
8.95
0.25
0.40
0.40

m2
m3
m
m
m
m

0.13

m2

Volume =
3 Pemasangan Pondasi
a Pondasi induk =
Penampang Pondasi :
Lebar Atas =
Lebar Bawah =
Tinggi =
Luas =
Volume =
b Pondasi Teras =
Lebar Atas =
Lebar Bawah =
Tinggi =
Luas =

S
m
m
m
m
m
m
m
m
m

S. Kanan
8.00

Depan
8.00
23.05

Satuan
m
m

Volume =
Pondasi
Pagar
=
c
Lebar Atas =
Lebar Bawah =
Tinggi =

m3
m
m
m
m

0.12
Volume =

2.77

m2
m3

Jumlah Volume =

9.84

m3

4 Urug Pasir Bawah Pondasi


Panjang Total Pondasi =

Luas =

74.25

Tebal Urugan =

0.03

Volume =

2.23

m2
m3

42.25

0.10

m2
m3

5 Anstamping
Panjang Pondasi Induk =
Tinggi Anstamping =
Volume =

4.23

6 Urug Tanah Bawa Lantai


Luas Total Lantai =

47.04

Tebal Urugan =

0.15

Volume =

7.06

m2
m3

7 Urug Pasir Bawa Lantai


Luas Total Lantai =

II

1.16
23.05
0.25
0.35
0.40

47.04

Tebal Urugan =

0.05

Volume =

2.35

m2
m3

51.20

0.03
1.54

m2
m3

3.30
17

m
tiang

0.02

PEKERJAAN BETON
1 Beton Sloof
Panjang Sloof =
Penampang Sloof =
b=
h=

Anstamping
Panjang Teras =

8.95

Tinggi Anstamping =

0.10

Volume =

0.15
0.20

a=
Volume =
2 Tiang Praktis
a. Bawah
Panjang Tiang / Tinggi =
Jumlah Tiang =
Luas Penampang =
b=
h=

0.15
0.15

Volume 1 tiang =

0.07

m2
m3

Volume total =

1.262

m3

a=

b. Atas
Kolom

Tinggi

Satuan

0.90

0.500

0.034

m3

1.120

0.050

m3

1.650

0.074

m3

2.200

0.099

m3

2.200

0.099

m3

1.820

0.041

m3

0.554

m3

V
6.25
6.25
2.25
3.00

H
4.50
1.50
3.50
3.00

S
m
m
m
m

3.00

3.00

3.00
3.00
26.75
48.25

3.00
3.00
21.50

m
m
m
m

0.0225

Jumlah Volume =
2.523

m3

48.25

a=

0.030

Volume =

1.45

m2
m3

Jumlah Total Volume =


3 Ring Balk
Panjang Ring Balk =
Penampang =
b=
h=

0.15
0.20

4 Plat Teras dan Balok


a Balok :
Panjang Balok =
b=
h=
a=
Volume =
b Plat :
Tebal =

0.15
0.30

5.50
m
m

0.05

m2
0.25

m3

0.10

7.00
Volume =

0.70

m2
m3

Jumlah Volume =

0.95

m3

Luas Plat =

5 Plat Kanopi / Cantylever


a Type 1 :
Tebal =
Luas =
Volume =
b Type 2 :
Tebal =
Luas =
Volume =
Type 3 :
c Tebal =
Luas =
Volume =

