Process Door Analysis: Business Enablers: Necessary NVA

The document discusses lean methodology which focuses on minimizing waste from processes. It defines value adding and non-value adding activities. It also discusses the eight types of waste and lean principles like identifying value and creating flow. The document explains value stream mapping to identify the percentage of value add in a process. It further elaborates on establishing pull and continuous improvement culture. Various tools like brainstorming, FMEA are explained to identify and implement solutions to improve the process.

Uploaded by

Kunal Vijayant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views29 pages

Process Door Analysis: Business Enablers: Necessary NVA

The document discusses lean methodology which focuses on minimizing waste from processes. It defines value adding and non-value adding activities. It also discusses the eight types of waste and lean principles like identifying value and creating flow. The document explains value stream mapping to identify the percentage of value add in a process. It further elaborates on establishing pull and continuous improvement culture. Various tools like brainstorming, FMEA are explained to identify and implement solutions to improve the process.

Uploaded by

Kunal Vijayant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 29

Process Door Analysis

Lean is a continuous improvement methodology which focuses on minimizing


or eliminating the waste from the process

Value Adding Activities: The activities for which your customer is willing to pay
for

Non Value Adding Activates: The activities which consume resources but still do
not add any value to the system

Business Enablers: Necessary NVA

Waste:Un ncecessary activities wt we perform in the process


8 Types of Wastes
• Transportation – unnecessary movement of material
• Inventory – Inventory above the safety stock level
• Motion - unnecessary movement of humans in the workplace
• Un utilized human intellect -
• Waiting Time -
• Overproduction -
• Over Processing -
• Defects -
Lean Principles
• Identify Value
• Map the value stream – Value Stream Mapping(VSM)
• Create Flow
• Establish Pull
• Seek Perfection –
• Mistake proofing - Poka Yoke
Add continuous improvement as a part of org. culture
VSM – Value Stream Mapping
Objective: To identify total % value add in the process

Total LT = 120 Mins

Order Dispatch

P1 P2 P3

C/T = 10 Mins C/T = 10 Mins C/T = 5 Mins

Total % Value Add in the process – Process Cycle Efficiency(PCE)


PCE = Total Cycle Time/Total Lead Time
PCE = VA/VA+NVA
= 25/120
VA – Value adding Time
PCE= 20.8%
VSM
• Objective of VSM: Is to identify Value adding and Non Value Adding
activities in the process and to determine the % value add in the
process.
LT
Order Dispatch

Process (P)

C/T
Create Flow
Flow is movement of material or service from supplier end to
customer end.
• Continuous Flow

P1 P2 P3

5 Mins 10 Mins 5 Mins

P2_
#4 Establish Pull
KANBAN – Card
Board
Bill KANBAN – Card, Bill
Push
Board
No. of Units. Material
No.Flow
of Units.
Specification Specification Customer
Supplier
Delivery Date Information FlowDate
Delivery
KANBAN – Card Bill
Board
No. of Units.
Specification Raw Material Production Unit Sales and Marketing
Delivery Date

Material Flow
Pull
Information Flow
Improve
Objective: To identify solutions and implement the same.
• Identification of solutions
• Mistake Proofing of solutions Y(CTQ) X1
• Risk Proofing of Solutions X2
X3
• Trial Implementation of solutions X4

• Full Scale implementation solutions


Identification of Solutions

Creative Approach Analytical Approach

Brainstorming Design of
Experiments(DOE)
Brainstorming

• 1) Identifying solutions(Capturing the solutions/Ideas)


• 2) Validating and Prioritization of solutions(Evaluate the
solutions/Ideas)
Identifying Solutions
• Channeling
• Analogy
• Anti solution
• Brainwriting
• Round Robin Method
Evaluation and Prioritization of Solutions
Nominal Group Technique (NGT)

Solutions SME 1 SME2 Total


Solution 1 5 4 9 Cut off value -
Solution 2 1 3 4 6
Solution 3 5 5 10
Solution 4 4 3 7

Criteria Based Matrix (CBM)


Criteria Weightage Solution 1 Solution 2
Safety 10 5 50
Reversibility 9 1 9
Cost 8 3 24
Time 7 1 7
Total 90 70
Mistake Proofing of the solution
• Mistake proofing: Making a process or a product such that, while
using the same you cannot do a mistake intentionally also.
• Poka Yoke – Fool proof or mistake proof
Failure Mode Effect Analysis (FMEA) – Risk
Proofing
First we identify 4 things:
1) If we have process P, what are the different ways in which this process can fail
2) If process P is failing in a particular way, then what is the effect it would generate
3) What can be the probable causes which make the process to fail in this particular
way
4) If Process P is failing in particular way due to some cause X, then as of now in my
process do I have controls to detect this failure.

