PP - Master Data: Digital Enablement (DE)
PP - Master Data: Digital Enablement (DE)
A u g u st 2 0 1 8
BE STELLAR
PP – Master Data
Agenda
Introduction & Workshop Participants
Workshop Objectives
2
Workshop Participants
3
Workshop Participants and Roles
Members Roles
Facilitators Mark Wilfong • Provide best practices, implementation expertise, and assistance with
Ganesh Gurumurthy workshop facilitation
Virtual Facilitator Team Member Name • Provide support via Skype. Ping virtual facilitator with any presentation
issues or if you have trouble being heard
• Prepare for workshops and determine participant roles
• Drive to results
• Document results and create deliverables
Core Team Members Team member names • Coordinate with and prepare SMEs
• Facilitate discussion
• Document and disposition user stories
• Update IP5 process flows
• Submit deliverables to project leadership for approval
Subject Matter Experts CBI Business Participants • Provide business process expertise and understand business,
(SMEs) CBI IT Participants technology, and change impacts
Application Team Members Application Team names • Identify specific requirements related to change, security, technology,
and data
Scribe / Timekeeper Team member name • Record Information (Fit/gaps, development objects, data, change
impacts)
If consensus cannot be achieved within 5-10 minutes, the item in question is parked and escalated to the appropriate parties outside of the workshop
Consensus
4
Workshop Objectives
5
Workshop Objectives & Desired Outputs
Workshop Objectives
Review and confirm L2 and L3 process definitions
Review the functional overview of leading practice L3 processes and process flows
Perform fit/gap analysis for each L3 process
Develop and document user stories for each L3 process and disposition each story as a fit or gap
Document KPIs and change impacts for each L3 process step
Define and document L4 tasks and identify roles and security restrictions for each task
Document reporting needs
Desired Outputs
L2 & L3 Process Fit/Gap Analysis Updated IP5 Process Change Impacts, Future State
User Stories Roles & Security
Definitions Dispositioning Flows Solution
6
Guiding Principles for Decision Framework
Be cie s c
Effi ts u
ag nt d lose
w
ge
ne
ile ec r t
WHY NOT SAP S/4HANA? How can we better PRIORITIZE what is required for go-live.
r
tie ko ’
fo
ni loo t?
isi o o
LIMIT CUSTOMIZATIONS to strategic / core
po th y
on u
op on ‘wh
-m r g
capabilities.
ak oa
quickly.
Be sk
in ls
A
g
UTILIZE BEST PRACTICES AND SIMILAR AND
ADD VALUE by working more efficiently and
EXISTING ASSETS and pushback if additional
delivering results sooner.
OUR GUIDING efforts are not really needed.
PRINCIPLES
Sp way er in ts, al
e e s l cr bo
Al eliv lien ern
d ook eas th
d r c xt
to fo in int
d b t
in I’s a
t
m B Ih
va r w g v ern
an
es
lu ay alu al
in e C B
st av C
e st et
FUTURE PROOF for the next 10 years. CHECK FOR ALIGNMENT with other impacted
re h ur
te ys o
A ea
ship, bill, collect cash, pay taxes, report UNDERSTAND THE DECISION’S FINALITY before
W
7
Security & Controls considerations for design workshops
Controls are
non-negotiable
Security and GRC Risks and how we mitigate them
Access Work closely with the business, IT, audit, and security to
risks identify risks proactively
8
L2 Process Definitions
9
CBI Capabilities
Integrated Commercial Integrated Supply Chain Back Office
Strategy to Order to Cash (O2C) Demand to Plan (D2P) Finance
Market
Market (S2M)
Customer Business Finance Data
Analysis Unconstrained Transportation Development
Order Management
Demand Planning (M&A and
Marketing Management & Reporting
Planning Inventory Finance Ventures) Treasury
Trade and After Sales Strategy & & Cash
Optimization
Commercial Promotion Joint Management Management
Fixed Asset Tax Strategy
Planning Customer
Management S&OP Distributor and CAPEX & Tax
Product Shipment
Planning Accounting Accounting
Distribution Corporate
Enablement POS Order Global Travel
Resource Finance & Risk Payroll
Management Services Investor
Master Planning Management
Invoice,
Long Term Operations Relations and
Sales to AR, and Planning
Planning Finance External
Collections And MPS Finance Product
Customers (S2C) Planning & Costing &
Reporting Revenue
Sales Processes Reporting Inventory Management
Customer Production to (FP&A) General Accounting Commercial
Negotiation and Material Inventory (P2I) Finance and Finance