0.08

1.06

m2
m3

0.08
0.08

3.00
0.24

m2
m3

0.08

m2
m3

0.08

Total Volume =

0.405

Plat Talang dan Dak


6 Plat :
Tebal =

0.10

Area Plat =

6.00

Volume =

0.60

m2
m3

Kolom Teras
7 Tinggi =
Luas Penampang =
Jumlah Tiang =
Volume =
II

m3

2.700

0.03
2

m2
bh
m3

0.162

PEKERJAAN DINDING
1 Pasangan Dinding
b

Pasangan Bata Dinding Utama


a

Vertikal

Horisontal

Uraian Pekerjaan Dinding


Bawah

Atas

19.635

13.3851

10.560

11.6938

m2

6.435

0.909

m2

6.905

3.412

m2

6.651

11.538

m2

9.405

3.210

m2

13.86

5.400

m2

2.881

1.512

m2

14.655

5.100

m2

7.850

m2

7.405

m2

7.336

7.805

Luas =

121.382

Luas Total =

5.460

Area

m2
m2

61.620

m2
m2

183.002

2 Plesteran Dinding
b

Plesteran Dinding Utama


a

Vertikal

Uraian
Luar

Dalam

38.406

20.826

12.250

15.225

m2

9.382

6.540

m2

7.165

m2

Horisontal

19.284

7.221

m2

15.060

9.975

m2

32.33

19.500

m2

Area

2
Horisontal

5.424

m2

9.809

6.912

m2

3.407

13.637

m2

15.950

m2

5
6

13.300

6.910

m2

8.588

8.3874

m2

161.816

143.673

m2

Luas =
Luas Total =

Area

m2

305.489

3 Plesteran Siar
Plesteran Siar
a

Uraian

Area

Total
A
Vertikal

Horisontal

B
C
D
E
F
1
2
3
4
5
6
7

Luas Total =

m2

0.000

4 Pengaccian

b
Pengaccian Dinding Utama

Vertikal

Uraian Pekerjaan Dinding


Luar

Dalam

38.406

20.826

12.250

15.225

m2

9.382

6.540

m2

7.165

m2

D
E

19.284

7.221

m2

15.060

9.975

m2

32.33

19.500

m2

5.424

m2

2
Horisontal

Area

9.809

6.912

m2

3.407

13.637

m2

15.950

m2

6.910

m2

5
6

13.300

Area

Horisontal

7
Luas =
Luas Total =

8.3874

m2

161.816

143.673

m2
m2

305.489

5 Pemasangan Batu Alur


Luas Total =
13.826

m2

1.383

m2

15.208

m2

Volume =
II

8.588

PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA


a Kusen
Type
Jumlah
Keterangan
P1
4
P2
1
Fiber
JI
2
J2
3
J3
1
Ksn. Sudut
Rstr
15
Uraian Panjang Kayu Kusen :
Type
P1
JI
J2
J3

Tinggi
4.04
3.20
4.80
3.20

b Daun Pintu dan Jendela


Type
Jumlah
P1
4
P2
1
JI
2
J2
3
c Kaca Sudut
Lebar =
Panjang =

II

Ukuran
Lebar
Telinga
Panjang
0.920
0.20
5.16
1.040
0.40
4.64
1.960
0.40
7.16
3.200
0.40
6.80
Panjang Total =

Keterangan
Fiber

Jumlah
Kusen
4
2
3
1

Jumlah
Panjang
20.64
9.28
21.48
6.80

Type

Jumlah

Pintu
Jendela

0.765
1.660

m
m

Luas =

1.270

m2

10%

0.127

m2

Jumlah Volume =

1.397

m2

4
5

PEKERJAAN LANTAI DAN KERAMIK


a Lantai Keramik
Uraian Luas Lantai
Area

Luas Lantai

10%

Jumlah

Keterangan

Satuan

Utama

36.67

3.67

40.33

K 40/40

m2

Teras Depan

5.72

0.57

6.29

K 40/40

m2

Wc/Km 1

1.82

0.18

2.00

K 20/20

m2

Teras Belakang
Jumlah =

2.84

0.28

3.12

K 40/40

m2

47.044

51.75

m2

b Dinding Keramik
Dinding
Luas

Area

Keterangan

Satuan

KM/WC

6.870

0.69

7.557

20 x 25

m2

Dinding Dapur

2.000

0.20

2.200

20 x 25

m2

Plat Dapur

2.000

0.20

2.200

20 x 20

m2

Jumlah =
III

Jumlah

m2

11.957

PEKERJAAN ATAP
Daftar Panjang Kayu :
Gording 8/12
Usuk 5/7
Reng 3/3

2.00
2.00

2.50
2.50
2.50

Panjang ( m )
3.00
3.00

3.50

4.00

a Rangka Atap
Panjang
Bentang
6.850
3.850
3.850
3.850
3.150
5.150
2.250
3.150
3.750

