KOWEPO – Lao International Co.
,Ltd
XE PIAN - XE NAMNOY HYDROELECTRIC
POWER PROJECT
Xe-namnoy Bottom Outlet Sliding Gates
Auto/Manual Operation
Operation Department
Present By: Souchitto SOUMOUNTHA
Position: Local Operator
December 14, 2018
Contents
1. Introduction.
1.1 Description and Functional Requirements.
1.2 General Structure.
1.3 Composition of Hydraulic Pump Station.
1.4 Cylinder Assumbly.
1.5 Local Control Panel.
2. Operation.
2.1 Method for Open The Bottom Outlet Sliding Gate.
2.2 Operation From Local Control Panel.
2.3 Manual Operation (Mechanical)
1. Introduction.
1.1 Description and Functional Requirements.
XE PIAN XE NAMNOY Hydroelectric Power Project , the
2100kN/1200kN - 2.6m hydraulic hoists are provided to operate bottom
outlet service gate. The hydraulic cylinder adopts a vertical arrangement, and
the hydraulic cylinder is positioned at EL.726.21m. The lifting head of
cylinder is connected to the gate. The project has 1 bay(bottom outlet service
gate and maintenance gate), during normal operation, the service gate work,
the maintenance gate always opening, the service gate breakdown or in need
of repair, the maintenance gate working, instead of working the function of the
service gate. Each hydraulic system consists of 2 cylinder, and 2 Stroke testing
device and 1 pump station and 2 control valve assembly and 1 local control
panel (LCP) and 1 pipe system. Each pump station provides two motors (one
main and one standby). The control system is installed in LCP nearby pump
station. Pump station and LCP are installed on concrete platform at
EL.725.65m. (Refer to JHMC-XPXN-1XN01MY001)
1.2 General Structure.
Hydraulic Hoist
Hydraulic Pump station
Ecological Discharge Pipe Air Vent Valve Air Vent Valve
Maintennace Gate
Service Gate
The Hydraulic hoist is designed to mainly function as following:
1. Manually operate the gate;
2. Automatically operate the gate;
3. Adequate spared parts in case of any fault: motor, spared pump ‐motor in
each HPU, and other spared parts for installation and maintenance.
4. System pressure protection (Ref. dwg JHMC –XPXN ‐1XN01MU002).
5. For hydraulic oil: filtering, dehumidifying, cleanness detecting,
temperature monitoring, and volume/level indicating.
6. Automatically detect gate position by calculating the stroke of cylinder
Gatepositions.
Main Parameter
Rate Lifting force 2100 kN
Normal Lowering force 1200 kN
Bore diameter of cylinder 420mm
Diameter of piston rod 200mm
Work stroke of cylinder 2.4 m
Max. stroke of cylinder 2.6 m
22.5 MPa
Max. working pressure in system
Operating pressure 19.6 Mpa
Closing pressure 8.7 Mpa
Lifting speed 0.5 m/min
Lowering speed 0.4 m/min
Flow of each oil pump 600l/m
PV046R1K1T1NMMC
Pump
35MPa , 46mL/r
M2QA200L4A B35‐TH, 30kW, 400V,
Motor of oil pump
50Hz, 1475r.p.m
Power supply AC400V, 50Hz
Voltage of electromagnetic valve DC24V
System cleanliness NAS8 Class
1.3 Composition of Hydraulic Pump Station.
Flow control valve and Check valve 32.1
Solenoid Valve YV2.2
Solenoid Valve YV2.1
Return filter
Line oil for Maintenance gate lifting the gate
Air dehumidifier
Line oil Relief vale return to tank Breather filter series
Line oil for Service gate lifting the gate
Manual oil pump
Line oil return to tank Level gauge series
OW control indicator oil water
Composition of Hydraulic Pump Station.