Setup Purchase to Pay (P2P) Resource
Accounting
Customer Planning
Quality
Service Grape
Management
Idea to Strategic Management
Materials Processes
Sourcing Manage
Consumer Planning Inventory Financial
(I2C) Supplier
Management Enablers Resources
Feasibility Relationship and Data Mgmt. Manage
Production
Evaluation Administration Maintenance Corporate
Scheduling & Reporting
Product Test & Direct Programs
Intercompany Manage Plan
Trial Execution Procurement
Transfer And Performance Manage IT
Product Process Plant Inbound
Accounts Payable Acquire and Manage Human
Development Production Transportation
Process Maintain Assets Capital
Product Indirect Management
Plant
Nursing Procurement1
Warehousing &
Storage Plant Outbound
Packaging Highly Moderately Minimally
Notes: Transportation Ke
1. Indirect Procurement is High for Beer and Low for W&S Process Management
impacted impacted Impacted by DE
y: by DE by DE / Not in Scope
2. Vineyard Management is specific to W&S
10
Production Master Data
11
Production Master Data
• Material Master
• Material master is an organization’s central repository for storing and retrieving material-
specific information and drive business processes
• Bill of Materials (BOMs)
• Bill of Material is a comprehensive, structured list of components that make up a product or
assembly
• Resources
• Resource is an organization unit where manufacturing activities are performed. Resource can
represent machines, production lines, assembly bays, labor resources etc.
• Recipe
• A recipe is a sequence of operations to be carried out during the production at resources or
machines. Recipe also aids planning and costing process
• Production versions
• The production version is the link between a product BOM and the routing. It determines the
BOM and routing structure combinations that is used to produce a material
12
Material Master
13
Material Master Overview
Material = Item = Product = Part
• The concept of the material master encompasses different types of materials such as raw materials, spare parts, semi-
14
Business Processes driven by Material Master
• The material master is critical for almost every business process of an organization
• Following are some key business processes influenced by the material master:
15
Material Types
Materials with the same basic attributes are grouped together and assigned to a material type. This allows the
management of different materials in a uniform manner in accordance with CBI’s operating requirements. Examples
of material types are given in the graphic below and key characteristics of each type has been explained beside.
Raw materials
Raw materials are always procured externally and then processed. A
material master record of this type contains purchasing data, but not
sales data since they are not to be sold.
Finished products
Finished products are produced in-house. Since they cannot be ordered
by Purchasing, the material master record of this material type does not
contain purchasing data.
16
Material Master Key Views
Material master can be divided into the following views based on business function:
*** Global
Data
____ _____
____
____
_ ____
_
____ _____
_
_____ _____
17
MRP1 View Key Fields
MRP Type Description
PD Forecast Consumption, No planning Time Fence
MRP Group :MRP Group
ND No Planning in SAP is a key with a set of
VB Manual reorder point planning planning parameters
which are specific for a
VM Automatic reorder point planning
set of materials.
VV Forecast based Planning
X0 Relevant for production planning in Advanced Planning
18
MRP2 View Key Fields
Procurement Type Description
E Material is produced in-house
19
MRP3 View Key Fields
A Strategy Group represents the
procedure used for planning a
material
20
MRP4 View Key Fields
This field controls how the dependent
requirements (BOM Components)are used as
an individual requirement or collective
requirement
21
Advanced Planning View Key Fields
This indicator enables the material to be Predefined algorithm for production
planned for constrained based capacity planning. These heuristics are used for
planning procurement planning for products and other
planning tasks.
22
Work Scheduling View Key Fields
Percentage rate that specifies the percent Percent by which the quantity that
below which the quantity posted for a is posted to goods receipt may
goods receipt may drop below the exceed the production order
production order quantity quantity.