Jenis Balok

Gording 8/12

Panjang
Bentang
3.700
3.000
2.750
3.950
1.150
1.850

Jenis Balok

Usuk 5/7

10%

Jumlah

0.685
0.385
0.385
0.385
0.315
0.515
0.225
0.315
0.375

7.535
4.235
4.235
4.235
3.465
5.665
2.475
3.465
4.125

Jarak Usuk

Jumlah Usuk

0.25

14.800
12.000
11.000
15.800
4.600
7.400

Total
Panjang
39.435

Satuan
m1

Dipakai
Usuk ( m )
6.100
3.010
4.000
4.820
1.480
2.730

Panjang Total
90.28
36.12
44.00
76.16
6.81
20.20

Panjang Total
112.85
45.15
55.00
95.20
8.51
25.25

Jumlah
Panjang
Bentang
6.100
3.010
4.000
4.820
1.480
2.730

Jenis Balok

Reng 3/3

Jarak Reng

Jumlah Usuk

0.20

30.500
15.050
20.000
24.100
7.400
13.650

Panjang
Reng
3.70
3.00
2.75
3.95
1.15
1.85

Total

Satuan

Jumlah

b Penutup Atap
1 Pasang Genteng
Area
Luas Atap

Luas

10%

Luas Atap

31.935

3.19

35.129

m2

28.758

2.88

31.633

m2

5.000

0.50

5.500

m2

72.262

m2

Jumlah Luas =
2 Pasang Kerpus
Atap

Panjang

10%

Total

Satuan

6.700

0.67

7.370

m1

1.850

1.24

3.090

m1

10.460

m1

Jumlah
27
27

m
m

Panjang Total =

c Lisplank ( Wood Plank )


Area
Panjang
1
26.620
Panjang Total =

IV

2%
0.53

PEKERJAAN PLAFOND
a Rangka Plafond 5/7
Luas Area Plafond :
Ruang
Luas

Satuan

Ket

Jumlah
41.913

Ruang Utama

19.8225

Kamar Tidur 1

8.1225

m2

Kamar Tidur 2

8.1225

m2

KM/WC

1.8225

m2

Teras

4.0225

m2
Jumlah

41.913

Rangka Plafond Dalam


Ruang

Panjang

Jumlah

10%

Jumlah

Satuan

3.100

15.500

1.550

17.050

m1

4.350

8.700

0.870

9.570

m1

2.850

8.550

0.855

9.405

m1

4.850

9.700

0.970

10.670

m1

5.850

23.400

2.340

25.740

m1

5.100
2.850
2.850

1
10
10

5.100
28.500
28.500

0.510
2.850
2.850

5.610
31.350
31.350

m1

Jumlah Total =

140.75

m1

10 % Penggantung =

14.075

m1

Kebutuhan Total / Vol Total =

154.820

m1

Ruang Utama

Kamar Tidur 1
Kamar Tidur 2

Rangka Plafond Luar


Plafond Luar =

46.446

m1

10 % Kayu Terbuang =

4.645

m1

Volume =

51.09

m1

b Plafond Gypsum ( Dalam )


Ruang
Luas

10%

Jumlah

Satuan

Ruang Utama

19.8225

1.982

21.805

m2

Kamar Tidur 1

8.1225

0.812

8.935

m2

Kamar Tidur 2

8.1225

0.812

8.935

m2

KM/WC

1.8225

0.182

2.005

m2

Teras

4.0225

0.402

4.425

m2

46.104

m2

Jumlah Luas =
Plafond Eternit ( Luar )
`Lebar
Panjang

0.700

Luas

10%

Jumlah

Satuan

3.700

2.590

0.259

2.849

m2

3.090

2.163

0.216

2.379

m2

3.000

2.100

0.210

2.310

m2

3.060

2.142

0.214

2.356

m2

3.300

2.310

0.231

2.541

m2

1.850

1.295

0.130

1.425

m2

4.450

3.115

0.312

3.427

m2

0.870

0.609

0.061

0.670

m2

17.9564

m2

Jumlah Luas =

c Lis Plafond
1
Ruang

Panjang

Dalam ( Gypsum Board )


10%
Jumlah

Ruang Utama

20.400

2.040

22.440

m1

Kamar Tidur 1

3.350

0.335

3.685

m1

Kamar Tidur 2

3.350

0.335

3.685

m1

KM/WC

2.850

0.285

3.135

m1

Teras

2.850

0.285

3.135

m1

36.080

m1

Jumlah Panjang =
Luar ( Kayu Lis )

