0% found this document useful (0 votes)
58 views

Six Sigma Project Case Study Improved Productivity of Fans Through Reduction of Defects/Defectives at Spindle Manufacturing

1) A six sigma project was initiated to reduce the high rejection rate of 6.5% for spindle components used in fan manufacturing. This would improve productivity and reduce losses. 2) Measurement found the main causes of rejection were four dimensions accounting for over 90% of defects. Improvement actions focused on increased process control, tool maintenance, and inspection methods. 3) After implementing controls, the rejection rate decreased to 2.1%, quality improved with sigma ratings over 3.5, and expected annual savings were $35,000.

Uploaded by

vishu_kirthi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Six Sigma Project Case Study Improved Productivity of Fans Through Reduction of Defects/Defectives at Spindle Manufacturing

1) A six sigma project was initiated to reduce the high rejection rate of 6.5% for spindle components used in fan manufacturing. This would improve productivity and reduce losses. 2) Measurement found the main causes of rejection were four dimensions accounting for over 90% of defects. Improvement actions focused on increased process control, tool maintenance, and inspection methods. 3) After implementing controls, the rejection rate decreased to 2.1%, quality improved with sigma ratings over 3.5, and expected annual savings were $35,000.

Uploaded by

vishu_kirthi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 9

Six Sigma Project Case Study: Improved Productivity of Fans through Reduction of Defects/Defectives at Spindle manufacturing

Preamble/Project Selection
High Loss of Production of Fans due to short supply of Critical Components Spindle was an important component. It was not possible to augment the production of However, it was observed that, rejection of spindles was very high (6.5%) If rejection is brought down, it will have great impact on business in the form of higher productivity of fans and reduced losses at spindle manufacturing Hence, management initiated a Six Sigma project at spindle manufacturing

Define Phase : The Project Charter


Problem Statement
High rejection of spindles due to various dimensions was causing heavy losses and loss of production of fans due to short supply of the component.

The Team
Sponsor: GM, components Manufacturing Leader : Manager (QC), a Black Belt Team Members: Two Green Belts and one supervisor Trainer & Guide : Consultant

Scope:
All types of Spindles manufactured

Define Phase : The Project Charter


The process and CTQs
The entire manufacturing process for spindle. Various dimensions of the spindle which may lead to rejections

A high level process map was drawn Schedule for the project milestones was drawn using a Gantt diagram. Target
It was decided to achieve a five-fold improvement in rejections. The current level being 6.5%, the target was set at 1.3%

Define Phase : The Project Charter


Defective
Any spindle which cannot be used in the assembly due to one or more of the dimensions being high or low is a defective product.

Defect
Any dimension which is high or low is considered as a defect. There were as many as 19 dimensions. Hence number of opportunities is 19

Measure Phase
Base line Data Past 1 months go-no-go inspection data was considered. The number of spindles inspected, the total number of defective spindles and the number of defects due to each dimension were noted down. Total no. inspected : 17,000 Number of defectives : 1130 Total no. of defects : 1350 P = 0.065 Yield = 93.5% dpmo = 4180 Sigma Rating for product: 3.01 (Z= 1.51 for p=0.065) Sigma for defects: 4.13 (based on dpmo) Target p = 0.013 Target sigma rating for product: 3.72

Analyze Phase
Pareto analysis was carried out with the Data on defects. Four dimensions accounted for over 90% of the defects (A group). These were selected for further study. There were 8 dimensions with negligible defects (C group). Remaining 7 dimensions (B group) were average. For each of the selected dimensions, data on actual measurement were collected for 150 components. Histograms were drawn The histograms suggested that the process capabilities were good. However, there was severe lack of control in 2 cases, improper setting in one case and shift in average dimension due to tool wear out in the fourth case.

Improve Phase
1. Improvement suggestions for A group items: For cases where lack of control was evident, control chart was recommended. ( X R ) For the case where there was improper setting, first off inspection (approval inspection) was recommended For the case where there was tool wear out, statistical analysis (regression analysis) was carried out and optimum tool grinding/ tool replacement were recommended

2. For B group items maintenance of p/np chart shift wise were recommended

Control Phase : Sustain the Gain


The control charts were designed and implemented for all the 11 dimensions. The manager of the spindle shop was assigned the task of routine follow and feedback as a process owner. 1 month after implementation, the status was as under: Overall rejection level: 2.1% dpmo : 1200 Sigma Rating for product: 3.54 Sigma Rating for defects: 4.54 The expected annual savings from increased production and reduced losses is 35 lakhs of rupees.