0% found this document useful (0 votes)
458 views21 pages

Commissioning RET Guidlines (Rosenberger Antenna) in SBTS17A

This document summarizes the steps to commission remote electrical tilt (RET) using a Rosenberger antenna on an Airscale BTS running SBTS17A software. It involves assigning the antenna ports, setting up the RET ports, adding monitoring objects for RET activation and logging, and filling in commissioning templates for each RET unit to specify the associated antenna and additional site details. The runtime view is checked after activation to verify proper RET unit detection and configuration. Angles are then calibrated and adjusted as needed using sample tests before and after tuning.

Uploaded by

ismuwahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
458 views21 pages

Commissioning RET Guidlines (Rosenberger Antenna) in SBTS17A

This document summarizes the steps to commission remote electrical tilt (RET) using a Rosenberger antenna on an Airscale BTS running SBTS17A software. It involves assigning the antenna ports, setting up the RET ports, adding monitoring objects for RET activation and logging, and filling in commissioning templates for each RET unit to specify the associated antenna and additional site details. The runtime view is checked after activation to verify proper RET unit detection and configuration. Angles are then calibrated and adjusted as needed using sample tests before and after tuning.

Uploaded by

ismuwahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 21

Commissioning RET Using

Antenna Rosenberger in
SBTS17A
Initial Information
• BTS Type : Airscale BTS
• BTS SW version :SBTS17A_ENB_0000_000430_000304
• Antenna Type : Rosenberger (BA-G7W8W8W8W8X65V-11) 10 Port
Antenna Port Assignment and RET Setting

R1:LWG900 Y2:TDD Ant3,4


Y1:TDD Ant1,2

Y3:LG1800 Y4:LU2100

RET PORT
AZNA

FXED FRGU
FXDB

Wiring Diagram
Initial configuration
RET Activation
Add & setup MO RSL
• Go to Parameter RMOD(which will be setup as RET controller)
• Add MO “RSL”
• Set power DC to “true”
• Set HDLC Enabled to “true”
RET Activation
• After plan activation, RET should be detected by
BTS

Check One by One RETU


which covered Port
- RETU-1 for R1
- RETU-2 for Y1
- RETU-3 for Y2
- RETU-4 for Y3
- RETU-5 for Y4
RET Activation
Add & Setup MO “LOGLINK”
• Go to Parameter HWTOP-1
• Add MO “loglink”
• Please refers to Runtime view to fill “firstEndpointDN” &
“secondEndpointDN” for this MO
RET Commissioning
• Go To Parameter Editor
• Add MO ALD-1 under APEQM
• Fill in Details ALD parameters
Commissioning
• Add MO RETU-1 until RETU-5
• Please refer to site Runtime View to check RETU’s in detail.
• If others RET were planed to be used by other’s, fill “external” in
associated Antenna list
• Fill in the additional info as request by Project
• Please follow as example below

Additional Information sample


Commissioning

Runtime View Result

Commissioning template

RETU1

Additional Information list


Commisioning

Runtime View Result

Commissioning template

RETU2

Additional Information list


Commisioning

Runtime View Result

Commissioning template

RETU3
Additional Information list
Commisioning

Runtime View Result

Commissioning template

RETU4

Additional Information list


Commisioning

Runtime View Result

Commissioning template

RETU5
Additional Information list
Site Runtime View
After Plan Activation
RET testing

Calibrating Sample test


Angles adjusting

Before
Angles adjusting

After
Rosenberger Antenna