Solenoid Valve YV3.1 Relief valve 34.1 Flow control valve and Check valve 32.3
Solenoid Valve YV3.3
Relief valve 34.2
Flow control valve and Check valve 32.2
Flow control valve and Check valve 32.4
Line oil return to filter
Level sensor
Line oil for lifting the gate
1.4 Cylinder Assumbly .
Valve on Cylinder
Pilot-control check valve 41.2
High pressure ball valve 42.1
Pilot-control check valve 41.1
1.5 Local Control Panel.
Touch Screen Analog amp Meter
Service Gate Fully Time Counter
Close
Maintenance Gate fully
Service Gate Fully Open
Open
Maintenance gate fully
Gate in Transit close
Power On Maintenance Gate
filling water
Reset
Gate Mechanical Lock
Gate Stop
Signaling Lamp Test
Gate Lifting
Fault Alarm
Gate Lowering Emergency Stop
Remote/Manual Water Filling mode
Operation
Maintenance-Service
gate
XP XN BO Graphic Screen Monitoring
2. Operation.
2.1 Method for Open The Bottom Outlet Sliding Gate.
1. Select to “Manual Mode”.
2. Select to “Maintenance Gate”. Local Control Panel
3. Select “On Filling Water” for balance pressure
between upstream and downstream.
4. Push the button “Gate Lifting” when the air vent valve
have some noise, then push the stop botton immedialtely
“Gate Stop”. The lifting ratio is less than 2% (or gate
lifting height less than 50mm) when the sound of air vent 7.Push Botton Gate Lifting
5. Select Off Filing Water
valve is disappeared. Once more push the lifting botton
“Gate Lifting” up to Maintenance gate fully open and
waiting until the indicator lamp of the Maintenance gate
fully open (“RED” is ON).. Push Botton Gate Stop
5. Select “Off Filling Water” Then can continue to lifting
gate Push Botton Gate Lifting Again
6. Select to “Service Gate”. 4.Push Botton Gate Lifting
7. Push the button “Gate Lifting” and waitng until the
indicator lamp of the Maintenance gate fully open (“RED” 2. Select Maintenance Gate
is ON).
6. Select Service Gate 1. Select Manual Mode 3. Select On Filing Water
2.2 Operation From Local Control Panel
Operating switches and signaling lamps of gate is arranged on the control
cabinet’s door.
The hydraulic hoist has three control modes can be selected by switch in
site: Normal, Off and Manual modes.
In the mode of “Normal” control, the gate is controlled by DCS, operation
command come from the DCS.
In the mode of “Off” control, the gate is locked and all operation
commands are noneffective .
In the mode of “Manual” control, the gate is controlled by the local control
cabinet, operation command come from the local.
Operation Of HMI
Operation of Power Supply
Open the control cabinet’s door, turn on the main circuit breaker, then
switch on all circuit breakers for control circuit in cabinet one by one. Close
cabinet’ s door after switching on all circuit. Switch off main circuit breaker if
this hoist is not used in long‐term.
Operator can trip the main circuit breaker by push red “Emergency
Stop” pushbutton to immediately switch off main power in case of emergency.
Main circuit breaker will be switched on again after removing the emergency
condition.
Note: Use “ Emergency stop” pushbutton to switch off power is forbidden in
normal operation condition.
Hydraulic System diagram
Refer DWG: JHMC-XPXN-1XN01MU002
List of electric solenoid Operation
Bottom Outlet Service Gate Lifting
Gate Lifting Gate automatic replacement:
• If gate goes down 50mm from
preset position for the hydraulic
system leaking, the control system
will start up the pump
electromotor to lift the gate to the
preset position according to the
signal send by outside stroke
Push BottomGate Lifting
testing device(45.1).
Pressure oil pass through flow control • If gate keep on going down to 60
valve 32.1 , Pilot-controlled check valve
41.1 , then flow into rod end chamber, at mm from preset position, the
same time pressure oil open Pilot-
Bottom outlet Service Gate
controlled check valve 41.2. Select Manual mode
control system willBottom
start upoutlet
the
standby pump electromotor
MaintenancetoGate lift
the gate to the preset position and
Valve YV2.1
Lifting BO
send an alarm signal.
Select Service gate
service gate Oil Pressure line
Then flow into rod end chamber, oil in
the rodless end chamber pass through
Oil Drain line
flow control valve 32.2 to control lifting
speed and return to the oil tank 5, then
Off gate lifting.
