0% found this document useful (0 votes)
143 views26 pages

Blast Furnace Overview

This document summarizes Prem Prakash's presentation on blast furnace processes at Tata Steel. It provides details on the specifications and production rates of blast furnaces A-G, as well as the planned upgrades that would increase inner volumes and production capacities. It also outlines the key parameters for blast furnace operations, including gas volumes, injection rates, and charge materials. Finally, it briefly describes the larger F, G, and planned H blast furnaces and their respective designs.

Uploaded by

Resego Phiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
143 views26 pages

Blast Furnace Overview

This document summarizes Prem Prakash's presentation on blast furnace processes at Tata Steel. It provides details on the specifications and production rates of blast furnaces A-G, as well as the planned upgrades that would increase inner volumes and production capacities. It also outlines the key parameters for blast furnace operations, including gas volumes, injection rates, and charge materials. Finally, it briefly describes the larger F, G, and planned H blast furnaces and their respective designs.

Uploaded by

Resego Phiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 26

Overview Of Blast Furnace

Process

BHEL ISG,Bangalore
Date : 15th july, 2014

PRESENTATION BY PREM PRAKASH


ENGINEER, BG IIA
PRESENTATION BY PREM
PRAKASH
Blast Furnace Process

PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
PRESENTATION BY PREM
PRAKASH
BLAST FURNACES at Tata Steel

PRESENTATION BY PREM
PRAKASH
A-G Blast Furnaces

Furnaces
Working Volume (m3) Inner Volume(m3)

A 956 1066

B 674 742

E 595 650

C 646 719

D 1012 1133

F 1585 1816

G 2306 2646
PRESENTATION BY PREM
PRAKASH
Hot Metal Production
Furnaces Inner Volume Productivity
(m3) TPD (t/m3/day) FY’07 (t)

A 1066 1500 1.41 518,970

B 742 1100 1.48 396,500

E 650 1500 2.30 266,430

C 719 1100 1.53 397,350

D 1133 1900 1.68 630,800

F 1816 4000 2.20 1,332,500

G 2646 6000 2.27 2,004,850

TOTAL 8772 17100 1.95 5,547,400


PRESENTATION BY PREM
PRAKASH
Facilities at Blast Furnaces
Furnaces High Top
Top Charging Stock House pressure Screening Cast House

A Double bell Larry car No Coke ND & D trough

B Double bell Larry car No Coke Drainable

E Bell less top Larry car 0.5 bar Coke ND & D trough

C Double bell Larry car No Coke Drainable


ND & D
D Double bell Larry car No Coke trough+ SG
Coke, Ore & Drainable+
F Bell less top Conveyor 0.83 bar Sinter SG
Coke ,Ore & Drainable+
G Bell less top Conveyor 1.5 bar Sinter SG

PRESENTATION BY PREM
PRAKASH
Blowing parameters at Blast Furnaces
Oxygen Coal/Tar
Fces. Wind Vol enrichment Hot Blast Coke rate rate
(Nm3/hr) (%) Temp. (oC) (Kg/thm) (Kg/thm) Charge

A 67000 3.5 1050 535 45 Sinter 65%

B 55000 3.5 1000 535 45 Sinter 65%

E 60000 5.7 1100 485 50 Sinter 65%


Sinter 70
C 55000 3.5 1070 570 50 %

D 70000 6.0 1040 470 95 Sinter 70%

F 152000 6.7 1020 434 112 Sinter 70%

G 240000 6.0 1150 BY PREM 430


PRESENTATION 140 Sinter 70%
PRAKASH
The Up gradation at A-F Blast Furnaces

Inner
Furnace Working Volume Inner Volume Working Volume (
(Existing) (existing) Volume (New) New)
A 956 1066 1350 1553
B 674 742 700 805

E 595 650 595 684


C 646 719 929 1061
D 1012 1133 1012 1133
F 1585 1816 1585 1823
5468 6126 6092 6975

PRESENTATION BY PREM
PRAKASH
Up graded Blowing Parameters
hot blast Press. Pressure at blast
Tgp ( Diff press ( Drop in furnace end (
FCE. bar g) pressure bar g) stoves bar g)

A 0.5 1.7 2.2 0.2 2.4

B 0.5 1.7 2.2 0.2 2.4

E 0.5 1.7 2.2 0.2 2.4

C 0.5 1.7 2.2 0.2 2.4

D 0.5 1.7 2.2 0.2 2.4

F 1 1.7 2.7 0.2 2.9

PRESENTATION BY PREM
PRAKASH
Planned Production Rate
Existing Planned

Furnace TPD MTPA


Furnace Prodn MTPA
A 3100 1.095
A 1500 0.548
B 1500 0.54
B 1100 0.402
E 1500 0.54
E 1500 0.548
C 2000 0.72
C 1100 0.402
D 2100 0.84
D 1900 0.694
F 4100 1.56
F 4000 1.460
TOTAL 14100 5.15
11100 4.052

PRESENTATION BY PREM
PRAKASH
F, G & H Blast Furnace
Changes F BF G BF H BF

Inner Volume( m3) 1816 2646 3814


Designed Production
(MTPA) 1.0 1.8 2.5
Expected Production
(MTPA) 1.4 2.2 3.0
No of tap holes &
Tuyeres 2 / 24 2 / 30 4 / 34

High Top Pressure (bar) 0.83 1.50 2.50

Slag Granulation system Natural filter Bottom Filter INBA


Internal External
Stoves combustion combustion Internal combustion

Stock house Conveyor & Skip All conveyor All conveyor


Cooling plates and Copper and cast Copper and Cast
PRESENTATION BY PREM
Cooling elements hearth spray
PRAKASH
iron staves iron staves