Hydropower Visit of Middle Marsyandi Hydropower Plant: Submitted by

This document summarizes a visit by engineering students to the Middle Marsyangdi Hydropower Plant (MMHPS) in Nepal. It provides details on the plant's installed capacity of 70MW, location, components such as the intake, desander, surge tank, penstock, turbines, generators, transformers, switchyard, transmission lines and auxiliary systems. The plant diverts water from the Marsyangdi River to generate electricity and has been operating since 2008.

Uploaded by

Merina Adhikari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views20 pages

Hydropower Visit of Middle Marsyandi Hydropower Plant: Submitted by

This document summarizes a visit by engineering students to the Middle Marsyangdi Hydropower Plant (MMHPS) in Nepal. It provides details on the plant's installed capacity of 70MW, location, components such as the intake, desander, surge tank, penstock, turbines, generators, transformers, switchyard, transmission lines and auxiliary systems. The plant diverts water from the Marsyangdi River to generate electricity and has been operating since 2008.

Uploaded by

Merina Adhikari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 20

HYDROPOWER VISIT OF MIDDLE

MARSYANDI HYDROPOWER PLANT

SUBMITTED BY:
 KESHAB RAJ JOSHI (2072/BEL/020)
 MANISH RAUT (2072/BEL/022)
 NARAYAN CHAPAGAIN (2072/BEL/024)
 PRABINA BASNET (2072/BEL/025)
 PRATIKSHYA HAMAL (2072/BEL/028)
 PRIYANKA KUMARI YADAV (2072/BEL/029)
 RAKHI JHA (2072/BEL/034)
 SHAMSHER KUMAR SINGH(2072/BEL/041)
INTRODUCTION:
• MMHPS project was completed on 14 December 2008 and
generation started one month later
• MMHPS has been generating electricity by diverting water of
Marsyangdi river.
• It is located near Besisahar in the lamjung district about 170km
west of kathmandu.
• The damsite is 35km and the powerhouse site is 27km from dumre
to the north.
• It is a daily pondage run off river hydropower with daily peaking
capacity of 5hrs at minimum discharge.
• MMHPS has an installed capacity of 70MW and designed annually
generation of 398GWHr.
Geographical location of MMHPS
2.SPILLWAY
 Capacity=4270m3/s
 There is two types of gate:(i)Radial gate
(ii)Flap gate
3.INTAKE
 3 intake
 Submerged tunnel intake with trash rack and
gate
 Height=19.54m ,Width=12m
4.Desander:
 Desander is underground in caverns
 Length=130m,Height=27m,Width=15m
 6 basins are accommodate in 3 caverns i.e. 2 basins in each
intake.
• 5.Surge tank:
 It is vertical ,circular surge tank, underground.
 It is concrete lined with throttle
 Height=45m,Diameter=20m
• 6.PENSTOCK
 It is a concrete castes steel pipe
 Length=212-218m
 It is located between discharge measurement chamber and
turbine inlet valve.
Components of powerhouse
1.Valves:
 Two types of valve:(i)Butterfly valve (ii)Bypass valve
 Butterfly valve are used for controlling the flow of water to
the turbine
 Bypass valve are used for maintaining the pressure
2.Turbine:
 2 unit of Francis turbine , vertical shaft
 Rated output=37.928MW
 Rated speed=333.33rpm ,
 Gross head=110m
 24 unit of guide veins are used to allow required quantity of
water to turbine
3.Governor
 Electronic governor
 Used to regulate the mean speed of engine

4.Generator
 2 unit of 3 phase synchronous generator
 Rated output=39MVA
 Power factor=0.85-0.9
 Rated voltage=11kv±7.5%
 Rated speed=333rpm,18pole
5.Excitation system
 Static excitation system
 Consist of automatic voltage regulator(AVR), exciter ,
measuring elements, power system stabilizer and limitation
and protection unit
 Exciter is controlled by the AVR and is required to provide
field current to the rotor of synchronous generator
 It consist of thyristor or transistor bridge, and transformer
6.Synchronous system
 Process of matching speed and frequency of generator to
the running network
 Synchronization relay are used
7. Transformer
 6 single-phase power transformer of rating 14.5MVA
 1-three phase transformer is used for local of rating
25MVA
 Forced oil type transformer
 Buchholz relay protects transformer
8.Switch yard
 An enclosed area of power system containing the switch
gear
 Open air type
 Area=43m*50m
9.Circuit breaker
 SF6 is used
 Rated voltage=145KV
 Rated normal current=3150A
 Rated lighting withstand voltage=650KV
 Rated breaking current=10KA
10.Transmission line:
 Cardinal conductor of capacity 960A
 Double line transmission: 132KV lines from upper
marsyangdi connected to the grid and later 1 line runs to
Kathmandu and another to Bharatpur

11.Potential transformer
 Primary voltage= 132000/√3V
 Secondary voltage=110/√3V
 Rated VA=50VA
12. Auxiliary system
 It includes Diesel generator , dc batteries
 Supplies excitation incase of primary excitation power
failure
 Provides a voltage of 110V until the fault has been cleared

13.Cooling system
 Open loop and closed loop type cooling system.
Single line diagram
Load curve
Thank you