0% found this document useful (0 votes)
160 views49 pages

RESERVOIR GEOMECHANICS COUPLING - EMI (Autoguardado)

The document discusses coupling reservoir flow simulation with geomechanical modeling. It presents an iterative coupling method using ABAQUS and Eclipse software. This method introduces pore pressures from Eclipse simulations into ABAQUS to model strain, before feeding strain conditions back into Eclipse. The document compares this iterative ABAQUS/Eclipse coupling to explicit coupling and Visage/Eclipse coupling, finding the iterative method provides more accurate results while being simpler and faster than explicit coupling.

Uploaded by

VP Leonel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views49 pages

RESERVOIR GEOMECHANICS COUPLING - EMI (Autoguardado)

The document discusses coupling reservoir flow simulation with geomechanical modeling. It presents an iterative coupling method using ABAQUS and Eclipse software. This method introduces pore pressures from Eclipse simulations into ABAQUS to model strain, before feeding strain conditions back into Eclipse. The document compares this iterative ABAQUS/Eclipse coupling to explicit coupling and Visage/Eclipse coupling, finding the iterative method provides more accurate results while being simpler and faster than explicit coupling.

Uploaded by

VP Leonel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 49

RESERVOIR GEOMECHANICS COUPLING

Supervisor: Pierre SAMIER

Armin DORGATHEN
RESERVOIR FLOW SIMULATION

-Geological Model (Seismic, Geophysics, Well Testing)


RESERVOIR FLOW SIMULATION

-Geological Model (Seismic, Geophysics, Well Testing)

-Petrophysics (Well Logging, Coring, Well Testing)


RESERVOIR FLOW SIMULATION

-Geological Model (Seismic, Geophysics, Well Testing)

-Petrophysics (Well Logging, Coring, Well Testing)

-Static Model

-Mathematic Simulation (Darcys Law, Material Balance)

-Simulation Model
RESERVOIR FLOW SIMULATION

-Reservoir History (Rate, Cum-rate, BHP, Pressure, etc)

-History Matching
RESERVOIR FLOW SIMULATION

-Reservoir History (Rate, Cum-rate, BHP, Pressure, etc)

-History Matching

-Forcasting

-3D View of flowing properties

-Well Planning and sensitivity analysis


GEOMECHANICS SIMULATION

-Overburden

-Petrophysics (Lab Tests)

-Model (Burden faces)

-Mathematic Simulation (Finite Elements)

-Strain and grid deformation


GEOMECHANICAL MODELING COUPLED WITH
FLOW MODELING, COMPARISON BETWEEN
VISAGE/ECLIPSE AND ABAQUS/ECLIPSE
COUPLING.
-Types of couplings (Sugar box covered reservoir )

-Grid Generation to create all the burden faces

-North Sea

-Africa

-Conclusion and Results


INTRODUCTION

The link between fluid flow and geomechanics modeling in some stress
sensitive reservoirs has been growing during the last years.
– In conventional reservoir simulation the only geomechanical parameter involved is rock
compressibility, this parameter is not sufficient to represent rock behavior in response to stress
variation in sensitive reservoirs.

– The importance of geomechanics in problems such as wellbore stability, hydraulic fracturing, and
subsidence is well known effects on pressure can damage the oil and gas production and
forecasting from the reservoir.

– A modification of such parameters strongly affects the flow pattern in the reservoir, ultimate
recovery factor and the production rate, this could be a problem if we define economic limits or
compromise some daily production that could not be achieved or that has an over rate.

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 15


COVERED SUGAR BOX RESERVOIR

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 16


SUGAR BOX COVERED RESERVOIR
0 psi

Boundary condition fixed on the border

u=0
RESERVOIR

7 Regions (GRID WITH ECLIPSE)

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 17


GEOMECHANICAL PROPERTIES

Young modulus

Biot’s Number

Poisson’s Ratio

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 18


NEW ITERATIVE COUPLING

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 19


Visage Modeler Get the pressures from
Run Eclipse simulation
(geomechanics eclipse file for all the
for n time step geomechanics steps
properties and regions)

Run Visage or Abaqus


Introduce pore pressures to the input processor for all the
Visage file *.MII or *.inp Abaqus geomechanical time steps

Get the strain conditions from the Create the multpv.dat to couple with Introduce the multpv.dat to the
output file *.MIO or *.dat Eclipse Eclipse data file