Satuan

Panjang Total =

46.446

m1

10 % Kayu Terbuang =

4.645

m1

Volume =

51.09

m1

PEKERJAAN PENGECATAN
a Pengecatan Dinding Utama
Pengecatan Dinding Utama

Vertikal

Bawah

Atas

38.406

20.826

12.250

15.225

m2

9.382

6.540

m2

Total =

7.165

10 % =

Satuan

Area

Dinding

Vertikal
E

19.284

m2
2

15.060

9.975

32.33

19.500

m2

5.424

m2

2
Horisontal

7.221

9.809

6.912

m2

3.407

13.637

m2

15.950

6.910

m2

Total =

10 % =

Volume =

6
7
Luas =

13.300
8.588

8.3874

161.816

143.673

305.489

m2

10 % =

30.549

m2

Volume =

336.038

m2

Volume Total Pengecatan Dinding :


Luas
Satuan

Dinding Utama

336.038

Dinding Pagar

45.430

Kanopy

6.524

Teras

Keteranga

Putih

Putih

Putih

Merah

m
m
m

12.392

Luas

Area

Luas Total =

b Pengecatan Plafond
Plafond Dalam
Ruang

3
5

Area

Volume =

Satuan

Total
387.992

12.392

Plafond Luar

Ruang Utama

19.8225

Panjang

Luas

Kamar Tidur 1

8.1225

m2

3.700

2.590

Kamar Tidur 2

8.1225

m2

3.090

2.163

1.8225

3.000

2.100

3.060

2.142

KM/WC
Teras

4.0225

Jumlah

41.913

`Lebar

0.700

3.300

2.310

10%

4.191

1.850

1.295

Volume =

46.104

m2

4.450

3.115

0.870

0.609

Volume =

c Pengecatan Kusen
Daftar Panjang Kayu Kusen
Type

Jumlah Kusen

Panjang
Kusen

Jumlah
Panjang

P1

5.160

20.640

JI

4.640

9.280

J2

7.160

J3

6.800

Kerliling
Balok

Luas

10%

7.327

0.733

3.294

0.329

21.480

7.625

0.763

6.800

2.414

0.241

Jumlah Luas

0.355

Daun Pintu dan Jendela

VI

Type

Jumlah Daun

Luas Daun

Jumlah Luas

Jumlah

Satuan

P1

3.486

13.944

13.94

m2

JI

0.560

1.12

1.12

m2

J2

0.560

2.24

2.24

J3

0.560

0.56

0.56

m2
m2

Jumlah Luas =

17.864

m2

Volume Total Kusen dan Daun =

40.591

m2

PEKERJAAN SANITASI DAN INSTALASI AIR


a Instalasi Air
Instalasi Air Bersih PVC 0.75 "

1
Panjang =

23.3

m1

10%

2.33

m1

26

m1

Panjang Total =

Instalasi Air Kotor PVC 3 "

11.00

m1

10%

1.1

m1

Panjang Total =

12

m1

Panjang =

Instalasi Air Tinja PVC 4 "

3
Panjang =

5.00

m1

10%

0.50

m1

m1

Unit

Buah

0.08
0.8

m
m2

0.064

m3

Unit

Buah

0.08
0.8

m
m2

0.064

m3

Unit

Buah

Panjang Total =
b Sanitasi
1 Septictank
Buis Beton 80 cm x 1 m
Jumlah =
Penutup Atas :
Tebal =
Diameter =
Volume =
2 Sumur Air
Buis Beton 80 cm x 1 m
Jumlah =
Penutup Atas :
Tebal =
Diameter =
Volume =
3 Sumur Peresapan
Buis Beton
Jumlah =

