The document discusses improvements made to the closed loop power control algorithm in 4G networks. The algorithm now takes into account key performance indicators to better decide the power control correction. Setting the SINR and RSSI windows too high or low can negatively impact network interference levels, throughput, and power consumption depending on the load levels and locations of user equipment. The proposed changes aim to balance these tradeoffs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
416 views3 pages

4G Power Control Optimization

The document discusses improvements made to the closed loop power control algorithm in 4G networks. The algorithm now takes into account key performance indicators to better decide the power control correction. Setting the SINR and RSSI windows too high or low can negatively impact network interference levels, throughput, and power consumption depending on the load levels and locations of user equipment. The proposed changes aim to balance these tradeoffs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 3

4G Closed loop power control

Background
Closed loop uplink power control – RSSI and SINR window  Too high SINR settings may increase
Closed Loop Power Control network interference a lot
Algorithm is improved with consideration of certain system KPI’s which are taken into account when  Cell-edge UE’s are forced to use

SINR
deciding about correction component for PC equation.
Target SINR
and RSSI full power
window  This is critical for high load
Key CLPC parameters scenarios, whereas it wouldn’t be
CLPC SINR and RSSI Window
PUSCH PUCCH RSSI so visible
LOW_QUAL ulpcLowqualSch ulpcLowqualCch under low to medium load
UP_QUAL lpcUpqualSch ulpcUpqualCch conditions
LOW_LEV ulpcLowlevSch ulpcLowlevCch
UP_LEV ulpcUplevSch ulpcUplevCch  Too low SINR settings limit the
throughput for UE’s in good
conditions
 Cell-center UE’s are forced to
lower down the power

Parameter Majority Proposed


ulpcUpqualSch 20 11
ulpcLowqualSch 18 8
ulpcLowlevSch -103 -103
ulpcUplevSch -98 -98

Payload Improve week to week around 200 GB


100.1
100

99.1
99.2
99.3
99.4
99.5
99.6
99.7
99.8
99.9

99

0
1000
2000
3000
4000
5000
6000
7000
14/06/2019
15/06/2019
16/06/2019
17/06/2019
18/06/2019
19/06/2019
20/06/2019
21/06/2019
22/06/2019
23/06/2019
24/06/2019
25/06/2019
26/06/2019

Sum of Payload
27/06/2019

Sum of Payload
28/06/2019
29/06/2019
30/06/2019
01/07/2019
4G KPI Performance

User THP vs Payload


02/07/2019
03/07/2019
04/07/2019
Accessibility vs Payload

05/07/2019
06/07/2019
Sum of CSSR

Sum of USER THP


07/07/2019
08/07/2019
09/07/2019
10/07/2019
11/07/2019
12/07/2019
13/07/2019

0
1
2
3
4
5
7
8

6 14/07/2019
0
1
2
3
4
5
6
7
8

0
5
10
15
20
25
30
35
40
45
50
0.1
0.2
0.3

0.05
0.15
0.25
0.35

14/06/2019
15/06/2019
16/06/2019
17/06/2019
18/06/2019
19/06/2019
20/06/2019
21/06/2019
22/06/2019
23/06/2019
Sum of Payload
24/06/2019
25/06/2019
26/06/2019
27/06/2019
28/06/2019
Sum of Payload

29/06/2019
30/06/2019
01/07/2019
RB vs Payload

02/07/2019
03/07/2019
04/07/2019
Retainability vs Payload

05/07/2019
06/07/2019
Sum of SDR

07/07/2019
08/07/2019
09/07/2019
Average of PRB DL Utilisation Rate

10/07/2019
11/07/2019
12/07/2019
13/07/2019
14/07/2019
0
1
2
3
4
5
7
8

6
1
2
4
5
7

0 74
76
3 78
80
6 82
8 84
86


14/06/2019
15/06/2019
day

16/06/2019
17/06/2019
18/06/2019
Implement

19/06/2019
20/06/2019
21/06/2019
22/06/2019
23/06/2019
24/06/2019
25/06/2019
26/06/2019
27/06/2019
Closed Loop Power Control

28/06/2019
Sum of Payload

29/06/2019
30/06/2019
01/07/2019
02/07/2019
03/07/2019
04/07/2019
Integrity vs Payload

05/07/2019
06/07/2019
Sum of CQI > 7

07/07/2019
08/07/2019
09/07/2019
Retainability and Integrity showing Improvement after CR

10/07/2019
11/07/2019
12/07/2019
User THP slightly Improve when payload increase compare day to

13/07/2019
14/07/2019
0
1
3
4
5
6
7
8

2
12.5
13.5
14.5
15.5

13
14
15
-103.4
-103.3
-103.2
-103.1
-102.9
-102.8
-102.7
-102.6

-103
19/06/2019
19/06/2019
20/06/2019
20/06/2019
21/06/2019
21/06/2019
22/06/2019
22/06/2019
23/06/2019
23/06/2019
24/06/2019
25/06/2019 24/06/2019

26/06/2019 25/06/2019
27/06/2019 26/06/2019
28/06/2019 27/06/2019
29/06/2019 28/06/2019
30/06/2019 29/06/2019
01/07/2019 30/06/2019
02/07/2019 01/07/2019
03/07/2019 02/07/2019
4G KPI Performance

MCS PUSCH
RSSI PUSCH

04/07/2019 03/07/2019
05/07/2019 04/07/2019
06/07/2019 05/07/2019
07/07/2019 06/07/2019
08/07/2019 07/07/2019
09/07/2019 08/07/2019
10/07/2019 09/07/2019
11/07/2019 10/07/2019
12/07/2019 11/07/2019
13/07/2019 12/07/2019
14/07/2019 13/07/2019
14/07/2019
9.5

11.2
11.4
11.6
11.8
12.2
12.4
12.6
12.8
10.5
11.5

13
10
11
12

12

19/06/2019 19/06/2019
20/06/2019 20/06/2019
21/06/2019 21/06/2019
22/06/2019 22/06/2019
23/06/2019 23/06/2019
24/06/2019 24/06/2019
25/06/2019 25/06/2019
26/06/2019 26/06/2019
27/06/2019 27/06/2019
28/06/2019 28/06/2019
29/06/2019 29/06/2019
30/06/2019 30/06/2019
01/07/2019 01/07/2019
02/07/2019 02/07/2019
03/07/2019 03/07/2019
SINR PUSCH

04/07/2019 04/07/2019
MCS PDSCH

05/07/2019 05/07/2019
06/07/2019 06/07/2019
07/07/2019 07/07/2019
08/07/2019 08/07/2019
09/07/2019 09/07/2019
10/07/2019 10/07/2019
11/07/2019 11/07/2019
12/07/2019 12/07/2019
13/07/2019 13/07/2019
14/07/2019 14/07/2019
0
1
2
3
4
5
6

19/06/2019
20/06/2019
21/06/2019
22/06/2019
23/06/2019
24/06/2019
25/06/2019
26/06/2019
27/06/2019
28/06/2019
29/06/2019
30/06/2019
Closed Loop Power Control

01/07/2019
02/07/2019
03/07/2019
headroom and MCS trend improved

04/07/2019
05/07/2019
Pwr Headroom Pusch

06/07/2019
07/07/2019
08/07/2019
09/07/2019
10/07/2019
11/07/2019
Quality statistic showing RSSI PUSCH reduce while power

12/07/2019