SHIPSET NO:……….……………..
WORK ORDER NO:………………………..
DATE:………..………………
PIP ANNEXURE- FIREWALL RH-FINAL
1
Last Updated Date- 21-May-2020
Firewall
INBOARD OUT BOARD
2
Firewall Inboard B1-
B9
LOCATIONS
S.NO CHECKLIST
1A 2A 3A 4A 5A
B1 Check for all open holes as per Engineering
B2 Verify the Edge distance in Firewall assembly As per B/P and HS217.
Inspect all the installed fasteners as per B/P Requirement & As per HP3-0(SOLID RIVET,
INSTALLATION),
B3 HP3-1(COUNTERSINKING), HP3-2(HI-LOK, INSTALLATION), HP3-5(BOLT,BLIND
INSTALLATION ) Check for Rivet head gaps, Rivet gap to shank, Rivet damages,
check for CSK rivet, Blind & Hilok fasteners protrusion & intrusion
Check for the orientation & floating of all Nut plates(one lug floating ,one lug fixed, two lug
B4
floating, two lug fixed) & Brackets as per Engineering
Check for interior & exterior surfaces for any nicks and scratches as per HS217
B5
check for part to part gap as per HS217
Check for Sealant Voids , delamination, Bubbles, Pin Holes, smoothness, uneven sealant and
B6
incomplete sealant.
B7 Check Bearing(2 Qty) free movement condition in Firewall assembly.
B8 Verify the electrical bonding surface protectively covered as per spec
B9 Ensure Bare metal touch up as per spec EPB4-230 and the applicable part spec
3
Firewall Outboard B1-
B9
LOCATIONS
S.NO CHECKLIST
1B 2B 3B 4B 5B
B1 Check for all open holes as per Engineering
B2 Verify the Edge distance in Firewall assembly As per B/P and HS217.
Inspect all the installed fasteners as per B/P Requirement & As per HP3-0(SOLID RIVET,
INSTALLATION),
B3 HP3-1(COUNTERSINKING), HP3-2(HI-LOK, INSTALLATION), HP3-5(BOLT,BLIND
INSTALLATION ) Check for Rivet head gaps, Rivet gap to shank, Rivet damages,
check for CSK rivet, Blind & Hilok fasteners protrusion & intrusion
Check for the orientation & floating of all Nut plates(one lug floating ,one lug fixed, two lug
B4
floating, two lug fixed) & Brackets as per Engineering
Check for interior & exterior surfaces for any nicks and scratches as per HS217
B5
check for part to part gap as per HS217
Check for Sealant Voids , delamination, Bubbles, Pin Holes, smoothness, uneven sealant and
B6
incomplete sealant.
B7 Check Bearing(2 Qty) free movement condition in Firewall assembly.
B8 Verify the electrical bonding surface protectively covered as per spec
B9 Ensure Bare metal touch up as per spec EPB4-230 and the applicable part spec
4
Firewall B10
S.NO CHECK LIST
Orientation of QTY (1) MS21061L3 nutplate common to the 7-311140132-178 angle to be checked
B10 as per B/P requirements
5
Firewall B11
S.NO CHECK LIST
Check for Availability of 4 Red Dots (Proof load test Evidence) Adjacent to Bearings on
B11 Firewall Engine Mount 7-311140048-8.
6
Firewall B12 &
B13
0.220-0.226
Faying should not be present
S.NO CHECK LIST
Ensure (0.220-0.226) Hole Size for MS21075L3 Nutplate center holes on 7-511140200-23
B12 Support assembly
Ensure that no Fay seal is present between Nutplate and 7-511140200-23 Support
B13 assembly
7
Firewall B14
S.NO CHECK LIST
B14 Check for Surface irregularities in 7-311140132-64 & 7-311140132-45 & 46 Angles
8
Firewall B15
S.NO CHECK LIST
B15 Ensure the Availability of 7-311140132-179 & 7-311140132-93 Parts are Clecoed on the Final Assembly
9
Firewall B16
S.NO CHECK LIST
B16 Check for Tapered Shim b/w 7-311140132-101 Doubler and 7-311141133-4 Web
10
Firewall B17
Shim is located between 7-
3111400048-8 , 7-311140047-4 and 7-
311141133-4 Web
S.NO CHECK LIST
B17 Check for Proper Application of Shim b/w 7-311140048-8 and 7-311140047-4 and 7-311141133-4 Web
11
Firewall B18
Min ED = 0.22”
S.NO CHECK LIST
B18 Ensure ED of the Rivet C/T 7-311141144-3 Doubler and 7-311140132-52 & 7-311141133-4 Web
12
Firewall B20 &
B22
S.NO CHECK LIST
B 20 Ensure all Electrical Bonding areas are taped using appropriate tape
Ensure no Primer in indicated holes as per PL note
B 22
13
Firewall B21
S.NO CHECK LIST
Ensure Grommet Lengths on 7-311140132-64P are as per B/P
B 21
14
Firewall B23
S.NO CHECK LIST
Check whether 5th and 11th Holes are in Open conditon till Final assembly
B 23
15
Firewall B24
S.NO CHECK LIST
B 24 Ensure part marking on the Final Assembly
16