80 cm x 1 m

Penutup Atas :
Tebal =
Diameter =

0.60

m
m2

Volume =

0.05

m3

Buah

0.30
0.60
0.10

m
m
m
m3

4 Bak Kontrol
Pasangan Bata 30 x 30 cm
Jumlah =
Volume Pasangan :
Tinggi =
2 x Lebar =
Tebal =
Volume =
Penutup Atas :

5
6
7
8
9
VII

0.02

Penampang =
Tebal =

0.21
0.08

Volume =

0.02

m2
m
m3

Kran Air Biasa


Kran Air Leher Angsa
Wastafel Dapur
Floor Drain
Klosed Jongkok

2
1
1
1
1

bh
bh
bh
bh
bh

7
7
2
5
7
7

titik
bh
bh
bh
bh
bh

16.750
0.08

m2
m
m3

PEKERJAAN ELEKTRIKAL
Jumlah Titik Lampu =
Fiting Tempel =
Saklar Seri =
Sanklar Engkel =
Stop Kontak =
Lampu TL =

VIII

0.08

PEKERJAAN FINISING
a Carport
Luas Carport Area =
Tebal Rabat =
Volume =
b Pembatas Taman / Pagar Taman
Dari Pasangan Bata
Tinggi =
Panjang =
Luas =

1.340

0.20
9.03
1.806

c Rabat Beton
Luas =
Tebal =

3.35
0.05

Volume =

0.17

d Paving Block

m
m
m2

m2
m
m3

Luas =
Urug Pasir =

5.00
0.05

Volume Pasir =

0.250

m2
m
m3

m
m2
m3

Anstamping
Panjang Pagar =

23.05

Tinggi Anstamping =

0.10

Volume =

2.31

m2
m3

Pasangan Bata Dinding Pagar


Luas :
Kanan

11.613

m2

Kiri Depan

5.013

m2

Kiri Belakang

5.000

m2

Belakang

5.775

m2

Depan

3.887

m2

31.287

m2

Total =

Plesteran Dinding Pagar


Luas :

Plesteran Kanopy

Kanan

11.613

m2

Type

Jumlah

Luas

Total

Kiri Depan

10.026

m2

1.058

1.058

Kiri Belakang

10.000

m2

2.858

2.858

1.000

1.000

Belakang
Depan

5.775

3.887
Total =

41.300
Plesteran Teras

Luas :

Luas

Jumlah Luas =

2.965

Plat

0.546

m2

Balok

4.000

m2

Kolom

6.720

m2

11.266

m2

Total =

Plesteran Siar Pagar


Luas :
Kanan

m2

Kiri Depan

m2

Kiri Belakang

m2

Belakang

m2

Depan

m2
Total =

m2

0.000

Pengaccian Dinding Pagar


Luas :
Kiri

11.613

m2

Depan 1

10.026

m2

Depan 2

10.000

m2

Kanan 1
Total =

Pengaccian Kanopy

Type

Jumlah

Luas

Total

1.06

2.12

3.887

2.86

5.72

41.300

m2

1.00

5.775

Kanan 2

Jumlah Luas =

Pengaccian Teras
Luas :

Luas

Plat

0.546

m2

Balok

4.000

m2

Kolom

6.720

m2

11.266

m2

Total =

2.00
9.830

10%

Total

2.064
0.928
2.148
0.68

22.70
10.21
23.63
7.48
64.02

Engsel

Grendel

Kait Aingin

12
10

4
5

10

Kunci
Tanam
4

10%
9.028
3.612
4.400
7.616
0.68
2.02

10%
11.285
4.515
5.500
9.520
0.851
2.525

Jumlah
Panjang/ m
99.31
39.73
48.40
83.77
7.49
22.22
300.92

Total
Kebutuhan/ btg
39.72
15.89
19.36
33.51
3.00
8.89
120.37

Jumlah
Panjang
124.14
49.67
60.50
104.71
9.36
27.78
348.38

Total
Kebutuhan
62.07
24.83
30.25
52.36
4.68
13.89
174.19

Pengecatan Dinding Pagar


Luas :
m2

Depan 1

10.026

1.058

1.764

Depan 2

10.000

m2

2.858

2.702

1.000

1.465

Kanan 1
Kanan 2
10 % =

Pengecatan Kanopy

11.613

Kiri

Total =

5.775
3.887
41.3
4.130

Type

Luas

Total

Jumlah Luas =

5.931

10 % =

0.593

m
m

Volume =

6.524

Volume =

45.430

m2

Pengecatan Teras
Luas :

