Quick Start Guide Gear Drive Flo Tap Annubar Installation Instructions Rosemount en 77370

The document provides installation instructions for a Gear Drive Flo-tap in 3 steps or less: 1. Mount the Flo-tap assembly to the pipe using tack welds and verify dimensions match specifications. 2. Drill the pipe using a hot tap machine, ensuring the valve is closed, then attach the Flo-tap assembly. 3. Insert the Annubar sensor by cranking the manual gear drive until fully inserted, then secure it with a lock pin and tighten nuts.

Uploaded by

homesxxx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
414 views26 pages

Quick Start Guide Gear Drive Flo Tap Annubar Installation Instructions Rosemount en 77370

The document provides installation instructions for a Gear Drive Flo-tap in 3 steps or less: 1. Mount the Flo-tap assembly to the pipe using tack welds and verify dimensions match specifications. 2. Drill the pipe using a hot tap machine, ensuring the valve is closed, then attach the Flo-tap assembly. 3. Insert the Annubar sensor by cranking the manual gear drive until fully inserted, then secure it with a lock pin and tighten nuts.

Uploaded by

homesxxx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Gear Drive Flo-tap

Installation Instructions
Quick Installation Guides:
00825-0400-4809 rev. EA – 485 Flanged Flo-tap
00825-0500-4809 rev. DB – 485 Threaded Flo-tap
00825-0200-4585 rev. AA – 585 Flanged Flo-tap
Nomenclature
Instrument
Connections
Lift Rings Top Plate
Gear Drive Plate

Gear Box

Rod Protectors
Full Port
Isolation Valve
Weld the Mounting Hardware Onto
the Pipe
Threaded Flo-tap Flanged Flo-tap
Tack Weld the Mounting Hardware
with 4 Equal Length Tacks
 Tack weld anywhere on
the mounting hardware
1
 Then again directly across
from the first tack weld
 Then on the other 2 sides

3 2
Check to See that the Mounting
Hardware is Level and Square
 If it’s not, use a
rubber mallet to
lightly adjust the
hardware and
recheck
Verify that the
ODF Dimension
Matches What is
Listed in the QIG
The ODF is the
dimension from outside
pipe diameter to face
of flange
485 585
Verify that the ODF Dimension
Matches What is Listed in the QIG
The ODF is the
dimension from
outside pipe diameter
to face of flange

For Threaded Flo-tap the dimension


from the pipe OD to the top of the
threadolet is called LMH:
485 Sensor Size 1: 1.38-in. (35 mm)
485 Sensor Size 2: 1.56-in. (40 mm)
485 Sensor Size 3: 2.06-in. (52 mm)
Complete a Continuous Weld Around
the Perimeter of the Unit
Attached the Full Port Valve to the
Mounting Hardware
Threaded Flo-tap Flanged Flo-tap
First, thread the guide nipple into the
mounting then thread the valve

ODV

The valve stem should be in-line with the pipe


so it will not interfere with the insertion rods

The valve must be a full port valve to allow the


Annubar to pass through the valve into the pipe
Verify the ODV Dimension
The ODV is the dimension from the outer diameter of the pipe to the top
of the valve
Flo-tap / Flange 485 Sensor Size 585 Sensor Size ODV Dimension
Rating
1 --- 7.51-in. (190.9 mm)
Threaded
2 --- 8.17-in. (207.5 mm)
ANSI 150 # 1 11 10.5-in. (266.7 mm)
ANSI 300 # 1 11 11.75-in. (298.5 mm)
ANSI 600# 1 11 14.06-in. (357.2 mm)
ANSI 150 # 2 22 11.25-in. (285.8 mm)
ANSI 300 # 2 22 13.00-in. (330.2 mm)
ANSI 600# 2 22 16.38-in. (416.0 mm)
ANSI 150 # 3 44 12.75-in. (323.9 mm)
ANSI 300 # 3 44 16.25-in. (412.8 mm)
ANSI 600# 3 44 19.50-in. (495.3 mm)
Drill the Hole by Using a Hot Tap
Drilling Machine
Guide Ring in
Rosemount
Supplied
Mounting
Hardware

Tag with correct drill hole size


attached to the Annubar
After the Hole is Drilled, Retract the Drill
Past the Valve and Close the Valve
Vent drilling machine and remove the per manufacturers
and site procedures
Threaded Flo-tap Flanged Flo-tap

Remember that the hot tap drilling


machine is under pressure and
exposed to the process fluid
Attach the Fully Retracted Flo-tap
Assembly to the Valve
Threaded Flo-tap
Attach the Fully Retracted Flo-tap
Assembly to the Valve
Flanged Flo-tap – Use a hoist strap and
crane if needed
Quickly Open and Close the Valve to
Pressurize the Annubar, Check for Leaks
If Leaks are Present, Tighten the
Packing Gland Nuts
Attach Rod Protectors
Caution During Insertion
During insertion, the top plate can twist due to the
torque of the gear drive. To keep the Annubar
from twisting, hold the top plate in place during
insertion. Gear Drive
Plate
Top Plate Top Plate and Gear Drive
Plate should remain
Shown parallel during insertion
twisted
~90° from
Gear Drive
Plate
If Using a Drill for Insertion, Attach
the Drill to the Insertion Mechanism
 Do not exceed
200 RPM on the
Drill
Insert the Annubar
Stop the
drill and
crank by
hand once
the orange
stripes
reach the
Gear Box
Plate
Continue to Insert the Sensor with
the Manual Crank
Place a finger above the packing
gland to feel for full insertion
 CAUTION: Be
careful if doing
this with steam or
other harmful
fluids
 When movement
stops, the
Annubar is fully
inserted
Turn the handle an additional ½ turn
to ensure it is fully inserted
Insert the Drive Lock Pin to Secure
the Sensor in Place
Tighten the Nuts to the Gear Box
Plate and Loosen ¼ turn
This gives
an
indication
of full
insertion if
the
Annubar is
retracted at
a later
date.
Retighten the Packing Gland Nuts