Way A Effects Cause X Control 1

Process P Way B Effect Cause Y Control 2

Way C Effect Cause Z Control 3


FMEA Worksheet

Process Potential Potential S O D R Actions S O D R


Step/Part Failure Failure Potential Current P Recomm Actions P
Number Mode Effects E Causes C Controls E ended Resp. Taken E C E
N N
V C T V C T

RPN = Severity
X
0 Occu rrence
X
ection
Det

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
14
RPN = Sev*Occ*Det

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
15
Severity Scale
RPN = Severity X Occurrence X Detection

High

Low

More the severity,


higher is the rating

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
16
Occurrence Scale
RPN = Severity X Occurrence X Detection

High

Low
More often it occurs,
higher is the rating

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
17
Detection Scale
RPN = Severity X Occurrence X Detection

Low

High
Lower the ability
to detect, higher
is the rating

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
18
FMEA - Template

Process Potential Potential S O D R Actions S O D R


Step/Part Failure Failure Potential Current P Recomm Actions P
Number Mode Effects E Causes C Controls E ended Resp. Taken E C E
N N
V C T V C T

RPN = Severity
X
0 Occu rrence
X
ection
Det

0
Trial(Pilot) Implementation
• Simulation models of process
• Fix certain number of runs/Trials – 30 Trials
Full Scale Implementation Plan
Solutions Responsibility Timeline Status
Solution 1(Kaizen 1) Team A
Solution 2(Kaizen 2) Team B
Solution 3 Team C

Kaizen: Small improvements which we do in our own


work area – (Problem Known and Solution Known)
5S
• It is a cont. improvement methodology which focuses on
standardizing, organizing and managing the workplace.
• Sort – necessary and un necessary items Red Tagged
Area
• Set in order – Every item has its own place
• Shine – Clean, you clean the workplace on regular interval
• Standardize – standardize the practice of first 3 S
• Sustain – Regular 5S Audits – Areas to improve and area’s doing good
Control Phase
Objective: Monitor and control the process

SPC – Statistical process control

Control Charts:

Walter Shewhart – Shewhart Charts

Xbar+3s
UCL – Upper control limit

3s
X Bar
CL

3s

LCL – Lower control limit


Xbar-3s
Process Parameter - Temperature

Initiate RCA – Root Cause Analysis


Root Cause Analysis: Fish
bone,5Why, 5W1H
Why
What
When
Where
which
How

1 2 3
Selecting Control Charts
TYPE OF DATA?

VARIABLE / CONTINUOUS DISCRETE /


ATTRIBUTE

Individual
measurements or Defect or Defective
subgroups?

Individual Subgroups Defectives Defects

I – MR Chart Subgroup < 10 Constant sample size? Constant sample size?

Yes No Yes No Yes No

X – Bar X - Bar
np-chart P-chart C-chart U-chart
R S chart
chart

© 2018 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved.
25
Normal distribution = (0.68)^15.

= (0.32)^8

Empherical rule of Normal Distribution, 68 95 99 rule


• X bar and R - Length
• X bar and S - Can
• NP – Bulb
• U – Typos

• Path – Stat – Control Charts – Variable chart(For variable Data), -


Attribute Charts(For Attribute Data)
Project Closure
• Statistical validation of results – Sigma level calculations, hyp. Test
• Project Handoff document – Modify the SOP or Introduce the new
SOP
• Cost Benefit Analysis – Calculate the net savings through project
• Financial Validation of the savings – Audited Savings
• Sponsor Signoff
• R&R
Agarwal, Vrinda <[email protected]>