YV1
ON Lifting BO service gate
YV1 1. Start pump with no-load pump
M1 & ON Valve YV1 delay 10 seconds
• Starts up the pump 2. ON Valve YV2.1 & OFF YV1
Tank electromotor with no-load, delay 10 sec
3. BO Service Gate Lifting
18
Bottom Outlet Service Gate Lowering
Gate Lowering
Push Bottom Gate Lowering
Pressure oil pass through flow control
valve 32.2 , Pilot-controlled check valve
41.2 , then flow into rodless end chamber,
at same time pressure oil open Pilot-
controlled check valve 41.1.
Bottom outlet Service Gate Select Manual mode Bottom outlet
Then flow into rodless end chamber, oil Maintenance Gate
in the rodl end chamber pass through
flow control valve 32.1 to control Valve YV3.1
lowering speed and return to the oil tank Lowering BO Select Service gate
5, then gate lowering. service gate
Off
YV1
ON Lowering BO service gate
YV1 1. Start pump with no-load pump
M1 & ON Valve YV1 delay 10 seconds
Tank 2. ON Valve YV3.1 & OFF YV1
• Starts up the pump electromotor with no-load, delay3.10BO
secService Gate Lowering 19
Gate automaticBottom Outlet Maintenance
replacement: Gate Lifting
Gate Lifting
• If gate goes down 50mm from
preset position for the hydraulic
system leaking, the control system
will start up the pump
electromotor to lift the gate to the
preset position according to the
signal send
Push Bottom Gateby outside stroke
Lifting
testing device(45.1).
Pressure oil pass through flow control
• If gate keep on going down to 60 valve 32.4 , Pilot-controlled check valve
mm from preset position,Select theMaintenance gate 41.3 , then flow into rod end chamber, at
same time pressure oil open Pilot-
control system will start up the controlled check valve 41.4.
Bottom outlet Service Gate Bottom outlet
standby pump electromotor to lift
Maintenance Gate
the gate to the preset position and
Valve YV2.2
send an alarm signal.
Select Manual mode Lifting BO maintenance
gate
Then flow into rod end chamber, oil in
the rodless end chamber pass through
Off flow control valve 32.3 to control lifting
YV1 speed and return to the oil tank 5, then
ON
gate lifting. Lifting BO maintenance gate
YV1 1. Start pump with no-load pump
M1 & ON Valve YV1 delay 10 seconds
Tank 2. ON Valve YV2.2 & OFF YV1
• Starts up the pump electromotor with no-load, delay3.10BO
secMaintenance Gate Lifting 20
Bottom Outlet Maintenance Gate Lowering
Gate Lowering
Push Bottom Gate Lowering
Pressure oil pass through flow control
valve 32.3 , Pilot-controlled check valve
41.4 , then flow into rodless end chamber,
at same time pressure oil open Pilot-
Selectcheck
controlled Maintenance gate
valve 41.3.
Bottom outlet Service Gate Bottom outlet
Maintenance Gate
Valve YV3.3 Then flow into rodless end chamber, oil
Select Manual mode Lowering BO in the rod end chamber pass through flow
maintenance gate control valve 32.4 to control lowering
speed and return to the oil tank 5, then
gate lowering.
Off
YV1
ON Lowering BO maintenance gate
YV1 1. Start pump with no-load pump
M1 & ON Valve YV1 delay 10 seconds
Tank 2. ON Valve YV3.3 & OFF YV1
• Starts up the pump electromotor with no-load, delay3.10BO
secMaintenance Gate Lowering 21
2.3 Manual Operation (Mechanical).
Gate lifting by manual pump : Push the button and hold the
lifting operation on HPU, electromagnet YV2.1 is on, operate
manual pump 21, pressure oil into rod end chamber, oil in the
rodless end chamber reflow to the oil tank, gate lifting;
Gate emergency lowing by manual : Push the button and hold
the lowering operation on HPU, electromagnet YV3.1 is on,
operate manual pump 21,pressure oil into rodless end
chamber, oil in the rod end chamber reflow to the oil tank,
gate lowering;
Gate emergency lowing: Firstly open the lock, and the second
open the ball valve42 by manual(Change position by rotation ).
