0% found this document useful (0 votes)
404 views

Data Migration

The document outlines the key activities involved in migrating data from legacy systems like Samlink and Bank to a new T24 system. The activities include initiation and mapping, preparation, data loading, and sanity checks. The mapping activity involves defining mappings between the legacy and T24 tables. Preparation deals with configuration of T24 for loading, extracting data from the legacy systems, and validating extracted data. Data is then loaded into T24 and various checks are performed to ensure data quality and accuracy of migration.

Uploaded by

Ayan Ghoshal
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
404 views

Data Migration

The document outlines the key activities involved in migrating data from legacy systems like Samlink and Bank to a new T24 system. The activities include initiation and mapping, preparation, data loading, and sanity checks. The mapping activity involves defining mappings between the legacy and T24 tables. Preparation deals with configuration of T24 for loading, extracting data from the legacy systems, and validating extracted data. Data is then loaded into T24 and various checks are performed to ensure data quality and accuracy of migration.

Uploaded by

Ayan Ghoshal
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Initiation Mapping Preparation Data Loading Sanity Check

Data migration method


Samlink, Bank and Tieto Samlink, Bank and Tieto

Migration requirement analysis Delivery standard T24 T24 DM Load configuration Target area pre-Requisite Check if the functionality with
Identify 24 base table definition in DMS DMS ,DES,DMD,DSC check the data
Target module for load and Delivery standard T24 data Data load test in T24 and Data Data file generation from Raise defects
Activities

reconciliation extraction specification in extract Test from T24 with Staging for T24 load Identify if any issues are there
Logistics and resource planning DES clinical data based on T24 Data file content validation in with the migrated data
Testing : Cut cover & reconciliation Mapping workshop sample mapped to DMS & DES T24 and provide error details Migrated table checks
planning Mapped DES and DMS Samlink / Bank system data Data file content load in T24
Initial project plan Migration Data Translation cleaning and transformation T24 data extraction for
control matrix effort estimations Samlink / Bank system data comparison
Process design, detailed workflow extraction program and staging Data file error rectification and
customization reconciliation
Review and sign off Error reporting and
Training on the T24 tool Management

Objective Data Mapping sheet migration versions and Records Moved by DM


Scope Static table packs Records moved Manually
Approach Financial table Migration routines Consolidated list of tables
Roles List of data that cannot be OFS Source creation moved (financial and static)
Deliverable

Responsibility moved Decision on how many


Delivery Data that needs agents to run the DM
Ownership conversion process based on server
Out of scope tables capacity