Pressure
Converged

ITERATIVE COUPLING
COMPLETED
RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 20
ITERATIVE COUPLING

VISAGE/ECLIPSE ABAQUS/ECLIPSE

2nd iteration
2nd iteration

1st iteration
1st iteration

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 21


ITERATIVE COUPLING COMPARISON
Run Time per run Total
Method Coupling Iterations Simplicity
s (s) time
ABAQUS 3,512.97 psi Iterative Visage/Eclipse 36 7 6 1512 YES
VISAGE 3,339.41 psi Iterative Abaqus/Eclipse 1 7 139 973 YES

4.94 %

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 22


ITERATIVE COUPLING COMPARISON

Method Coupling Runs Iterations Time per run (s) Total time Simplicity
Geomechanics Iterative Visage/Eclipse 36 7 6 1512 YES
Iterative Abaqus/Eclipse 1 7 139 973 YES

55 %

Flow
ABAQUS
VISAGE

Run Iteratio Time per Total


Method Coupling Simplicity
s ns run (s) time
Visage/Ecli
Iterative 1 7 1.17 8.16 YES
pse
Abaqus/Ecl
Iterative 1 7 0.74 5.18 YES
ipse

57 %

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 23


CLASSICAL ITERATIVE EXPLICIT
COUPLING

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 24


EXPLICIT COUPLING
Run Eclipse simulation Run Eclipse simulation Run Eclipse simulation
for time step k for time step k+1 for time step k+i

Get the pressures from eclipse file Get the pressures from eclipse file

Visage Modeler Visage Modeler


(geomechanics (geomechanics
properties and regions) properties and regions)
Introduce pore pressures to the Introduce pore pressures to the
input visage file .MII input visage file .MII

Run Visage processor Run Visage processor

Get the strain conditions from the Get the strain conditions from the
output file *.MIO output file *.MIO

Create the multpv.dat to couple with Create the multpv.dat to couple with
Eclipse Eclipse

Introduce the multpv.dat to the Introduce the multpv.dat to the


Eclipse data file Eclipse data file

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 25


EXPLICIT COUPLING VS. ITERATIVE COUPLING (VISAGE-ECLIPSE)

ITERATIVE 3,326.97 psi


0.38%
EXPLICIT 3,339.41 psi

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 26


COMPARISON TIME

Run Iteration Time per


Method Coupling Total time Simplicity
s s run (s)

GEOMECHANICS Explicit Visage/Eclipse 36 1 3 108 NO

Iterative Visage/Eclipse 36 7 6 1512 YES

Iterative Abaqus/Eclipse 1 7 139 913 YES

Run Time per


Method Coupling Iterations Total time Simplicity
s run (s)
ECLIPSE Explicit Visage/Eclipse 36 1 0.86 30.86 NO

Iterative Visage/Eclipse 1 7 1.17 8.16 YES

Iterative Abaqus/Eclipse 1 7 0.74 5.18 YES

Abaqus tends to takes less time for geomechanical and flow simulation

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 27


SUGAR BOX RESERVOIR

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 28


SIMPLE SUGAR BOX RESERVOIR

geomechanics

Constant cr

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 29


SIMPLE SUGAR BOX RESERVOIR
6000 psi

4000 psi

4000 psi

6000 psi

U=0

U=0

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 30


FIELD CASE 1 RESERVOIR

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 31


FIELD CASE 1 RESERVOIR

So Sg
Water Injection
Natural Depletion

Sw

The Field case 1 is a


chalk oil saturated
reservoir located in the
north sea with a grid size
44 x 84 x 12 the
recovery is by water
injection
RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 32
GRID GENERATION VISAGE

•Region 1 Reservoir with porosity 0.30 – 0.45.


•Region 2 Reservoir with porosity < 0.3.
•Region 3 Overburden Pliocene
•Region 4 Overburden Lower Miocene
•Region 5 Overburden Middle Eocene
•Region 6 Overburden Paleocene
•Region 7 Sideburden left
•Region 8 Sideburden down
•Region 9 Underburden

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 33


GRID GENERATION

IMPORT

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 34


GRID GENERATION VISAGE

- Create Regions
- Introduce geomechanical
properties

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 35


GRID GENERATION VISAGE

GRID INCREASES TO 52 X 92 X 21
Number of elements 100,464 for geomechanics simulation

Export
RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 36
VISAGE/ECLIPSE COUPLING

Geomechanic effects:
-Pressure increases
-Oil Production increases
-Gas production reduces
-Reservoir pore volume
reduces
1 2

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 37


ABAQUS/ECLIPSE COUPLING

1st iteration
Geomechanic effects:
-Pressure increases
-Oil Production increases
-Gas production reduces
-Reservoir pore volume
reduces

