INTERCHANGE
SELECTION
CE 550 SPRING 2007
OBJECTIVE
Identify types of interchange by
function and geometry
Learn process for optimizing the type
of interchange for a specific site
Just what is an
interchange?
An interchange is a system of
interconnecting roadways in conjunction
with one or more grade separations that
provides for the movement of traffic
between two or more roadways or highways
on different levels. (AASHTO Green
Book 2001)
Basically it is a grade-separated
intersection, with connections between 2
or more roads
3
But first, two
categories
Service interchange freeway to
surface street
System interchange freeway to
freeway
Whats on the
Interchange menu?
Diamond
Single-point urban interchange
Partial cloverleaf
Full cloverleaf
Trumpet
Directional
5
Your Basic Diamond
Your Basic Diamond
Source: Empire State Roads.com
When to use
Service interchange only (why?)
Mostly rural locations
Low volumes
Is a diamond anyones
best friend?
Plusses:
Lower ROW needs than most
Excellent in low volume situations,
especially where volumes not expected
to increase
Low cost
Most common (overall, 79%)
Is a diamond anyones
best friend?
Minuses:
Two ramp termini may be problem with
high volume side roads
May require signalization at ramps; delay
issues due to signals on arterial side road
High exiting volumes may require
excessively long ramps
10
Diamond Variants
Half diamond
Tight urban diamond (aka single-point
urban interchange)
Diamond with roundabout
11
Diamond Variants
Half-diamond, West Des Moines IA
Source: Google Earth
12
Diamond Variants
Source: Center for
Transportation
Research & Training
(KSU)
13
When is a diamond not a
diamond?
When its a parclo (partial cloverleaf)
A diamond with one to three loops
14
Partial Cloverleaf
Aka parclo
Service interchange (7%)
Higher volumes than diamond
Variety of arrangements
Diagonally opposite most common
15
Parclo Layouts
Source:
AASHTO
Green Book
16
About Parclos
Use with high turning volumes or side
road volumes
Exit low-speed loop reinforces need
to slow down
Entrance low-speed loop increases
difficulty of entering high-speed
traffic
17
About Parclos
Site constraints (topography,
development, etc) suggest preferred
configuration
Remember driver expectancy and
work load
Loops make for less direct turning
movements and longer paths
18
And now, the full
Cloverleaf
Loops and ramps in all four quadrants
Service interchange (9%) as well as
system interchange (29%)
Higher volumes and speeds
19
And now, the full
Cloverleaf
Source: AASHTO
Green Book
20
Cloverleaf Issues
Out of route (long) paths for loop
users
Very land intensive
Merging and weaving sections become
problems when volumes increase
Multiple exit points signing and
safety problems
21
Cloverleaf Issues
Need constant radius loops (some
older ones tightened up at end)
Need C-D roads to address highvolume weaving and merging as well as
multiple exit points
22
Trumpets
Limited ROW
Low volumes
Service (1%) or system (3%)
Limited applicability
23
Trumpets
Source: AASHTO Green Book
24
Single-Point Urban
Interchange
Aka SPUI
Less ROW
More $$
Signalization benefits
About 1% of service interchanges
25
Single-Point
Urban
Interchange
Source: AASHTO
Green Book
26
Single-Point
Urban
Interchange
27
Single-Point Urban
Interchange
Usually dual lane ramps (higher
volumes)
Good arterial signal progression
Somewhat unfamiliar, operationally
Large skew angles increase costs
Not pedestrian friendly
28
Directional Interchange
Direct paths for all (most)
movements
Most expensive
Land intensive
System interchanges only (52%)
29
Directional Interchange
30
Directional Interchange
31
Source: Virginia Transportation
Research Council (1999)
32
The Proper Interchange
Selection is very site specific
Requires considerable experience
A lot of things to consider
33
The Process
Basics
Data collection
Evaluation and analysis
Two general conditions
34
The Process Basics
New or existing
Number of legs
Functional class of all roadways
General environment
35
The Process Data
Collection
ADT (and traffic projections if
available)
Crash history
Land uses
Design criteria
Community impact data
36
ADT
Projections from planning agencys
model
Applying historic growth data to
current ADT
Traffic impact analyses data
Traffic composition (esp. trucks &
buses)
Pedestrian and bicycle needs
37
Traffic Forecasting
Procedure varies with circumstances
38
39
40
41
Crash History
Primarily on existing facilities
Data for both roadways
Five years minimum for projects not
related to crash problems
As many years as possible for
projects aimed at solving crash
problems
42
Land Uses
Existing and proposed in immediate
area
Changes expected by jurisdiction
(city?) not in MPO model
If new interchange consider
likelihood of added growth
43
Design Criteria
Level-of-service
Design speed
Superelevation
Lane widths, especially for ramps
Ramp geometry
44
Community Impacts
Amount of right-of-way available
Number and approximate value of
homes in proximity
Public buildings and facilities
affected
Access to adjacent properties
Wetlands
45
Others
Soils information
Other improvements programmed
Interchange spacing
ITS strategies
46
Basic Design Criteria
All exits and entrances on right side
Single exit per interchange
Proper ramp spacing
Lane balance and basic number of
lanes
47
Selection Process Flow
Charts
Service interchanges
System interchanges
48
Source:
Virginia
Transportation
Research
Council
49
Source:
Virginia
Transportation
Research
Council
50
Source:
Virginia
Transportation
Research
Council
51
Evaluation and Analysis
Four broad categories
Operations and safety
Project costs
Constructability and maintenance of
traffic
Social and environmental impacts
52
Evaluation and Analysis
Operations and safety
Vehicular and non-motorized safety
Level-of-service for projected traffic
Flexibility in accommodating future
traffic (when projections are exceeded)
53
Evaluation and Analysis
Costs of improvements
Right-of-way
Construction
Impact mitigation (e.g., wetlands)
Operations (maintenance)
54
Evaluation and Analysis
Constructability
Maintenance of traffic
Ability to add improvements
55
Evaluation and Analysis
Social and environmental effects
Air, noise, water, etc.
Economic
Land use changes
Public transportation
56
Process Step 1
Look at all forms of interchanges
Screen for suitability (fatal flaws)
Documentation
57
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
58
Process Step 2
Develop scaled concepts
remaining candidate forms
sketch plans
Evaluate data
Compare to criteria (matrix?)
Advance reduced number
59
Source: Freeway and
Interchange Geometric
Design Handbook (ITE)
60
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
61
Process Step 3
Prepare functional layout plan and
profile
Cross-sections
Bridge TS&L
Maintenance of traffic
Costs (ROW and construction)
62
Process Step 3
Operational analysis (simulation)
Evaluation and comparison of
alternatives
Final selection of preferred
alternative
PUBLIC INVOLVEMENT
THROUGHOUT!
63
Documentation
Design Study Report
Interchange Justification Report
Interchange Modification Report
64
Design Study Report
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
65
Design Study Report
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
66
Federal Requirements
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
67
Federal Requirements
Source: Freeway and Interchange
Geometric Design Handbook (ITE)
68
IJR/IMR
Source: Freeway and
Interchange Geometric
Design Handbook (ITE)
69
Caveats
No substitute for experience
Public involvement throughout
Often no right answer
Frequently many wrong answers
70