23
Bill of Material (BOM)
24
BOM types
1.Simple BOM
• Standard BOM with the same finished product and components
2.Multiple BOM
• A group of BOMs representing a single product that can be manufactured from different combinations
of materials (alternatives).
25
BOM Header Overview
BOM HEADER: Finished/ Semi finished material for which
the Bill of Material is created
26
Bill of Materials – Component Overview
Item Description Details
Category
L Stock Items Assigned for material that is kept in stock
N Non-Stock Selected for material that is not kept in stock and is only procured on demand
Items
D Document Used for different documents (such as design drawings, photographs, or texts of any Sub Assembly Indicator: This
Items word-processing program)
indicator denotes that the
T Text item This category implies use of text in the BOM Structure to mention specific component has its own BOM
instructions/information
structure
Quantity: Quantities of materials
that are consumed in the
production process
Component Description:
Description populated from the
material master for stock materials
27
Bill of Materials – Data Upload Template
BOM Upload
Template
28
Resource
29
Resource- Overview
Formulae for calculating capacity
Various default values requirements , shift intervals, factory
calendar etc can be maintained here. Formulae for calculating operation
can be maintained in duration can be maintained here.
the Resource for
General Data
operations.
30
Basic Data
Key which distinguishes the Resources by their
category (for example, production Resource,
maintenance Resource), The Resource
The person or group of people category determines which data can be
who are responsible for the maintained in the master record for the
maintenance of the Resource Resource.
master files.
Key to control in
which type of This indicator
task list can the enables the
resource be used resource to be
planned for
constrained based
capacity planning
31
Key Default Values
Key that controls the functions like scheduling, capacity
planning, costing that can be performed in a routing operation
32
Capacities
Processing Formula used to determine the capacity requirements for processing based on the
SAPC00
Formula duration for which the resource is available
33
Intervals and Shifts
The Factory calendar has the information of working days, holidays and also
planned shutdown days for the plant. The Factory calendar assigned to resource
helps while generating capacity and scheduling requirements
34
Intervals and Shifts
The time at which the shift at a
The time at which the shift at a Duration for which the resource
The Shift Sequences under resource ends under a
resource starts under a is maintained idle and no
which the resources operate at particular shift sequence
particular shift sequence operations are performed.
the manufacturing unit
CAPACITY TAB
35
Scheduling
36
Costing
controlling
area
Provides the cost center
where the costing of the
resource is allotted
37
Resource – Data Upload Template
Resource Upload
Template
38
Recipe
39
Recipe Usages
The business object recipe is the description of an enterprise-specific process in
process industries, that does not relate to a specific order. The recipe is used for the
manufacture of products or for rendering services.
40
Recipe Header
41
Recipe Operations
42
Recipe – Data Upload Template
Recipe Upload
Template
43
Production Version
44
Production Version
The production version is the link between a product BOM (Bill of Material) and the
process Recipe. It determines which alternative BOM is used together with which
routing to produce a material or plan a material. There may be different production
versions based on the lot sizes and validity dates
Production Version 1
BOMs
A
B
Production Version 2
C
Production Version 3
A
Recipe
B
45
Production Version Overview
• Producti on versions are used in discrete manufacturing, repeti ti ve manufacturing, and process
manufacturing.
• Producti on versions are used in sales & operati ons planning (SOP), material requirements planning (MRP),
producti on order creati on and product costi ng to select the most suitable task list and the corresponding
material list.
Validity Dates
Recipe Assignment
BOM assignment
46
Production Version Overview
BOM assignment
47
Production Version – Data Upload Template
Production
Version Upload Template
48
Roles &
Security Restrictions
49
Roles & Security Restrictions
Team discussion on identifying roles and restrictions for tasks
50
Reporting
51
Reporting Requirements
Team discussion on specific reporting requirements
Microsoft Excel
Worksheet
52
Next Steps
53
Next Steps
Parking Lot Items
Assign parking lot items and
schedule follow-up discussions IP5 Process Flows
Update IP5 process to
reflect workshop
outcomes
54