Luas

Plat

0.546

m2

Balok

4.000

m2

Kolom

6.720

m2

Total =

11.266

m2

10 % =

1.127

m2

Volume =

12.392

m2

10%

Jumlah

Satuan

0.259

2.849

m2

0.216

2.379

m2

0.210

2.310

m2

0.214

2.356

m2

0.231

2.541

m2

0.130

1.425

m2

0.312

3.427

m2

0.061

0.670

m2

17.956

m2

e=

Jumlah

Satuan

8.060

m2

3.624

m2

8.388

m2

2.655

m2

22.73

m2

n Kanopy

m2
m2
m2
m2

n Kanopy

m2
m2
m2
m2

n Kanopy

m2
m2
m2
m2
m2
m2

RENCANA ANGGARAN BIAYA TYPE 45


A. BAHAN
NO

URAIAN PEKERJAAN

VOL

SAT

a. Pembersihan Area

88.00

m2

b. Memasang Bowplank

46.00

m1

a. Galian tanah pondasi

22.28

m3

b. Urugan kembali 1/4 Galian

5.57

m3

c. Urugan Tanah Bawah Lantai

7.06

d. Urugan Pasir Bawah Lantai

HRG SATUAN

JUMLAH HRG

I. Pekerjaan Persiapan
1

Permulaan

Rp

5,600.00

Rp

257,600.00

m3

Rp

110,000.00

Rp

776,222.70

2.35

m3

Rp

110,000.00

Rp

258,740.90

2.23

Rp

100,000.00

Rp

222,750.00

4.23

m3

Rp

135,000.00

Rp

570,375.00

2.Teras

0.90

Rp

135,000.00

Rp

120,825.00

3.Pagar Keliling

2.31

m3

Rp

135,000.00

Rp

311,175.00

1.Induk

5.92

m3

Rp

235,120.00

Rp

1,390,734.80

2.Teras

0.13

m3

Rp

235,120.00

Rp

30,565.60

3.Pagar Keliling

2.77

m3

Rp

235,120.00

Rp

650,341.92

1. Balok Sloof

1.54

m3

Rp

451,236.00

Rp

693,098.50

2. Ring Balk

1.45

m3

Rp

451,236.00

Rp

653,164.11

3. Kolom Praktis

2.52

Rp

451,236.00

Rp

1,138,468.43

4. Plat Kanopy

0.40

m3

Rp

451,236.00

Rp

182,660.33

5. Plat Talang dan Dak

0.60

m3

Rp

451,236.00

Rp

270,741.60

6. Kolom Teras

0.16

Rp

451,236.00

Rp

73,100.23

7. Plat dan Balok Teras

0.95

m3

Rp

451,236.00

Rp

427,546.11

II. Pekerjaan Pondasi


1

Pondasi Staal

e. Urugan Pasir Bawah Pondasi


e. Aastampang Batu Kali
1.Induk

e. Pasangan Pondasi Batu kali

III. Pekerjaan Beton Bertulang


1

Beton Bertulang

Besi Tulangan 8 mm

Rp

3,306,000.00

Besi Tulangan 6 mm

Rp

408,000.00

Besi Begel

Rp

562,400.00

Kawat Bendrat

Rp

196,840.00

IV. Pekerjaan Dinding


1

Pasangan Dinding Induk

183.00

m2

Rp

58,080.00

Rp

10,628,750.35

Pasangan Dinding Pagar Dan Tembok Pembatas

31.29

m2

Rp

58,080.00

Rp

1,817,160.58

Plesteran Induk ( Halus )

305.49

m2

Rp

10,264.00

Rp

3,135,541.15

Plesteran Dinding Pagar dan Tembok Pembatas

41.30

m2

Rp

10,264.00

Rp

423,903.20

Plesteran Teras ( Kolom dan Balok )

11.27

m2

Rp

10,264.00

Rp

115,630.12

Plesteran Kanopy

2.97

m2

Rp

10,264.00

Rp

30,432.76

305.49

m2

Rp

5,043.50

Rp

1,540,734.78

Plesteran Dinding

Pengacian Dinding
Pengaccian Dinding Induk

Pengaccian Pagar dan Tembok Pembatas

41.30

Rp

5,043.50

Rp

208,296.55

Pengaccian Teras ( Kolom dan Balok )