2nd iteration

1st iteration

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 38


VISAGE/ECLIPSE VS. ABAQUS/ECLIPSE

Visage

Abaqus

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 39


COUPLING RUNNING TIME AND FILES
Geomechanical Time for each Number of
Total Time (s)
modeler iteration(s) iterations
Visage/Eclipse 1699.76 4 6799.04
Abaqus/Eclipse 2353.37 5 11766.85

Memory each Iterations Total Memory


Abaqus output
Memory each Total Memory step Ko (Files) Ko
Visage File Time steps
step Ko Ko *.dat 1 939 347 1 1 939 347
*.MIO 295 067 23 6 786 541 *.prt 13 911 1 13 911
*.PUN 73 755 23 1 696 365 *.odb 2 359 387 1 2 359 387
*.TOM 198 082 23 4 555 886 *.sim 648 1 648
Total 566 904 13 038 792 *.sta 2 1 2
Total 4 313 295 4 313 295

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 40


FIELD CASE 1’S PRODUCTION RATE AND GEOMECHANICAL
EFFECT VISAGE/ECLIPSE

DAYS Oil Oil C Gas Gas C


62 6779 6779 8418.6826 8418.6826
1005 56833.891 56835.363 91674.734 91416.297
2010 62777.391 62777.391 114905.05 108594.31
3015 70007.289 70049.727 294661.19 238946.27
5207 59558.188 65326.781 210306.59 216809.98
6027 70785.766 75314.805 276853.53 271035.28
7002 54804.383 58903.531 244105.5 249293.16
8026 15495.454 18052.328 17876.432 22062.51
9010 13044.366 15421.486 12404.152 14384.31
10320 9186.0801 11290.666 8420.9053 9852.7373
16895 8485.0596 11100.296 5718.418 7673.5259

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 41


FIELD CASE 1’S TOTAL PRODUCTION

DAYS Water Water C Oil Oil C Gas Gas C


32 1535.0338 1535.0338 51212 51212 67402.633 67402.633

W 16% 1005 769792.94 773437.19 34074632 34075212 51340596 51235600


2010 1833811.9 1937209 84365904 84367592 1.301042E+8 1.2771952E+8
3015 3234584.3 3454802.8 1.5310518E+8 1.5315774E+8 3.1404269E+8 2.8823923E+8
O 7% 4019 5868853 5988158.5 2.163992E+8 2.1721862E+8 6.2534765E+8 5.6395251E+8
5023 8859343 9083969 2.6837475E+8 2.7322573E+8 8.4478227E+8 7.8750886E+8
6027 13519105 14475820 3.3359606E+8 3.4339018E+8 1.0910167E+9 1.0314531E+9
G -2.4% 7002 22395172 25181944 3.9380746E+8 4.0830282E+8 1.3376705E+9 1.2847913E+9
8026 28185892 32290034 4.1937597E+8 4.3683005E+8 1.4335878E+9 1.3874934E+9
10320 36788964 43287640 4.4769296E+8 4.702017E+8 1.4608294E+9 1.418966E+9
13242 49225384 58753524 4.7224989E+8 4.9840038E+8 1.4821704E+9 1.4421184E+9
16895 82712896 96003112 5.0575725E+8 5.4026893E+8 1.5049455E+9 1.4704644E+9

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 42


GAS CAP BEHAVIOR

30/sep/1982

01/jan/2002

01/jan/2006

01/jan/2020

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 43


FIELD CASE 2 RESERVOIR

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 44


FIELD 2

So Sg

Sw

Is a Field onshore located in Africa, it is


reservoir with a gas cap, production is by
water flooding, and gas in situ. 203 X 252
X 81

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 45


GRID GENERATION

Number of elements 4 772 820

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 46


VISAGE/ECLIPSE AND ABAQUS/ECLIPSE

Abaqus crashed before giving any output file

VISAGE OUTPUT FILES PER


MEMORY in Kb
TIME STEP
*.MIO 13 963 758
*.TOM 9 386 131
*.PUN 3 323 564
*.GEO 2 405 667
TOTAL 29 079 120

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 47


CONCLUSIONS

-The forecast and pressure


changes with geomechanical
effects in stress sensitive
reservoirs.

-Iterative and Explicit coupling


are giving same results.

-Visage is easier to handle and


optional for each time step.

-Abaqus takes less memory


and time for geomechanical
modeling. However, not
capable to run for huge
models.

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 48


THANK YOU

RESERVOIR GEOMECHANICS COUPLING – Pau France – 21/09/2012 49

You might also like