Gate Lifting
Bottom Outlet Service Gate Lifting by Manual
Then flow into rod end chamber, oil in
the rodless end chamber reflow to the oil
tank 5, then gate lifting.
Push and hold solenoid valve of
the lilting operation on HPU
Bottom outlet Service Gate
Push and hold solenoid
valveYV2.1
Lifting BO service gate Oil Pressure line
Oil Drain line
Operate maual pump by hand
Operate manual pump
21
Lifting BO service gate
1. Push bottomYV2.1 Lifting BO
Pressure oil into rod end chamber service gate
Tank 2. Operate manual pump 21
Bottom Outlet Service Gate Lowering by manual
Gate Lowering
Push and hold solenoid valve of
the lowering operation on HPU
Operate maual pump by hand
Bottom outlet Service Gate Bottom outlet
Maintenance Gate
Pressure oil into rodless end chamber Push and hold solenoid
valveYV3.1
Lowering BO service gate
Then flow into rodless end chamber, oil
Operate manual pump in the rod end chamber reflow to the oil
21 tank 5, then gate lowering.
Lowering BO service gate
1. Push bottomYV3.1 Lowering BO
service gate
Tank 2. Operate manual pump 21
24
Bottom Outlet Maintenace Gate Lifting by Manual Gate Lifting
Push and hold solenoid valve of
the lifting operation on HPU
Then flow into rod end chamber, oil in
the rodless end chamber reflow to the oil
tank 5, then gate lifting.
Bottom outlet Service Gate
Push and hold solenoid
Operate maual pump by hand valveYV2.2
Lifting BO maintenance
gate Oil Pressure line
Oil Drain line
Operate manual pump Pressure oil into rod end chamber
21
Lifting BO Maintencae gate
1. Push bottomYV2.2 Lifting BO
Maintenace gate
Tank 2. Operate manual pump 21
Bottom Outlet Maintenance Gate Lowering Gate Lowering
Pressure oil into rodless end chamber
Push and hold solenoid valve of
the lowering operation on HPU
Bottom outlet ServiceGate Bottom outlet
Maintenance Gate
Push and hold solenoid
Operate maual pump by hand valveYV3.3
Lowering BO maintenance gate
Then flow into rodless end chamber, oil
in the rod end chamber reflow to the oil
tank 5, then gate lowering.
Operate manual pump
21
Lowering BO maintenance gate
1. Push bottomYV3.3. Lowering BO
service gate
Tank 2. Operate manual pump 21
26
Bottom Outlet Sliding Gate Lowering Emergency
Gate lowering emergency:
Firstly open the lock, and the second
open the ball valve42 on Cylinder by
manual (Change position by
rotation).
Oil Pressure line
Oil Drain line
Tank
KOWEPO – Lao International Co.,Ltd
THANK YOU
Notices During Operation
• To achieve proper viscosity of hydraulic oil, hydraulic system shall be first started without
load for 5‐10 min. Hydraulic oil may be very thin in the summer while may be very stiff in
the winter. Especially when in winter temperature is lower than 5℃, hydraulic system can
be started without load for 2 or 3 times until detected temperature is suitable for operations.
• For any commissioning or maintenance, manual or local operation mode shall be adopted
• If any abnormal as following, the hydraulic hoist shall be stopped and inspected
immediately, to remove any fault: Abnormal noise; insufficient pressure or great fluctuation
of pressure; insufficient flow or great fluctuation of flow; overtop of oil temperature, etc.
• During the operation, the following shall be observed and inspected any time, to avoid any
accident: Temperature rising of motor and pump; system pressure; high pressure
connections, etc
• During the operation, the following shall be recorded in detail to provide references for
future maintenance and fault analysis: Replacement of hydraulic oil; replacement of
hydraulic components; fault handling, etc.
• The hydraulic hoist shall be operated regularly, minimum once per month, to discover any
fault in time and prepare for any untimely need.
• The hydraulic hoist shall be stopped and inspected immediately although there is only tiny
and partial leakage of oil. It is forbidden to block the leakage with hands or goods.
• The hydraulic oil, if small leakage, shall be cleaned; if mass leakage, shall be retrieved and
no
• Discharge into drainage system or the river; if replaced, shall be handled properly and no
optional discharge.