11.27

m2

Rp

5,043.50

Rp

56,818.05

Pengaccian Kanopy

9.83

m2

Rp

5,043.50

Rp

49,577.61

15.21

Rp

100,264.00

Rp

1,524,841.98

Pintu P1

22.70

Rp

53,325.00

Rp

1,210,690.80

Jendela J1

10.21

Rp

53,325.00

Rp

544,341.60

Jendela J2

23.63

Rp

53,325.00

Rp

1,259,963.10

Pemasangan Batu Tempel / Batu Alur

V. Pekerjaan Kusen dan Roster


1

Kusen

Jendela J3
2

7.48

Rp

53,325.00

Rp

398,871.00

15.00

bh

Rp

3,000.00

Rp

45,000.00

a. Pasang Nok, Gording 8/12

39.44

m1

Rp

20,600.00

Rp

812,361.00

b. Pasang Usuk 5/7

300.92

m1

Rp

4,550.00

Rp

1,369,197.83

c. Pasang Reng 2/3

348.38

m1

Rp

1,550.00

Rp

539,982.03

Roster
VI. Pekerjaan Atap

Rangka Atap

27.15

m1

Rp

45,800.00

Rp

1,243,579.92

a. Memasang Genteng

72.26

m2

Rp

76,000.00

Rp

5,491,893.00

b. Memasang Perabung Genteng / Kerpus

10.46

m1

Rp

20,102.00

Rp

210,256.87

a. Plafond Dalam

154.82

m1

Rp

5,087.50

Rp

787,644.21

b. Plafond Luar

51.09

m1

Rp

5,087.50

Rp

259,922.59

a. Memasang Plafon Datar ( Gypsum )

46.10

m2

Rp

30,078.13

Rp

1,386,714.36

b. Memasang Plafond Luar ( Eternit )

17.96

m2

Rp

22,620.00

Rp

406,173.77

a. Memasang List Datar ( Gypsum )

36.08

m1

Rp

6,600.00

Rp

238,128.00

b. Memasang List Luar ( Kayu List )

51.09

m1

Rp

3,200.00

Rp

163,489.39

d. Lisplank Papan 2/20 ( Wood Plat )


Penutup Atap

VII. Pekerjaan Plafon


1

Rangka Plafon

Memasang Plafon

Memasang Lis Plafond

VIII. Pekerjaan Lantai dan Keramik


1

Memasang Keramik Lantai Utama 40 x 40

40.33

m2

Rp

43,521.50

Rp

1,755,407.06

Memasang Keramik Dinding KM/WC 20 X 25

7.56

m2

Rp

40,521.50

Rp

306,220.98

Memasang Keramik Dinding Dapur 20 X 25

2.20

m2

Rp

40,521.50

Rp

89,147.30

Memasang Keramik Lantai Teras Depan 40 x 40

6.29

Rp

43,521.50

Rp

273,779.83

Memasang Keramik Lantai Teras Belakang 40 x 40

3.12

m2

Rp

43,521.50

Rp

135,721.80

Memasang Keramik Lantai KM/WC 20 x 20

2.00

m2

Rp

40,521.50

Rp

81,235.48

2.20

m2

Rp

40,521.50

Rp

89,147.30

unit

Rp

502,500.00

Rp

2,010,000.00

unit

Rp

301,500.00

Rp

1,507,500.00

c. Pasang Kaca Sudut

1.40

m2

Rp

52,180.00

Rp

72,889.72

d. Pasang Pintu Fiber

unit

Rp

175,875.00

Rp

175,875.00

12

bh

Rp

6,500.00

Rp

78,000.00

5
6

Memasang Plat Dapur 20 x 20


IX. Pekerjaan Daun Pintu, Jendela, Kaca dan Kunci

Pintu/Jendela
a. Daun Pintu :
Type 1 ( Kayu Laban/Lokal ) )
b. Daun Jendela + Kaca

Penggantung/Kunci
Pintu
a. engsel

b. kunci tanam + Handle

bh

Rp

60,000.00

Rp

240,000.00

e. grendel

bh

Rp

5,000.00

Rp

20,000.00

d. engsel

10

bh

Rp

6,500.00

Rp

65,000.00

e. grendel

bh

Rp

5,000.00

Rp

25,000.00

f. kait angin

10

bh

Rp

2,500.00

Rp

25,000.00

336.04

m2

Rp

8,960.00

Rp

3,010,901.56

Jendela

X. Pekerjaan Pengecatan
1

Mengecat Tembok Luar Dalam ( Vinilex )


