Problem Statement
Failure
occurred on an Fiber Optic umbilical
during installation campaign which lead to a loss
of 1.5 million USD to a Company
5 Why Analysis
Recovery Load
exceeded Umbilical • Why?
Capacity
Installation
analysis was not • Why?
performed
Chute Calculations
were used instead of
Analysis. Error • Why?
Occurred here.
From previous
Operational Experience,
it was deemed that
Calculations were
• Why?
sufficient