OEE
Presentation
Presented By:-
Muhammad Atique Tipu
DGK HUB
1 2/22/2020
What is OEE ?
OEE
Definition
OEE
OEE Calculation
Overall Equipment
Effectiveness
2 2/22/2020
OEE is the way to measure how effectively machine / equipment hours are used
Overall Equipment Effectiveness
(Value Adding)
OEE is loss due to:
Total time
Depending on definition TPM knows 6-16
e.g. 480 min. (1 shift)
different losses
Planned - breaks, planned
Available time maintenance, training
Downtime
- breakdowns, repairs
Running time - changeover
Downtime - adjustment
- start up
- machine speed
Productive time Performance - short stoppages
Losses - lower yield
- scrap
Effective time Quality Losses - reject
- rework
3 2/22/2020
Calculation of LOSSES
Total time
e.g. 480 min. (1 shift)
Available time Planned - breaks, planned
maintenance, training
420 min. Downtime
- breakdowns, repairs
- changeover
Running time Downtime - adjustment
340 min. - start up
- long cycle time
Productive time Performance - minor stoppages
270 min. Losses - reduced yield
- scrap
Effective time Quality Losses - rework
- rejects
250 min.
Total losses = 170 min / shift
4 2/22/2020
Calculation of OEE
Available time - Downtime
Running Efficiency =
Availability
OEE (in %) =
420 min - 80 min
=
420 min
factor 81%
Productive Performance=
Running time - Performance loss X
Running time
340 min – 70 min
=
340 min
factor 79.4%
Quality =
Productive time - Quality loss time X
Productive time
270 min - 20 min
=
270 min
factor 92.6%
Overall Equipment Effectiveness = 59.6%
5 2/22/2020
World Class OEE
85 % or more is considered to be
the world class OEE.
6 2/22/2020
Fundamental concept of plant effectiveness
16 Kinds of loss
8 availability losses 5 productivity losses 3 production/ cost losses
– not part of OEE -
Machine failure Management losses
Motion Loss of energy
Set up & adjustments
Line organization Die, Jig and tool losses
Tool changes
Yield losses
Start-up losses Logistics
Minor stoppages Adjustments
Speed Losses
Defects and Rework
Shutdown
7 2/22/2020
8 2/22/2020