Mengecat Kanopy ( Vinilex )

6.52

Rp

8,960.00

Rp

58,453.96

Mengecat Pagar dan Tembok Pembatas ( Vinilex )

45.43

m2

Rp

8,960.00

Rp

407,052.80

Mengecat Kolom dan Balok Teras ( Decholt )

12.39

m2

Rp

8,960.00

Rp

111,033.75

Mengecat Plafon Dalam

46.10

m2

Rp

8,960.00

Rp

413,089.60

Mengecat Plafon Luar

17.96

m2

Rp

8,960.00

Rp

160,889.34

Mengecat Kusen + Daun ( Avvian )

40.59

m2

Rp

8,210.00

Rp

333,252.93

XI. Pekerjaan Instalasi Listrik


1

Instalasi Listrik 900 watt ( PLN )


Harga Borong / 3 Titik

3.00

titik

Rp

666,666.67

Rp

2,000,000.00

Memasang Fiting Tempel + Pelengkapan

7.00

bh

Rp

22,700.00

Rp

158,900.00

Memasang Saklar Seri + Perlengkapan

2.00

bh

Rp

31,700.00

Rp

63,400.00

Memasang Saklar Engkel + Perlengkapan

5.00

bh

Rp

29,700.00

Rp

148,500.00

Memasang Stop Kontak + Perlengkapan

7.00

bh

Rp

24,700.00

Rp

172,900.00

Memasang Lampu TL

7.00

bh

Rp

20,000.00

Rp

140,000.00

a. Pipa Air Tinja Dia. 4 "(PVC)

5.50

Rp

55,000.00

Rp

302,500.00

b. Pipa Air Kotor Dia. 3 "(PVC)

12.10

Rp

38,500.00

Rp

465,850.00

c. Pipa Air Bersih Dia. 0.75" (PVC)

25.63

Rp

20,350.00

Rp

521,570.50

d. Kloset Jongkok

1.00

bh

Rp

95,990.80

Rp

95,990.80

e. Kran Air Biasa

2.00

bh

Rp

13,200.00

Rp

26,400.00

Ket : Perlengkapan :
Kabel NYA
Pipa Instalasi dll
XII. Pekerjaan Sanitasi Dan Instalasi Air
1

Instalasi Air

f. Kran Air Leher Angsa

1.00

bh

Rp

38,500.00

Rp

2,750.00

38,500.00

g. Floor Drain

1.00

bh

Rp

Rp

2,750.00

h. Wastafel + Kitcheset

1.00

bh

Rp

165,000.00

Rp

165,000.00

a. Septiktank + Penutup

1.00

unit

Rp

438,550.00

Rp

438,550.00

b. Sumur Air + Penutup

1.00

unit

Rp

838,550.00

Rp

838,550.00

c. Sumur Peresapan + Penutup

1.00

unit

Rp

218,550.00

Rp

218,550.00

d. Bak Kontrol + Penutup

1.00

unit

Rp

50,000.00

Rp

50,000.00

Sanitasi

XIII. Finishing
1

Carport Beton

16.75

m2

Rp

38,550.00

Rp

645,712.50

Paving Block t 6 cm segi 6

5.00

m2

Rp

54,000.00

Rp

270,000.00

1.81

m1

Rp

58,080.00

Rp

104,892.48

Pembatas Taman / Pagar Taman t 20 cm

Total Harga
Keterangan :
Harga Belum Termasuk :
Harga Tanah
Upah Pekerja
Fasilitas Jalan, Saluran/Drainase
Pajak dan Lain - lain

TOTAL

Rp

257,600.00

Rp

4,331,730.92

Rp

7,912,019.31

Rp

19,531,687.13

Rp

3,458,866.50

Rp

9,667,270.64

Rp

3,242,072.31

Rp

2,730,659.74

Rp

4,219,264.72

Rp

4,494,673.95

Rp

2,683,700.00

Rp

3,164,211.30

Rp

1,020,604.98

Rp

66,714,361.50