0% found this document useful (0 votes)
84 views5 pages

Steel Plant Communication Equipment

The document outlines a modernization project for a telecom equipment shop floor. It lists 29 project packages with details on the number of cameras, monitors, network/radio equipment and cable runs needed for each. The total equipment needed across all packages includes 409 cameras, 155 monitors, 53 network/radio devices, and over 1000 connections for various cable networks.

Uploaded by

uvsubhadra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views5 pages

Steel Plant Communication Equipment

The document outlines a modernization project for a telecom equipment shop floor. It lists 29 project packages with details on the number of cameras, monitors, network/radio equipment and cable runs needed for each. The total equipment needed across all packages includes 409 cameras, 155 monitors, 53 network/radio devices, and over 1000 connections for various cable networks.

Uploaded by

uvsubhadra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Shop floor Telecom Equipment's

upcoming Under 7 MT
Modernization Project
CCTV LSIS VHF PLANT CABLE NETWORK
PROJECT
SL.NO MONITO DVR/ BSP Auto
PACKAGE DESPATCHER
CAMERA R NVR HH MOBILE STATIC Telephone
PKG-60
1 OHP 5 3 1 25 10 2
PART-A
PKG-025
2
BOF 12 9 1 125 12 150

PKG-025A
SECONDA
3
RY 11 9 7 28 6 2 7
REFINING
UNIT
PKG-127
BOF+HM
4
DS, CCP,
176 123 44 306 85
SRU
RAJHARA
MINES
5
CCTV 18 4 4
SYSTEM
OHP IP
6 CCTV 10 2 2
SYSTEM
WATER
TRT
7
PLANT
6 1 1
MARODA
PKG 062
8 CHP- COB 29 12 50 30 10 6 25
11
PKG-70
9 MSDS I- 30 7 7
VII CCTV
CCTV LSIS VHF PLANT CABLE NETWORK
PROJECT
SL.NO MONITO DVR/
PACKAGE AUTO DESPATCHER
CAMERA R NVR HH MOBILE STATIC
PKG-10
10
BF#8
19 4 2 40 25 1 80 200
BF#6
11 14 4 2 15
CCTV
SURVEILL
ANCE
12
GATES,
62 10 4
YARDS &
WB
MSDS I &
13
II
11 2 1

14 PKG-071A 32 24 2 16 16
(HT /SS)
PKG-061
(NEW
15
OHP-
20 50 30 10 6 225
PART-B)
PKG-64
AGUMEN
TATION
OF FUEL
16 AND 20 10 2
FLUX
CRUSHIN
G
FACILITY
CCTV LSIS VHF PLANT CABLE NETWORK
PROJECT
SL.NO MONITO DVR/
PACKAGE AUTO DESPATCHER
CAMERA R NVR HH MOBILE STATIC
PKG-031 HOT
METAL
17
HANDELING 15 15 3 10
SYSTEM
PKG-90A
QUALITY
ASSURANCE
18
AND QUALITY 50
CONTROL
FACILITY
COB-9
19
REBUILDING 10 5 5

20 PKG-028 LDC 50 30 10 6 100


PLANT AT RMP-3
PKG-138 NEW
21 CENTRAL FIRE 10 12 2 30
STATION
PKG-027
HOT METAL
22
DESULPHURISAT 6 4 1
ION COMPLEX
CCTV LSIS VHF PLANT CABLE NETWORK
PROJECT
SL.NO DVR/ HAND
PACKAGE AUTO DESPATCHER
CAMERA MONITOR NVR HELD MOBILE STATIC
PKG-001 COB 11
23
CCTV 15 15 2 15 45
PKG-20 SP3
24
Machine 2
4 2 2 100 25 2 100
PKG-049-1 BRM
25 REHEATING 5 5 1
FURNACE
26 PKG-046 (BRM) 18 8 2 70 30 50
27 PKG-047 (URM) 42 11 2 69 24 1 30 50
RAIL WELDING
28 LINE COMPLEX 10 4 2 64 49
(URM) PKG - 121

TOTAL 409 155 53 892 340 44 80 646 1001